09. development plan for pcmc
DESCRIPTION
Slides related to the Draft Development Plan for Pimpri-Chinchwad in the presentation made by the Commissioner to the Chief MinisterTRANSCRIPT
![Page 1: 09. Development Plan For Pcmc](https://reader035.vdocuments.us/reader035/viewer/2022081804/54cf07484a79597a6d8b45d3/html5/thumbnails/1.jpg)
Development Plan for PCMCDevelopment Plan for PCMC
![Page 2: 09. Development Plan For Pcmc](https://reader035.vdocuments.us/reader035/viewer/2022081804/54cf07484a79597a6d8b45d3/html5/thumbnails/2.jpg)
D.P. Information (PCMC)
Newly Merged villages Area – 84.51 sq.km.
a. Newly Merged villages in PCMC area on 11.9.1997
b. Draft D.P. Published on – 05.10.2000
c. Draft D.P. submitted to State Govt. for approval - 14.07.2003
d. Part approval to DP on 30/5/2008 (for roads, Water supply & Drainage reservations ( except wakad area)
f. Part approval to DP of wakad area on 9/7/2008 ( for roads, Water supply & Drainage reservations (except some roads i.e. EP-1,2,3)
![Page 3: 09. Development Plan For Pcmc](https://reader035.vdocuments.us/reader035/viewer/2022081804/54cf07484a79597a6d8b45d3/html5/thumbnails/3.jpg)
![Page 4: 09. Development Plan For Pcmc](https://reader035.vdocuments.us/reader035/viewer/2022081804/54cf07484a79597a6d8b45d3/html5/thumbnails/4.jpg)
DP Roads Status for Extended AreaPCMC
WardSr.No.
Name of Village
Road Length in
Kms.
Survey completed
in kms
Survey Work in %
Demarcation completed
in kms
Demarcation on site in %
1 Talawade 39.86 29.10 73% 0.00
2 Chikhali 55.04 55.04 100% 16.51 30%
3 Punawale 22.81 22.81 100% 13.46 59%
4 Rawet 25.18 22.91 91% 13.29 58%
5 Kiwale 25.48 22.17 87% 0.00
6 Mamurdi 12.47 10.97 88% 0.00
7 Boradewadi 11.80 11.80 100% 0.00
8 Moshi 28.32 28.32 100% 0.00
9 Dudulgaon 18.68 18.68 100% 16.81 90%
10 Chowisawadi 15.58 15.58 100% 8.88 57%
11 Wadmukhwadi 16.11 16.11 100% 2.26 14%
12 Charoli 48.64 35.51 73% 7.10 20%
13 Dighi 15.67 15.67 100% 15.67 100%
14 Bhopkhel 6.53 6.53 100% 0.00
D 15 Wakad 25.82 23.49 91% 18.79 80%
Total 367.97 334.67 91% 112.76 34%
A
B
C
![Page 5: 09. Development Plan For Pcmc](https://reader035.vdocuments.us/reader035/viewer/2022081804/54cf07484a79597a6d8b45d3/html5/thumbnails/5.jpg)
PCMC DP for Extended Area (PLU) PCMC
• Residential= 4727.52 Ha.• Commercial = 267.62 Ha.• Industrial = 251.92 Ha.• PSP = 265.79 Ha.• Pub. Utility= 96.53 Ha.• Trans. = 1094.47 Ha.• NDZ = 1288.50 Ha.• Water Bodies = 133.04 Ha.• S.T.Park = 69.71 Ha.
-------------------------------
• Total = 8451.00 Ha.
PCMC DP for Extended Area (PLU)
3%
3%
3%
13%
16%
2%
1%
1%
58%
Residential
Commercial
Industrial
PSP
Pub. Utility
Trans.
NDZ
Water Bodies
S.T.Park
![Page 6: 09. Development Plan For Pcmc](https://reader035.vdocuments.us/reader035/viewer/2022081804/54cf07484a79597a6d8b45d3/html5/thumbnails/6.jpg)
Status of Draft D.P. (PCMC)
• State Govt. sanction is awaited (Partly).– Changes suggested by General Body are sent to Govt.
• IMPLEMENTATION– Survey work and demarcation of DP roads is in
progress of all newly merged villages.– Advance possession of DP roads is taken in subject to
condition of TDR– Possession of DP roads is being taken in lieu of FSI.