Purpose
First Quarter Performance Overview against Predetermined Objective
Departmental Budget for the First Quarter
Programme Performance for each Programme
Main Achievements for each Programme
2
PURPOSE
The purpose is to present progress made for the period 01 April 2014 to 30 June 2014,including challenges confronting the department in its pursuit of the 2014/15 financial targets as outlined in the department’s Annual Performance Plan
3
PERFORMANCE OVERVIEW FOR THE FIRST QUARTER OF THE 2014/15FINANCIAL YEAR
The figure below illustrates the overall performance of the Department for the first Quarter
The department planned a total of 30 targets for the first quarter and achieved 18 targets (60%) while 12 targets
(40%) were not achieved.
4
FINANCIAL PERFORMANCE
5
The total Budget for the year 2014/15 is R218 530 million including funds for the Commission on Gender Equality and the
Actual Expenditure for the 1st Quarter was R46 949 million
The figure below illustrates that the departmental planned projections were R50 933 million for the 1st quarter of 2014 /15 and
that the Actual Expenditure amounted to R46 949 million representing a variance of R3 984 million, therefore the department
has spent 21% against its planned budget projections
Programme Appropriation Projected Spending Plan 30/06/2014
Projected Spending Plan %
Actual Expenditure 30/06/2014
% Spent
R’ 000 R’ 000 R’ 000
Administration 96 365 23 855 25% 22 044 23%
WEGE 92 250 20 491 22% 20 606 22%
CRR 11 550 2 377 21% 1 619 14%
RPD 18 365 4 210 23% 2 680 15%
TOTALS 218 530 50 933 23% 46 949 21%
PROGRAMME 1:PERFORMANCE INFORMATION
The figure below illustrates that out of 16 targets planned for the first quarter of the 2014/15 financial year, Programme 1
(Administration) achieved 12 targets (75%) while 4 targets (25%) were not achieved.
6
The figure below illustrates that out of the total planned budget projection of R23 855 million for the 1st quarter, the
actual expenditure was R22 044 million, with an under expenditure of R 1 811 million Therefore Programme 1 has
spent 23 % of its budget for the 1st quarter
PROGRAMME 1 :FINANCIAL PERFORMANCE
7
Programme Appropriation
Projected Spending Plan 30/06/2014
Projected Spending Plan %
Actual Expenditure 30/06/2014
% Spent
R’ 000 R’ 000 R’ 000MINISTRY 23 084 5 607 24% 6 834 30%
MANAGEMENT 20 068 4 971 25% 5 319 27%
CORPORATE SERVICES 39 197 9 773 25% 8 207 21%
OFFICE ACCOMODATION 14 016 3 504 25% 1 684 12%
TOTALS 96 365 23 855 25% 22 044 23%
PROGRAMME 1:ADMINISTRATION
Performance Indicator Annual
Target
2014/15
Q1 Target Performance
Status
Description of
progress made
in Q1
Reason for
Deviation
Corrective
measures
Coordinate
implementation of
Prevention Campaign
against gender-based
violence, through
awareness material,
and capacity building
All planned
activities in
prevention
campaign
achieved *1
GBV
Awareness
baseline study
initiated and
finalised
Not achieved Request for
quotation done
however the
study has been
put on hold
pending review
of the target
The process
requires at
least 24
months
The target
need to be
revised
National Strategic Plan
(NSP) 2014/2019 to
end
GBV developed
NSP (GBV)
developed
and
marketed
Service
Provider
Appointed
Achieved Service Provider
Appointed
N/A N/A
8
PROGRAMME 1:ADMINISTRATION
Performance
Indicator
Annual Target
2014/15
Q1 Target Performance
Status
Description of
progress made
in Q1
Reason for
Deviation
Corrective
measures
Number of quarterly
Internal Audit reports
issued on the 3 year
rolling plan (risk
Based and
Performance audits)
4 1 Achieved 1 N/A N/A
Number of follow-up
audit reports issued
and tabled to Audit
Committee
4 1 Achieved 1 N/A N/A
9
PROGRAMME 1:ADMINISTRATION
Performance
Indicator
Annual
Target
2014/15
Q1 Target Performance
Status
Description of
progress made
in Q1
Reason for
Deviation
Corrective
measures
Percentage of all
service providers
paid within 30
days
100%
invoices
received paid
within 30 days
100% Not achieved The department
is at 21.7%
There was a delay
in submission of
invoices
Invoice tracking
register has
been
implemented to
monitor date of
receipt of
invoice up to
date of payment
from the 2nd
quarter
10
PROGRAMME 1:ADMINISTRATION
Performance
Indicator
Annual Target
2014/15
Q1 Target Performance
Status
Description of
progress made
in Q1
Reason for
Deviation
Corrective
measures
% of deviation on
expenditure against
allocated funding
5% Timely
submission
of In Year
Monitoring
(IYM) with
actual
expenditure in
line with cash
flow
projections
Achieved Variance between
projected
spending and
Actual
expenditure is at
2%
N/A N/A
11
PROGRAMME 1:ADMINISTRATION
Performance
Indicator
Annual
Target
2014/15
Q1 Target Performance
Status
Description of
progress made
in Q1
Reason for
Deviation
Corrective
measures
Percentage of
reduction
of vacancy rate
10%
reduction
of vacancy
rate
14% Achieved The vacancy rate
is 13.2%.
N/A N/A
Percentage of
women
employed in
Senior
Management
positions in the
department
50% 50% Achieved 60.5% of women
employed in
Senior
Management
positions in the
department
N/A N/A
12
PROGRAMME 1:ADMINISTRATION
Performance
Indicator
Annual Target
2014/15
Q1 Target Performance
Status
Description of
progress made
in Q1
Reason for
Deviation
Corrective
measures
Percentage of
persons
with disabilities
employed
in the
department
2% 2% Achieved The department
has 4.6 % of
persons with
disabilities in its
staff
N/A N/A
13
PROGRAMME 1:ADMINISTRATION
Performance
Indicator
Annual Target
2014 /15
Q1 Target Performance
Status
Description of
progress made in
Q1
Reason for
Deviation
Corrective
measures
Percentage
of compliance
with the
Occupational
Health and
Safety
Standards
100%
compliance
with the
Occupational
Health
and Safety
Standards
Appointment
of a new
physical
security
service
Provider
Installation
of X-Ray
Machine
Achieved A new security
service provider
was appointed and
assumed duties on
01 April 2014
X-Ray machine
and metal detector
delivered in April
and May 2014
respectively
N/A N/A
14
PROGRAMME 1:ADMINISTRATION
Performance
Indicator
Annual Target
2014/15
Q1 Target Performance
Status
Description of
progress made in
Q1
Reason for
Deviation
Corrective
measures
Percentage
uptime and
security of
main ICT
systems
95% 95% Achieved 98% uptime
achievement of the
main ICT Wide Area
Network (WAN) SLA
with SITA
N/A N/A
15
PROGRAMME 1:ADMINISTRATION
Performance
Indicator
Annual Target
2014/15
Q1 Target Performance
Status
Description of
progress made in
Q1
Reason for
Deviation
Corrective
measures
Number of
reports
Coordinated and
facilitated for an
inclusive
participation of all
the sectors at
local, national,
regional,
multilateral and
bilateral levels as
well as on treaty
obligations
Coordination
and facilitation
for an inclusive
participation
of all the
sectors at
local, national,
regional,
multilateral
and bilateral
levels as well
as on treaty
obligations
Facilitate and
participate at
the 7th
Conference of
State
parties
Achieved Facilitation and
participation at the
UN 7th Conference
of State Parties
Commission on the
Rights of Persons
with Disabilities, 10-
12 June 2014
N/A N/A
16
PROGRAMME 1:ADMINISTRATION
Performance
Indicator
Annual Target
2014/15
Q1 Target Performance
Status
Description of
progress made
in Q1
Reason for
Deviation
Corrective
measures
Percentage of
Presidential
Hotline service
delivery
complaints
resolved
60% 20% Achieved No new cases
were logged
with the
Presidential
hotline cases
N/A N/A
Number of
Anti-Corruption
Initiatives
championed
(4) Anti-
Corruption
Initiatives
championed
Establishment
of an internal
whistleblowing
mechanism
on intranet and
website
Achieved An Internal
Whistle-Blowing
mechanism has
been developed
on our intranet
N/A N/A
17
PROGRAMME 1:ADMINISTRATION
Performance
Indicator
Annual Target
2014/15
Q1 Target Performance
Status
Description of
progress
made in Q1
Reason for
Deviation
Corrective
measures
Approved 2014
Communication
Strategy
Develop and
Implement
approved 2014
Communication
Strategy
1st draft of 2014
communication
strategy
developed
and consulted
Not achieved Document put
on hold pending
confirmation of
the new
mandate
2015/2019
corporate
strategy not yet
finalised
Indicator
need to be
revised
Research
agenda
finalised and
implemented
3 reports
developed that
are aligned to
the research
agenda
Research
agenda
developed and
approved
Not achieved Draft Research
Agenda but not
approved
Document put on
hold pending
confirmation of
the new
mandate.
The
document
will be
resubmitted
for approval
as mandate
has been
confirmed.
18
PROGRAMME 1:MAIN ACHIEVEMENTS
19
Advisory committee for development of NSP set up to ensure quality control. A
total of 67 participants availed themselves in June 2014 to contribute without
remuneration. The Advisory Committee will operate at 3 levels, namely
Strategic/Operational advice; Quality Control Group and an Oversight Group.
On 21 June 2014 a successful meeting was held between Joint Gender Fund
(JGF) and Development Partners and civil society members (also NCGBV
members) to strengthen the extensive provincial consultations of the draft NSP
through supporting project that will reach 9 Provinces (additional to the 5
Provinces /500 participants) that HSRC will reach.
PROGRAMME 2:PERFORMANCE INFORMATION
The figure below illustrates that out of 7 targets planned for the first quarter of the 2014 /15 financial year; Programme
2 (WEGE) achieved 3 (43%)targets and 4 ( 57%)targets were not achieved
20
PROGRAMME 2:FINANCIAL PERFORMANCE
The figure below illustrates that out of the total planned budget projections of R20 491 million for the 1 st quarter the actual
expenditure was R20 606 million with an over expenditure of (R115 thousand) .Therefore Programme 2 has spent 22 % of its
budget for the 1st quarter
21
Programme AppropriationProjected Spending
Plan 30/06/2014Projected Spending
Plan %
Actual Expenditure 30/06/2014
% Spent
R’ 000 R’ 000 R’ 000
A&M WEGE 11 884 1 095 9% 943 8%
ISCD WEGE 4 668 641 14% 699 15%
M&E WEGE 8 463 1 946 23% 2 155 25%
CGE 67 235 16 809 25% 16 809 25%
TOTALS 92 250 20 491 22% 20 606 22%
PROGRAMME 2:WOMEN EMPOWERMENT AND GENDER EQUALITY
Performance
Indicator
Annual Target
2014/15
Q1Target Performance
Status
Description of
progress made
in Q1
Reason for
Deviation
Corrective
measures
Number of
programmes on
gender parity
(50/50)
coordinated
1 Programme on
mainstreaming
50/50 principle into
designated bodies
Guidelines on
the 50/50
parity
principles
compiled
Not achieved Guidelines on
the 50/50 parity
principles
compiled
Focus was
on research
to develop
guideline
Guidelines
will be
compiled by
Q3
22
PROGRAMME 2:WOMEN EMPOWERMENT AND GENDER EQUALITY
Performance
Indicator
Annual Target
2014/15
Q1Target Performance
Status
Description
of progress
made in Q1
Reason for
Deviation
Corrective
measures
Number. Of
women reached
through advocacy
interventions to
empower women
and eliminate
discrimination
30 000 women
(Implementation of
interventions/
measures to
promote women’s
rights and
empowerment and
gender equality
5 000 women
Popularization of
women’s rights and
empowerment
undertaken through
consultations /
dialogues and
information
education and
communication (IEC)
material production
on gender based
violence
Not achieved 3700 women
directly
reached
Not enough
consultation
and dialogue
convened
More
consultation
s will be
undertaken
in Q2
23
PROGRAMME 2:WOMEN EMPOWERMENT AND GENDER EQUALITY
Performance
Indicator
Annual Target
2014/15
Q1Target Performance
Status
Description of progress
made in Q1
Reason for
Deviation
Corrective
measures
Number of
programmes
for women’s
economic
empowermen
t
1 (programme
on projects
coordinated with
key government
and other
stakeholders)
Projects
coordinated
with the
Department of
Trade and
Industry &
EDD
Not achieved Project on 5 by 20 Coca
Cola project in
partnership with the
UNWOMEN initiated
Project on ICT initiated
with Intel, UN Women
and DoC on ICT and
women programmes in
South Africa
Project conceptualisation
women’s access to land,
“One Woman One
Hectare’ initiated
Engagemen
ts were
made with
UN Women
and DOC
and not with
DTI and
EDD
Engage the
DTI and
EDD in Q2
24
PROGRAMME 2:WOMEN EMPOWERMENT AND GENDER EQUALITY
Performance
Indicator
Annual Target
2014/15
Q1Target Performance
Status
Description of
progress
made in Q1
Reason for
Deviation
Corrective
measures
Number of
programmes on
gender
mainstreaming
coordinated
1 (Programme on
facilitation of
gender
mainstreaming
across designated
bodies)
Consultation on
the Draft
Reviewed of
National Policy
on WEGE
conducted
Finalisation of
and
consultation on
the
Mainstreaming
Strategy
Not achieved Draft National
Policy
developed
Work underway
for
development of
the
Mainstreaming
Strategy
The focus
was on the
development
of the
Beijing+20
report to
UNECA
which had a
due
submission
date of 30
June 2014
Finalisation and
consultations on
the
Mainstreaming
Strategy to be
done by Q4
25
PROGRAMME 2:WOMEN EMPOWERMENT AND GENDER EQUALITY
Performance
Indicator
Annual Target
2014/15
Q1Target Performance
Status
Description of
progress made
Reason for
Deviation
Corrective
measures
Number of
Capacity
building and
institutional
support
activities
facilitated
4 Consult on
draft Gender
Responsive
Budgeting
Framework
Achieved Consulted drafted
Gender Responsive
Budgeting (GRB)
Framework with the
Financial Fiscal
Commission (FFC)
N/A N/A
26
PROGRAMME 2:WOMEN EMPOWERMENT AND GENDER EQUALITY
Performance
Indicator
Annual Target
2014/15
Q1Target Performance
Status
Description of
progress made in Q1
Reason for
Deviation
Corrective
measures
Number of
initiatives for
empowerment
of young
women
facilitated
1 1 Report on
the intake of
young
women in
the STEM
field
compiled
Achieved Compiled report on
intake of young women
in STEM fields
Facilitated and
supported the
empowerment of a
young women through
participation at the Post
2015 World youth
conference in Sri Lanka
to make gender
mainstreaming inputs
from a youth
perspective
N/A N/A
27
PROGRAMME 2: WOMEN EMPOWERMENT AND GENDER EQUALITY
Performance
Indicator
Annual Target
2014/15
Q1Target Performance
Status
Description of
progress made
in Q1
Reason for
Deviation
Corrective
measures
Number of Status
reports on women
empowerment &
gender equality
compiled
2 (Reports on
Status of gender
mainstreaming
across different
sectors compiled)
1 Status report
on gender
mainstreaming
across sectors
compiled
Achieved Status report on
gender
mainstreaming
in the economic
sector compiled
N/A N/A
28
PROGRAMME 2:WOMEN EMPOWERMENT AND GENDER EQUALITY
Main Achievements
The department participated in the AU African Charter Commission on Human, Peoples Rights in April in Angola and
AU Heads of State Summit in Malabo, Equatorial Guinea in June 2014.
The department also participated in the “2014 World Conference on Youth” in Sri Lanka, which was the last platform
for mainstreaming the issues of youth into the Post 2015 Development Agenda and supported participation of one
young woman.
Department hosted the take a girl child to school initiative in Moletsane High School in Soweto and registered new
girls for the techno-girl programme.
29
PROGRAMME 3:CHILDREN’S RIGHTS AND RESPONSIBILITIES (CRR)
The figure below illustrates that out of 5 targets planned for the first quarter, Programme 3 (CRR) achieved 3 targets (60%)
and 2 targets (40%) were not achieved.
30
PROGRAMME 3:FINANCIAL PERFORMANCE
The figure below illustrates that out of the total planned budget projections of R2 377 million, the actual expenditure was R1
619 million, with an under expenditure of R758 thousand. Therefore Programme 3 has spent 14% of its budget for the 1st
quarter
31
Programme AppropriationProjected
Spending Plan 30/06/2014
Projected Spending Plan %
Actual Expenditure 30/06/2014
% Spent
R’ 000 R’ 000 R’ 000 A&M CRR 4 577 1 000 22% 479 10%ISCD CRR 3 059 541 18% 543 18%M&E CRR 3 914 836 21% 597 15% TOTALS 11 550 2 377 21% 1 619 14%
PROGRAMME 3:CHILDREN’S RIGHTS AND RESPONSIBILITIES
Performance Indicator
Annual Target 2014/15
Q1 Target Performance Status
Description of progress made in Q1
Reason for Deviation
Corrective measures
Number of
Municipalities
targeted for
mainstreaming
children’s rights
in line with the
National Plan of
Action for
Children (NPAC)
4 1 Not achieved Communicated
with relevant
Political Heads
(Minister and
Premier ) on
awareness raising
activities
The process of
reconfiguration
with the
Department of
Social
Development
affected some of
the activities
To conduct the
sessions in the
second quarter
post the
briefing
sessions
regarding the
amalgamation
into DSD
32
PROGRAMME 3:CHILDREN’S RIGHTS AND RESPONSIBILITIES
Performance
Indicator
Annual
Target
2014 /15
Q1 Target Performance
Status
Description of
progress made in
Q1
Reason for
Deviation
Corrective
measures
Number of Social
campaigns on
rights of
children
conducted
3 1 Achieved The child protection
week event was
held on 5 June
2014, in Phalaborwa
N/A N/A
33
PROGRAMME 3:CHILDREN’S RIGHTS AND RESPONSIBILITIES
Performance Indicator
Annual Target 2014/15
Q1 Target Performance Status
Description of progress made in Q1
Reason for Deviation
Corrective measures
Number of
national M&E
Forums
Provincial and
municipal M&E
reports on the
status of children
1 National M&E
interdepartmenta
l forum
conducted
3 Provincial child
status reports 6
Municipalities
workshopped on
the M&E
instrument
1 Provincial
Report
2
municipalities
work
shopped
Achieved Conducted M&E
Workshop in East
London, Eastern
Cape on 05 June
2014
Conducted M&E
demonstration visits
at East London
Child and Youth
Care Centre and
Bosasa Youth
Development
Centre on 06 June
2014
N/A N/A
34
PROGRAMME 3:CHILDREN’S RIGHTS AND RESPONSIBILITIES
Performance
Indicator
Annual Target
2014/15
Q1 Target Performance
Status
Description of
progress made
in Q1
Reason for
Deviation
Corrective
measures
M&E data
developed and
implemented
Ulwazi
Ngabantwana
data system
launched and
implemented
Ulwazi
Ngabantwa
na
Database
launched
Not achieved Meeting was held
with UNICEF on
27 June 2014 to
verify the
indicator data
values
Launch is still
on hold
pending
agreement with
the
Department of
Social
Development
Plan to launch
to be revisited
in consultation
with
Department of
Social
Development
35
PROGRAMME 3:CHILDREN’S RIGHTS AND RESPONSIBILITIES
Performance
Indicator
Annual Target
2014/15
Q1 Target Performance
Status
Description of
progress made
in Q1
Reason for
Deviation
Corrective
measures
AU report on the
African rights and
welfare of the child
presented to the
Expert Committee
Country report
to the AU
Expert
Committee on
Children’s
Rights and
Welfare
presented
and progress on
the depositing
of the UNCRC
monitored
Report on
dialogue
between civil
society and
government
produced
Achieved Inputs from the
Department of
Education were
received and
the report was
finalised
N/A N/A
36
PROGRAMME 3:MAIN ACHIEVEMENTS
The department presented the Chid Friendly Communities Framework as well as the DWCPD’s plans at the Child Protection
Week planning meeting facilitated by the DSD on 9 April 2014.
The department participated in the community dialogue awareness raising campaign spearheaded by SASSA for the
distribution of social assistance materials to the community of Mmaditlhokoa around Marikana to the families that were
affected by the protracted mine strike that lasted for five months. The Activity was targeting women and children including
school children for the provision of school uniforms on the 28 and 29 June 2014.
37
PROGRAMME 4:RIGHTS OF PEOPLE WITH DISABILITIES
The figure below illustrate that out of 2 targets planned for the first quarter, Programme 4 (RPD) achieved 1 target (50%) and 1
target (50%) was not achieved
38
PROGRAMME 4:FINANCIAL PERFORMANCE
The figure below illustrates that out of the total planned budget projections of R4 210 for the 1 st quarter , the actual
expenditure was R2 680 million, with an under expenditure R1 530 million. Therefore Programme 4 has spent 15% of its
budget for the 1st quarter
39
Programme AppropriationProjected Spending
Plan 30/06/2014
Projected Spending Plan
%
Actual Expenditure 30/06/2014
% Spent
R’ 000 R’ 000 R’ 000
A&M RPD 4 374 771 18% 417 10%
ISCD RPD 6 550 1 677 26% 637 10%
M&E RPD 7 441 1 762 24% 1 626 22%
TOTALS 18 365 4 210 23% 2 680 15%
PROGRAMME 4:RIGHTS OF PEOPLE WITH DISABILITIES
Performance
Indicator
Annual Target
2014/15
Q1 Target Performance
Status
Description of
progress made in
Q1
Reason
for
Deviation
Corrective
measures
Transversal
policy and
legislation to
promote, protect
and uphold the
rights of persons
with disabilities
developed
National
Disability Rights
Policy developed
One strategic
dialogue on
draft policy
consulted
Achieved National Disability
Rights Machinery
convened in May
2014 to discuss
draft Policy as well
as National
Disability Rights
M&E Policy
Framework
N/A N/A
40
PROGRAMME 4:RIGHTS OF PEOPLE WITH DISABILITIES
Performance
Indicator
Annual Target
2014/15
Q1 Target Performance
Status
Description of
progress made
in Q1
Reason for
Deviation
Corrective
measures
Strategy to fast-
track
the employment of
persons with
disabilities
developed
Strategy
developed
Consultation
on
the draft
discussion
document
Not Achieved The strategy is
currently in draft
phase
The process
of consultation
was
suspended
due
reconfiguratio
n with the
Department of
Social
Development
The target
will be
reviewed
during the
2nd Quarter
41
PROGRAMME 4:MAIN ACHIEVEMENTS
42
South Africa continues to provide leadership on the international front. The Country Opening Statement at the
Seventh Session of the UN Conference of States Parties to the Convention on the Rights of Persons with
Disabilities (CRPD), held at the UN headquarters in New York from 10-12 June 2014, was well received and
briefing documents prepared for the South African leadership enabled strong participation from South Africa in the
Roundtables and informal session. The South African delegation included participation from civil society as
required by the CRPD. A draft report is available.
The department hand-over of assistive devices sponsored by ACSA to the Muscular Dystrophy Association of
South Africa as well as to learners and students with visual impairments and self-help groups of persons with
disabilities in Gauteng
A total of 77 disability rights news items on the national and international front, calls for public comment on
policies and legislation affecting the lives of persons with disabilities, as well as the job and learnership
opportunities were circulated through the Disability Rights Mailing List advocacy platform
A Memorandum of Agreement (MOA) was signed between DWCPD and W&RSETA which will release R20
million to implement a national project that aims to up-skill learners with disabilities within the Wholesale and Retail
Sector