1 05/28/2021 - cambridgema.gov

54
05/28/2021 1

Upload: others

Post on 24-Apr-2022

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 1 05/28/2021 - cambridgema.gov

05/28/20211

Page 2: 1 05/28/2021 - cambridgema.gov

Historic Photos

Interior View

Interior View

View from Massachusetts Ave

View from Massachusetts Ave

Closeup View of Facade from Massachusetts Ave

View from Massachusetts Ave Looking East

05/28/20212

Page 3: 1 05/28/2021 - cambridgema.gov

Existing Conditions Map

05/28/20213

Page 4: 1 05/28/2021 - cambridgema.gov

Existing Conditions Photos

View from Massachusetts Ave Looking West Closeup View from Massachusetts Ave Looking East

05/28/20214

Page 5: 1 05/28/2021 - cambridgema.gov

Existing Conditions Photos

View from Massachusetts Ave Looking EastInterior View from Convenience Store

Interior View from Convenience Store

05/28/20215

Page 6: 1 05/28/2021 - cambridgema.gov

Existing Conditions Photos

View from Temple Street Looking Into Back Alley View from Back Alley Looking at Temple Street

05/28/20216

Page 7: 1 05/28/2021 - cambridgema.gov

Existing Basement Plan

05/28/20217

Page 8: 1 05/28/2021 - cambridgema.gov

Existing First Floor Plan

Vaulted Ceiling Above Vaulted Ceiling Above

05/28/20218

Page 9: 1 05/28/2021 - cambridgema.gov

Existing Second Floor Plan

Vaulted Ceiling Vaulted Ceiling

05/28/20219

Page 10: 1 05/28/2021 - cambridgema.gov

Existing Third Floor Plan

05/28/202110

Page 11: 1 05/28/2021 - cambridgema.gov

Proposed Demolition Plan

Existing RoofTo Be Removed

Existing MechanicalPenthouses To Be Removed

Existing Car PortTo Be Removed

Existing BulkheadTo Be Removed

Mass Ave.

Tem

ple

Stre

et

05/28/202111

Page 12: 1 05/28/2021 - cambridgema.gov

Site Context Map

Bus Stop

Blue Bikes

ZipcarTrain Station

Public Parking

CENTRAL SQUARE STATION

TEMPLE PLACE APARTMENTS

CAMBRIDGE HOUSING AUTHORITY

FIRST BAPTIST CHURCH CAMBRIDGE

CAMBRIDGE CITY HALL

US POSTAL SERVICE

SITE

05/28/202112

Page 13: 1 05/28/2021 - cambridgema.gov

Proposed Context Plan REVISED SLIDE:5th FLOOR SETBACK

5th Floor Setback (Approx. 4’x 75’)

6th Floor Setback (Approx. 10’ x75’)

05/28/202113

Page 14: 1 05/28/2021 - cambridgema.gov

Proposed Site Plan

Bicycle Access

Second Egress Exit

Fire Control Room Access

Accessible Retail Entries

Retail Entry + Vault Access

Main Hotel/Office Entry

Bank Entry to Remain

Service Alley

Service Alley Entry

New Fence

Property Line

Curb Cut to be Closed

ExistingFire Hydrant

ExistingStreet Light

Existing Pedestrian Light

ExistingPedestrian Light

ExistingStreet Light

Reduction of Rooftop Elements6th Floor Setback (Approx. 10’x 75’)

5th Floor Setback (Approx. 4’ x 75’)

REVISED SLIDE:5th FLOOR SETBACK

05/28/202114

Page 15: 1 05/28/2021 - cambridgema.gov

Proposed Basement Plan

Existing

New

Relocation of Controller Rooms from Rooftop to Basement

05/28/202115

Page 16: 1 05/28/2021 - cambridgema.gov

Bicycle Parking Plans

05/28/202116

Page 17: 1 05/28/2021 - cambridgema.gov

Proposed First Floor Plan

New

Existing

Bicycle Access

Second Egress Exit

Fire Control Room Access

Accessible Retail Entries

Retail Entry + Vault Access

Main Hotel/Office Entry

Bank Entry to Remain

Service Alley

Service Alley Entry

New Fence

Property Line

Curb Cut to be Closed

ExistingFire Hydrant

ExistingStreet Light

Existing Pedestrian Light

ExistingPedestrian Light

ExistingStreet Light

05/28/202117

Page 18: 1 05/28/2021 - cambridgema.gov

Proposed Second Floor Plan

Existing

New

05/28/202118

Page 19: 1 05/28/2021 - cambridgema.gov

Proposed Third Floor Plan

Existing

New

Existing

New

05/28/202119

Page 20: 1 05/28/2021 - cambridgema.gov

Proposed Fourth Floor Plan

Existing

New

368 SF 252 SF 383 SF 383 SF 254 SF 732 SF

05/28/202120

Page 21: 1 05/28/2021 - cambridgema.gov

Proposed Fifth Floor Plan

Existing

New

5th Floor Setback (Approx. 4’ x75’)

05/28/202121

Page 22: 1 05/28/2021 - cambridgema.gov

Proposed Sixth Floor Plan

Existing

New

REVISED SLIDE:5th FLOOR SETBACK

6th Floor Setback (Approx. 10’ x75’)

5th Floor Setback (Approx. 4’ x75’)

05/28/202122

Page 23: 1 05/28/2021 - cambridgema.gov

Original Design and Revised Roof Plan

Original Design Revised Roof Plan

Revised Mechanical Area264 SF

New Roof Hatch for Maintenance Access

Revised Green Roof Area 1,420 SF

Revised Mechanical Area2,322 SF

Removal of Rooftop Deck

5th Floor Setback (Approx. 4’ x 75’)

6th Floor Setback (Approx. 10’ x 75’)

REVISED SLIDE:5th FLOOR SETBACK

05/28/202123

Page 24: 1 05/28/2021 - cambridgema.gov

Proposed Building Section(s) with Setback Diagrams

Existing

New

00.00’

Removal of Rooftop Deck and 6th Floor Setback

5th Floor Setback

REVISED SLIDE:5th FLOOR SETBACK

05/28/202124

Page 25: 1 05/28/2021 - cambridgema.gov

Landscaping Plan - Fourth Floor Private Terraces

05/28/202125

Page 26: 1 05/28/2021 - cambridgema.gov

Landscaping Plan - Private Terrace Precedents

05/28/202126

Page 27: 1 05/28/2021 - cambridgema.gov

Alterations to Existing Building

New Accessible Entries

New Insulated Glazing Units

New Addition

Existing Stone Facade to Remain

Existing Glazing to Remain

Roof Layout Update

05/28/202127

Page 28: 1 05/28/2021 - cambridgema.gov

Alterations to Existing Building

New Insulated Glazing Units

East Facade West Facade

New Addition

Existing Brick Facade W/ Mural to Remain

Existing Stone Facade to Remain

Cut Existing Chimney Down to

Parapet Height

Existing Glazing to Remain

Existing Mechanical Penthouses To Be Removed

Existing Single Story Structure In Foreground

Roof Layout Update Roof Layout Update

05/28/202128

Page 29: 1 05/28/2021 - cambridgema.gov

Alterations to Existing Building

New Brick Wall to Match the Appearance of the Existing Brick Facade

Infill with New Brick Wall to Match the Appearance of the Existing Brick Facade

Existing Brick Wall to Remain

Cut Existing Chimney Down to Parapet Height

Roof Layout Update

6th Floor Setback

Proposed 5th Floor Setback

REVISED SLIDE:5th FLOOR SETBACK

05/28/202129

Page 30: 1 05/28/2021 - cambridgema.gov

Proposed South Facade

Roof Layout Update

05/28/202130

Page 31: 1 05/28/2021 - cambridgema.gov

Proposed East and West Facade

West FacadeEast Facade

Existing Brick Facade W/ Mural to Remain

Existing Single Story Structure In Foreground

Lowered Entry

Solid Reveal Joint

Roof Layout UpdateRoof Layout Update

05/28/202131

Page 32: 1 05/28/2021 - cambridgema.gov

Proposed North Facade

Roof Layout Update

6th Floor Setback

5th Floor Setback

REVISED SLIDE:5th FLOOR SETBACK

05/28/202132

Page 33: 1 05/28/2021 - cambridgema.gov

Updated Design - Graphic Representation

05/28/202133

Page 34: 1 05/28/2021 - cambridgema.gov

Original Design - Aerial View

Previous Planning Board Original Design 12/15/2020

NEW SLIDE:NEW VIEW- SHOWING ORIGINAL SUBMISSION

Aerial View

05/28/202134

Page 35: 1 05/28/2021 - cambridgema.gov

Previous Design

Planning Board Hearing 04/27/2021

Roof Layout Update 6th Floor Setback

• 6th floor setback approximately 10’x 75’

• Loss of 725sf of hotel space, reducing total to 36 rooms

• Relocation of all existing mechanical equipment located on the top roof facing Temple Place Apartments to interior of equipment screening

• Stair head houses eliminated and elevator penthouse reduced

• Improved line of sight for Temple Place Apartment neighbors

Aerial View

05/28/202135

Page 36: 1 05/28/2021 - cambridgema.gov

Revised DesignRoof Layout Update 6th Floor Setback

5th Floor Setback

Eliminated Rear Portion of Upper Roof 2’ Parapet Down to Roof Edge

• 5th floor setback approximately 4’x75’

• 6th floor setback approximately 10’ x 75’

• Loss of 1,015sf of hotel space

• Relocation of all existing mechanical equipment located on the top roof facing Temple Place Apartments to interior of equipment screening

• Stair head houses eliminated and elevator penthouse reduced

• Improved line of sight for Temple Place Apartment neighbors

Aerial View

REVISED SLIDE:5th FLOOR SETBACK

Planning Board Hearing 06/15/2021

05/28/202136

Page 37: 1 05/28/2021 - cambridgema.gov

Original Design

Previous Planning Board Original

Design 12/15/2020

Building Section

05/28/202137

Page 38: 1 05/28/2021 - cambridgema.gov

• 6th floor setback approximately 10’ x 75’

• Loss of 725sf of hotel space, reducing total to 36 rooms

• Relocation of all existing mechanical equipment located on the top roof facing Temple Place Apartments to interior of equipment screening

• Stair head houses eliminated and elevator penthouse reduced

• Improved line of sight for Temple Place Apartment neighbors

Roof Layout Update

6th Floor Setback

Building SectionPrevious Design

Planning Board Hearing 04/27/2021 05/28/202138

Page 39: 1 05/28/2021 - cambridgema.gov

Revised Design (Massing Removed)

• 5th floor setback approximately 4’x75’

• 6th floor setback approximately 10’ x 75’

• Loss of 1,015sf of hotel space, reducing total to 36 rooms

• Relocation of all existing mechanical equipment located on the top roof facing Temple Place Apartments to interior of equipment screening

• Stair head houses eliminated and elevator penthouse reduced

• Improved line of sight for Temple Place Apartment neighbors

Building Section

REVISED SLIDE:5th FLOOR SETBACK

Planning Board Hearing 06/15/2021

6th Floor Setback

Roof Layout Update

5th Floor Setback

05/28/202139

Page 40: 1 05/28/2021 - cambridgema.gov

Upper Roof ParapetLevel 4 Terrace

Section - Mass Ave Section - Temple Street

Railing Removed

Roof Layout Update

Roof Layout Update

6th Floor Setback

5th Floor Setback

Roof Edge Details and Sight line Diagrams REVISED SLIDE:5th FLOOR SETBACK

05/28/202140

Page 41: 1 05/28/2021 - cambridgema.gov

Mechanical Screen Details REVISED SLIDE:5th FLOOR SETBACK

ROOF BELOW AT LEVEL 5

5th Floor Setback

05/28/202141

Page 42: 1 05/28/2021 - cambridgema.gov

Shielded Downlighting Solutions

Specialty Glazing/Filming To Reduce Light TransferNorth Elevation Facing Abutter

Light reflective glazing solutions and light reducing filming to reduce interior light casting out

Potential automated window shading solutions to filter/reduce light transfer to neighbors.

Light Transfer to Neighbors - Design Solution Options

05/28/202142

Page 43: 1 05/28/2021 - cambridgema.gov

Proposed Renderings

1Mass Ave

Temple St

View from Massachusetts Ave Looking West1

Key Plan

JANUARY 2020 - WIDE ANGLE VIEW

05/28/202143

Page 44: 1 05/28/2021 - cambridgema.gov

2Mass Ave

Temple St

View from Massachusetts Ave Looking West2

Key Plan

Proposed Renderings

05/28/202144

Page 45: 1 05/28/2021 - cambridgema.gov

3

Mass Ave

Temple St

View from Massachusetts Ave Looking North3

Key Plan

Roof Layout Update (Removal of Railing)

Proposed Renderings

05/28/202145

Page 46: 1 05/28/2021 - cambridgema.gov

View from Massachusetts Ave Looking East

4

4

Mass Ave

Temple St

Key Plan

Roof Layout UpdateRemoved Massing

Proposed Renderings

05/28/202146

Page 47: 1 05/28/2021 - cambridgema.gov

Proposed Renderings

View from Massachusetts Ave Looking East - Dusk Shot

5

5

Mass Ave

Temple St

Key Plan

Roof Layout UpdateRemoved Massing

05/28/202147

Page 48: 1 05/28/2021 - cambridgema.gov

Proposed Renderings

Key Plan

Mass Ave

Temple St

6

View from Temple Street6

Key Plan

05/28/202148

Page 49: 1 05/28/2021 - cambridgema.gov

Proposed Renderings

View of Hotel Entry7

Mass Ave

Temple St

7

Key Plan

05/28/202149

Page 50: 1 05/28/2021 - cambridgema.gov

View of Hotel Entry From Temple Street - Near8

Mass Ave

Temple St

8

Key Plan

REVISED SLIDE:5TH FLOOR SETBACK6th Floor Setback

5th Floor Setback

Proposed Renderings

05/28/202150

Page 51: 1 05/28/2021 - cambridgema.gov

View of Hotel Entry From Temple Street - Far9

Mass Ave

Temple St

9

Key Plan

Roof Layout UpdateRemoved Massing

Proposed Renderings

05/28/202151

Page 52: 1 05/28/2021 - cambridgema.gov

Nighttime Photo - Existing Building

Existing Night View10

10

Mass Ave

Temple St

Key Plan

05/28/202152

Page 53: 1 05/28/2021 - cambridgema.gov

Dusk Shot11

11

Mass Ave

Temple St

Key Plan

Roof Layout Update (Removal of Railing)

Proposed Renderings

05/28/202153

Page 54: 1 05/28/2021 - cambridgema.gov