London’s Cycling Action Plan

(LCAP) Vision: “to make London

a city where people of all

ages, abilities and

cultures have the

incentive and confidence

to cycle whenever it suits

them.”

Transport for London

(TfL): the Mayor of

London’s transport

authority

Published February 2004

Cycling in London vs. Europe

The level of cycling in London is low

compared to other European cities

Amsterdam – 28%

Copenhagen – 20%

Munich – 12%

Berlin – 5%

London –2%

Key Stats

Currently 450,000 cycle trips a day. Saw

a dramatic spike after 7/7 terrorist

attacks, then normalised at higher level.

Cycle trips up 87% since 2001

Casualty rates down 50% (from ’00 levels with a

slight up-turn in serious or killed: 2003 ~ 2006 Crash Stats: 7752,

Slight, 1115 Serious, 46 Fatal) speeds up in CCZ

Target - 80% increase by 2010 achieved!

New Target - 200% increase by 2020

Role of Borough - Design and implement facilities to

complete the LCN+ on the borough road network

What is the London Cycle

Network+?

A 900km strategic

network that will provide

cyclists with of fast, safe,

comfortable conditions

Phases of Management Control

Budgeting

Reporting & Analysis

Programming

Operating & Measuring

Summary & Annual

Report

MM, Bi-monthly,

ICS forms

CRISP Datasheets

Package Bid

Package Bid

Description, Benefits / disbenefits

Stage: F,C,D,I

MM forms / Bi-monthly / ICS

Monthly reporting

Scheme progress

Financial progress

Reallocation

overspend

Scheme Information

Management System (SIMS)

www.londoncyclenetwork.org.uk/webmap

Datasheet Future Programme

Reference

Key road features & setting

Problems that can be resolved with appropriate design work

Local Knowledge Problems that are impossible to

resolve

Digital Photos

Proposed design features

Accurate Cost Information

Justification

CRIM – Stakeholders Site Meeting

CRISP Programme of Works

Summary & Annual Reports

Annual Report ‘cont

H.R.I Barriers

H.R.I. Barriers ‘cont

Closing – Key Facts

London’s Pop. + 900k in next 15 years

Programme spend to date: $104m

Network Delivered to date: 551km

3.25 years remaining to 2010