1 18 july 2005 “mini-review” on cngs horns introduction by k. elsener 1 “mini-review” -...
TRANSCRIPT
![Page 1: 1 18 July 2005 “Mini-Review” on CNGS Horns Introduction by K. Elsener 1 “Mini-Review” - Introduction Function of focusing horns “History” of CNGS horns](https://reader036.vdocuments.us/reader036/viewer/2022082820/56649ec75503460f94bd3681/html5/thumbnails/1.jpg)
118 July 2005“Mini-Review” on CNGS Horns
Introduction by K. Elsener 1
““Mini-Review” - IntroductionMini-Review” - Introduction
Function of focusing horns
“History” of CNGS horns
Milestones and set-backs
Modifications – examples
Installation / Schedule
Comments to this “Mini-Review”
N.B. This presentation is using slides presented by Ans Pardons to the workshop NBI2005, Fermilab 7-11 July 2005
![Page 2: 1 18 July 2005 “Mini-Review” on CNGS Horns Introduction by K. Elsener 1 “Mini-Review” - Introduction Function of focusing horns “History” of CNGS horns](https://reader036.vdocuments.us/reader036/viewer/2022082820/56649ec75503460f94bd3681/html5/thumbnails/2.jpg)
218 July 2005“Mini-Review” on CNGS Horns
Introduction by K. Elsener 2
CNGS – function of focusing hornsCNGS – function of focusing horns
150 kA 180 kA
2.7 m
43.5 m
400Gev
6.5 ms
Electrical Pulse Timing
Beam Extraction = double pulse= 2.4x10E13 protons per pulse = 10.5µs (flat top el. pulse)
![Page 3: 1 18 July 2005 “Mini-Review” on CNGS Horns Introduction by K. Elsener 1 “Mini-Review” - Introduction Function of focusing horns “History” of CNGS horns](https://reader036.vdocuments.us/reader036/viewer/2022082820/56649ec75503460f94bd3681/html5/thumbnails/3.jpg)
318 July 2005“Mini-Review” on CNGS Horns
Introduction by K. Elsener 3
0.35 m
35 GeV positively charged particles leaving the target
Magnetic Horn : Principle of focusing
inner conductor
![Page 4: 1 18 July 2005 “Mini-Review” on CNGS Horns Introduction by K. Elsener 1 “Mini-Review” - Introduction Function of focusing horns “History” of CNGS horns](https://reader036.vdocuments.us/reader036/viewer/2022082820/56649ec75503460f94bd3681/html5/thumbnails/4.jpg)
418 July 2005“Mini-Review” on CNGS Horns
Introduction by K. Elsener 4
![Page 5: 1 18 July 2005 “Mini-Review” on CNGS Horns Introduction by K. Elsener 1 “Mini-Review” - Introduction Function of focusing horns “History” of CNGS horns](https://reader036.vdocuments.us/reader036/viewer/2022082820/56649ec75503460f94bd3681/html5/thumbnails/5.jpg)
518 July 2005“Mini-Review” on CNGS Horns
Introduction by K. Elsener 5
Particles traverse inner conductor Particles traverse inner conductor -> it must be thin (e.g. 2 mm)-> it must be thin (e.g. 2 mm)
High current High current -> heating-> heatingBeam pulse (energy depos.) Beam pulse (energy depos.) -> heating-> heating
-> stresses ---> fatigue-> stresses ---> fatigue(1 year < 4 Mio. Pulses)(1 year < 4 Mio. Pulses)
Radiation + HumidityRadiation + Humidity -> corrosion-> corrosion
Building horns is a difficult business …Building horns is a difficult business …
![Page 6: 1 18 July 2005 “Mini-Review” on CNGS Horns Introduction by K. Elsener 1 “Mini-Review” - Introduction Function of focusing horns “History” of CNGS horns](https://reader036.vdocuments.us/reader036/viewer/2022082820/56649ec75503460f94bd3681/html5/thumbnails/6.jpg)
618 July 2005“Mini-Review” on CNGS Horns
Introduction by K. Elsener 6
““History” of CNGS hornsHistory” of CNGS horns
T=24°C T=33°C
Design + fabrication of 2 horns + 1 reflector under responsibility LAL/Orsay - Paris
Some design studies, calculations, …Horn plates & outer conductor readyNon-conformity on location “spider grooves” inner conductor (repair started)Horn assembly startedStriplines & cooling circuit: not started
![Page 7: 1 18 July 2005 “Mini-Review” on CNGS Horns Introduction by K. Elsener 1 “Mini-Review” - Introduction Function of focusing horns “History” of CNGS horns](https://reader036.vdocuments.us/reader036/viewer/2022082820/56649ec75503460f94bd3681/html5/thumbnails/7.jpg)
718 July 2005“Mini-Review” on CNGS Horns
Introduction by K. Elsener 7
MilestonesMilestones & Set-backs & Set-backs
Horn 1 delivered to CERN by LAL/Paris in April 2004
A number of 15+ points have to be corrected to guarantee the reliability (e.g: stirrups, frame, ceramic insulation on water outlets, glass disk, …) -- LAL team reluctant to discuss repairs.
Crisis meetingCERN / LAL 24 July 2004
LAL to concentrate on (a) reflector modifications (b) electric “fast coupling”
Repair, modifications & final assembly of horn taken over by CERN
Stripline + cooling circuit: design, fabrication & tests taken over by CERN
![Page 8: 1 18 July 2005 “Mini-Review” on CNGS Horns Introduction by K. Elsener 1 “Mini-Review” - Introduction Function of focusing horns “History” of CNGS horns](https://reader036.vdocuments.us/reader036/viewer/2022082820/56649ec75503460f94bd3681/html5/thumbnails/8.jpg)
818 July 2005“Mini-Review” on CNGS Horns
Introduction by K. Elsener 8
Modifications - ExamplesModifications - Examples
Ex. 1: Link between outer conductors and drain pipe for cooling water evacuation
Helicoflex SS collar
Ceramic muff withTitanium flanges
TIG Weld (Al 6083)
Tin/Ag seal
SS bellow (316L)
Outer conductor
Drain pipe
Solution
ARCLEX insulators cannot be used in humid areas
Rejec
ted
Received from LAL
![Page 9: 1 18 July 2005 “Mini-Review” on CNGS Horns Introduction by K. Elsener 1 “Mini-Review” - Introduction Function of focusing horns “History” of CNGS horns](https://reader036.vdocuments.us/reader036/viewer/2022082820/56649ec75503460f94bd3681/html5/thumbnails/9.jpg)
918 July 2005“Mini-Review” on CNGS Horns
Introduction by K. Elsener 9
Modifications - ExamplesModifications - Examples
Ex. 2: Modifications on the cooling water feed lines (normal + spare line)
Rejecte
d
Received from LAL
(to ceramic insulators) Brazed connection with ceramic
insulators broke (too much strain)
New smooth bellowsto avoid stress in ceramic insulators
Solution
![Page 10: 1 18 July 2005 “Mini-Review” on CNGS Horns Introduction by K. Elsener 1 “Mini-Review” - Introduction Function of focusing horns “History” of CNGS horns](https://reader036.vdocuments.us/reader036/viewer/2022082820/56649ec75503460f94bd3681/html5/thumbnails/10.jpg)
1018 July 2005“Mini-Review” on CNGS Horns
Introduction by K. Elsener 10
Horn Assembly - CERNHorn Assembly - CERN(with all modifications)(with all modifications)
![Page 11: 1 18 July 2005 “Mini-Review” on CNGS Horns Introduction by K. Elsener 1 “Mini-Review” - Introduction Function of focusing horns “History” of CNGS horns](https://reader036.vdocuments.us/reader036/viewer/2022082820/56649ec75503460f94bd3681/html5/thumbnails/11.jpg)
1118 July 2005“Mini-Review” on CNGS Horns
Introduction by K. Elsener 11
StriplineStripline
10kV
150kA
TRANSFO
![Page 12: 1 18 July 2005 “Mini-Review” on CNGS Horns Introduction by K. Elsener 1 “Mini-Review” - Introduction Function of focusing horns “History” of CNGS horns](https://reader036.vdocuments.us/reader036/viewer/2022082820/56649ec75503460f94bd3681/html5/thumbnails/12.jpg)
1218 July 2005“Mini-Review” on CNGS Horns
Introduction by K. Elsener 12
LAL Crisis – cont.LAL Crisis – cont.
24 July 2004:LAL to concentrate on (a) reflector modifications (b) electric “fast coupling”
10 Dec 2004:LAL to concentrate on electric “fast coupling”Reflector modifications takenback to CERN
Several months / many visits to LAL / many discussionsMis-understandings on engineering / production quality ?Non-communication ?
![Page 13: 1 18 July 2005 “Mini-Review” on CNGS Horns Introduction by K. Elsener 1 “Mini-Review” - Introduction Function of focusing horns “History” of CNGS horns](https://reader036.vdocuments.us/reader036/viewer/2022082820/56649ec75503460f94bd3681/html5/thumbnails/13.jpg)
1318 July 2005“Mini-Review” on CNGS Horns
Introduction by K. Elsener 13
Glass Disk EnigmaGlass Disk Enigma
Received from LAL
Glass plate broken Problem = conceptual
After modification
Crack discovered ~weeks after electrical tests
SolutionProblem
![Page 14: 1 18 July 2005 “Mini-Review” on CNGS Horns Introduction by K. Elsener 1 “Mini-Review” - Introduction Function of focusing horns “History” of CNGS horns](https://reader036.vdocuments.us/reader036/viewer/2022082820/56649ec75503460f94bd3681/html5/thumbnails/14.jpg)
1418 July 2005“Mini-Review” on CNGS Horns
Introduction by K. Elsener 14
CNGS Installation Planning
Horn & Reflector: Oct. 2005Striplines & Cooling: Nov. 2005
Installation / ScheduleInstallation / Schedule
CNGS Commissioning w/beam
Start: 29 May 2006
various scenarios can be imagined
![Page 15: 1 18 July 2005 “Mini-Review” on CNGS Horns Introduction by K. Elsener 1 “Mini-Review” - Introduction Function of focusing horns “History” of CNGS horns](https://reader036.vdocuments.us/reader036/viewer/2022082820/56649ec75503460f94bd3681/html5/thumbnails/15.jpg)
1518 July 2005“Mini-Review” on CNGS Horns
Introduction by K. Elsener 15
Comments to this “Mini-Review”Comments to this “Mini-Review”
Why hold this “Mini-Review” ?provide an opportunity to discuss possible solutions
Background:2002 – 2004: CNGS had yearly reviews
2005: no review foreseen15 June 2005: there appears to be a design problem
on horns (glass disk)
Goal (ambitious?):reach a consensus on the direction to take / the next steps
Main problems: Manpower / Time (not money)