Process Data Reconciliation Software VALI III Possible use for the Measurement uncertainty recapture power uprate in Nuclear Power Plants Public NRC-Review in Washington, Rockville, MD Monday, September 16, 2002 BTB Magnus Langenstein (speaker), Dr. J. Jansky BTB-Jansky GmbH, Gerlingerstrasse 151 JANSKY Germany -71229 Leonberg, BFTel.: +49 7152/30 87-11 FAX: +49 7152/30 87-22 e-mail: [email protected] INTERNET: www.btbjansky.com BB 2002 BTB-Jansky GmbH www.btbjansky.com slide 1 m:\projekte\Epd/EPRI.ppt -1

Upload: others

Post on 16-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 09/16/2002 Meeting Slides for Process Data Reconciliation ... · Process Data Reconciliation Software VALI III CONTENT "* Why do you need and what are the benefits of process data

Process Data Reconciliation Software VALI III Possible use for the Measurement uncertainty

recapture power uprate in Nuclear Power Plants

Public NRC-Review in Washington, Rockville, MD Monday, September 16, 2002

BTB Magnus Langenstein (speaker), Dr. J. Jansky BTB-Jansky GmbH, Gerlingerstrasse 151

JANSKY Germany -71229 Leonberg, BFTel.: +49 7152/30 87-11

FAX: +49 7152/30 87-22 e-mail: [email protected] INTERNET: www.btbjansky.com

BB 2002 BTB-Jansky GmbH www.btbjansky.com slide 1

m:\projekte\Epd/EPRI.ppt

-1

Page 2: 09/16/2002 Meeting Slides for Process Data Reconciliation ... · Process Data Reconciliation Software VALI III CONTENT "* Why do you need and what are the benefits of process data

Process Data Reconciliation Software VALI III

CONTENT

"* Why do you need and what are the benefits of process data reconciliation ?

"* Some general remarks about the process data reconciliation with VALI III

"* Use of VALI III in nuclear power plants in Germany and

Switzerland

0 Process data reconciliation with VALI III in a 4-Loop PWR (1350 MW) - modelling, execution and results

N Process data reconciliation in a 3-Loop PWR (920 MW) results

©TB @ 2002 BTB-Jansky GmbH www.btbjansky.com slide 2

m :\projekteTEpri/EPRI.ppt

Page 3: 09/16/2002 Meeting Slides for Process Data Reconciliation ... · Process Data Reconciliation Software VALI III CONTENT "* Why do you need and what are the benefits of process data

Process Data Reconciliation Software VALI III

CONTENT (cont'd)

[] Use of VALI III for special acceptance tests, maintenance activities and for component diagnosis

U] Possible use of VALI III for the Measurement

uncertainty recapture power uprate

. Conclusions

BTB

m.:\projekte\EprVEPRI.ppt

© 2002 BTB-Jansky GmbH www.btbjansky.com slide 3

Page 4: 09/16/2002 Meeting Slides for Process Data Reconciliation ... · Process Data Reconciliation Software VALI III CONTENT "* Why do you need and what are the benefits of process data

Why do you need and what are the benefits of process data reconciliation ?

Why do you need process data reconciliation ?

Buncertainties = randomnand systematical errors

BTB

m,.\proje kte\Epd/E PRI.ppt

© 2002 BTB-Jansky GmbH www.btbjansky.com

All results of measurements are erroneus (DIN 1319)

slide 4

Page 5: 09/16/2002 Meeting Slides for Process Data Reconciliation ... · Process Data Reconciliation Software VALI III CONTENT "* Why do you need and what are the benefits of process data

Why do you need and what are the benefits of process data reconciliation ?

Why do you need process data reconciliation ? (cont'd)

With incorrect measurements the conservation laws

m mass balance m energy balance and m material balances

cannot be fulfilled.

BTB

m :\projekte\Epri/EPRI.ppt

© 2002 BTB-Jansky GmbH www.btbjansky.com slide 5

Page 6: 09/16/2002 Meeting Slides for Process Data Reconciliation ... · Process Data Reconciliation Software VALI III CONTENT "* Why do you need and what are the benefits of process data

Why do you need and what are the benefits of process data reconciliation ?

What are the benefits of process data reconciliation system VALI IIl?

You get

reconciled values which fulfill the

"* mass balance "* energy balance and m material balances

- reduced uncertainties of the reconciled values

the clues, where the suspected tags in your process are (ERROR-DETECOR)

BTB

m:\projekte\E prUEPFIl.ppt

© 2002 BTB-Jansky GmbH www.btbjansky.com slide 6

Page 7: 09/16/2002 Meeting Slides for Process Data Reconciliation ... · Process Data Reconciliation Software VALI III CONTENT "* Why do you need and what are the benefits of process data

General remarks about process data reconciliation with VALI

General Remarks

VALI III works with an overdetermined system of equations. (IMPORTANT: VALI III is not a simulation program!!!)

The overdetermined system of equations, that results when

m all available redundancies and m secondary conditions (conservation laws mass-,

energy- and material balances)

are taken into account, is resolved with the aid of the Gaussian correction principle.

BTB 2002 BTB-Jansky GmbH www.btbjansky.com slide 7

m:\projekte\Epn/EPRIppt

Page 8: 09/16/2002 Meeting Slides for Process Data Reconciliation ... · Process Data Reconciliation Software VALI III CONTENT "* Why do you need and what are the benefits of process data

General remarks about process data reconciliation with VALI

General Remarks (cont'd)

m The theoretical basis of Process Data Reconciliation with VALI III is described in the VDI 2048 guideline (VDI society of german engineers)

* VALI III get the final certificate of the VDI 2048 commitee at October/11/2002

m VALI III was aknowledged by TOV-southwest nuclear section as a support system for the calibration of the feedwater-mass flow measurements (official paper from August/1i6/2002)

B© 2002 BTB-Jansky GmbH www.btbjansky.com slide 8

m:Xprojekte\Epri/EPR1.ppt

Page 9: 09/16/2002 Meeting Slides for Process Data Reconciliation ... · Process Data Reconciliation Software VALI III CONTENT "* Why do you need and what are the benefits of process data

Use in Nuclear Power Plants

Use of VALI III in Nuclear Power Plants

N Determine all measurements more accurately (that's important for example for the mean coolant temperature or the thermal reactor power)

"* Error detection system for the measuring devices (for example to get an early hint of drifting measuring devices)

"* Perform acceptance tests more accurateley

"U Evaluate maintenance activities more precise

" Use the reconciliation results as calibration standard

"U Reduce the cost of calibrating measuring devices

B 2002 BTB-Jansky GmbH www.btbjansky.com slide 9

m \projekte\Epd/EPRI.ppt

Page 10: 09/16/2002 Meeting Slides for Process Data Reconciliation ... · Process Data Reconciliation Software VALI III CONTENT "* Why do you need and what are the benefits of process data

Process data reconciliation with VALI III in a 4-Loop PWR (1350 MW) model, execution and results

Model

BTB

m:\projekte\Epri/EPRI.ppt

© 2002 BTB-Jansky GmbH www.btbjansky.com slide 10

Page 11: 09/16/2002 Meeting Slides for Process Data Reconciliation ... · Process Data Reconciliation Software VALI III CONTENT "* Why do you need and what are the benefits of process data

Process data reconciliation with VALI III in a 4-Loop PWR (1350 MW) model, execution and results

Graphical User Interface (GUI) model of the 4-LOOP PWR

m l- I I.........

D PRECIS

m

PLOOP2 I

HPTURB2

HPPREH2

SUPHEAT2LPTURB2 GENERA2

VAPO2El

OPTVAL

LPPREH2 CONDENS2 COOL-T2

8THBTBe

m A•p rojekte\E pri/E P Rl. ppt

© 2002 BTB-Jansky GmbH www.btbjansky.com slide 11

I

Page 12: 09/16/2002 Meeting Slides for Process Data Reconciliation ... · Process Data Reconciliation Software VALI III CONTENT "* Why do you need and what are the benefits of process data

Process data reconciliation with VALI III in a 4-Loop PWR (1350 MW) -tion and results

CUTP-REA

Steam generatorsGUI-model of primary loop

CUT-IREA

MASSEN1 n, MASSEN2

MAfN3

MASSEN4

El MASSENST

FE FLEX-07

El FLEX-09

2002 BTB-Jansky GmbH www.btbjansky.com slide 12

m:\projekte\Epri/EPRIppt

Page 13: 09/16/2002 Meeting Slides for Process Data Reconciliation ... · Process Data Reconciliation Software VALI III CONTENT "* Why do you need and what are the benefits of process data

Process data reconciliation with VALI III in a 4-Loop PWR (1350 MW) model, execution and results

Execution, spezify runtime options

BTB

m:\projekte\Epr/EPRI.ppt

© 2002 BTB-Jansky GmbH www.btbjansky.com slide 13

Page 14: 09/16/2002 Meeting Slides for Process Data Reconciliation ... · Process Data Reconciliation Software VALI III CONTENT "* Why do you need and what are the benefits of process data

Process data reconciliation with VALI III in a 4-Loop PWR (1350 MW) model, execution and results

ICvit-nrt. i.;n* II - I mp..

W A I [11 1 -0 ic n e 1 6 B. . .A*K # II - I Il:!!Iliil.'Il1,..ý f

L.ACI.sUIILPE IUFle EkecIutionHelp

Settings

File Name gkn-0l5-rev6.bls

Model GKN2

Version 6.0

Mea File Gkn2.mea

Tag File Gkn2.tag

Flex File Gkn2.rea

Options -sqp

Analysis

Number of equations 629

Number of unmeasured variables 506

Number of measured variables 273

Number of constants 100

Obvious number of redundancies 123

Total number of redundancies 189

Number of trivial redundancies 0

Resolution

Iteration Sum of square residues Objective Function Chi-square Number of active bounds Flagged tags

1000. ion.

1.

I.1

5 / 100 0.42008E-06

274.91

222.08

0

0

BTBSTS

M.:\proje kte•Eph/E PRI.ppt

© 2002 BTB-Jansky GmbH www.btbjansky.com

Phase INF URN ERR ERS ERF CPU

TAG Reading 2 0 0 0 0 0.710

Verification 6 0 0 0 0 2.800

Analysis 610 14 0 0 0 6.210

Resolution 1 0 0 0 0 7.960

Report 0 0 0 0 0 8.190

Output 43 0 2 1 0 8.680

It er I

slide 14

I

Page 15: 09/16/2002 Meeting Slides for Process Data Reconciliation ... · Process Data Reconciliation Software VALI III CONTENT "* Why do you need and what are the benefits of process data

Process data reconciliation with VALI III in a 4-Loop PWR (1350 MW) model, execution and results

Drifting measuring device - mean coolant temperature309,5

309

308,5

308

307,5

307

306,5

306

305,51 i i i 07.10.99 00:00 17.10.99 00:00 27.10.99 00:00 06.11.99 00:00 16.11.99 00:00 26.11.99 00:00 06.12.99 00:00 16.12.99 00:00 26.12.99 00:00

Date/Time

BTB

m:\projekte\Epr/EPRI.ppt

© 2002 BTB-Jansky GmbH www.btbjansky.com

C

(U G) 0. 2 C)

2

C) C)

slide 15

Page 16: 09/16/2002 Meeting Slides for Process Data Reconciliation ... · Process Data Reconciliation Software VALI III CONTENT "* Why do you need and what are the benefits of process data

Process data reconciliation with VALI III in a 4-Loop PWR (1350 MW) model, execution and results

Drifting measuring device - feedwater pressure68

67

66

65

64

63

62

( 61

60

59

58

57

56

23.7.00

i • LA B60CP001 reconciled value

S...........LAB60CP001 measurement

IMPORTANT

Although the measurement is drifting, the reconciled value represent a long time the true state of the pocess!!!

00:00:00 02.8.00 00:00:00

BTBBTB

m :\proje kt e\Epri/E P Rlppt

12.8.00 00:00:00 22.8.00 00:00:00

Date/Time

© 2002 BTB-Jansky GmbH

01.9.00 00:00:00 11.9.00 00:00:00 21.9.00 00:00:00

www.btbjansky.com

£4

slide 16

Page 17: 09/16/2002 Meeting Slides for Process Data Reconciliation ... · Process Data Reconciliation Software VALI III CONTENT "* Why do you need and what are the benefits of process data

Process data reconciliation with VALI III in a 4-Loop PWR (1350 MW) model, execution and some results

PENALTY (OBJECTIVE)-function; The Error-indicator in VALI

PENALTY (whole process) = 1: reconciled value - measured value 2

standard deviation of the measured value68

67

66

65

64

' 63

• 62

- 61

60

59

58

57

56

23.7.00 00:00:00 02.8.00 00:00:00 12.8.00 00:00:00 22.8.00 00:00:00 01.9.00 00:00:00 11.9.00 00:00:00

Date/Time

21.9.00 00:00:00

BTB jANSKt

mAproje~kte\Epri/EPRI ppt

© 2002 BTB-Jansky GmbH www.btbjansky.com

CL

slide 17

Page 18: 09/16/2002 Meeting Slides for Process Data Reconciliation ... · Process Data Reconciliation Software VALI III CONTENT "* Why do you need and what are the benefits of process data

Process data reconciliation with VALI III in a 4-Loop PWR (1350 MW) model, execution and some results

Single-PENALTY; The Error- detector in VALI

BTB m:\projekte\Ep6/EPRI.ppt

Date/Tim e

© 2002 BTB-Jansky GmbH www.btbjansky.com slide 18

Page 19: 09/16/2002 Meeting Slides for Process Data Reconciliation ... · Process Data Reconciliation Software VALI III CONTENT "* Why do you need and what are the benefits of process data

Results

Supecteci Tap-S4

Tags Report

4] Ii IeP:(/j/ t:jPROJEKTEIVALI/'!ý VAL--l!'/DM48A rv fJ~ Lokales intranet

©2002 BTB-Jansky GmbH www.btbjanlsky.com slide 19 m:\projekteXEpnJ/EPRI ppt

----------------- w 5;_ -- 11 I z

Page 20: 09/16/2002 Meeting Slides for Process Data Reconciliation ... · Process Data Reconciliation Software VALI III CONTENT "* Why do you need and what are the benefits of process data

Process data reconciliation with VALI III in a 4-Loop PWR (1350 MW) model, execution and some results

Single-PENALTY; The Error- detector in VALI

If the Single -PENALTY = reconciled value - measured value 2 > 1,96 2 (j 3,84) stan darddeviation of the measured value

then the measured value must be queried.

Single

TAG NAME MEA.VAL. MEA.ACC. REC.VAL. REC.ACC. PENALTY P.U.

"* MACIOCT071A 45.938 1.50 43.107 0.725 17.86 C

"* JEC20CP007 158.36 0.500 157.42 0.169 15.25 barg

"* JEC20CT003A 323.94 1.00 325.61 0.370 12.53 C

"* MAA50CP001 58.991 0.500 58.195 0.337 17.82 barg

"* LBA60CP001 62.185 0.500 62.972 0.111 10.02 barg

"* LBA60CP004 62.188 0.500 62.972 0.111 9.95 barg

"* LBA20CT001 278.25 1.00 279.80 0.115 9.36 C

"* LBAIOCTOO1 278.25 1.00 279.80 0.115 9.36 C

BTB m:\proje kt e'Epri/E PRI.ppt

© 2002 BTB-Jansky GmbH www.btbjansky.com slide 20

Page 21: 09/16/2002 Meeting Slides for Process Data Reconciliation ... · Process Data Reconciliation Software VALI III CONTENT "* Why do you need and what are the benefits of process data

Process data reconciliation with VALI III in a 4-Loop PWR (1350 MW) model, execution and some results

Systematical errors -311 ,5

311

310,5

310

309,5

309

308,5

308

307,5

307

306,5

7.9.98 4:48 7.9.98 6:00 7.9.98 7:12

AM AM AM

mean coolant temperature

7.9.98 8:24 7.9.98 9:36 7.9.98 10:48 7.9.98 12:00 7.9.98 1:12 7.9.98 2:24 AM AM AM PM PM PM

red line: nominal value at 100 % power Date/Time

BTB

m,:\projekte\EpriIEPR.ppt

© 2002 BTB-Jansky GmbH www.btbjansky.com

ca CL

PU

slide 21

Page 22: 09/16/2002 Meeting Slides for Process Data Reconciliation ... · Process Data Reconciliation Software VALI III CONTENT "* Why do you need and what are the benefits of process data

Process data reconciliation with VALI III in a 4-Loop PWR (1350 MW) model, execution and some results

Systematical errors - Feedwater mass flow LAB60CF711

550 SLAB60CF711 Reconciled

548 -m LAB60CF711 Measurement

546

544

O0 542 -

u 540 ] E 8 kg/s

538

536 -__

534

532 -_-

08.11.01 08.11.01 08.11.01 08.11.01 08.11.01 08.11.01 08.11.01 08.11.01 08.11.01 08.11.01 08.11.01

03:36 04:48 06:00 07:12 08:24 09:36 10:48 12:00 13:12 14:24 15:36

Date/Time

BTB w 2002 BTB-Jansky GmbH www.btbjansky.com slide 22

m:\projekte\EprilEPRI.ppt

Page 23: 09/16/2002 Meeting Slides for Process Data Reconciliation ... · Process Data Reconciliation Software VALI III CONTENT "* Why do you need and what are the benefits of process data

Process data reconciliation with VALI III in a 4-Loop PWR (1350 MW) model, execution and some results

Systematical errors - Measured and reconciled thermal reactor power

3870

3860

* 3850

,

- 3840

. 3830

" 3820

3810 t1] i ] + + i 08.11.01 08.11.01 08.11.01 08.11.01 08.11.01 08.11.01 08.11.01 08.11.01 08.11.01 08.11.01 08.11.01

03:36 04:48 06:00 07:12 08:24 09:36 10:48 12:00 13:12 14:24 15:36

Date/Tim e

BTBBTB

mrAprojekte\Epn/EPRI.ppt

© 2002 BTB-Jansky GmbH www.btbjansky.com slide 23

Page 24: 09/16/2002 Meeting Slides for Process Data Reconciliation ... · Process Data Reconciliation Software VALI III CONTENT "* Why do you need and what are the benefits of process data

Process data reconciliation in a 3-Loop PWR (920 MW) results

Systematical errors - Measured and reconciled feedwater mass-f low

12.10.01 12.10.01 12.10.01 12.10.01 13.10.01 13.10.01 13.10.01 13.10.01 13.10.01 14.10.01

04:48 09:36 14:24 19:12 00:00 04:48 09:36 14:24 19:12 00:00

date/time

BTB m.\p rojekteE pni/E PRI.ppt

© 2002 BTB-Jansky GmbH www.btbjansky.com

460

455

450

445

S440 E

435

430

425 4 12.10.01

00:00

slide 24

Page 25: 09/16/2002 Meeting Slides for Process Data Reconciliation ... · Process Data Reconciliation Software VALI III CONTENT "* Why do you need and what are the benefits of process data

Process data reconciliation in a 3-Loop PWR (920 MW) results

PRIMARY LOOP results in flow-sheet

BTBBTB

kM T = -06,3 C IA)C I::'",',r antM K T '3 .,• T=-72-.-M ta i/ cT•2 dT = R,,,,', T 29 3.5 'C

d T <; I2 7,0.8 K T=293.-7 •C d T 2 K 27,88 K = ;('C

d T=2 79 K Ir _ IL .o. •2 , ,

R L22 -

TA40 TA00 Z

"""-- I •

70 1 ?LI AII I~

© 2002 BTB-Jansky GmbH

model-nam e:

VALI-Version: 111/10.01

date Vail-run: 17.01.02

time VALI-run: 10:27:51

Penalty (VD1l2048): 374,856 CHI-square: 164,22 reconciliation quality (<1 good): 2,28

steps of Iterations: 9

norm-efficiency: 33!77 %

plant-efficiency: 3 .7 %

DELTA efficiency: -0,1 % NIKP YD I :P=.- "q loads primary loop M KP YD I11, : I 1:4 , 1.W NI KP YD30P-4 . N6 7.74 NI W

uM tt:hrmr1 ct r '4 6 9.6 2 %1W peen o ,e r: 2462 57 NM W

28.3 n ea u re e nt V er lustfl, I., un, R I)R

28,7 reconciled value h...owr SG YB30 %Vl.t•

KMT =308,1 C IKS11 31,6' =12 6 T=_121.1 V 22. =2 arý 1( dT=25.4 K O h [•ar~pan raklwk[a]Dtbarar 2dT ,= 2 dT 2, 155SA bul Ed= .. 7.6 26,962 K

dT=2 .3 K dTR13 5 5. Rbr bt =I '1ba 4 E-1 =26 K 26946 K 2ý, "

TP=4 • 9 M MWyPý I

5 I :, T = 946C. : s 1T=294 IT d ,8 2 b.,

1.6 b94 - 11, !32i ~

www.btbjansky.com slide 25

I

28,7 Iconstant I

Page 26: 09/16/2002 Meeting Slides for Process Data Reconciliation ... · Process Data Reconciliation Software VALI III CONTENT "* Why do you need and what are the benefits of process data

Process Data Reconciliation in Nuclear Power Plants with VALI III

Use of VALI III for special acceptance tests, maintenance activities and component diagnosis

Method: Comparison measurements for actual analysis of the process

Goal: A more precise statement as with conventional methodsis possible.

This method is used for

M a more precise judgement of the replacement of turbine blades

N a more precise judgement of maintenance activities (cleaning of turbo charger)

m component diagnosis

BTB JAN$KYPý © 2002 BTB-Jansky GmbH www.btbjansky.com slide 26

Page 27: 09/16/2002 Meeting Slides for Process Data Reconciliation ... · Process Data Reconciliation Software VALI III CONTENT "* Why do you need and what are the benefits of process data

Use of VALI III for special acceptance tests, maintenance activities...

Vaiui A ER..- -odl mi -oefzineId 00.l

ABGAS2

GASTURB GUD-TUR ABOAS1

HD+MD

LAB LAD CONDENSA

: Correlation coefficients

ABGAS2N HD+MDN

GASTURBN GUD-TURN ABGAS1 N LABN LADN CONDENSN

:TB

m.:\projekte\EprVEPRI.ppt

© 2002 BTB-Jansky GmbH www.btbjansky.com

Fl OPTVAL

slide 27

A

Page 28: 09/16/2002 Meeting Slides for Process Data Reconciliation ... · Process Data Reconciliation Software VALI III CONTENT "* Why do you need and what are the benefits of process data

-I

Use of VALI III for special acceptance tests, maintenance activities...

Evaluation of a maintenance activity (Compressor cleaning in a CCGT) with and without correlation coefficients

Result of data reconciliation without correlations between the measurements before and after the compressor cleaning

APEL= 3 ,9 2 MW -± 3.17 MW

APEL= 4 ,0 2 M ± 1.77 MW

Result of data reconciliation with correlations between the measurements before and after the compressor cleaning

BTBBeTBe

m,.\p rojekte\Epd/EP R1.ppt

© 2002 BTB-Jansky GmbH www.btbjansky.com slide 28

Page 29: 09/16/2002 Meeting Slides for Process Data Reconciliation ... · Process Data Reconciliation Software VALI III CONTENT "* Why do you need and what are the benefits of process data

Use of VALI III for special acceptance tests, maintenance activities...

Evaluation of a maintenance activity (Compressor cleaning in a CCGT) with and without correlation coefficients

0,5

0,45

0,4

0,35

0,3

0,25

0,2

0,15

0,1

0,05

0

BTB JA etN$ E ly

M:\projekte\Ep6/EPRl.ppt

© 2002 BTB-Jansky GmbH www.btbjansky.com

increase of electrical power output 4,02 MW with a probability of 95%

2,54 MW"•,--- without correlation coefficients

wih orelation coefficients

ci,

.0

-0 0~ (L

1 1,5 2 2,5 3 3,5 4 4,5 5 5,5 6 6,5 7 7,5 8 8,5

increase of electrical power output in [MWel]

0,5

slide 29

-I

Page 30: 09/16/2002 Meeting Slides for Process Data Reconciliation ... · Process Data Reconciliation Software VALI III CONTENT "* Why do you need and what are the benefits of process data

Use of VALI III for special acceptance tests, maintenance activities...

Example: Acceptance test in a NPP

Conversion of the Low-pressure turbines

Result of a conventional acceptance test (without correlations between the measurements before and after the conversion)

APEL= 3 7 ,88 MW ± 15.84 MW

APEL= 3 8, 5 M ± 8.24 MW

Result of the acceptance test with VALI III (with correlations between the measurements before and after the conversion)

BTB ANSKY

m:.rojekie\Epd/E PRI.ppt

© 2002 BTB-Jansky GmbH www.btbjansky.com slide 30

Page 31: 09/16/2002 Meeting Slides for Process Data Reconciliation ... · Process Data Reconciliation Software VALI III CONTENT "* Why do you need and what are the benefits of process data

Possible Use of VALI III for the Measurement uncertainty recapture power uprate

BTBBTB

m:\kprojekte\E pd/E PRI.ppt

© 2002 BTB-Jansky GmbH www.btbjansky.com

3590

3585

3580

3575

3570

3565

3560

3555

3550

3545

3540

3535

3530

3525

3520

3515

3510-

0..

0

E

0,5 % reconciled uncertainty

slide 31

Page 32: 09/16/2002 Meeting Slides for Process Data Reconciliation ... · Process Data Reconciliation Software VALI III CONTENT "* Why do you need and what are the benefits of process data

CONCLUSIONS

8TB JANSIKY -1m B

m:'.projekte\EprIIEPRI.ppt

©2002 BTB-Jansky GmbH www.btbjansky.com slide 32

Page 33: 09/16/2002 Meeting Slides for Process Data Reconciliation ... · Process Data Reconciliation Software VALI III CONTENT "* Why do you need and what are the benefits of process data

SLIDES for possible QUESTIONS

BTBBTB 4AN$K

m.'projekte\Epd/EPRI.ppt

© 2002 BTB-Jansky GmbH www.btbjansky.com slide 33

Page 34: 09/16/2002 Meeting Slides for Process Data Reconciliation ... · Process Data Reconciliation Software VALI III CONTENT "* Why do you need and what are the benefits of process data

-L-

If this condition is fullfill, the reconciled values represent the true state of the process.

BTB

m:\projekte\Epd/EPRI.ppt

© 2002 BTB-Jansky GmbH www.btbjansky.com

Objective function < Chi-Square distribution

measurement - reconciled value)2

Penalty (objective function)- _ standard deviation

95%-quantile of the CHI-square distribution; Xr,95%O2 of freedom r

slide 34

Page 35: 09/16/2002 Meeting Slides for Process Data Reconciliation ... · Process Data Reconciliation Software VALI III CONTENT "* Why do you need and what are the benefits of process data

VALI-models

plant BWR CCGT-plant PWR GKN 1 PWR GKN 2 Leibstadt RDK

(KKL)

Installation ONLINE OFFLINE ONLINE ONLINE

ON/OFFLINE PENALTY 28 547 259 305,8

CHISQUARE 103 245 164 222,1

VALI-goodness 0,27 I 2,23 1,58 1,38

BTB JANekepE

m:\projekte\Epri/EPRI.Ppt

© 2002 BTB-Jansky GmbH www.btbjansky.comslide 35slide 35

Page 36: 09/16/2002 Meeting Slides for Process Data Reconciliation ... · Process Data Reconciliation Software VALI III CONTENT "* Why do you need and what are the benefits of process data

Measurement values with specified standard deviations

mI = 500 ±+Vx1 where vxi = 25 t/h

m m2 =245+v x2 where vx2 =12,25 t/h]

m3 =250+v x3 where vx3 =12,5t/h

2 Vxi with t = 1,96 implying a 95% confidence intervall (1)

Covariance 2

SA

SSxil

Sxkl

Sxnl

matrix

Sxli Sxlk

2 Sxi Sxik

2 Sxki Sxk

Sxni Sxnk

Sxln

S xin

Sxkn

2 S xn

Vector of measured values

S5001 (2) M2 2451(3)

m 3_j .2501

Restrictions

ml -m 2 -m 3 =0(4)

Vector of restrictions f(x) = (mn -m 2 -m 3 )= (0)(5)

BTB m:\proje kte\Epri/E PRI.ppt

© 2002 BTB-Jansky GmbH www.btbjansky.com slide 36

Page 37: 09/16/2002 Meeting Slides for Process Data Reconciliation ... · Process Data Reconciliation Software VALI III CONTENT "* Why do you need and what are the benefits of process data

L

f(x) = f(x)+-axv where f(x) - Vector of contradictions, v - Corrective vector applied to the

present example f xx=(1 -1 -1)andf(x)=ml-m 2 -m 3 =5(6)

ax and Sx The minimization problem

[162,69 0 00 Sx= 0 39,06 0 (7) v.-SX-'v -2A- f ý)=4o --- Min(8)

0 0 40,67_

yields, after a few adjustments and the linearization of f(x) = f(x) + L-fv (9), ax

the corrective vector V T r±L~f SJT7' 10 ax d.Sx axf Ifx ' f I)0

With the values specified above it can be calculated that r f fffs.j 4: ]a673

( a x"••a x X ". --(a x d- 0 ,1 61x(1 1) an d L-O,168

BTBANKY © 2002 BTB-Jansky GmbH www.btbjansky.com slide 37

m.\projekte\Epri/EPRI.ppt

Page 38: 09/16/2002 Meeting Slides for Process Data Reconciliation ... · Process Data Reconciliation Software VALI III CONTENT "* Why do you need and what are the benefits of process data

0,673-] [3,36 V 0,1 6 1 [51= 0,81 (12) L--0,168_- L-0,84-J

As a result, the restriction fulfilling values yield

F-3,36 + 0,81 =

L0,84L

496,641 245,81 (13)

250,84

The covariance matrix of corrections can be calculated as follows:

C - S, s .= f, . af s, (14) ax tax, *(ax (a

Implemented into the example it yields

19,49 - 26,24 -27,31 =v 26,2 6,28 6,54 (15)

-2733 6,55 6,83

BTB

m:Aprojekte\Epri/EPRI.ppt

© 2002 BTB-Jansky GmbH www.btbjansky.com

m,

M= M2

500

=m +v =245

L25o

slide 38

Page 39: 09/16/2002 Meeting Slides for Process Data Reconciliation ... · Process Data Reconciliation Software VALI III CONTENT "* Why do you need and what are the benefits of process data

0 0 109,49

),06 0 - -26,2

0 40,67 -- 2 7 ,3 3

-26,24 6,28

6,55

-27,31 6,54 =

6,83

(-53,2 =26,2

27,3

26,24

32,78

27,3(16)

- 6,55 33,84

With the corrected covariance matrix and equation

can be calculatedvx, = sx2 .t with t = 1,96)implying

the vector mNew without contradiction

mNEW =-

BTB slide 39BTB

m :\prolekte'\E pr/E PRI.ppt

© 2002 BTB-Jansky GmbH www.btbjansky.com

---

and the corrected covariance matrix162,69

0

0Sx =S

(1), the new corrected confidence intervals

a 95% confidence interval (17) So you get

[496,64 14,3t/h 245,81+11,2 tlh (18)

250,84 ±+11,4 tlh

3•

slide 39

Page 40: 09/16/2002 Meeting Slides for Process Data Reconciliation ... · Process Data Reconciliation Software VALI III CONTENT "* Why do you need and what are the benefits of process data

Mass balance: m 1 -m 2 -m 3 =O

,81+± 11,2 t/h

,84±+11,4 t/h_

IAnd the uncertainties were reduced

BTB

m.\projekle\Epr/EPRI.ppt

© 2002 BTB-Jansky GmbH www.btbjansky.com slide 40

Page 41: 09/16/2002 Meeting Slides for Process Data Reconciliation ... · Process Data Reconciliation Software VALI III CONTENT "* Why do you need and what are the benefits of process data

Make a modelMEA-File

Zuordnung der Messwerte und der Korrelationen zwischen den Messwerten

VORRETROFIT vmHK 1224 vtHK 39.16 vpHK 17.36 vmNKNDV 155.16 vtNKNDV 88.39 vpNKNDV 14.75 vmHDNK 660.47 vtHDNK 151.2 vpHDNK 10.14 vmKAVHDV 203.32 vtKAVHDV 186.9

CORREL vpAnz4 pAnz4 0.5

447M• wE (3NO~m EW, RA

PRECIS

2 20 L Q OD

•VL DU HPPPIEW t LPPREIQ CONDEý ,

Fl OPP#A&

7A -

I GUI-model

I I

BTBBTBJ m:\proje kteYpd/EPRI.ppt

© 2002 BTB-Jansky GmbH

zzz�Resuitfiles.I

www.btbjansky.com slide 41

TAG-File

vmHEK STREAM vlp.3aMASSF 1224 -2.16[kg/s !1 vtHK STREAM vlp.3a T 39.1( 0.054ý C !2 vpHK STREAM vlp.3aP p 17.361-1 bar !3

I

[] REPV•