09 wellheads

10
1 Wellheads 2 Wellheads • Purpose Comparison of Styles Unocal Thailand Specifics National Kvaerner

Upload: phytoxgraz

Post on 18-Dec-2014

1.647 views

Category:

Documents


4 download

DESCRIPTION

 

TRANSCRIPT

Page 1: 09   Wellheads

1

1

Wellheads

2

Wellheads

• Purpose• Comparison of Styles• Unocal Thailand Specifics

– National Kvaerner

Page 2: 09   Wellheads

2

3

Purpose of Wellheads

• Hydraulic isolation of annular spaces– Pressure integrity

• Controlled access to annular spaces– Flow control

• Structural support for BOP / trees

4

Weld on Casing WellheadsConventional Unihead

Page 3: 09   Wellheads

3

5

Install Blow Out Preventers

6

Install Test Plugs and Test BOP’s

Page 4: 09   Wellheads

4

7

Running Casing

8

Lift BOP to Install Slips Land Casing Hanger

Page 5: 09   Wellheads

5

9

Land Casing on Slips Pull Landing String

10

Cut Casing and LD Install Seal Assembly

Page 6: 09   Wellheads

6

11

ND Spool and DSA Test BOP

12

Remove Spool and DSA Test Seal

Page 7: 09   Wellheads

7

13

NU Casing Spool Go Back to Drilling

• No waiting on Cement• No Risk of Flow After Cementing• No ND / NU BOP• No Heavy Lifts• Fewer flange leaks

• Saved ~24 hrs rig time

14

• No waiting on Cement• No Risk of Flow After Cementing• No ND / NU BOP• No Heavy Lifts• Fewer flange leaks

• Saved ~24 hrs rig time

NU DSA Go Back to Drilling

Page 8: 09   Wellheads

8

15

NU BOP Go Back to Drilling

• No waiting on Cement• No Risk of Flow After Cementing• No ND / NU BOP• No Heavy Lifts• Fewer flange leaks

• Saved ~24 hrs rig time

16

• No waiting on Cement• No Risk of Flow After Cementing• No ND / NU BOP• No Heavy Lifts• Fewer flange leaks

• Saved ~24 hrs rig time

Test BOP, then go back to drilling Go Back to Drilling

Page 9: 09   Wellheads

9

17

Unocal Thailand Wellhead System

9” 6.5 M Slimhole LST wellhead system:

• 3 Strings Casing Design• For 9-5/8” x 7” or 6 5/8”

or 5 ¾” x 2 7/8” or 3 ½”• 6,500 Psi WP• Integral CSG & TBG

Hangers• Two 2 1/16” 6.5M

Studded Valve• One DHSV Control Line

18

Unocal Thailand Wellhead System

19.18’

12.46’

7.62’

2.88’

• Project economic– Platform Size.– Cheaper system.

• Sale Opportunities– Turn around time from

Drilling to Production.

• Operational Ease– Drilling Operation.– Flow Line Installation &

Testing.– Simultaneous Operations– WSVC Operation.

Page 10: 09   Wellheads

Notes: __________________________________________________________

__________________________________________________________

__________________________________________________________

__________________________________________________________

__________________________________________________________

__________________________________________________________

__________________________________________________________

__________________________________________________________

__________________________________________________________

__________________________________________________________

__________________________________________________________

__________________________________________________________

__________________________________________________________

__________________________________________________________

__________________________________________________________

__________________________________________________________

__________________________________________________________

__________________________________________________________

__________________________________________________________

__________________________________________________________

__________________________________________________________

__________________________________________________________

__________________________________________________________

__________________________________________________________

__________________________________________________________