    SECTION 08 44 13

    GLAZED ALUMINUM CURTAIN WALLS

    SPEC WRITER NOTE: Delete between //---- // if not applicable to projectDelete an! ot"er ite# or article notapplicable in Section an$ ren%#berpara&rap"'

    PART 1 - GENERAL

    1.1 DESCRIPTION

    ( Section 'pecifie' &la)e$ al%#in%# c%rtain wall '!'te#

    1 T"er#all! i'olate$* pre''%re e+%ali)e$ on interior

    , T!pe: // Stic // .nit // .nit an$ %llion // '!'te# to incl%$e

    followin&:

    00000000a // la'' // In'%late$ etal Panel' // .nin'%late$

    etal Panel' // la'' Span$rel Panel' // b Inte&ral reinforcin&

    c Clo'%re'* tri#* '%b'ill' an$ fla'"in&'

    $ Col%#n coer'

    e 2a'tener'* anc"or'* an$ relate$ reinforce#ent

    1.2 RELATED WORK

    (00 Str%ct%ral 'teel: Section 03 1, 00* STR.CT.R(4 STEE4 2R(IN

    5 i'cellaneo%' #etal #e#ber': Section 03 30 00* ET(4 2(5RIC(TIONS

    C 2ire'toppin& between c%rtain wall an$ 'tr%ct%re: Section 06 78 00*

    2IRESTOPPIN

    D S"eet #etal fla'"in& an$ tri#: Section 06 90 00* 24(SIN (ND SEET

    ET(4

    a ;oint 'ealant': Section 06

  • 8/13/2019 084413.doc

    2/25

  • 8/13/2019 084413.doc

    3/25

    10-11

    1 Delete re+%ire#ent' for #oc%p if notwarrante$ b! project 'i)e or portion'of (rticle not $ee#e$ nece''ar!

    , In$icate location 'i)e an$confi&%ration of #oc%p panel onarc"itect%ral contract $rawin&'

    //5 oc%p //

    //1 Con'tr%ct* at job 'ite* f%ll 'i)e t!pical wall %nit w"ic"

    incorporate' "ori)ontal an$ ertical joint'* fra#in&* win$ow %nit'*

    panel'* &la)in&* 'ealant'* an$ ot"er acce''orie' a' $etaile$ an$

    'pecifie$ oc-%p wall %nit location* 'i)e an$ $e'i&n '"all be a'

    in$icate$ Orient #oc%p to be facin& f%ll '%n w"en con'tr%cte$ //

    //, Perfor#ance Te't //

    //a Con$%ct perfor#ance te't after approal of i'%al a'pect' "a'

    been obtaine$ 2ini'"e$ wor '"all #atc" approe$ #oc-%p //

    //b Refer to Perfor#ance Re+%ire#ent' an$ 2iel$ B%alit! Control(rticle'* incl%$e$ "ereinafter* for te'tin& re+%ire#ent' //

    //= (pproe$ oc-%p //

    //a (fter co#pletion an$ approal of te't re'%lt' of job 'ite #oc%p*

    a' $irecte$* approe$ #oc-%p panel '"all be %'e$ a' #ini#%#

    'tan$ar$ of co#pari'on for entire c%rtain wall '!'te# //

    SPEC WRITER NOTE: Delete t"i' (rticle ifproject 'i)e $oe' not warrant a pre-in'tallation conference

    //C Pre-In'tallation Conference //

    //1 Prior to 'tartin& in'tallation of &la)e$ c%rtain wall '!'te#

    'c"e$%le conference wit" Contractin& Officer to en'%re followin&:

    a Clear %n$er'tan$in& of $rawin&' an$ 'pecification'

    b On'ite in'pection an$ acceptance of 'tr%ct%ral an$ pertinent

    'tr%ct%ral $etail' relatin& to c%rtain wall '!'te#

    c Coor$ination of wor of ario%' tra$e' inole$ in proi$in&

    '!'te# Conference '"all be atten$e$ b! ContractorG per'onnel

    $irectl! re'pon'ible for in'tallation of c%rtain wall '!'te#*

    fla'"in& an$ '"eet #etal wor* fire'toppin& '!'te# an$ c%rtainwall #an%fact%rer an$ t"eir Tec"nical 2iel$ Repre'entatie'

    Conflict' '"all be re'ole$ an$ confir#e$ in writin& //

    1.4 SUBMITTALS

    SPEC WRITER NOTES:10000 4i't below ite#' inten$e$ for

    %'e in project* nece''ar! for reiewprior to #an%fact%re Refer to Section

    07 88 1= - =

  • 8/13/2019 084413.doc

    4/25

  • 8/13/2019 084413.doc

    5/25

    10-11

    'ection or =00 ## b! =00 ## 1,-inc" b! 1,-inc" wi$e 'ection' of

    '"eet '"ape'

    , S%b#it corner 'ection of fra#in& #e#ber' '"owin& fa'tener'* panel'*

    &la)in& #et"o$'* &la)in& #aterial'* an$ weat"er-'trippin& S%b#it

    one 'a#ple #ini#%# =00 ## b! =00 ## 1, inc"e' b! 1, inc"e' In

    lie% of '%b#ittin& 'eparate 'a#ple' for corner 'ection* inter#e$iate

    'ection* an$ panel* one co#po'ite 'a#ple incorporatin& all

    co#ponent' an$ feat%re' li'te$ #a! be '%b#itte$

    = W"ere nor#al color ariation' are anticipate$* incl%$e , or #ore

    %nit' in 'et in$icatin& etre#e li#it' of color ariation'

    E0 la'':

    1 Specifie$ in Section 07 70 00* 4(AIN

    20 B%alit! Control S%b#ittal':

    1 De'i&n Data:a S%b#it 'tr%ct%ral an$ t"er#al calc%lation' for co#plete wall

    a''e#bl! Str%ct%ral calc%lation' an$ $e'i&n '"op $rawin&' '"all

    be 'i&ne$ an$ 'eale$ b! a 'tr%ct%ral en&ineer re&i'tere$ in 'tate

    in w"ic" project i' to be locate$

    ,0 2actor! Te't Report':

    a Te't Report': Proi$e certifie$ te't report'* for eac" of

    followin& li'te$ te't'* fro# a +%alifie$ in$epen$ent te'tin&

    laborator! '"owin& t"at &la)e$ al%#in%# c%rtain wall '!'te#

    a''e#bl! "a' been te'te$ in accor$ance wit" 'pecifie$ te'tproce$%re' an$ co#plie' wit" perfor#ance c"aracteri'tic' a'

    in$icate$ b! #an%fact%rerF' te'tin& proce$%re' an%fact%rer

    '"all '%b#it appropriate te'tin& n%#ber' for 'pecific te't'

    in$icate$ below

    1 Deflection an$ 'tr%ct%ral te't'

    , Water penetration te't'

    = (ir infiltration te't'

    8 Dela#ination te't'

    3 T"er#al con$%ctance te't'

    //9 So%n$ tran'#i''ion lo'' te't //

    6 S%b#it factor! te't' re+%ire$ ecept t"at w"ere a c%rtain wall

    '!'te# or co#ponent of 'i#ilar t!pe* 'i)e* an$ $e'i&n a'

    'pecifie$ for t"i' project "a' been preio%'l! te'te$ wit"in

    07 88 1= - 3

  • 8/13/2019 084413.doc

    6/25

    10-11

    la't !ear* %n$er con$ition' 'pecifie$ "erein* re'%ltin& te't

    report' #a! be '%b#itte$ in lie% of li'te$ te'tin&

    000 an%fact%rerH' Certificate':

    1 S%b#it Certificate' of Co#pliance* wit" 'pecification re+%ire#ent'*

    for t"e followin&:

    a etal etr%'ion'

    b etal acce''orie'

    c Statin& t"at al%#in%# "a' been &ien 'pecifie$ t"icne'' of

    ano$i)in& or or&anic coatin& fini'"

    $ In$icatin& #an%fact%rerF' an$ in'tallerF' #eet +%alification' a'

    'pecifie$

    e S%b#it li't of e+%ialent 'i)e in'tallation'* for bot"

    #an%fact%rer an$ in'taller* w"ic" "ae "a$ 'ati'factor! an$

    efficient operation00 an%fact%rerF' 2iel$ Report':

    1 S%b#it fiel$ report' of #an%fact%rerF' fiel$ repre'entatie

    ob'eration' of c%rtain wall in'tallation in$icatin& ob'eration'

    #a$e $%rin& in'pection at be&innin& of project* $%rin& #i$$le of

    in'tallation an$ at concl%'ion of project In$icate re'%lt' of fiel$

    te'tin& of #oc%p fiel$ panel* an$ an! $irection' &ien Contractor

    for correctie action

    1.5 DELIERY! STORAGE AND "ANDLING

    ( Refer to ((( CW 10 for care an$ "an$lin& of arc"itect%ral al%#in%#

    fro# '"op to 'ite

    5 Prior to paca&in& for '"ip#ent fro# factor!* #ar wall co#ponent' to

    corre'pon$ wit" '"op an$ erection $rawin&' an$ t"eir place#ent location

    an$ erection

    C Prior to '"ip#ent fro# factor!* place noce$-$own lineal #e#ber' in

    car$boar$ container' an$ coer fini'"e$ '%rface' of #e#ber' wit"

    protectie coerin& of a$"e'ie paper* waterproof tape* or 'trippable

    pla'tic Do not coer #etal '%rface' t"at will be in contact wit"

    'ealant' after in'tallation

    D In'pect #aterial' $eliere$ to 'ite for $a#a&eG %nloa$ an$ 'tore wit"

    entilation* free fro# "ea! $%'t* not '%bject to co#b%'tion pro$%ct'

    or 'o%rce' of water* an$ '"all per#it ea'! acce'' for in'pection an$

    "an$lin& Sealin& an$ ca%lin& co#po%n$'* incl%$in& "an$lin&* '"all be

    in accor$ance wit" re+%ire#ent' of Section 06

  • 8/13/2019 084413.doc

    7/25

    10-11

    1.# PRO$ECT CONDITIONS

    2iel$ ea'%re#ent': W"ere &la)e$ al%#in%# c%rtain wall '!'te#' are

    in$icate$ to fit to ot"er con'tr%ction* erif! $i#en'ion' of ot"er

    con'tr%ction b! fiel$ #ea'%re#ent' before fabrication an$ in$icate

    #ea'%re#ent' on S"op Drawin&' Coor$inate fabrication 'c"e$%le wit"

    con'tr%ction pro&re'' to aoi$ $ela!in& Wor

    1.% APPLICABLE PUBLICATIONS

    ( P%blication' li'te$ below for# a part of t"i' 'pecification to etent

    reference$ P%blication' are referre$ to in tet b! ba'ic $e'i&nation

    onl!

    5 (#erican (rc"itect%ral an%fact%rer' (''ociation (((:

    CW-1-7

  • 8/13/2019 084413.doc

    8/25

    10-11

    C (#erican National Stan$ar$' In'tit%te (NSI:

    A

  • 8/13/2019 084413.doc

    9/25

    10-11

    %n$er Specifie$ Pre''%re Difference (cro'' t"i'

    Specification

    E==0-0,R,010Str%ct%ral Perfor#ance of Eterior Win$ow'*

    C%rtain Wall'* an$ Door' b! .nifor# Static (ir

    Pre''%re Difference

    E==1-00R,00

  • 8/13/2019 084413.doc

    10/25

    10-11

    1.8 WARRANTY

    (S%b#it #an%fact%rerF' written warrant! for #aterial'* in'tallation an$

    weat"erti&"tne''* an$ '%bject to ter#' of Warrant! of Con'tr%ctionJ*

    2(R cla%'e 3,,89-,1* ecept t"at warrant! perio$ '"all be eten$e$ to

    fie 3 !ear' fro# $ate of final acceptance of project b! oern#ent

    PART 2 - PRODUCTS

    2.1 SYSTEM DESCRIPTION

    ( De'i&n Re+%ire#ent':

    1 C%rtain Wall S!'te#: T%b%lar al%#in%# 'ection' // T%b%lar al%#in%#

    'ection' wit" t"er#al brea con$ition // 'elf '%pportin& //

    '%pple#entar! '%pport // fra#in&* factor! prefini'"e$* i'ion &la''*

    // &la'' // in'%late$ #etal panel // 'pan$rel infill* // an$ lo%er'

    // G relate$ fla'"in&'* anc"ora&e an$ attac"#ent $eice'

    , S!'te# (''e#bl!: // Site a''e#ble$ // S"op %niti)e$ a''e#bl! //= No c%rtain wall fra#in& #e#ber '"all $eflect* in a $irection nor#al

    to plane of wall* #ore t"an 1/163 of it' clear 'pan or ,0 ## =/8

    inc"* w"ic"eer i' le''* w"en $e'i&ne$ in accor$ance wit"

    re+%ire#ent' of TIR (11 an$ te'te$ in accor$ance wit" (ST E==0*

    ecept t"at w"en a // pla'tere$ // &!p'%# wallboar$ // '%rface will

    be affecte$* $eflection '"all not ecee$ 1/=90 of 'pan No fra#in&

    #e#ber '"all "ae a per#anent $efor#ation in ece'' of 0, percent

    of it' clear 'pan w"en te'te$ in accor$ance wit" (ST E==0 for a

    #ini#%# te't perio$ of 10 'econ$' at 13 ti#e' $e'i&n win$ pre''%re'

    in$icate$ a' part of 'tr%ct%ral $rawin& win$ loa$ re+%ire#ent' No

    &la'' breaa&e* $a#a&e to fa'tener'* "ar$ware or acce''orie' '"all

    be per#itte$ $%e to $efor#ation 'tate$ aboe:

    a Proi$e '!'te# co#plete wit" fra#in&* #%llion'* tri#* fa'tener'*

    anc"or'* acce''orie'* conceale$ a%iliar! #e#ber'* an$ attac"#ent

    $eice' for 'ec%rin& wall to 'tr%ct%re a' 'pecifie$ or in$icate$

    .nle'' note$ ot"erwi'e* co#pl! wit" CW-1

    b C%rtain wall '!'te# co#ponent' // an$ inte&ral $oor an$/or win$ow

    %nit' // '"all be f%rni'"e$ b! one #an%fact%rer or fabricatorG

    "oweer* all co#ponent' nee$ not be pro$%ct' of 'a#e #an%fact%rer

    c 2%ll! coor$inate '!'te# acce''orie' $irectl! incorporate$* an$

    a$jacent to conti&%o%' relate$ wor an$ in'%re #aterial'

    co#patibilit!* $eflection li#itation'* t"er#al #oe#ent'* an$

    clearance' an$ tolerance' a' in$icate$ or 'pecifie$

    07 88 1= - 10

  • 8/13/2019 084413.doc

    11/25

  • 8/13/2019 084413.doc

    12/25

    10-11

    face of wall 4eae $raina&e an$ weep openin&' in #e#ber' an$

    wall open $%rin& te't

    9 (ir Infiltration: Te't &la)e$ al%#in%# c%rtain wall '!'te# accor$in&

    to ((( 30=* w"ic" re+%ire' te'tin& accor$in& to (ST E67=

    a Static-(ir-Differential: 63 Pa 136 lbf/'+ ft #ini#%#

    b (ir 4eaa&e: 00= 4/' per '+ # 009 cf#/'+ ft of '%rface

    #ai#%#

    SPEC WRITER NOTE: In$icate $e'i&n ofentire '!'te# to wit"'tan$ win$ an$concentrate$ loa$' a' in$icate$ on'tr%ct%ral Contract Drawin&'

    6 Deflection' Te't: (ST E==0* Proce$%re 5:

    a No #e#ber '"all $eflect in a $irection parallel to plane of wall*

    w"en carr!in& it' f%ll $e'i&n loa$* #ore t"an an a#o%nt w"ic"

    will re$%ce e$&e coer or &la'' bite below 63 percent of $e'i&n

    $i#en'ion No #e#ber after $eflection %n$er f%ll $e'i&n loa$*

    '"all "ae a clearance between it'elf an$ top of panel* &la''*

    'a'"* or ot"er part i##e$iatel! below it le'' t"an = ## 1/7

    inc"G clearance between #e#ber an$ an operable win$ow or $oor

    '"all be #ini#%# 13 ## 1/19 inc"

    7 Dela#ination Te't:

    a ($"e'iel! bon$e$ #etal-face$ // KKKKK // panel' '"all '"ow no

    ei$ence of $ela#ination* warpa&e or ot"er $eterioration or

    $a#a&e w"en '%bjecte$ to t"e 'i L(ccelerate$ (&in& C!cle'L

    'pecifie$ in (ST D10=6

    //

  • 8/13/2019 084413.doc

    13/25

    10-11

    re+%ire#ent' for $eflection an$ 'tr%ct%ral a$e+%ac! a' 'pecifie$

    for fra#in& #e#ber' w"en te'te$ in accor$ance wit" (ST E==0

    ecept per#anent $efor#ation '"all not ecee$ 08 percentG t"ere

    '"all be no &la'' breaa&e* an$ no per#anent $a#a&e to fa'tener'*

    anc"or'* "ar$ware* or operatin& $eice' Win$ow' '"all "ae no

    water penetration w"en te'te$ in accor$ance wit" re+%ire#ent' of

    (ST E==1 //

    //11So%n$ (tten%ation T"ro%&" Wall S!'te# Eterior to Interior:

    a STC // 30 // KKKKKK // * #ea'%re$ in accor$ance wit" (ST E81=

    2.2 MATERIALS

    ( Etr%$e$ (l%#in%# 2ra#in& e#ber': (ST 5,,1G 909=-T3 etr%$e$

    al%#in%# for non-'tr%ct%ral co#ponent' or 909=-T9 etr%$e$ al%#in%# for

    'tr%ct%ral #e#ber'G te#per an$ allo! a' reco##en$e$ b! #an%fact%rer

    5 S"eet (l%#in%#: (ST 5,0

  • 8/13/2019 084413.doc

    14/25

    10-11

    //8 Str%ct%ral 'ilicone 'ealant perfor#ance re+%ire#ent': (ST CC foa# 'ealant tape* 'eale$

    at corner'= la'' Si)e' an$ Clearance':

    a (cco##o$ate %p to ,3 ## 1 inc" &la)in&

    b Si)e' in$icate$ are no#inal >erif! act%al 'i)e' re+%ire$ b!

    #ea'%rin& fra#e' Coor$inate $i#en'ion' for &la'' an$ &la''

    "ol$in& #e#ber' to #eet applicable #ini#%# clearance' a'

    reco##en$e$ b! &la'' #an%fact%rer Do not nip &la'' to re#oe

    flare' or to re$%ce oer'i)e$ $i#en'ion' (ll c%ttin& '"all occ%r

    in factor!

    8 la'' Settin& aterial':

    a Proi$e "ea$ bea$ an$ $rie we$&e re+%ire$ for &la'' in'tallation

    to '%it c%rtain wall '!'te# in accor$ance wit" #an%fact%reF'

    reco##en$ation'

    b If %'e$ in p'!c"iatric facilitie'* t"e &la'' '"all be retaine$ in

    t"e fra#in& '!'te# in '%c" a #anner t"at it can wit"'tan$ lateral

    07 88 1= - 18

  • 8/13/2019 084413.doc

    15/25

    10-11

    force' in ece'' of force re+%ire$ to brea t"e &la'' Pla'tic

    clip' for "ol$in& &la'' are not per#itte$ //

    //I 4o%er':

    1 (' 'pecifie$ %n$er Section 07 ERS (ND >ENTS

    //; 4o%er Screenin&:

    1 (' 'pecifie$ %n$er Section 07 ERS (ND >ENTS

    //? Col%#n Coer' Eterior an$ Interior S%rface': // KKKKK // ## //

    KKKKK // inc" // t"ic prefini'"e$ al%#in%#* // KKKKK // f%ll contact

    pre''%re bon$e$ to // KKKKKKK // en'%rin& flat '%rface* // KKKKKK //

    fini'" a' 'electe$ // to #atc" c%rtain wall #%llion 'ection' //

    4 2ire'toppin&: Refer to Section 06 78 00* 2IRESTOPPIN for re+%ire#ent'

    2.3 &ABRICATION

    ( C%rtain wall co#ponent' '"all be of #aterial' an$ t"icne'' in$icate$

    or 'pecifie$ Detail' in$icate$ are repre'entatie of re+%ire$ $e'i&nan$ profile' aintain 'i&"tline' in$icate$ on $rawin&' .nle''

    'pecificall! in$icate$ or 'pecifie$ ot"erwi'e* #et"o$' of fabrication

    an$ a''e#bl! '"all be at $i'cretion of c%rtain wall #an%fact%rer

    Perfor# fittin& an$ a''e#blin& of co#ponent' in '"op to #ai#%# etent

    practicable (nc"ora&e $eice' '"all per#it a$j%'t#ent in t"ree

    $irection' T"ere '"all be no epo'e$ fa'tener'

    5 ;oint': ;oint' ecee$in& 13 ## 1/19L '"all be #ec"anicall!

    fa'tene$

    C >entilation an$ Draina&e: Direct water leaa&e to eterior b! #ean' of

    conceale$ $raina&e '!'te# an$ weep' 2la'"in&' an$ ot"er #aterial' %'e$

    internall! '"all be non'tainin&* noncorro'ie* an$ nonblee$in&

    D Protection an$ Treat#ent of etal':

    1 Re#oe fro# #etal '%rface' l%bricant' %'e$ in fabrication an$ clean

    off ot"er etraneo%' #aterial before leain& '"op

    , Proi$e protection a&ain't &alanic action w"ereer $i''i#ilar

    #etal' are in contact* ecept in ca'e of al%#in%# in per#anent

    contact wit" &alani)e$ 'teel* )inc* 'tainle'' 'teel* or relatiel!

    '#all area' of w"ite bron)e Paint contact '%rface' wit" one coat

    bit%#ino%' paint confor#in& to I4-C-17870 or appl! appropriate

    ca%lin& #aterial or nonab'orptie* noncorro'ie* an$ non'tainin&

    tape or &a'et between contact '%rface'

    07 88 1= - 13

  • 8/13/2019 084413.doc

    16/25

    10-11

    E etal 'ill' an$ Clo'%re': 2abricate acce''orie'* 'pan$rel panel'* tri#

    clo'%re' of 'i)e' an$ '"ape' in$icate$ fro# 'i#ilar #aterial' an$

    fini'" a' 'pecifie$ for wall '!'te#

    //2 Conceale$ Interior %llion Reinforcin&: (ST (=9 'teel '"ape' a'

    re+%ire$ for 'tren&t" an$ #%llion 'i)e li#itation'* "ot $ip &alani)e$

    after fabrication in accor$ance wit" (ST (1,= //

    // etal Span$rel Panel': an%fact%rerH' 'tan$ar$ la#inate$ al%#in%#-face$

    panel' of t"icne'' in$icate$* flat wit" no $eiation' in plane

    ecee$in& 13 ## in 900 ## 1/19 inc" in ,8 inc"e' or = ## 1/7 inc"

    oer entire panel Proi$e wit" e$&e flan&e':

    1 2ace S"eet': 09 ## 00,8-inc" #ini#%# t"icne'' fini'"e$ to #atc"

    '!'te# fra#in&

    a // Tet%re: // S#oot" // E#bo''e$ //

    , Conceale$ 5ac S"eet': (l%#in%# or &alani)e$ 'teel in#an%fact%rerH' 'tan$ar$ t"icne''

    SPEC WRITER NOTE: Select proper'tabili)er-'"eet t!pe if re+%ire$ forproject Ce#ent boar$ 'tabili)er '"eet'in = ## 01,3 inc" an$ 8 ## 0136inc" t"icne''e' al'o aailable Ce#entboar$ not '%'ceptible to #oi't%re b%t i'er! brittle an$ po''ibl! #ore epen'ieContact panel #an%fact%rer for $e'i&na''i'tance before in'ertin& ce#ent boar$re+%ire#ent' Delete ite#' not applicablefor %'e an$ ren%#ber para&rap"'

    // Stabili)er S"eet':

    //1 = ## 1/7 inc" t"ic te#pere$ "ar$boar$ //

    //, 1= ## 1/, inc" t"ic &!p'%# boar$ //

    SPEC WRITER NOTE: Select 'tabili)er-'"eett!pe below if fire re'i'tant panel' arere+%ire$ for project >erif! re+%ire#ent'of (%t"oritie' "ain& j%ri'$ictionDelete ite#' not applicable for %'e an$ren%#ber para&rap"'

    //= !p'%# boar$ at inner face an$ "ar$boar$ at o%ter face a' re+%ire$to proi$e '%rface b%rnin& c"aracteri'tic' w"en te'te$ accor$in& to

    (ST E78 a' follow':

    SPEC WRITER NOTE: Proi$e act%al al%e're+%ire$ for panel ratin&' re+%ire$ forproject >erif! re+%ire#ent' wit"(%t"oritie' "ain& j%ri'$iction Delete

    07 88 1= - 19

  • 8/13/2019 084413.doc

    17/25

    10-11

    ite#' not applicable for %'e an$ ren%#berpara&rap"'

    // a 2la#e Sprea$: KKKK //

    // b S#oe Deelope$: KKKK //

    SPEC WRITER NOTE: Select proper core t!pere+%ire$ for project ba'e$ on R->al%ere+%ire$ for wall '!'te# or $e'i&n t!pere+%ire#ent' R->al%e' in$icate$ areea#ple' onl! (%t"oritie' "ain&j%ri'$iction #a! re'trict in'%lation#aterial' ba'e$ on fire perfor#ancec"aracteri'tic' >erif! re+%ire#ent' wit"(%t"oritie' "ain& j%ri'$ictionDelete ite#' not applicable for %'e an$ren%#ber para&rap"'

    //I Panel Core aterial:

    //1 Ri&i$* clo'e$-cell* pol!i'oc!an%rate t"er#al in'%lation: R->al%e: //R11 // R1< // // //

    //, Etr%$e$-pol!'t!rene t"er#al in'%lation co#pl!in& wit" (ST C367*

    T!pe I> re+%ire#ent': R->al%e: // R11 // R1< // // //

    //= Ri&i$* &la''-fiberboar$ t"er#al in'%lation co#pl!in& wit" (ST C91,

    re+%ire#ent' an$ wit"

  • 8/13/2019 084413.doc

    18/25

    10-11

    //C 2l%orocarbon 2ini'": ((( ,903

    1 Color a' 'electe$ //

    SPEC WRITER NOTE: Select one of followin&para&rap"' for pri#er t!pe re+%ire$Select a pri#er co#patible wit" fini'"#aterial 2or "i&" perfor#ance fini'"*caref%l 'election of pri#er i' re+%ire$Con'%lt wit" #an%fact%rer forreco##en$ation of proper pri#er to be%'e$

    D S"op an$ To%c"-.p Pri#er for Steel Co#ponent': SSPC Paint ,3 re$ oi$e

    // KKKKKKK //

    E To%c"-.p Pri#er for &alani)e$ Steel S%rface': SSPC Paint ,0 )inc ric"

    // KKKKKKK //

    2 Conceale$ Steel Ite#': alani)e$ in accor$ance wit" (ST (1,= to

    910 // KKKK // /'+ # // ,0 // KKKKKK // o)/'+ ft // // Pri#e$ wit"iron oi$e paint //

    (ppl! one coat // KKKKK coat' // of bit%#ino%' paint to conceale$

    al%#in%# // an$ 'teel // '%rface' in contact wit" ce#entitio%' or

    $i''i#ilar #aterial'

    PART 3 - E'ECUTION

    3.1 E'AMINATION

    ( Prior to in'tallation of &la)e$ c%rtain wall '!'te#* arran&e for

    repre'entatie' of #an%fact%rer to ea#ine 'tr%ct%re an$ '%b'trate to

    $eter#ine t"at t"e! are properl! prepare$* an$ rea$! to receie &la)e$

    c%rtain wall wor incl%$e$ "erein

    5 >erif!in& Con$ition' an$ ($jacent S%rface': (fter e'tabli'"#ent of

    line' an$ &ra$e' an$ prior to '!'te# in'tallation ea#ine '%pportin&

    'tr%ct%ral ele#ent' >erif! &oernin& $i#en'ion'* incl%$in& floor

    eleation'* floor to floor "ei&"t'* #ini#%# clearance' between c%rtain

    wall an$ 'tr%ct%ral fra#e'* an$ ot"er per#i''ible $i#en'ional

    tolerance' in b%il$in& fra#e

    3.2 PREPARATION

    ( Tae fiel$ $i#en'ion' an$ ea#ine con$ition of '%b'trate'* '%pport'*

    an$ ot"er con$ition' %n$er w"ic" wor of t"i' 'ection i' to be

    perfor#e$ to erif! t"at wor #a! properl! co##ence Do not procee$

    wit" in'tallation %ntil %n'ati'factor! con$ition' "ae been correcte$

    07 88 1= - 17

  • 8/13/2019 084413.doc

    19/25

    10-11

    5 Contact between al%#in%# an$ $i''i#ilar #etal' '"all receie a

    protectie coatin& of a'p"altic paint for preention of electrol!tic

    action an$ corro'ion

    3.3 INSTALLATION

    ( In'tallation an$ erection of &la)e$ c%rtain wall '!'te# an$ all

    co#ponent' '"all be in accor$ance wit" written $irection' of c%rtain

    wall #an%fact%rer atc" profile'* 'i)e'* an$ 'pacin& in$icate$ on

    approe$ '"op $rawin&'

    5 5enc" ar' an$ Reference Point': E'tabli'" an$ per#anentl! #ar benc"

    #ar' for eleation' an$ b%il$in& line off'et' for ali&n#ent at

    conenient point' on eac" floor leel S"o%l$ an! error or $i'crepanc!

    be $i'coere$ in location of #ar'* 'top erection wor in t"at area

    %ntil $i'crepancie' "ae been correcte$

    C En'%re t"at $raina&e '!'te# operate' properl! in accor$ wit" ((( 301proce$%re'

    D Do not procee$ wit" 'tr%ct%ral 'ilicone wor w"en #etal te#perat%re i'

    below 0 $e&ree' C =, $e&ree' 2

    E I'olate between al%#in%# an$ $i''i#ilar #etal' wit" protectie coatin&

    or pla'tic 'trip to preent electrol!tic corro'ion

    2 In'tall &la)e$ al%#in%# c%rtain wall '!'te# 'o a' to #aintain a

    irt%all! flat face cap* wit" no i'ible bowin&

    In'tall entire '!'te# 'o t"at fa'tener' are not i'ible

    Tolerance':

    1 ai#%# ariation fro# plane or location '"own on approe$ '"op

    $rawin&': = ## per =900 ## 1/7 inc" per 1, feet of len&t" %p to

    not #ore t"an 1= ## 1/, inc" in an! total len&t"

    , ai#%# off'et fro# tr%e ali&n#ent between two i$entical #e#ber'

    ab%ttin& en$ to en$ in line: 07 ## 1/=, inc"

    = Sealant Space 5etween C%rtain Wall %llion an$ ($jacent

    Con'tr%ction: ai#%# of 1< ## =/8 inc" an$ #ini#%# of 9 ## 1/8

    inc"

    SPEC WRITER NOTE: Delete followin&para&rap" on win$ow' if not part ofc%rtain wall '!'te#

    //I Win$ow': //

    1 Refer to // Section 07 31 1=* (4.IN. WINDOWS // an$/or // Section

    07 31 1=11* SIDE-INED (4.IN. WINDOWS // for win$ow

    re+%ire#ent'

    07 88 1= - 1

  • 8/13/2019 084413.doc

    20/25

    10-11

    //, In'tall win$ow' in accor$ance wit" $etail' in$icate$ an$ approe$

    '"op $rawin& $etail $rawin&' //

    //= Seal eterior #etal to #etal joint' between #e#ber' of win$ow'*

    fra#e'* #%llion'* an$ #%llion coer' in accor$ance wit" re+%ire#ent'

    of Section 06

  • 8/13/2019 084413.doc

    21/25

    10-11

    can be in'talle$ wit"in fo%r "o%r'* b%t at no ti#e '"all t"i' a#o%nt

    ecee$ 1< liter' 3 &allon'

    8 (ppl! pri#er to #a'onr!* concrete* woo$* an$ ot"er '%rface' a'

    reco##en$e$ b! 'ealant #an%fact%rer Do not appl! pri#er to '%rface'

    w"ic" will be epo'e$ after ca%lin& i' co#plete$

    3 Ti&"tl! pac bacin& in botto# of joint' w"ic" are oer 1= ## 1/,

    inc" in $ept" wit" 'pecifie$ bacin& #aterial to $ept" in$icate$ or

    'pecifie$ Roll bacin& #aterial of "o'e or ro$ 'toc into joint' to

    preent len&t"wi'e 'tretc"in&

    9 In'tall bon$ preentie #aterial at bac or botto# of joint caitie'

    in w"ic" no bac'top #aterial i' re+%ire$* coerin& f%ll wi$t" an$

    len&t" of joint caitie'

    6 Re#oe co#po%n$ '#ear' fro# '%rface' of #aterial' a$jacent to 'eale$

    joint' a' wor pro&re''e' .'e #a'in& tape on eac" 'i$e of jointw"ere tet%re of a$jacent #aterial will be $iffic%lt to clean

    Re#oe #a'in& tape i##e$iatel! after fillin& joint Scrape off

    fre'" co#po%n$ fro# a$jacent '%rface' i##e$iatel! an$ r%b clean wit"

    approe$ 'olent .pon co#pletion of ca%lin& an$ 'ealin&* re#oe

    re#ainin& '#ear'* 'tain'* an$ ot"er 'oilin&* an$ leae wor in clean

    neat con$ition

    ? la'':

    1 Refer to Section 07 70 00* 4(AIN* an$ $rawin& for &la'' t!pe'

    In'tall in accor$ance wit" #an%fact%rerH' reco##en$ation' a'#o$ifie$ "erein

    , 5efore in'tallin& &la''* in'pect 'a'" an$ fra#e' to receie &la''

    for $efect' '%c" a' $i#en'ional ariation'* &la'' clearance'* open

    joint'* or ot"er con$ition' t"at will preent 'ati'factor! &la''

    in'tallation Do not procee$ wit" in'tallation %ntil $efect' "ae

    been correcte$

    = Clean 'ealin& '%rface' at peri#eter of &la'' an$ 'ealin& '%rface' of

    rebate' an$ 'top bea$' before appl!in& &la)in& co#po%n$* 'ealin&

    co#po%n$* &la)in& tape* or &a'et' .'e onl! approe$ 'olent' an$

    cleanin& a&ent' reco##en$e$ b! co#po%n$ or &a'et #an%fact%rer (ll

    'a'"e' '"all be $e'i&ne$ for o%t'i$e &la)in& Proi$e contin%o%'

    'nap in &la)in& bea$' to '%it &la'' a' 'pecifie$

    8 In'%latin& an$ te#pere$ &la''* an$ &la'' of ot"er t!pe' t"at ecee$

    100 %nite$ inc"e' in 'i)e: Proi$e oi$ 'pace at "ea$ an$ ja#b to

    07 88 1= - ,1

  • 8/13/2019 084413.doc

    22/25

  • 8/13/2019 084413.doc

    23/25

    10-11

    panel' Re#oe an$ replace co#ponent' t"at cannot be cleane$

    '%cce''f%ll!

    3.# &IELD QUALITY CONTROL

    ( Te'tin& (&enc!: En&a&e an ((( accre$ite$ co##ercial +%alifie$

    in$epen$ent te'tin& an$ in'pectin& a&enc! to perfor# fiel$

    +%alit!-control te't' 'pecifie$* an$ to prepare te't report': S%b#it

    infor#ation re&ar$in& te'tin& laborator!H' facilitie' an$

    +%alification' of tec"nical per'onnel to Contractin& Officer for

    approal

    5 Con$%ct fiel$ c"ec te't for water leaa&e on $e'i&nate$ wall area'

    after erection to co#pl! wit" CW-1 Con$%ct te't on two wall area'*

    two ba!' wi$e b! two 'torie' "i&" w"ere $irecte$ Con$%ct te't an$ tae

    nece''ar! re#e$ial action a' $irecte$ b! Contractin& Officer

    C Te't Speci#en:1 Te't 'peci#en '"all incl%$e c%rtain wall a''e#bl! an$ con'tr%ction

    Te't c"a#ber '"all be affie$ to eterior 'i$e of te't 'peci#en an$

    te't '"all be con$%cte$ %'in& po'itie 'tatic air pre''%re

    , Te't 'peci#en' '"all be 'electe$ b! Contractin& Officer after

    c%rtain wall '!'te# "a' been in'talle$ in accor$ance wit" contract

    $rawin&' an$ 'pecification

    D Sealant ($"e'ion Te't': Te't in'talle$ 'ealant* in pre'ence of 'ealant

    #an%fact%rerF' fiel$ repre'entatie* in a #ini#%# of two area' an$ a'

    follow':

    //1 Te't 'tr%ct%ral 'ilicone 'ealant accor$in& to fiel$ a$"e'ion te't

    #et"o$ $e'cribe$ in ((( CW 1=* LStr%ct%ral Sealant la)in& S!'te#'

    ( De'i&n %i$eL //

    , Te't weat"er'eal 'ealant a' reco##en$e$ in writin& b! 'ealant

    #an%fact%rer

    E (ir Infiltration: Te't &la)e$ al%#in%# c%rtain wall '!'te# accor$in& to

    ((( 30=* w"ic" re+%ire' te'tin& accor$in& to (ST E67=

    1 2iel$ air leaa&e te'tin& i' not re+%ire$ for contin%o%' c%rtain

    wall '!'te#'

    , Static-(ir-Pre''%re Differential: 63 Pa 136 lbf/'+ ft #ini#%#

    = (ir 4eaa&e: 00= 4/' per '+ # 009 cf#/'+ ft of '%rface

    #ai#%#

    07 88 1= - ,=

  • 8/13/2019 084413.doc

    24/25

    10-11

    2 Water Penetration: Te't &la)e$ al%#in%# c%rtain wall '!'te# for

    co#pliance wit" re+%ire#ent' accor$in& to ((( 30=* w"ic" re+%ire'

    te'tin& accor$in& to (ST E1103

    1 .nifor# Static-(ir-Pre''%re Difference: ,0 percent of po'itie

    $e'i&n win$ loa$* b%t not le'' t"an 86< Pa 10 p'f No %ncontrolle$

    water '"all be pre'ent

    Rete'tin&:

    1 S"o%l$ '!'te# fail fiel$ te't* '!'te# #a! be #o$ifie$ or repaire$*

    an$ rete'te$

    , S"o%l$ '!'te# fail 'econ$ fiel$ te't* '!'te# #a! be a$$itionall!

    #o$ifie$ or repaire$* an$ rete'te$

    = (ll #o$ification' an$ repair' #a$e to te'te$ area' '"all be

    recor$e$* an$ 'a#e #o$ification' an$ repair' #a$e to all '!'te# an$

    a$jacent con'tr%ction on project8 S"o%l$ 'econ$ te't fail* Contractin& Officer #a! re+%ire te'tin& of

    a$$itional area' of t"e c%rtain wall

    Rejection:

    1 2ail%re of an! of 'peci#en' to #eet te't re+%ire#ent' of t"ir$ te't

    '"all be ca%'e for rejection of wall '!'te# an$ a$jacent

    con'tr%ction on project

    SPEC WRITER NOTE:T"e followin& (rticle #a! not be re+%ire$if no operatin& co#ponent' '%c" a' win$ow

    an$ $oor %nit' are incl%$e$ in c%rtainwall '!'te#

    ((3.% DEMONSTRATION! TESTING! AND ACCEPTANCE

    //( In'tr%ct OwnerH' per'onnel in proper operation an$ #aintenance of //

    win$ow' // reolin& entrance $oor e+%ip#ent // or // "ori)ontal

    'li$in& entrance $oor e+%ip#ent // Train per'onnel in proce$%re' to

    follow in eent of operational fail%re' or #alf%nction' //

    //5 (cceptance: (t co#pletion of project* an$ a' a con$ition of acceptance*

    // reolin& entrance $oor e+%ip#ent // or // "ori)ontal 'li$in&

    entrance $oor e+%ip#ent // an$ '!'te#' '"all be operate$ for a perio$

    of fifteen 13 con'ec%tie calen$ar $a!' wit"o%t brea$own //

    3.8 PROTECTION

    ( (fter in'tallation* protect win$ow'* an$ ot"er epo'e$ '%rface' fro#

    $i'fi&%ration* conta#ination* contact wit" "ar#f%l #aterial'* an$ fro#

    ot"er con'tr%ction "a)ar$' t"at will interfere wit" t"eir operation* or

    07 88 1= - ,8

  • 8/13/2019 084413.doc

    25/25

    10-11

    $a#a&e t"eir appearance or fini'" Protection #et"o$' '"all be in

    accor$ance wit" reco##en$ation' of pro$%ct #an%fact%rer' or of

    re'pectie tra$e a''ociation Re#oe paper or tape factor! applie$

    protection i##e$iatel! after in'tallation Clean '%rface' of #ortar*

    pla'ter* paint* '#ear' of 'ealant'* an$ ot"er forei&n #atter to pre'ent

    neat appearance an$ preent fo%lin& of operation In a$$ition* wa'"

    wit" a 'tiff fiber br%'"* 'oap an$ water* an$ t"oro%&"l! rin'e W"ere

    '%rface' beco#e 'taine$ or $i'colore$* clean or re'tore fini'" in

    accor$ance wit" reco##en$ation' of pro$%ct #an%fact%rer or re'pectie

    tra$e a''ociation

    - - - END - - -