08.01.2013 at 3.00 p.m. capital applied for page …...27 tech mahindra ltd, plot no-1, rajiv gandhi...

63
List of Cases to be submitted before 9th Consent Appraisal Committee Meeting Scheduled on 08.01.2013 at 3.00 P.M. Sr. No. Name & Address Capital Investment Applied For Section Page No. Remar ks Resubmitted Agenda 1 M/s. Alicon Castalloy Ltd., Gat No. 1426, Shikrapur, Tal- Shirur, Dist - Pune 116.0 Crs Renewal JD(APC) 1 to 35 2 M/s. Chandrapur Ferro Alloy Plant, S. No. 498/2, 499 & 500 503/2, Mul Road, Chandrapur 221.42 Crs Establish for Expansion JD(APC) 36-62 3 M/s. Sona Alloys Pvt. Ltd., C-1, MIDC Lonand, Tal- Khandala, Dist - Satara 445.38 Crs Renewal JD(APC) 63-78 Fresh Agenda 1 M/s. Shilpa Steel & Power Ltd., B-209, MIDC Butibori, Nagpur 117.17 Crs Establish (Expansion) JD(APC) 79-86 2 M/s. Lloyds Metals & Energy Ltd., A-1 & 2, MIDC Ghugus, Dist - Chandrapur 331 Crs Establish (Expansion) JD(APC) 87-94 3 M/s. Angre Port Pvt. Ltd. (formerly known as M/s. Jaigad Ports Infrastructure Pvt. Ltd.,) Vill- Sande Lavgan, Tal- & Dist - Ratnagiri 217.18 Crs Establish JD(APC) 95-108 4 M/s. Manikgarh Cemet Unit-II, PO- Gadchandur, Tal- Korpana, Dist - Chandrapur 350 Crs Establish JD(APC) 109-119 5 M/s CEAT Limited,Off L.B.S Marg, Bhandup(W), Mumbai - 400078 212.89 Crs Establish PAMS 120-136 6 M/s. Lupin Ltd, T-142, MIDC, Sr. No. 30/10,30/11,30/12,30/13,64/7, Tarapur, Tq-Palghar via Boiser, Dist- Thane 581.65 Establish (Expansion) PAMS 137-166 7 Purti Power & Sugar Ltd ( Distillery), Nagpur Chandrapur Road, Tq- Umred, Dist- Nagpur 241.47 Crs Establish ( Expansion) JD(WPC) 167-172 8 National Highways Authority of India, Khed, Ambegaon, Junner Tahasil in Pune District. 705.07 Crs Esatblish RO(HQ) 173-180 9 Lodha Dwellers Pvt. Ltd, Usarghar, Nilje, Katai, Ghesarkatai, Ghesar, Kalyan, Dist- Thane 2568 Crs Establish ( Expansion) RO(HQ) 181-188

Upload: others

Post on 10-Jun-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 08.01.2013 at 3.00 P.M. Capital Applied For Page …...27 Tech Mahindra Ltd, Plot No-1, Rajiv Gandhi Infotech Park, Phase-III, Hinjewadi, Pune 502.59 Crs Renewal RO(HQ) 381-388 28

List of Cases to be submitted before 9th Consent Appraisal Committee Meeting Scheduled on 08.01.2013 at 3.00 P.M.

Sr. No. Name & Address Capital

Investment Applied For

Section Page No.

Remarks

Resubmitted Agenda 1 M/s. Alicon Castalloy Ltd., Gat

No. 1426, Shikrapur, Tal- Shirur, Dist - Pune

116.0 Crs Renewal JD(APC) 1 to 35

2 M/s. Chandrapur Ferro Alloy Plant, S. No. 498/2, 499 & 500 503/2, Mul Road, Chandrapur

221.42 Crs Establish for Expansion JD(APC)

36-62

3 M/s. Sona Alloys Pvt. Ltd., C-1, MIDC Lonand, Tal- Khandala, Dist - Satara

445.38 Crs Renewal JD(APC) 63-78

Fresh Agenda

1 M/s. Shilpa Steel & Power Ltd., B-209, MIDC Butibori, Nagpur 117.17 Crs Establish

(Expansion) JD(APC) 79-86

2 M/s. Lloyds Metals & Energy Ltd., A-1 & 2, MIDC Ghugus, Dist - Chandrapur

331 Crs Establish (Expansion) JD(APC)

87-94

3 M/s. Angre Port Pvt. Ltd. (formerly known as M/s. Jaigad Ports Infrastructure Pvt. Ltd.,) Vill- Sande Lavgan, Tal- & Dist - Ratnagiri

217.18 Crs Establish JD(APC) 95-108

4 M/s. Manikgarh Cemet Unit-II, PO- Gadchandur, Tal- Korpana, Dist - Chandrapur

350 Crs Establish JD(APC) 109-119

5 M/s CEAT Limited,Off L.B.S Marg, Bhandup(W), Mumbai - 400078

212.89 Crs Establish PAMS 120-136

6 M/s. Lupin Ltd, T-142, MIDC, Sr. No. 30/10,30/11,30/12,30/13,64/7, Tarapur, Tq-Palghar via Boiser, Dist- Thane

581.65 Establish (Expansion) PAMS 137-166

7 Purti Power & Sugar Ltd ( Distillery), Nagpur Chandrapur Road, Tq- Umred, Dist- Nagpur

241.47 Crs Establish

( Expansion)

JD(WPC) 167-172

8 National Highways Authority of India, Khed, Ambegaon, Junner Tahasil in Pune District.

705.07 Crs Esatblish RO(HQ) 173-180

9 Lodha Dwellers Pvt. Ltd, Usarghar, Nilje, Katai, Ghesarkatai, Ghesar, Kalyan, Dist- Thane

2568 Crs Establish

( Expansion)

RO(HQ) 181-188

Page 2: 08.01.2013 at 3.00 P.M. Capital Applied For Page …...27 Tech Mahindra Ltd, Plot No-1, Rajiv Gandhi Infotech Park, Phase-III, Hinjewadi, Pune 502.59 Crs Renewal RO(HQ) 381-388 28

10 M/s. INA Bearing India Pvt. Ltd., A-3, MIDC Talegaon, Vill- Navlakh Umbre, Tal- Maval, Dist - Pune

243.41 Crs

1st operate with

amalgamation

JD(APC) 189-195

11 M/s. Mahindra Hinoday Industries Ltd., Gat No. 318, A/p- Urse, Tal- Maval, Dist - Pune

252.36 Crs

1st operate with

amalgamation

JD(APC) 196-204

12 M/s. JSW Ispat Steel Ltd., (formerly known as M/s. Ispat Industries Ltd., ), A-10/1, MIDC Indl. Area, Kalmeshwar, Nagpur

553.98 Crs Operate JD(APC) 205-220

13 Vinati Organics Ltd, Plot No. A-20, MIDC Lote, Tal- Khed, Dist- Ratnagiri. 182.5 Crs

1st Opertae with

amalgamation

PAMS 221-233

14 Lodha Dwellers Pvt. Ltd, Usarghar, Nilje, Katai, Ghesarkatai, Ghesar, Kalyan, Dist- Thane

140 Crs 1st Opertae ( Part) RO(HQ) 234-240

15 Infosys Ltd, Plot No.1, Rajiv Gandhi Info Tech Park, Phase-I, Hinjewadi, Pune

1031.95 Crs 1st Opertae RO(HQ) 241-248

16 Serene Properties Pvt. Ltd, Plot No.-3, TTC Industrial Area, MIDC Airoli, Navi Mumbai

303.23 Crs 1st Opertae RO(HQ) 249-278

17 Maharashtra Airport Development Company, Special Economic Zone, At- MIHAN Area, Nagpur.

452.51 Crs 1st Opertae RO(HQ) 279-297

18 Shree Chhtrapati Shahu SSK, Kagal, Kolhapur

204.06 Crs 1st Operate

( Expansion)

JD(WPC) 298-305

19 M/s. Bharat Forge Ltd., E-1/1, MIDC Baramati, Tal- Baramati, Dist - Pune

556.78 Crs

Renewal with 1st

operate for expansion

and amalgamati

on

JD(APC)

306-313

20 M/s. Bharat Bijlee Ltd., Plot No. 2, MIDC Airoli, TTC Thane Belapur Raod, Navi Mumbai

136.56 Crs Renewal

with expansion

JD(APC) 314-323

21 M/s. Kalyani Hayes Lemmerz Ltd., (Truck Wheel Plant), Gat No. 635, Kuruli Village, Tal- Khed, Dist - Pune

185.71 Crs Renewal JD(APC)

324-332

22 M/s. LG Electronics India Pvt. Ltd., A-5, MIDC Ranjangaon, Tal- Shirur, Dist - Pune

674.76 Crs Renewal JD(APC) 333-341

Page 3: 08.01.2013 at 3.00 P.M. Capital Applied For Page …...27 Tech Mahindra Ltd, Plot No-1, Rajiv Gandhi Infotech Park, Phase-III, Hinjewadi, Pune 502.59 Crs Renewal RO(HQ) 381-388 28

23 M/s. John Deere India Pvt. Ltd., Gat No. 166 to 167, 271 to 291, off Pune Nagar Road, Sanaswadi, Tal- Shirur, Dist - Pune

516.62 Crs Renewal JD(APC)

342-349

24 M/s. Wheels India Ltd., C-1, MIDC Ranjangaon, Tal- Shirur, Dist - Pune

112.04 Crs Renewal JD(APC) 350-358

25 M/s. Maharashtra Seamless Ltd., Vill- Sukeli, Tal- Roha, Dist - Raigad

182.83 Crs Renewal JD(APC) 359-373

26 Syntel International (P) Ltd, B-1 & B-2, Software Technology Park, Talwade MIDC, Tal- Haveli, Dist- Pune

599.62 Crs Renewal and 1st Opertae

RO(HQ) 374-380

27 Tech Mahindra Ltd, Plot No-1, Rajiv Gandhi Infotech Park, Phase-III, Hinjewadi, Pune

502.59 Crs Renewal RO(HQ) 381-388

28 Serum Institute of India Ltd, 212/2, Pune Solapur Road, Hadpsar, Tal- Haveli, Dist - Pune

1081.53 Crs Renewal PAMS 389-400

29 Oil & Natural Gas Corporation Ltd Uran, Tal- Uran, Dist- Raigad

Amendment in consent PAMS 401-411

30 Hindustan Unilever Ltd. Plot No. C-9, MIDC Khamgaon, Dist. Buldana

144.76 Crs Renewal with merger PAMS 412-428

31 Manjara SSK Ltd ( Distillery) Vilas Nagar, Tq & Dist- Latur 168.81 Crs Renewal JD(WPC) 429-441

32 Mula ssk Ltd, ( Sugar & Co- Generaion), Post- Sonai Newasa, Dist- Ahemadnagar.

149.52 Crs Renewal JD(WPC) 442-455

33 Bhaurao Chavan SSK Ltd ( Distillery), Laxmi Nagar,Tq- Ardhapur, Dist- Nanded

135.67 Crs Renewal JD(WPC) 456-462

34 Urjankur Shree Datta Power Co. Ltd, Gat No. 251, ( Shree Datta SSK Ltd, Dattanagar, Shirol, Kolhapur

207.21 Crs

Renewal

JD(WPC) 463-471

35 Soktas India Pvt. Ltd, Plot No. T-8, Five Star MIDC, Kagal, Hatkanangale, Kolhapur

225.49 Crs Renewal JD(WPC) 472-479

36 Shri Ambalika Sugars Pvt. Ltd, Ambalika Nagar, Jagdamba Factory, Tal - Karjat, Dist- Nagar.

132.83 Crs Renewal JD(WPC) 480-488

37 Karmayogi Shankarraoji Patil SSK ( Sugar & Co- Gen), Mahatma Phulenagar ( Bilwadi), Tal- Indapur, Dist- Pune

129 Crs Renewal JD(WPC) 489-500

Page 4: 08.01.2013 at 3.00 P.M. Capital Applied For Page …...27 Tech Mahindra Ltd, Plot No-1, Rajiv Gandhi Infotech Park, Phase-III, Hinjewadi, Pune 502.59 Crs Renewal RO(HQ) 381-388 28

38 M/s. ISTA Hotel A unit of IHHR Hospitality Pvt. Ltd) S.No. 206, A/1,206B, Plot No. 88, Sub- Plot No.4, Pune- Nagar Road,Pune-16.

204.28 Renewal AS(T) 501-508

39 M/s. Epcos India Ltd., E-22/25, MIDC Satpur, Dist - Nashik

245.68 Crs

Renewal with

amalgamation

JD(APC) 509-520

40 M/s. Westen Coalfields Ltd., Umred OCM, Tal- Umred, Dist - Nagpur

168.34 Crs Renewal JD(APC) 521-529

41 M/s. Mahindra and Mahindra Ltd., 89, MIDC Satpur, Dist - Nashik

1479.15 Crs Renewal JD(APC) 530-541

42 M/s. Tulsi Casting & Machining Ltd., E-2, MIDC Kupwad, Tal- Miraj, Dist - Sangli

193.24 Crs Renewal JD(APC) 542-555

43 M/s. Tata Steel Ltd., (Wire Division), A-6, MIDC Tarapur Indl., Area, Thane

203.76 Crs Renewal JD(APC) 556-573

44 M/s. Hindustan National Glass and Industries Ltd., F-1, MIDC Malegaon, Sinnar, Nashik 718.64 Crs

Renewal with

amalgamation

JD(APC) 574-582

45 M/s. Maharashtra State Power Generation Co. Ltd., ( Khaparkheda) Thermal Power Station, Nagpur

2416.5 Crs Renewal JD(APC) 583-590

46 M/s. Bosch Ltd., 75, MIDC Estate, Trimbak Road, Satpur, PO No.64, Nashik

1483.16 Crs Renewal JD(APC) 591-602

47 M/s. Hindalco Industries Ltd., Vill- Daheli, Tal- Mouda, Dist - Nagpur 359.47 Crs

Renewal with

amalgamation

JD(APC) 603-609

48 M/s. Atlas Capco (India) Ltd., Svenagar Pune Mumbai Road, Dapodi, Pune

155.95 Crs Renewal JD(APC) 610-616

49 Shirpur Gold Refinery Ltd, A. No.- 247, Agra Mumbai Road, Shirur, Dist- Dhule.

353.52 Crs Renewal JD(APC) 617-629

50 Shri Dyaneshwar Sahakari Sakar Karkhana Ltd. Dyanesharnagar, Bhende Bk. Tal - Newasa Dist - Ahmadnagar

194.08 Cr.

C to R (amalgamati

on Sugar +CoGen)

JD (WPC)

630-639

51 Municipal Corporation of Greater Mumbai, Water Treatment Plant, Bhandup Complex, Kjindipada Road, Bhandup (West) Mumbai

321 Cr. 1st Operate JD (WPC)

640-646

Page 5: 08.01.2013 at 3.00 P.M. Capital Applied For Page …...27 Tech Mahindra Ltd, Plot No-1, Rajiv Gandhi Infotech Park, Phase-III, Hinjewadi, Pune 502.59 Crs Renewal RO(HQ) 381-388 28

52 Bhima SSK Ltd., (Distillery Unit), At Madhukar -Patas, Tal- Daund, Dist-Pune

139.92 Cr. Renewal JD (WPC) 647-654

53 Mira Bhyaender Municipal Corporation STP, Chattrapati Shivaji Maharaj Marg, Bhyendar, Dist- Thane.

Renewal JD (WPC)

655-661

54 Baramati Agro Ltd., (Distillery Unit), Village Shetfal Gade, Tal - Indapur, Dist- Pune

186.25 Cr. Establish (Expansion) JD (WPC)

662-669

List of Review Item to be submitted before 9th Consent Appraisal Committee Meeting ( Part-II) Scheduled on 08.01.2013 at 3.00 P.M.

Review Items

1 Mechanism for ensuring timely applications for consent and Authorization and to avoid delayed applications from the defaulting industries, which are not making applications within stipulated statutory period.

SLO 1-5

2 Review of water balnace for BulkDrugs,Automobile Industries, Sugar, Chemical and Power Plant industries.

PAMS 6-17

3 Comprehensive Agenda Note on installation of CAAQMS

JD(APC) 18-28

4 Review of Fly Ash JD(APC) 29-38 5 M/s. Bilt Graphics Paper

Products Ltd., PO- Ballapur, Dist - Chandrapur

Proposal of Bank

Guarantee JD(APC) 39-60

6 Extension for completion of the project on MSW of Amravati Municipal Corporation

RO(HQ) 61-63

7 Review of Bank Guarantee ALL HOD 64-143

Page 6: 08.01.2013 at 3.00 P.M. Capital Applied For Page …...27 Tech Mahindra Ltd, Plot No-1, Rajiv Gandhi Infotech Park, Phase-III, Hinjewadi, Pune 502.59 Crs Renewal RO(HQ) 381-388 28

Resubmitted Agenda CAC Item No.01 Name of the Industry: M/s. Alicon Castalloy Ltd., Gat No. 1426, Shikrapur, Tal- Shirur, Dist - Pune HOD Remarks

• Applied for renewal of consent • Application received at SRO- Pune on dtd 21/01/2011 and at HQ on

26/06/2012 • Previous consent was valid up to 31/12/2010 • Industrial effluent is 40 CMD for which ETP provided • Domestic Effluent Generation 140 CMD for which provided sewage treatment

plant. • JVS result on 17/08/2011; 01/10/2011 & 12/12/2011 are submitted. Limit of

PH (2.35, 10.16), BOD (164 PPM), COD (164,368 PPM) are higher to prescribed limit.

• RO Pune has recommended for grant of renewal of consent • The case has been discussed in the Consent Appraisal Committee meeting

held on 26/09/2012 and the Consent Appraisal Committee has decided to issue SCN for refusal for non-submission of BG in time.

• SRO Submiited compliance report on 26/12/2012 reported that industry submitted BG of Rs. 1/- Lakhs

• We may grant renewal up to 31/12/2013 with forfeiting of the existing BG of Rs. 1/- Lakhs and obtain fresh BG of RS. 5/- Lakhs towards O& M

• We may place the consent application before CAC for further consideration. Joint Director (APC)

Page 7: 08.01.2013 at 3.00 P.M. Capital Applied For Page …...27 Tech Mahindra Ltd, Plot No-1, Rajiv Gandhi Infotech Park, Phase-III, Hinjewadi, Pune 502.59 Crs Renewal RO(HQ) 381-388 28

CAC Item No.02 Name of industry : - M/s. Chandrapur Ferro Alloy Plant, S. No. 498/2, 499 & 500 503/2, Mul Road, Chandrapur

HOD Remarks

1) Applied for consent to establish for expansion project by installing one submerged Electric Arc Furnace of capacity of 45 MWA for production of high carbon ferro-manganese, silico-mangnese and electricity plant of capacity of 4.0 MW based on co-gas generated from manufacturing process.

2) Existing unit consent for manufacturing of Ferro Manganese Plant, Sinter Plant and Power Plant was valid up to 31.12.2011 and Capital Investment of existing unit is Rs.86.70 Crores. Applied for renewal of consent for existing unit. Show cause notice issued to the existing unit vide letter dated 23.04.2012 due to non-compliance of consent conditions and interim directions issued by the Board and due to discharge of substandard into river Zarpat.

3) Capital Investment of the expansion project is Rs. 221.42 Crores. Industry has paid Consent fee of Rs.4,42,480/-, as per new GR

5) Domestic Effluent is 24 CMD. and Industrial Effluent is 500 CMD, Septic Tank and Soak pit provided.

6) This office has issued interim directions vide letter dated 19/12/2011 to carry out Environmental Works in time bound manner.

The case was discussed in CAC meeting held on 24.09.2012 and it was decided to keep the case in abeyance till the completion of pollution control system for existing unit. Though the MPCB has issued the communication to bank for depositing DD in lieu of bank guarantee of Rs.12/- Lakhs (two reminders issued to bank including SCN) but so far bank authorities has not deposited the DD in lieu of communication from company. Also not deposited additional bank guarantee of Rs.24/- Lakhs as per consent conditions. In view of above we may not grant consent to Establish to the unit till above matter i.e. deposition of DD and submission of Rs.24/- B.G. is completed. Till that time consent to establish for expansion may be kept in abeyance.

Joint Director (APC)

Page 8: 08.01.2013 at 3.00 P.M. Capital Applied For Page …...27 Tech Mahindra Ltd, Plot No-1, Rajiv Gandhi Infotech Park, Phase-III, Hinjewadi, Pune 502.59 Crs Renewal RO(HQ) 381-388 28

CAC Item No.03 Name of industry :- M/s. Sona Alloys Pvt. Ltd., C-1, MIDC Lonand, Tal- Khandala,

Dist - Satara

HOD Remarks :

• Applied renewal of consent • Application received at SRO- Pune on dtd 09/11/2012 and at HQ on

06/12/2012. • Previous consent was valid up to 30/11/2012 • Industrial effluent generation 37 CMD • Domestic effluent generation is 21CMD • Industry has provided STP and ETP for treatment of domestic and industrial

effluent respectively (details enclosed). Earlier effluent generated from power plant unit was used in slag cooling pond and now, the same is taken to ETP and after treatment it is used in slag cooling pound.

• JVS result of dated16/08/2012, 26/09/2012 and 03/10/2012 submitted which is under prescribed limit.

• JVS ambient air monitoring result on dated 17/08/2012,31/07/2012 and 29/04/2012 submitted. Parameters of SPM (572,809 and 335 ug/m3) and RSPM (193,262 ug/m3) not meeting the prescribed standards

• The case was discussed in CAC dated 27/12/2012 It was decided to resubmit the case after examining compliance of earlier consent condition.

• We may release the BG of Rs. 20/- Lakhs (out of 50/- Lakhs)and retain BG of Rs. 20/- Lakhs against the compliance of installation of secondary fume extraction system which is expected to be completed by June 2014 with extension of BG up to Dec 2014. We may forfeit BG of Rs. 50/ % (5 Lakhs out of 10 Lakhs) of BG against non compliance of consent condition (exceeding result ) and take another BG of Rs. 10/- Lakhs against compliance of the Same

• We may place the consent application before CAC for further consideration. Joint Director (APC)

Page 9: 08.01.2013 at 3.00 P.M. Capital Applied For Page …...27 Tech Mahindra Ltd, Plot No-1, Rajiv Gandhi Infotech Park, Phase-III, Hinjewadi, Pune 502.59 Crs Renewal RO(HQ) 381-388 28

Fresh Agenda CAC Item No.01 Name of the industry: - M/s. Shilpa Steel & Power Ltd., B-209, MIDC Butibori,

Nagpur HOD Remarks:-

1. Applied for Consent to Establish for expansion. 2. Consent of existing galvanizing unit is valid up to 31.03.2013. 3. The information regarding compliance of consent conditions of existing unit,

details of cess payment, environment, B.G. status and other relevant information called from R.O. Nagpur vide e-mail dated 27.12.2012. But till date the same is awaited.

In view of above, we may consider Consent to Establish (Expansion) only after receipt of information.

Joint Director (APC)

Page 10: 08.01.2013 at 3.00 P.M. Capital Applied For Page …...27 Tech Mahindra Ltd, Plot No-1, Rajiv Gandhi Infotech Park, Phase-III, Hinjewadi, Pune 502.59 Crs Renewal RO(HQ) 381-388 28

CAC Item No.02 Name of Industry :- M/s. Lloyds Metals & Energy Ltd., A-1 & 2, MIDC Ghugus, Dist- Chandrapur HOD Remarks

1. Applied for consent to establish for installation of induction furnace, rolling mill and pelletization plant.

2. Existing unit consent valid up to 31.1.2013. 3. The information related to compliance of consent condition / EC

condition/Status of Court case/Cess payment/Environment statement is awaited from R.O. Chandrapur. The proposed expansion requires E.C. from MoEF and comes under critically polluted area and moratorium imposed by MoEF till further orders.

In view of above we may keep the consent application in abeyance and call for additional information from R.O. Chandrapur. Joint Director (APC)

Page 11: 08.01.2013 at 3.00 P.M. Capital Applied For Page …...27 Tech Mahindra Ltd, Plot No-1, Rajiv Gandhi Infotech Park, Phase-III, Hinjewadi, Pune 502.59 Crs Renewal RO(HQ) 381-388 28

CAC Item No.03 Name of industry :-M/s. Angre Port Pvt. Ltd. (formerly known as M/s. Jaigad

Ports Infrastructure Pvt. Ltd.,) Vill- Sande Lavgan, Tal- & Dist - Ratnagiri

HOD Remarks :

1. This is for 1st consent to operate. 2. Cargo handling activity without ship breaking. 3. Have changed the name from M/s. Jaigad Ports Infrastructure Pvt. Ltd.

to M/s.. Angre PortPvt. Ltd. 4. CI is Rs. 217.18 crores, earlier it was Rs. 292.0 crores, the decrease in

CI is of Rs. 74.82 crore. Have submitted CA certificate and it is actual deployed cost and earlier it was proposed cost.

5. Obtained EC from MoEF Govt. of India. The EC is in the name of M/s. Jaigad Ports Infrastructure Pvt. Ltd.

6. Indl effluent is NIL. Domestic effluent is 4.8 CMD, the consumption is 75 CMD, the effluent quantity shown is very very less as compared against consumption( considering 80 % as effluent out of total consumption the qty is 60CMD). Provided septic tank & soak pit. Propose to provide STP of 100 CMD.

7. In view of above we may recommend grant of consent to operate subject to BG of Rs. 10.0 lacs for provision of STP before 30/6/2013 and operational BG of Rs. 5.0 lacs

We may place the case before CAC for further discussions.

Joint Director (APC)

Page 12: 08.01.2013 at 3.00 P.M. Capital Applied For Page …...27 Tech Mahindra Ltd, Plot No-1, Rajiv Gandhi Infotech Park, Phase-III, Hinjewadi, Pune 502.59 Crs Renewal RO(HQ) 381-388 28

CAC Item No.04 HOD Remarks Name of industry: M/s. Manikgarh Cemet Unit-II, PO- Gadchandur, Tal- Korpana, Dist – Chandrapur HOD Remarks : 1. Applied for consent to Establish for 60 MW CPP. 2. The MoEF has issued amendment in environment clearance vide letter dated

16.10.2012. We may grant consent to Establish for 60 MW CPP.

Joint Director (APC)

Page 13: 08.01.2013 at 3.00 P.M. Capital Applied For Page …...27 Tech Mahindra Ltd, Plot No-1, Rajiv Gandhi Infotech Park, Phase-III, Hinjewadi, Pune 502.59 Crs Renewal RO(HQ) 381-388 28

CAC Item No.05 Name of industry :- M/s CEAT Limited,Off L.B.S Marg, Bhandup(W), Mumbai - 400078 HOD Remarks :

• Application received at Mumbai on 11/05/2012 • Application received at HQ on 17/09/2012. • Industry is engaged in manufacturing of Automotive Tyres holding consent

valid up to 31/12/2013. • Industry is having Four nos of Boilers –

1) PNG/FO fired boiler of capacity 13 TPH , 2) PNG/FO fired boiler of capacity 20 TPH, 3) PNG/FO fired boiler of capacity 13 TPH 4) Briquette fired boiler of 25 TPH.

• Application submitted for replacement of existing 13 TPH Boiler No.3 by 20TPH capacity Boiler (PNG/FO fired) along with the provision of economizer.

• I.E. 200 m3/d, DE-350 m3/d. Combined ETP comprising primary, secondary & tertiary treatment. The treated water is reused for boiler feed. STP provided.

• Stack of adequate height provided for natural dispersion. APC provided for Briquette fired boiler.

• The new boiler is intended to be operated on Natural Gas. Only in case of non-availability of NG, it would be operated on FO. Existing boilers have reduced capacity and were operating at around 85 % efficiency. Hence were consuming more fuel. The new proposed boiler will be of 98 % efficiency. Hence the fuel consumption will not be affected. Industry is in the process of acquiring the NOC regarding MMR policy from Directorate of Industries as per the directions.

• RO M has recommended for grant consent to establish. We may consider the case for grant of Consent to Establish for replacement of existing 13 TPH Boiler with 20TPH capacity Boiler by imposing the condition of obtaining NOC as per MMR location policy before applying for consent to operate. JD(PAMS)

Page 14: 08.01.2013 at 3.00 P.M. Capital Applied For Page …...27 Tech Mahindra Ltd, Plot No-1, Rajiv Gandhi Infotech Park, Phase-III, Hinjewadi, Pune 502.59 Crs Renewal RO(HQ) 381-388 28

CAC Item No.06 Name of industry :- M/s. Lupin Ltd, T-142, MIDC, Sr. No. 30/10,30/11,30/12,30/13,64/7, Tarapur, Tq-Palghar via Boiser, Dist- Thane HOD Remarks :

- Applied for Consent to establish for expansion. - Application received at SRO ON 26.10.2012 and at HQ it received

on 04.12.2012.

- Existing CI was Rs. 526.65/- Crs & CI for expansion is ,Rs. 55.0/- Crore

- Cess assessment done up to Aug. 2011 and paid up to Aug. 2011. - Envt. Statement submitted for the year 2011-2012.

- Industry has provided APC/WPC systems. - JVS results are within the limits.

- Industry has submitted pollution load assessment certificate of ICT,

Mumbai. and stated that there is no increase in pollution load, accordingly we may consider the case for change in product mix i. e. for consent to establish for expansion with following conditions.

a. BG of Rs. 5.0/- Lacs towards compliance of C to E conditions.

b. There will be not be any additional pollution load in terms of Air, Water and Hazardous Waste.

c. Treated effluent recycling to the extend of 400 m3/day. JD(PAMS)

Page 15: 08.01.2013 at 3.00 P.M. Capital Applied For Page …...27 Tech Mahindra Ltd, Plot No-1, Rajiv Gandhi Infotech Park, Phase-III, Hinjewadi, Pune 502.59 Crs Renewal RO(HQ) 381-388 28

CAC Item No.07 Name of the Industry: Purti Power & Sugar Ltd ( Distillery), Nagpur Chandrapur Road, Tq- Umred, Dist- Nagpur HOD Remark:-

• Applied for Consent to establish . Proposed Molasses based Distillery 45 KLPD.

• Application received a SRO on 21.08.12 & at HQ 19.11.12. • Existing distillery Is having Consent valid till 30.04.2013 Sugar & Co gen

31.12.2012. • Capital Investment is 84.16 Cr Sugar , Cogen 111.26 Cr & proposed

distillery 46.15 Crores. Total Total 241.47 Crs. • No notified river within 3.5 kms from Proposed site of expansion. However @

1.6 KMs Veena River non Notified is in existence & @ 1.4 Kms from Vadgaon dam.

• Existing Distillery is CREP complied. • Attracts Environmental Clerance. • Proposed Primary , Secondary treatment followed by Composting to achieve

zero discharge. • Obtained TOR from MOEF. Application for public hearing is not submitted by

industry. • We may grant Cto E.

JD(WPC)

Page 16: 08.01.2013 at 3.00 P.M. Capital Applied For Page …...27 Tech Mahindra Ltd, Plot No-1, Rajiv Gandhi Infotech Park, Phase-III, Hinjewadi, Pune 502.59 Crs Renewal RO(HQ) 381-388 28

CAC Item No.08 Name of Industry: - National Highways Authority of India, Khed, Ambegaon, Junner Tahasil in Pune District.

HOD Remarks-

1. Applied for consent to Establish for the widening of existing 2 lane carriageway to 4/6 lane divided carriageway for Khed-Sinar section of NH-50 from 42.00 Kms to 97.00 kms

2. Application Received at SRO on 30/11/25012 and at HQ on 15/12/2012 3. Water requirements:

Consumption for Effluent generation a) Domestic -15.0 m3/day 12.0 m3/day b) Industrial cooling, - 270 m3/day Nil spraying, The firm has proposed septic tank for the sewage treatment.

4. The solid waste generation is Nil.

5. The project proponent has not obtained/submitted EC. However public hearing has been conducted for grant of EC. 6. RO has recommended the case for grant of consent to establish. 7. Consent may be granted with the condition of obtaining BG of Rs. 10 lacs for compliance of consent conditions.

RO(HQ)     

Page 17: 08.01.2013 at 3.00 P.M. Capital Applied For Page …...27 Tech Mahindra Ltd, Plot No-1, Rajiv Gandhi Infotech Park, Phase-III, Hinjewadi, Pune 502.59 Crs Renewal RO(HQ) 381-388 28

CAC Item No.09 Name of Industry: - Lodha Dwellers Pvt. Ltd, Usarghar, Nilje, Katai, Ghesarkatai,

Ghesar, Kalyan, Dist- Thane HOD Remarks- 1. Application for consent to establish Expansion. 2. Application received at SRO 10/12/2012 at at HQ on 27/12/2012 3. Total C.I. Rs. 2568.00 Crs. And C.I. for the expansion is Rs.1068.00 Crs. 2. Previous/Existing C to E granted vide No. CC-231 dt.23/06/2010 for; Total Plot Area-10, 62, 607.00 M2 Total BUA- 13, 26,675.00 M2 With C.I. of Rs.1500.62 Crs. 3. Previous/Existing EC obtained vide No. SEAC- 2009/CR.145/TC.2 dt. 17/07/2012,

for; Total Plot Area -10, 62, 607.00 M2 Total BUA - 13, 26,675.00 M2 4. Revised Amended/ EC obtained vide No. SEAC- 2011/CR.102/TC.2 dt.03/11/2012

for; Total Plot Area -14,54,275.00 M2 Total BUA - 19, 87,994.46 M2 4. Now applied for; Total Plot Area-14,54,275.00 M2 Total BUA- 19, 87,994.46 M2 Total C.I. is Rs. 2568.00 Crs. C.I. for the expansion is Rs.1068.00 Crs. 6. Water Requirement -15201 M3/day Sewage generation -12160 M3/day STP proposed- 13900 M3/day 7. Solid Waste generation: 56.38 MT/Day Onsite segregation and Mechanical composting proposed. 8. RO has recommended the Case for C to E in expansion 9. Consent may be issued with overriding effect, and with validity in consensus with the

earlier consent 

Page 18: 08.01.2013 at 3.00 P.M. Capital Applied For Page …...27 Tech Mahindra Ltd, Plot No-1, Rajiv Gandhi Infotech Park, Phase-III, Hinjewadi, Pune 502.59 Crs Renewal RO(HQ) 381-388 28

CAC Item No.10 Name of Industry: - M/s. INA Bearing India Pvt. Ltd., A-3, MIDC Talegaon, Vill- Navlakh Umbre, Tal- Maval, Dist - Pune HOD Remarks-

• Applied 1st consent to operate for expansion with amalgamation • Application received at SRO- Pune on dtd 26/11/2012 and at HQ on

20/12/2012. • The generation of Industrial effluent is 4.0 CMD to treat industrial effluent for

which they have provided ETP of capacity 4.0 CMD. • Domestic Effluent is 66.5 CMD to treat sewage STP has been provided of

capacity 75 CMD • RO Pune has recommended the case for amalgamation of existing valid

consent & consent to operate with expansion for the period upto 31.03.2013. • We may grant 1st consent to operate with expansion with amalgamation up

to 31/03/2013 with imposing BG of 5/- Lakhs towards Operation & Maintenance of pollution control system

• We may place the consent application before CAC for further consideration.

Joint Director (APC)

Page 19: 08.01.2013 at 3.00 P.M. Capital Applied For Page …...27 Tech Mahindra Ltd, Plot No-1, Rajiv Gandhi Infotech Park, Phase-III, Hinjewadi, Pune 502.59 Crs Renewal RO(HQ) 381-388 28

CAC Item No.11

Name of the industry :- M/s. Mahindra Hinoday Industries Ltd., Gat No. 318, A/p- Urse, Tal- Maval, Dist - Pune

HOD Remarks:-

• Applied 1st consent to operate for expansion with amalgamation of consent • Application received at SRO- Pune on dtd 02/08/2012 and at HQ on

20/12/2012 • Existing consent is valid up to 31/05/2015 & obtained consent to establish on

22/02/2012 • Industrial effluent is Nil. • Domestic effluent is 232 CMD from which they have provided STP • APCS are provided to DG Set, shot blasting & paint booth section. bag filter

dust collection system is provided to shot blasting section • Industry has submitted the Bank Guarantee of Rs. 5.0 Lakhs, 2.0 lakhs & 2.0

Lakhs to this office which is valid 22/07/2013 and 12/03/2013 • RO Pune has Recommended for grant of consent to operate with

amalgamation with earlier existing consent for the period upto 31.05.2015 with overriding effect on earlier consent, subject to submission of detail about consent fees.

• We may grant 1st consent to operate for expansion with amalgamation with the existing valid consent with operation BG of Rs. 5/- Lakh

• We may place the consent application before CAC for further consideration. Joint Director (APC)

Page 20: 08.01.2013 at 3.00 P.M. Capital Applied For Page …...27 Tech Mahindra Ltd, Plot No-1, Rajiv Gandhi Infotech Park, Phase-III, Hinjewadi, Pune 502.59 Crs Renewal RO(HQ) 381-388 28

CAC Item No.12 Name of Industry M/s. JSW Ispat Steel Ltd., (formerly known as M/s. Ispat

Industries Ltd., ), A-10/1, MIDC Indl. Area, Kalmeshwar, Nagpur

HOD Remarks 1. Applied for consent to Operate for new color coating line having production

capacity of color coated sheets & coils 1,20,000 MT/Year. 2. Existing unit consent is valid up to 30.07.2013. 3. As results are exceeding the standard, we may issue show cause notice for

refusal of consent and forfeit the existing Bank Guarantee of Rs.5/- Lakhs.

Joint Director

(APC)

Page 21: 08.01.2013 at 3.00 P.M. Capital Applied For Page …...27 Tech Mahindra Ltd, Plot No-1, Rajiv Gandhi Infotech Park, Phase-III, Hinjewadi, Pune 502.59 Crs Renewal RO(HQ) 381-388 28

CAC Item No.13 Name of Industry:- Vinati Organics Ltd, Plot No. A-20, MIDC Lote, Tal- Khed, Dist- Ratnagiri. HOD Remarks

1. Application for 1st consent to operate for expansion along with amalgamation of existing consent.

2. Product- Chemicals. Existing consent is valid up to 31/05/2016. 3. Application received at SRO on 02/11/2012 and at HQ on 01/12/2012. 4. As per existing Consent to Operate CI is Rs. 88.50 Crore. As per Consent to

Establish granted on 28/08/2012 CI for expansion is Rs. 94 Crore. Total CI is Rs. 182.50 Crore.

5. Existing ETP consisting of Primary, secondary & tertiary treatment i.e. Reverse Osmosis, Evaporation & spray dryer. RO permeate utilize for cooling tower & RO reject is recycled for making mixed polymer to achieve the zero discharge. From expansion 30 m3/d effluent generated (20 m3/d from process, 10 m3 from domestic) & same is treated in existing ETP. Analysis results are with in consented limits.

6. This office vide letter dtd. 20/12/2012 requested RO/SRO to submit the present status report about commissioning of the plant and machinery. REMINDER E-mail sent to RO/SRO on 20/112/2012, 02/01/2013 & 05/01/2013. Status report not yet submitted by RO/SRO.

Considering this, case may be decided accordingly

Page 22: 08.01.2013 at 3.00 P.M. Capital Applied For Page …...27 Tech Mahindra Ltd, Plot No-1, Rajiv Gandhi Infotech Park, Phase-III, Hinjewadi, Pune 502.59 Crs Renewal RO(HQ) 381-388 28

CAC Item No.14 Name of Industry Lodha Dwellers Pvt. Ltd, Usarghar, Nilje, Katai, Ghesarkatai, Ghesar, Kalyan, Dist- Thane HOD Remarks 1. Application for grant of 1st consent to operate in part.. 2. Application received at SRO 12/12/2012 at HQ on 27/12/2012 3. Total C.I. of the project is Rs. 1500.62 Crs. And C.I. for the consent to 1st

operate in part is is Rs.14000 Crs. 4. C to E granted vide No. CC-231 dt.23/06/2010 for; otal Plot Area - 10, 62, 607.00 M2 Total BUA - 13, 26,675.00 M2 5. Now applied for C to O in Part for Total Plot Area-10, 62, 607.00 M2 Total BUA- 12222.169 M2 6. Water Requirement - 9826.00 M3/day Sewage generation - 7857.0 M3/day STP provided - 9400 M3/day 7. Solid Waste generation is 36.83 MT/Day Onsite segregation and Mechanical composting provided. 8. EC obtained vide No. SEAC-2009/CR.145/TC.2 dt. 17/07/2010, for; Total Plot Area - 10, 62, 607.00 M2 Total BUA - 13, 26,675.00 M2 7. RO has recommended the Case for C to O 8. Consent may be granted with condition of obtaining BG of R s. 10 lac for operation

and maintenance of STP and MSW processing plant RO(HQ)           

Page 23: 08.01.2013 at 3.00 P.M. Capital Applied For Page …...27 Tech Mahindra Ltd, Plot No-1, Rajiv Gandhi Infotech Park, Phase-III, Hinjewadi, Pune 502.59 Crs Renewal RO(HQ) 381-388 28

CAC Item No.15 Name of Industry Infosys Ltd, Plot No.1, Rajiv Gandhi Info Tech Park, Phase-I, Hinjewadi, Pune HOD Remarks 1. Application for combined consent to 1st Operate. 2. Application received at SRO 07/09/2012 at HQ on18/12/2012 I. Application for Consent to 1st Operate for IT & ITES Project for Plot 1 in Part for ; Total Plot Area - 1,00,000.00 Sq. Mtrs , Total Construction Area - 36,145.823 Sq. Mtrs , II. Gross C.I. of the project is 1031.95 Cr. Now applied for Consent tos 1st operate for Plot 1 in part for C.I. 95.82 Crores. III. RO/SRO reports that; a) Board has granted Consent to Applicant on 25/01/2001 which is valid upto

31/1/2003. However copy is not submitted. b) Applicant has also applied on 19/09/2009 AND 12/5/2010, jointly for phase-I

& II, but applicant has not received the consent. However applied details are not furnished

c) The project proponent has showed C.I. in the year 2009 of Rs. 875.08 crores the consent fees of Rs. 8,75,080/- is submitted, further the project proponent has paid fees in the year 2010 for same capital investment along with fees with excess consent fees of Rs.19,38,969/- & Rs.1,61,228/-

d) Now they have applied for renewal of consent with expansion by showing C.I. of Rs. 1031.95 Cr hence issued a letter to industry for clarification of increased in CI form 875.08 Cr to 1031.95 crores and payment of additional fees of Rs. 10,90,271/-. In this regard the industry has replied vide letter dtd 29.11.2012, that the capital investment of Rs. 1031.95 Cr is for two phases i.e. Plot No. 01 (Phase-I)& Plot No. 24(Phase-II).

e) The C.I. of the said project for plot No. 1 is Rs. 95.82 crores (Now Applied)for which they have paid consent fees as per revised fee structure of Rs. 1,25,000/- & 100/-.

f) Separate consent is granted for No. 24 for Phase-II which is valid upto 31/8/2014 for

Total plot area of 4,61,264.00 Sq mtrs Total Construction BUA 4,04,897.00.Sq mtrs V. Water Consumption- 225.00 M3. Sewage Generation- 192.00 M3. STP provided - 230.00 M3. (Analysis results not furnished) VI. Solid waste management details , Metal Waste: 18.45 Tons/Annum (By Sale to Authorized Party) Plastic Waste: 0.88 Tons /Annum (By sale to Authorized Party) Paper Waste: 22.86 Tons Annum (By sale to Authorized Party) Food Waste: 7.08 Tons /Annum Vermicomposting.Compost Used as Manure) VII. D.G.Sets – (1250 KVA x 2 Nos &2000 KVA x2), Fuel – Diesel – 505 rs/Hr. VIII. The firm has not submitted Environmental Statement ,CESS details, Environmental Clearance and copies of the previous issued consents, IX. RO Pune recommended Consent to 1st operate for Plot no 1(Phase-I)for Period upto 31.01.2014. X Consent may be granted with the condition of obtaining BG of Rs. 10 lacs for operation and maintenance of STP and MSW processing plant and after receipt of compliance from RO Pune

Page 24: 08.01.2013 at 3.00 P.M. Capital Applied For Page …...27 Tech Mahindra Ltd, Plot No-1, Rajiv Gandhi Infotech Park, Phase-III, Hinjewadi, Pune 502.59 Crs Renewal RO(HQ) 381-388 28

CAC Item No.16

Name of Industry: Serene Properties Pvt. Ltd, Plot No.-3, TTC Industrial Area, MIDC Airoli, Navi Mumbai HOD Remarks 1. Two application for consent to Operate for building No. 2 and 5 & 6 for IT project.. 2. Application Received at SRO on 08/10/2012,at HQ on 03/11/2012 3. The project proponent has obtained C to E vide No.BO/RO/CC-254 dt. 21/04/2008

for entire project i.e.for total plot area 1,96,440.0 M2, and total BUA of 3,49,192.41 M2 with the capital investment of Rs.534.92 Crores.

4. Earlier C to O issued under auto renewal format on same plot for building no. 3,4,7, and 14 vide No. 595 dt. 11/09/2012 valid upto 31/07/2014 for,. Total plot area of 1,96,440.0 M2 Built up area of 109824.15 M2 C.I.- 308.59 Crores

3. Now applied separately (two applications) for building No. 2 and 5 & 6 for 1st C to O for; Total plot area of 1,96,440.0 M2 Built up area of 93129.99 M2 C.I.- 303.2335 lacs.

The total BUA as per Sr. No. 2 and 3 will be 202954.14 M2 4. The Project proponent has obtained EC vide No. 21-268/2007-IA.III dt.23/08/2007 for;

Total plot area 1,96,440.0 M2, Total BUA of 3,49,192.41 M2.

5. Personal hearing was extended to the firm on 17/10/2012, wherein it was opined that ; i) Unit shall commission MSW disposal facility within 10 days. ii) Unit shall submit undertaking with Board resolution stating that they have submitted

false information to MPCB for auto renewal of application, hiding the facts that they have not fully complied the conditions of 1st C to O.

iii) Due to Non compliance of the consent conditions imposed in 1st C to O, in particular composting of MSW and other general conditions, the B.G. of Rs. 10 lacs which is ontained at the time of 1st C to O shall be forfeited. Unit shall submit Demand Draft of Rs. 10 lacs in favor of Regional Officer, Navi Mumbai within 7 days.

iv) The unit shall submit fresh B.G. of Rs. 10 lacs within 10 days,, which is stipulated in Auro Renewal of the consent for operation and maintenance of STP and MSW processing plant.

v) The next Personal Hearing will be conducted in the 1st week of November, 2012 for taking further decision in the matter.

6. As per report of RO/SRO, the firm has submitted Demand Draft of Rs.10 Lacs on 02/11/2012 and also submitted the fresh BG of Rs. 10 lacs. on 02/11/2012. However the firm has not submitted the undertaking on false information submitted during auto renewal.

7. RO (NM) has recommended the cases for 1st consent to Operate. 8. Combined Consent may be granted with the condition of obtaining undertaking for false submission of information, within 15 days with B.G. of Rs. 25 lacs.

Page 25: 08.01.2013 at 3.00 P.M. Capital Applied For Page …...27 Tech Mahindra Ltd, Plot No-1, Rajiv Gandhi Infotech Park, Phase-III, Hinjewadi, Pune 502.59 Crs Renewal RO(HQ) 381-388 28

CAC Item No.17 Name of Industry: - Maharashtra Airport Development Company, Special Economic Zone, At- MIHAN Area, Nagpur. HOD Remarks- 1. Applied for consent to 1st Operate. 2. Application Received at SRO on 20/10/2012 and at HQ on 13/12/2012 3. Previous C to E granted vide No. 389dt.19/09/2009 for, Plot are - 2066 Hectares. With C.I. of Rs.125256 lacs. 4. Now applied for consent to 1st operate with C.I. Rs.45251 lacs, with no explanation

for reduction 5. The statement of total construction area is not submitted. 6. Water consumption -45000.00 M3 /day Sewage generation -32800.00 M3 /day STP’s provided - 39000.00 M3 /day 7. The Solid Waste generation - Details not furnished 8. SRO reports that,

a) The firm has provided common STP of capacity 39 MLD with tertiary treatment plant of 77 MLD. The treated sewage will be recycled.

b) The firm has not provided ETP c) The firm has reduced the C.I. from 1252.56 to 452.51 Crores. 9. The project proponent has obtained EC of MoEF vide No. 21-197/2007-IA.III

dt. 16/04/2008 for; Total Plot Area - 2066 ha Processing Zone - 1472 .0 ha Non-Processing Zone - 614 ha 10. The case is submitted before CAC for further approvals.

 

Page 26: 08.01.2013 at 3.00 P.M. Capital Applied For Page …...27 Tech Mahindra Ltd, Plot No-1, Rajiv Gandhi Infotech Park, Phase-III, Hinjewadi, Pune 502.59 Crs Renewal RO(HQ) 381-388 28

CAC Item No.18 Name of Industry:- Shree Chhtrapati Shahu SSK, Kagal, Kolhapur HOD Remark-

• Industry has applied for consent to Operate for Expansion for capacity from 3500 TCD to 4950 TCD (1450 TCD expansion) It is RED/LSI Unit.

• Capital Investment is 52.75 Cr. • Total Capital Investment of Industry - Rs. 204.06 Cr.

(Sugar Rs. 66.76 Cr. + Co-gen Rs. 53.63 Cr. + Distillery Rs. 16.70 Cr.) • Previous consent C to O granted by the Board vide letter no. BO/JD (WPC)

EIC No.KP-7745-11/E/CC-CAC-247 dt. 04.02.2012 valid up to 31.12.2012 • Previous consent C to E granted by the Board vide letter no. BO/JD (WPC)

EIC No.KP-7744-11/E/CC-CAC-246 dt. 04.02.2012 valid up to commissioning of unit/5 yrs.

• Proposed Water Consumption is 380 CMD. IE generation is 130 CMD industry upgraded its existing ETP comprising with Primary, Secondary and Tertiary Treatment facility.

• Domestic effluent generation will be 16 CMD & will be treated in septic tank and soak pit.

• As per SRO’s Report CREP Compliances are as follows, − Industry has provided 15 days storage tank − Provided ESP as an APC system to boiler. − Waste water generation is less than 100 lit /ton cane crushed.

• Treated effluent will be disposed on 98.8 acre land for irrigation which is sufficient.

• JVS analysis result of existing unit dt. 03.01.2012, 30.03.2012 is within consented limit.

• Industry has submitted environmental statement for year 2011-12 • Cess paid up to May 2012; assessment done up to Nov 2012. • Industry has provided ESP as APC attached to Baggase/Coal Fired Boiler

having stack height of 70 m. • Industry has paid consent fee Rs. 1,00,000/- for consent to operate for

expansion. • SRO Kolhapur has recommended for consent to operate. • Applied for renewal with expansion from 3500 TCD + 1450 TDC = 4950 TCD • JVS dt. 30.03.2012 is within limit. • ESP Provided. • BG submitted 5+2 • Recommended to grant C to O with expansion.

JD(WPC)

Page 27: 08.01.2013 at 3.00 P.M. Capital Applied For Page …...27 Tech Mahindra Ltd, Plot No-1, Rajiv Gandhi Infotech Park, Phase-III, Hinjewadi, Pune 502.59 Crs Renewal RO(HQ) 381-388 28

CAC Item No.19 Name of Industry: M/s. Bharat Forge Ltd., E-1/1, MIDC Baramati, Tal- Baramati, Dist - Pune HOD Remarks

• Applied renewal of consent with 1st consent to operate for expansion with amalgamation

• Application received at SRO- Pune on dtd 12/11/2012 and at HQ on 20/12/2012.

• Industrial effluent is 27.2 CMD for which they have provided ETP of capacity 35 CMD.

• Domestic effluent is 55 CMD from which they have provided STP of capacity 100 CMD.

• APCS are provided to DG Set, Heat treatment, Ring rolling section. Fume extraction followed by dust collection system are provided to furnaces.

• As per the condition in the consent the industry has submitted the Bank Guarantee of Rs. 5.0 Lakhs & 10.0 Lakhs which is valid for one year.

• RO Pune has recommended for grant of consent to operate with expansion and amalgamation with earlier existing consent for the period upto 31.12.2013.

• We may grant of consent to operate with expansion up to 31/12/2013 with extension of BG of Rs. 10/- Lakhs & submitting of company Board resolution

• We may place the consent application before CAC for further consideration. Joint Director (APC)

Page 28: 08.01.2013 at 3.00 P.M. Capital Applied For Page …...27 Tech Mahindra Ltd, Plot No-1, Rajiv Gandhi Infotech Park, Phase-III, Hinjewadi, Pune 502.59 Crs Renewal RO(HQ) 381-388 28

CAC Item No.20 HOD Remarks Name of industry :- M/s. Bharat Bijlee Ltd., Plot No. 2, MIDC Airoli, TTC Thane Belapur Raod, Navi Mumbai HOD Remarks :

• Applied for renewal of consent with expansion • Application received at SRO- NM on dtd 27/10/2012 and at HQ on 20/12/2012 • Previously consent was valid up to 31/12/2012 • Previous capital investment was Rs. 100.65 Crs. Now it 136.58 Crs(Total

increased Rs.35.93 Crs) . • Generation of industrial effluent is 0.5 for which ETP (Primary) provided &

after treatment sent to CETP. • Industry is generating 180 CMD of domestic effluent for which Sewage

treatment plant provided. • JVS analysis result dated 19/07/2012; 07/08/2012 and 11/09/2012 are under

prescribed limit. • Regional Officer, Navi Mumbai, has recommended for grant of renewal of

consent. • We may grant renewal of consent with expansion for period up to 31/12/2015

with imposing operational B.G. of Rs. 10 Lakhs & Board resolution regarding carrying out expansion without prior permission from the Board

• We may place the consent application before CC for further consideration.

Joint Director (APC)

Page 29: 08.01.2013 at 3.00 P.M. Capital Applied For Page …...27 Tech Mahindra Ltd, Plot No-1, Rajiv Gandhi Infotech Park, Phase-III, Hinjewadi, Pune 502.59 Crs Renewal RO(HQ) 381-388 28

CAC Item No.21 HOD Remarks Name of industry :- M/s. Kalyani Hayes Lemmerz Ltd., (Truck Wheel Plant), Gat No. 635, Kuruli Village, Tal- Khed, Dist - Pune HOD Remarks :

• Applied renewal of consent • Application received at SRO- Pune on dtd 05/10/2012 and at HQ on

20/12/2012. • Previous consent was valid up to 30/11/2012 • Total effluent generation is industrial 600 CMD + domestic 40 CMD. Industry

has provided combine effluent treatment plant, after septic tank domestic effluent is treated into secondary treatment of ETP. ETP consist of primary, secondary and tertiary treatment for the treatment of industrial effluent i.e. waste coolant and effluent from paint shop.

• Analysis report of JVS on 25/04/2012, 10/05/2012 and 16/07/2012 are submitted. parameters of BOD, COD, TDS are is exceeding the consented limit

• Industry has provided stack of adequate height to pretreatment, paint shop, oven.

• Dust collector provided to shot blasting. Acoustic enclosure with stack provided to DG Set.

• Industry has not provided scrubber to phosphating section. • RO Pune has recommended for grant of consent subject to installation of

scrubber to phosphating section. • We may issue SCN for refusal of consent • We may place the consent application before CAC for further consideration.

Joint Director (APC)

Page 30: 08.01.2013 at 3.00 P.M. Capital Applied For Page …...27 Tech Mahindra Ltd, Plot No-1, Rajiv Gandhi Infotech Park, Phase-III, Hinjewadi, Pune 502.59 Crs Renewal RO(HQ) 381-388 28

CAC Item No.22 Name of industry :- M/s. LG Electronics India Pvt. Ltd., A-5, MIDC Ranjangaon, Tal- Shirur, Dist - Pune HOD Remarks :

• Applied renewal of consent • Application received at SRO- Pune on dtd 27/09/2012 and at HQ on

29/10/2012 • Previous consent was valid up to 31/10/2012 • Domestic effluent generation is 225 CMD for which sewage treatment plant • JVS result of STP dated 20/08/2012 submitted of Moef lab which is under

prescribed limit. • APCS provided to DG sets and hot water generator • RO Pune has recommended the case for grant of consent subject to

compliance of letter issued by the SRO. • We may grant of renewal of consent up to 31/10/2013 with condition that the

unit shall submit the operational BG of Rs. 10/- Lakhs towards O & M & also company Board

• We may place the consent application before CAC for further consideration. Joint Director (APC)

Page 31: 08.01.2013 at 3.00 P.M. Capital Applied For Page …...27 Tech Mahindra Ltd, Plot No-1, Rajiv Gandhi Infotech Park, Phase-III, Hinjewadi, Pune 502.59 Crs Renewal RO(HQ) 381-388 28

CAC Item No.23 Name of Industry :- M/s. John Deere India Pvt. Ltd., Gat No. 166 to 167, 271 to 291, off Pune Nagar Road, Sanaswadi, Tal- Shirur, Dist – Pune HOD Remarks

• Applied renewal of consent • Application received at SRO- Pune on dtd 31/10/2012 and at HQ on

20/12/2012. • Domestic effluent generation is 228 m3/day for which they have provided STP • The treated effluent is used on land for gardening • The JVS results of ETP and STP are within the limit • APC’s are provided, Dust collection system is provided to paint booth • RO Pune has recommended for grant of renewal of consent to operate for

period upto 31.12.2013, subject to submission of additional consent fees for expansion.

• We may grant of renewal of consent up to 31/12/2013 with imposing operational of BG of Rs. 5/- Lakhs

• We may place the consent application before CAC for further consideration.

Joint Director (APC)

Page 32: 08.01.2013 at 3.00 P.M. Capital Applied For Page …...27 Tech Mahindra Ltd, Plot No-1, Rajiv Gandhi Infotech Park, Phase-III, Hinjewadi, Pune 502.59 Crs Renewal RO(HQ) 381-388 28

CAC Item No.24 Name of Industry :- M/s. Wheels India Ltd., C-1, MIDC Ranjangaon, Tal- Shirur, Dist – Pune HOD Remarks :-

• Applied renewal of consent to operate • Application received at SRO- Pune on dtd 1810/2012 and at HQ on

20/12/2012. • Effluent generation is 160 CMD for which ETP provided consisting of primary

followed by tertiary treatment with capacity is 180 CMD. • Domestic effluent generation is 60 CMD for which STP of capacity 90 CMD

provided. Treated effluent is used on land for gardening within premises. • Analysis results are exceeding the consented limit in case of parameters

BOD, COD, SS, Chloride on dated 06/06/2012 and 09/08/2012 • Stack of adequate height provided to hot water generator, oven DG Sets and

welding section. • RO Pune has recommended the case for grant of Renewal of consent for

period up 31/10/2015. • We may renewal of renewal of consent to operate for period up to

31/10/2015 with operation BG of Rs. 10/- Lakhs • We may place the consent application before CAC for further consideration.

Joint Director (APC)

Page 33: 08.01.2013 at 3.00 P.M. Capital Applied For Page …...27 Tech Mahindra Ltd, Plot No-1, Rajiv Gandhi Infotech Park, Phase-III, Hinjewadi, Pune 502.59 Crs Renewal RO(HQ) 381-388 28

CAC Item No.25 Name of Industry :- M/s. Maharashtra Seamless Ltd., Vill- Sukeli, Tal- Roha, Dist - Raigad HOD Remarks 1. Applied for renewal of consent to operate on 26.07.2012. 2. Application received at H.Q. on 20.12.2012. 3. Industry has provided ETP and STP for treatment of industrial and domestic

effluent. Analysis results are within limit. 4. Industry has provided scrubber system. 5. Industry has paid Water Cess up to February, 2012. 6. Industry has submitted Environment statement for the year 2011-2012. 7. Consent fees paid Rs.18,54,200/- 8. SRO/RO Raigad recommended for grant of consent up to 30.09.2017

imposing the additional parameter for effluent and sewage discharge as mentioned in restart order dated 23.12.2011.

9. No proper justification is given by the unit due to six times increase in Hazardous Waste quantity.

10. Varnish sludge is newly added in the H.W. but details of source not given. 11. Point wise compliance of restart order is not given by RO / SRO in a

processing report. 12. SRO Raigad-II has reported that industry fails to reduce quantity of domestic

water consumption from 80 to 40 m3 /day. 13. Chloride parameter exceeding. 14. Recommended to issue show cause notice for refusal of the consent. Joint Director (APC)

Page 34: 08.01.2013 at 3.00 P.M. Capital Applied For Page …...27 Tech Mahindra Ltd, Plot No-1, Rajiv Gandhi Infotech Park, Phase-III, Hinjewadi, Pune 502.59 Crs Renewal RO(HQ) 381-388 28

CAC Item No.26 Name of Industry :- Syntel International (P) Ltd, B-1 & B-2, Software Technology Park, Talwade MIDC, Tal- Haveli, Dist- Pune HOD Remarks :- Application for combined consent for renewal and 1st Operate. 2. Application received at SRO 05/10/2012 at at HQ on18/12/2012 3. Previously combine C to E and C to O issued vide No. 200 dt. 24/06/2009 as; C to O for Phase-I Plot area - 160000.00 M2 Total BUA - 105442.52 M2 C to E for Phase-II Plot area - 84104.0 M2 Total BUA - 162610.73 M2 4. Now applied for Plot area - 160000.00 M2 Total BUA - 57020.00 M2 5. Water consumption - 2022.0 M3 /day Sewage generation - 1447.00 M3 /day STP’s Provided - Capacity not furnished 6. The Solid Waste generation - Biodegradable waste – 1593.0 kg/day On site Composting not provided. Open dumping on MSW site Dry Garbage- 2043.0 kg/day Open dumping on MSW site STP sludge – 150.0 kg/day Used as Manure 6. The project proponent has obtained EC vide No. SEAC 2010/CR.858/TC.2 dt.12/06/2012 for; Plot area - 2,22,574.93 M2 Total BUA - 252501.49 M2 7. RO-Pune has reported that i) STP is not in operation and untreated sewage is discharge in to nalla leading to river Indrayani. ii) MSW processing plant not provided. iii) Environment Statement and CESS returns not furnished iv) The construction activity, as .on Indrayani river, attracts RRZ policy. 8. The case is recommended for SCN-refusal.   

RO(HQ)

 

Page 35: 08.01.2013 at 3.00 P.M. Capital Applied For Page …...27 Tech Mahindra Ltd, Plot No-1, Rajiv Gandhi Infotech Park, Phase-III, Hinjewadi, Pune 502.59 Crs Renewal RO(HQ) 381-388 28

CAC Item No.27 Name of Industry :- Tech Mahindra Ltd, Plot No-1, Rajiv Gandhi Infotech Park, Phase-III, Hinjewadi, Pune HOD Remarks :-

1. Application for consent to operate-Renewal. 2. Application received at SRO 22/08/2012 at HQ on 03/12/2012 3. Previous consent issued under CC category vide No. BO/RO (HQ)/Pune/CO/CC-82

dt. 01/06/2011 for IT park project as; Plot Area -98,400 M2 Total Const. BUA. – 80,500.34 M2 With C.I. of Rs.389.02 Crores 4. Applied for renewal of consent for; Plot Area -98,400 M2 Total Const. BUA. – 82,000.0 M2 With C.I. of Rs.502.59 Crores i.e. increase in C.I. of Rs. 113.57 Crores. 4. For this increase in C.I. of Rs. 113.57 Crores, the firms vide its letter dt. 28/12/2012 have stated that, the said increase in C.I. is due to;

a) Building fitment, corporate block interior, office furniture, servers, computers & office expenditure increased.

b) Cost of M&E, as well as IT infrastructure enhancement 5. Water Balance Previous consent Now applied for

(Domestic)- 540.0 M3/day 688.0 M3/day Sewage gen- 460.0 M3/day 460.0 M3/day STP provided- -- 551.0 M3/day

6. Solid waste generation; Biodegradable- 2490 kgs/day On site composting not provided . Presently dumped at MSW dump site Non Biodegradable- 2800.0 Kgs/day- MSW dump site 7. RO has reported that, SCN has been issued on 08/10/2012 for initiating the

construction over and above EC i.e above 80500M2. Also it is reported that, the firm vide in its reply dt. 23/10/2012 has stated that, further construction is stopped and requested for renewal of the consent for the areas as per previous consent i.e. for the Total construction BUA area of 80,500M2.

8. RO Pune has recommended the case for renewal with the condition of imposing condition of ot to take any effective steps towards construction activity till Environmental Clearance and C to E for expansion are obtained.

9. Consent may be renewed with the condition of, forfeiting the earlier BG of Rs. 10 lacs and taking fresh BG of Rs. 15 lacs for providing MSW processing pant within 3 months period and operation and maintenance of STP and MSW processing plant.

Page 36: 08.01.2013 at 3.00 P.M. Capital Applied For Page …...27 Tech Mahindra Ltd, Plot No-1, Rajiv Gandhi Infotech Park, Phase-III, Hinjewadi, Pune 502.59 Crs Renewal RO(HQ) 381-388 28

CAC Item No.28 Name of Industry :- Serum Institute of India Ltd, 212/2, Pune Solapur Road, Hadpsar, Tal- Haveli, Dist - Pune HOD Remarks

• Application recd at RO Pune on 09.11.2012 • Application recd at HQ, Sion on 24.12.2012 • Industry engaged in Pharmaceuticals activity. • Industry has applied for consent to Renewal with increased CI , Water Budget and

additional briquette fired boiler without change in production quantity. • Cap Inv- Existing CI Rs 706.63 Cr, Applied CI Rs 1081.53 Cr • As per industry justification, CI is increased due to replacement of old equipment &

machineries. Water consumption and effluent quantity is increased due to quality compliance for current goods mfg practices.

• Existing IE 464 CMD , Proposed IE 864 CMD. DE 96 CMD. • ETP comprising primary , secondary and tertiary system. Disposal : On land for

gardening. • JVS reports are within limit except BOD & COD on 23.07.12 report. • Land available 25 Hectors, which is seems to be adequate for total effluent quantity

for land disposal. • Adequate APC system provided. Industry has started installation of one additional

briquette fired boiler with cyclone and bag filter system, installation work is at the stage of completion.

• Industry has obtained BMW authorization. • RO Pune has recommended for renewal of consent with increased CI and water

budget by imposing appropriate BG towards O & M of ETP.

We may consider for renewal of consent with increased CI, water budget and addition of briquette-fired boiler without change in production quantity by imposing BG of Rs 5 lakhs towards O & M of ETP and installation of briquette fired boiler without prior permission from the Board.

JD(PAMS)

Page 37: 08.01.2013 at 3.00 P.M. Capital Applied For Page …...27 Tech Mahindra Ltd, Plot No-1, Rajiv Gandhi Infotech Park, Phase-III, Hinjewadi, Pune 502.59 Crs Renewal RO(HQ) 381-388 28

CAC Item No.29 Name of Industry :- Oil & Natural Gas Corporation Ltd Uran, Tal- Uran, Dist- Raigad HOD Remarks

• Industry request letter for Amendment in consent for change in effluent parameters. • Report called from RO Navi Mumbai. • RO NM has recommended for amendment in consent for the effluent discharge

standards as per GSR.176(E). • Industry is engaged in mfg of Petrochemical products. • Industry has submitted MoEF, I.A. Division Corrigendum letter vide no.F. No. J-

11011/635/2008-IA II (I), dated 20th Sept.2010 regarding oil drilling & gas extraction industry as per GSR 176 (E).

Cosidering industry’s request & RONM’s remark about the activity of the unit we may grant amendment in consent for effluent discharge standards as per GSR.176(E).

 

Page 38: 08.01.2013 at 3.00 P.M. Capital Applied For Page …...27 Tech Mahindra Ltd, Plot No-1, Rajiv Gandhi Infotech Park, Phase-III, Hinjewadi, Pune 502.59 Crs Renewal RO(HQ) 381-388 28

CAC Item No.30 Name of Industry :- Hindustan Unilever Ltd. Plot No. C-9, MIDC Khamgaon, Dist. Buldana HOD Remarks

• Application received at Amravati on 27/11/2012 • Application received at HQ on 17/12/2012. • Industry is engaged in manufacturing of Toilet Soaps and Pears holding

consent valid up to 31/12/2012. • Application submitted for renewal with merger of Pears and Toilet soaps with

combined quantity remaining unchanged • I.E. 120 m3/d, DE-70 m3/d. Combined ETP comprising primary, secondary &

tertiary treatment. The treated water is reused for cooling tower to max. extent & rest is disposed on land for gardening purpose. BOD and COD limits are exceeding the limit in Mar and June 12. STP provided.

• Adequate APC provided. SPM from coal fired boiler is exceeding the limit in Mar 12.

• The RO/SRO has requested to comment about the request of the industry for considering ETP Sludge as Non Hazardous waste so as to use for vermi- composting purpose including the analysis results of ETP sludge.

• SRO Akola has recommended for Renewal up to 31/12/2014.

We may consider the case for the grant of renewal by merging two products and imposing B.G of Rs 5.00 lakhs towards O & M of pollution control system. Since the industry is having biological treatment facility, we may consider the biological sludge generated from secondary treatment facility as non- hazardous whereas the sludge from primary treatment facility can be considered as Non-Hazardous based on he analysis results of sludge to be received from RO/SRO JD(PAMS)

Page 39: 08.01.2013 at 3.00 P.M. Capital Applied For Page …...27 Tech Mahindra Ltd, Plot No-1, Rajiv Gandhi Infotech Park, Phase-III, Hinjewadi, Pune 502.59 Crs Renewal RO(HQ) 381-388 28

CAC Item No.31 Name of Industry :- Manjara SSK Ltd ( Distillery) Vilas Nagar, Tq & Dist- Latur HOD Remarks

• Industry has applied for Renewal of Consent with expansion First Operate.. • Application received at SRO Latur on 06.12.12 & at HQ on 27.12.12 • Capital Investment is 4.40 crores & Expansion 25.32 Crores . Total 29.72 Crores. • Consent of Existing distillery was valid till 31.12.12 & Consent of First Operate of

Expansion of Distillery was refused by Board on 12.03.2012 for non provision of ESP to the Boiler for expansion.

• Obtained Environmental Clearance for expansion of distillery . • Capital investment 63.97 Crores, Distillery 29.72 crores & Co-gen 75.12 Crores.

Total C.I.of industry 168.81 crores. • Now industry has installed ESP about 80% work of installation of ESP is completed &

expected to commission by Month end as reported by SRO. • Industrial effluent generated 696 CMD. • Provided Biodigester followed by 5 stage multiple effect evaporation system. • After evaporation the effluent quantity will be 188 CMD. • The Spent wash will be further sent to Bio Composting. • Ind has provided impervious Compost yard of 7.0 Acres. • Industry has complied CREP guideline. • Cess returns submitted upto Dec 2012 & paid upto March 2009. • Submitted Environmental statement for year 2010-11. • Ind has submitted B.G. of Rs 2.0 lakhs as per previous consent issued which is valid

till 31.12.12. • SRO, & RO has recommended case for renewal . • Consent to Operate for expansion was refused by Board on 12.03.12 for non

provision of ESP. • ESP work 80% completed we may not consider expansion till ESP put into

Operation. • We may grant Plain renewal of Consent.

JD(WPC)

Page 40: 08.01.2013 at 3.00 P.M. Capital Applied For Page …...27 Tech Mahindra Ltd, Plot No-1, Rajiv Gandhi Infotech Park, Phase-III, Hinjewadi, Pune 502.59 Crs Renewal RO(HQ) 381-388 28

CAC Item No.32 Name of Industry :- Mula ssk Ltd, ( Sugar & Co- Generaion), Post- Sonai Newasa, Dist- Ahemadnagar. HOD Remarks

• Applied for Consent for renewal of consent for sugar & Co-generation unit. • During visit of SRO, Ahmednagar it was observed that industry was

discharging untreated effluent in Panas Nalla. • Present status of not available. • We may grant renewal with addition B.G. of 5 + 2 + 3 ( O & M of ETP, APC +

Ingress + Wet scrubber APC).

JD(WPC)

Page 41: 08.01.2013 at 3.00 P.M. Capital Applied For Page …...27 Tech Mahindra Ltd, Plot No-1, Rajiv Gandhi Infotech Park, Phase-III, Hinjewadi, Pune 502.59 Crs Renewal RO(HQ) 381-388 28

CAC Item No.33 Name of Industry :- Bhaurao Chavan SSK Ltd ( Distillery), Laxmi Nagar,Tq- Ardhapur, Dist- Nanded HOD Remarks

• Industry has applied for Renewal of Consent. • Application received at SRO nanded on 30.11.12 & at HQ on 21.12.12 • Capital investment 67.03 Crores, Distillery 15.08 crores & Proposed Co-

gen 53.56 Crores. Total C.I.of industry 135.67 crores. • Molasses based distillery. • Industrial effluent generated 240 CMD. • Primary treatment system – Reboiler with 30 days storage tank HDPE Lined,

after which composting process on 7 acres of Land which is HDPE lined and impervious as per CREP Norms.

• Achieved Zero discharge. • Industry has complied CREP guideline. • SRO, has recommended case for renewal . • We may application in CAC as C.I is 135.67 Crores. • We may renew consent with extension of B.g Coterminus with Consent

period.

JD(WPC)

Page 42: 08.01.2013 at 3.00 P.M. Capital Applied For Page …...27 Tech Mahindra Ltd, Plot No-1, Rajiv Gandhi Infotech Park, Phase-III, Hinjewadi, Pune 502.59 Crs Renewal RO(HQ) 381-388 28

CAC Item No.34 Name of Industry :- Urjankur Shree Datta Power Co. Ltd, Gat No. 251, ( Shree Datta SSK Ltd, Dattanagar, Shirol, Kolhapur HOD Remarks

• Industry has applied for Renewal of Consent to Operate. It is RED/LSI unit. • Industry is engaged in production of Electricity using Bagasse and Coal as fuel. • Total capital investment is Rs. 207.21 Cr. as per CA certificate submitted by industry

which was Rs. 232 Cr. against pervious consent granted by the Board. • Industry has paid fees of Rs. 8,28,877/- • The Industry site is located at Gut. No. 251, M/s. Shree Datta Shetkari SSK Ltd.

Dattanagar, Shirol, Kolhapur - 416 120. Site location is 7 km away from A-II Class Krishna River, hence satisfy RRZ criteria.

• Previous consent is valid up to 30.09.2012 • Industry is generating 4 m3/day domestic effluent which will be treated in septic tank

followed by soak pit. • Industry is generating 578 m3/day Industrial Effluent from Bleed of Cogeneration,

Boiler Blow Down and Soot Blowing De-aerator which is treated in ETP. This ETP comprised with following units Equalization tank, Neutralisation Tank, Clarifier, Treated Water Sump, Sludge drying bed.

• Treated effluent is used for gardening on own land of 5.60 hectors. • Industry has provided to Baggase/Coal fired High Pressure Boiler which having stalk

height of 100 m attached with ESP for air pollution control. • RO Kolhapur has recommended application for renewal of consent to operate up to

30.09.2014 • This case was discussed in CAC dt. 26.09.2012 and was not approved. • It was decided to revert back to CAC after reexamining the case regarding

compliance of consent conditions (Not meeting standards as per JVS reports, Environmental Statement) and get clarifications regarding CI.

• JD (WPC) has issued letter to industry regarding clarification in CI, Cess returns vide letter No. BO/JDW/TB/B-5492 dt. 11.09.2012.

• Industry has replied clarification of CI vide letter dt. 24.12.2012 and paid remaining fees of Rs. 38,879/- towards gross block value.

• Industry has paid advance cess payment of Rs. 2000/- vide ch no. 023081 dt. 23.10.2012 drawn on Sampada Bank, Navi Mumbai.

• SRO has submitted latest JVS results dt. 13.06.2012 which is within consented limits except Chromium.

• Industry has submitted Environmental Statement for year 2010-2011. • Previous consent valid up to 30.09.2012 (36 MW) • Resubmitted to CAC after compliance asked • JVS reports received to 13.6.2012 within limit. • Cess paid, Environmental Statement submitted (2011-2012) • Applied for C to R renewal. • Regular renewal is separate unit of separated management its separate name. • Recommend to grant C to R renewal.

JD(WPC)

Page 43: 08.01.2013 at 3.00 P.M. Capital Applied For Page …...27 Tech Mahindra Ltd, Plot No-1, Rajiv Gandhi Infotech Park, Phase-III, Hinjewadi, Pune 502.59 Crs Renewal RO(HQ) 381-388 28

CAC Item No.35 Name of Industry :- Soktas India Pvt. Ltd, Plot No. T-8, Five Star MIDC, Kagal, Hatkanangale, Kolhapur HOD Remarks

• Industry has applied for Renewal of Consent to Operate. It is RED/LSI unit. • Previous consent is valid up to 30.11.2012 • Industry has increased its CI by 12.49 Cr. for modernization and ETP up

gradation. The total CI is 225.49 Cr. for which industry has paid additional fees of Rs. 50,000/-

• Water consumption is 1500 - CMD; IE - 1295 CMD; DE - 40 CMD • Industry has upgraded its ETP comprising Primary, Secondary and Tertiary

Treatment facility and member of CETP. • The Board has forfeited BG of Rs. 10 Lakhs towards operational and specific

conditions as per CAC decision dt. 19.10.2011 • Industry has submitted new BG of Rs. 20 lakhs. • Industry has paid fees of Rs. 9,02,065/- for renewal of consent. • Industry has paid Cess up to Jan 2012 and submitted returned up to Oct -

2012 • Industry has submitted Environmental Statement for the year 2011-2012 • JV results dt. 25.05.2012 and 25.07.2012 are slightly exceeding in BOD • RO Kolhapur has recommended application for renewal of consent to operate

up to 30.11.2014 • Recommend to renewal with existing BG

JD(WPC)

Page 44: 08.01.2013 at 3.00 P.M. Capital Applied For Page …...27 Tech Mahindra Ltd, Plot No-1, Rajiv Gandhi Infotech Park, Phase-III, Hinjewadi, Pune 502.59 Crs Renewal RO(HQ) 381-388 28

CAC Item No.36 Name of Industry :- Shri Ambalika Sugars Pvt. Ltd, Ambalika Nagar, Jagdamba Factory, Tal - Karjat, Dist- Nagar. HOD Remarks

• Capital Investment has increased by Rs. 58.87 Cr. Total C.I. Rs. 132.83 Cr. • Industry has not submitted form 4 for the hazardous waste disposal. • Industry has not submitted CREP compliance report along with the

application. • Industry has not submitted Annual Environment Statement along with the

application. • Industry has not submitted any reply. • We may refuse the consent.

JD(WPC)

Page 45: 08.01.2013 at 3.00 P.M. Capital Applied For Page …...27 Tech Mahindra Ltd, Plot No-1, Rajiv Gandhi Infotech Park, Phase-III, Hinjewadi, Pune 502.59 Crs Renewal RO(HQ) 381-388 28

CAC Item No.37 Name of Industry :- Karmayogi Shankarraoji Patil SSK ( Sugar & Co- Gen), Mahatma Phulenagar ( Bilwadi), Tal- Indapur, Dist- Pune HOD Remarks

• Applied for renewal of existing consent along with amalgamation of production type & quantity which was granted in consent to establish dated 02.03.2012.

• Industry has applied for additional quantity as per EC i.e. 2334.46 MT sugar with out obtaining Consent to Establish.

• JVS are not available for Nov and Dec 2012. • Bank Guarantee of 5 + 2 lakh submitted. • We may grant renewal with quantity of C to E only additional quantity asked

by industry may not be considered, i.e. sugar production 2334.42 MT/M.

JD(WPC)

Page 46: 08.01.2013 at 3.00 P.M. Capital Applied For Page …...27 Tech Mahindra Ltd, Plot No-1, Rajiv Gandhi Infotech Park, Phase-III, Hinjewadi, Pune 502.59 Crs Renewal RO(HQ) 381-388 28

CAC Item No.38 Name of Industry :- M/s. ISTA Hotel A unit of IHHR Hospitality Pvt. Ltd) S.No. 206, A/1,206B, Plot No. 88, Sub- Plot No.4, Pune- Nagar Road,Pune-16 HOD Remarks

• Applied for renewal. Total Rooms 209 Nos. RED/LSI. • Total C. I. is Rs. 204.28 Cr • Application received at RO Pune on 30.8.2012 & at HQ on 06.12.12 • Total Plot area is 8251.77 Sq. Mtrs. and total Built up area 12809.43 sq.m.and

utilities & seevices as per occupancy certificate of Local Body. The total plot area and total built up area shall not exceed 25168.26 Sq. mtrs. And 32668.57 Sr.Mtrs. as per the previous consent which is valid upto 31.8.2012.

• Water Consumption 365 CMD and domestic effluent generation is 281 CMD and trade effluent is 5 CMD.

• Hotel has provided ETP comprising with primary treatment & treated effluent is mixed with sewage. For further treatment hotel has provided STP.

• The treated effluent is used for flushing after disinfection & partly for gardening & remaining to PMC sewer line.

• The hotel has provided UV radiation system for disinfection of swimming pool water.

• The JVS sample collected on 28.11.2012 is within limit except detergent. • Capital investment is increased from 203.289 Crs to 204.283 Croes. (

Escalation of 99.45 Lakhs) for which hotel has paid C to E fee of Rs. 7000/- • Hotel has paid consent fee Rs. 164567 & previous pending fee of Rs. 244000

as per consent condition. Total fee paid by the hotel is Rs. 415567 for renewal of consent for 1 year.

• Hotel has paid cess upto Dec 2010 and assessment done upto Dec. 2011. Hotel has submitted the Environmental Statement of year 2011-12

• RO Pune has recommended for renewal of consent to operate upto 31.8.2013

• Recommended for renewal of consent

AS(T)

Page 47: 08.01.2013 at 3.00 P.M. Capital Applied For Page …...27 Tech Mahindra Ltd, Plot No-1, Rajiv Gandhi Infotech Park, Phase-III, Hinjewadi, Pune 502.59 Crs Renewal RO(HQ) 381-388 28

CAC Item No.39 Name of Industry :- M/s. Epcos India Ltd., E-22/25, MIDC Satpur, Dist - Nashik HOD Remarks 1. Applied for grant of renewal of Consent to Operate with amalgamation on

12.10.2012. 2. Application grant of renewal of Consent to Operate with amalgamation received

at H.Q. on 20.12.2012. 3. Paid Consent fee of Rs.11,07,720/-. 4. Water Cess paid up to July, 2012. 5. Environment Statement for the year 2011-2012 submitted. 6. SRO/RO Nashik recommended for grant of Consent to Operate with

amalgamation up to 31.12.2014. 7. Recommended for grant of Consent to Operate with amalgamation up to

31.12.2014 with extension of bank guarantee up to consent validity period for O & M. And direct to industry to apply for Consent to Establish for A.C. Capacitor – 5 Lakhs Pieces/Month. `

Joint Director (APC)

Page 48: 08.01.2013 at 3.00 P.M. Capital Applied For Page …...27 Tech Mahindra Ltd, Plot No-1, Rajiv Gandhi Infotech Park, Phase-III, Hinjewadi, Pune 502.59 Crs Renewal RO(HQ) 381-388 28

CAC Item No.40 Name of Industry :- M/s. Westen Coalfields Ltd., Umred OCM, Tal- Umred, Dist – Nagpur HOD Remarks 1. Applied for renewal of consent. 2. Earlier consent was valid up to 31.12.2012. 3. SRO, Nagpur-II mentioned that application for renewal of Consent to Operate

may be considered only after the compliance of directions issued and regarding this matter personal hearing may given to the industry at HQ.

The unit is non complied. Analysis results are high. Work of pollution control system remaining. In view of above we may issue show cause notice for refusal of consent. .

Joint Director (APC)

Page 49: 08.01.2013 at 3.00 P.M. Capital Applied For Page …...27 Tech Mahindra Ltd, Plot No-1, Rajiv Gandhi Infotech Park, Phase-III, Hinjewadi, Pune 502.59 Crs Renewal RO(HQ) 381-388 28

CAC Item No.41 Name of Industry :- M/s. Mahindra and Mahindra Ltd., 89, MIDC Satpur, Dist – Nashik HOD Remarks 1. Applied on 08.10.2012 for renewal of Consent to Operate. 2. Renewal of Consent to Operate application received at H.Q. on 20.12.2012. 3. Industry has provided ETP/STP for treatment of industrial effluent. Analysis

results of JVS are within consented limits. 4. Industry has provided Dust Collector & Scrubber system. 5. SRO/RO Nashik recommended for grant of Consent to Operate up to

31.12.2015. 6. Recommended grant of renewal of consent to operate after receipt of

Rs.1,25,000/-towards difference in capital investment with B.G.of Rs.5 Lakhs towards O & M.

Joint Director (APC)

Page 50: 08.01.2013 at 3.00 P.M. Capital Applied For Page …...27 Tech Mahindra Ltd, Plot No-1, Rajiv Gandhi Infotech Park, Phase-III, Hinjewadi, Pune 502.59 Crs Renewal RO(HQ) 381-388 28

CAC Item No.42 Name of Industry :- M/s. Tulsi Casting & Machining Ltd., E-2, MIDC Kupwad, Tal- Miraj, Dist - Sangli HOD Remarks

1) This is renewal of consent without changes in product & its quantities. 2) Ci is Rs. 193.24 Crores, existing was Rs.164.43 crores, the increase is of Rs.

28.81 lacs, this is due to modification and revamping of existing plant. 3) Indl effluent is NIL. 4) Provided fume extraction system followed by Dust collector to furnace &

knock out section, Dust collector to shot blasting & sand reclamation unit. 5) JVs results of stack air monitoring for parameter TPM are exceeding the

limits. 6) Cess paid upto June 2011 and returns submitted upto march 2012. 7) BG of Rs.1.0 lac is valid upto 21/6/2013. RO/SRO recommended grant

renewal of consent upto 30/09/2013. 8) We may consider grant of renewal of consent and forfiet the existing BG of

Rs.1.0 lac and take fresh BG of Rs.2.0 lacs as operational BG, as the JVS results are exceeding.

We may place the consent application before CAC for further consideration.

(V. M. Motghare)

Joint Director (Air Pollution Control)

Page 51: 08.01.2013 at 3.00 P.M. Capital Applied For Page …...27 Tech Mahindra Ltd, Plot No-1, Rajiv Gandhi Infotech Park, Phase-III, Hinjewadi, Pune 502.59 Crs Renewal RO(HQ) 381-388 28

CAC Item No.43 Name of Industry :- M/s. Tata Steel Ltd., (Wire Division), A-6, MIDC Tarapur Indl., Area, Thane HOD Remarks

1. Applied for renewal of Consent for mfg. of Steel Wires – 136800 MT/A. Also separately applied for consent to establish for provision of ARP.

2. Application received at SRO-Tarapur-I on dtd 17.11.2012 and at HQ on dtd 21.12.2012.

3. Previous consent was valid upto 31/12/2012. 4. Existing industrial effluent is 800 CMD for which industry has provided two

effluent treatment plant having capacity 400 CMD. 5. Existing domestic effluent is 150 CMD. Provided STP. 6. Treated effluent from both ETP is partially utilized for preparation of lime

solution and rest along with waste water generated from STP is being combinely disposed to MIDC drainage network to CETP. JVS water analysis results dtd 12.7.201 (TWP I &II) ,7.3.2012 (TWP I&II, STP). Which is under prescribed limit

7. Existing unit has provided air pollution control system to Pickling section, Galvanizing section and Patenting line.

8. This office query Letter issued to industry dtd. 05/01/2013 for submission of consent fee of Rs. 15000/-.

9. SRO reported, a. As per consent condition no. 11 - industry has submitted the B.G. of

Rs. 5,00,000/- to RO Thane. Industry has submitted production quantity 135362 MT/A from their log sheet verified and found with complying.

b. Consent condition no. 12- B.G. of Rs. 5,00,000/- submitted to RO Thane for sending spent acid to ARP. Now regularly disposing spent acid to M/s Indrox Global. Ltd.

c. Consent condition 13 – Industry has suspended/discontinued for loading /unloading of spent acid with M/s Purnima chemicals.

10. Proposed additional treatment facility for spent acid will be operated only when the approved Acid recovery plant is not in operation for any reason. There will be not be any consumption of water except 30 Kl one time water consumption during start up. The entire 242 MT spent acid will be treated in this facility & evaporation in Psychrometric evaporator leading to zero effluent discharge.

11. SRO recommended the existing consent for grant period upto 31.12.2015 and grant of consent to establish for provision of ARP.

12. HOD Remark – Renewal of consent with clause that they can establish ARP as standby. Submitted B.G. of Rs 5/-Lacs each against earlier consent condition no. 11 &12. In view of above, we may grant renewal upto 31.12.2015 with condition of establish of standby ARP & extension of both B.G. upto consent validity period.

We may pace the consent application before CAC for further consideration. JD(APC)

Page 52: 08.01.2013 at 3.00 P.M. Capital Applied For Page …...27 Tech Mahindra Ltd, Plot No-1, Rajiv Gandhi Infotech Park, Phase-III, Hinjewadi, Pune 502.59 Crs Renewal RO(HQ) 381-388 28

CAC Item No.44 Name of Industry :- M/s. Hindustan National Glass and Industries Ltd., F-1, MIDC Malegaon, Sinnar, Nashik HOD Remarks 1. Applied on 10.10.2012 for renewal of Consent to Operate with amalgamation. 2. Application received at H.Q. on 20.12.2012. 3. Industry has provided STP for treatment of domestic effluent. Analysis results of

JVS are within consented limits. 4. Industry has provided stack to the furnaces. 5. SRO/RO Nashik recommended for grant of renewal of consent to operate with

amalgamation up to 31.10.2013. 6. Recommended for grant of renewal of consent to operate with amalgamation up

to 31.10.2013 with overriding effect on consent dated 27.03.2012. Joint Director (APC)

Page 53: 08.01.2013 at 3.00 P.M. Capital Applied For Page …...27 Tech Mahindra Ltd, Plot No-1, Rajiv Gandhi Infotech Park, Phase-III, Hinjewadi, Pune 502.59 Crs Renewal RO(HQ) 381-388 28

CAC Item No.45 Name of Industry :- M/s. Maharashtra State Power Generation Co. Ltd., ( Khaparkheda) Thermal Power Station, Nagpur HOD Remarks

1. Applied for renewal of consent for 840 MW coal based thermal power plant. 2. Earlier consent was valid up to 31.12.2012. 3. The non-compliances are reported by RO/SRO. The unit is discharging ash

content effluent in to local nalla which further meets to Kanhan river. Not achieving the zero discharge.

4. As per the point no.17 of the consent condition Industry has submitted bank guarantee of Rs.10/- Lakhs to complete the remaining works. But so far not completed and hence we may forfeit B.G. of Rs.10/- Lakhs.

5. As unit has not upgraded APC to achieve 100 mg/Nm3 standard within six months hence we may forfeit the Bank Guarantee of Rs.50/- Lakhs.

6. The action plan is now revised as per MPCB guidelines. Hence, we may renew the consent up to 31.12.2013 as per specified time period programe as per schedule given and B.G. of Rs. 150 Lakhs. Joint Director (APC)

Page 54: 08.01.2013 at 3.00 P.M. Capital Applied For Page …...27 Tech Mahindra Ltd, Plot No-1, Rajiv Gandhi Infotech Park, Phase-III, Hinjewadi, Pune 502.59 Crs Renewal RO(HQ) 381-388 28

 CAC Item No.46 Name of Industry :- M/s. Bosch Ltd., 75, MIDC Estate, Trimbak Road, Satpur, PO No.64, Nashik HOD Remarks 1. Applied on 29.10.2012 for renewal of Consent to Operate. 2. Application received at H.Q. on 20.12.2012. 3. Provided ETP/STP for treatment of industrial effluent. Analysis results are within

limits. 4. Industry has provided Scrubber system. 5. Cess returns submitted up to Sept., 2012. 6. Environment Statement for the year 2011-2012 submitted. 7. As per earlier consent condition, it was directed that incinerator is not as per

CPCB standard, it should not be used.SRO Nashik has reported on 05.01.2013,that industry are using incinerator and which is not as per CPCB standard.

8. We may issue SCN for refusal. Joint Director (APC)

Page 55: 08.01.2013 at 3.00 P.M. Capital Applied For Page …...27 Tech Mahindra Ltd, Plot No-1, Rajiv Gandhi Infotech Park, Phase-III, Hinjewadi, Pune 502.59 Crs Renewal RO(HQ) 381-388 28

CAC Item No.47 Name of Industry :- M/s. Hindalco Industries Ltd., Vill- Daheli, Tal- Mouda, Dist – Nagpur HOD Remarks

1. Applied for Renewal of consent with amalgamation of two consents. 2. Earlier consent for operation of Rolling Mill & other Unit – 28.02.2013 & for

Aluminium Strips & Sheets – 31.12.2012. 3. Unit has not submitted CA certificate for total Capital Investment. 4. Analysis results of stack and ambient air are exceeding. 5. Warning notice issued by SRO. In view of above we may issue SCN for refusal of consent. Joint Director (APC)

Page 56: 08.01.2013 at 3.00 P.M. Capital Applied For Page …...27 Tech Mahindra Ltd, Plot No-1, Rajiv Gandhi Infotech Park, Phase-III, Hinjewadi, Pune 502.59 Crs Renewal RO(HQ) 381-388 28

CAC Item No.48 Name of Industry :- M/s. Atlas Capco (India) Ltd., Svenagar Pune Mumbai Road, Dapodi, Pune HOD Remarks

• Applied for renewal of consent with change in product • Application received at SRO- Pune on dtd 19/11/2012 and at HQ on

20/12/2012 • Previous consent was valid up to 31.12.2012 • Industry decrease in main production of earlier consent & introduction of new

product i.e. filters by way of assembly activity only • Location of industry is 0.5 Km away from River Pawana (A – IV class) • Industrial effluent generation is 0.20 CMD for which ETP provided (primary,) • Sewage treatment plant provided to 35.0 CMD domestic Effluent. • APCS are provided to DG Sets & dry paint booth • RO Pune has reported that as per the new GR the painting activity falls under

Orange category, hence the case is recommended for grant of renewal of consent to operate in Orange Category as per new CPCB circular for category of industries for period upto 31.12.2018 with introduction of new product by an assembly activity

• We may grant consent to operate up to 31/12/2018 under orange category • We may place the consent application before CAC for further consideration.

Joint Director (APC)

Page 57: 08.01.2013 at 3.00 P.M. Capital Applied For Page …...27 Tech Mahindra Ltd, Plot No-1, Rajiv Gandhi Infotech Park, Phase-III, Hinjewadi, Pune 502.59 Crs Renewal RO(HQ) 381-388 28

CAC Item No.49 Name of Industry :- Shirpur Gold Refinery Ltd, A. No.- 247, Agra Mumbai Road, Shirur, Dist- Dhule. HOD Remarks

1. Applied on 01.11.2012 for grant of renewal of consent to operate.. 2. Application for grant of renewal of consent to operate received to HQ on

20.12.2012. 3. SRO-Jalgaon –II has reported industry has provided full-fledged ETP for

treatment of industrial effluent. 4. Industry has provided continuous monitor for chlorine gas. 5. SRO/Regional officer – Nashik has recommended case for grant of

renewal of consent to operate up to 31.12.2013. 6. Recommended for grant of renewal of consent to operate up to

31.12.2013.After receipt of additional consent fees Rs.15,000/- towards increase in C.I.

Joint Director (Air Pollution Control)

Page 58: 08.01.2013 at 3.00 P.M. Capital Applied For Page …...27 Tech Mahindra Ltd, Plot No-1, Rajiv Gandhi Infotech Park, Phase-III, Hinjewadi, Pune 502.59 Crs Renewal RO(HQ) 381-388 28

CAC Item No.50 Name of Industry :- Shri Dyaneshwar Sahakari Sakar Karkhana Ltd. Dyanesharnagar, Bhende Bk. Tal - Newasa Dist – Ahmadnagar HOD Remarks

• Applied for renewal of consent to operate with amalgamation of sugar & co-generation plant.

• Capital Investment Rs. 19408.00 Lacs. • Earlier consent of sugar was valid up to: 31.12.2012. • Earlier consent of electricity generation was valid up to: 31.12.2012. • Industrial effluent generation to the tune of 437.0 CMD and domestic effluent

generation to the tune of 184.50 CMD. • Provided primary & Tertiary Treatment arrangement for industrial effluent &

treated effluent disposal on land for gardening. • for Domestic effluent septic tank and soak pit provided & disposal on land for

gardening. • For air pollution control, boiler no. 1,2,& 3 multi cyclone fly ash arrester

provided with height of chimney 30 mtr. But industry has not provided wet scrubber/ESP to the boilers.

• Boiler no. 4, multi cyclone fly ash arrester provided with height of chimney 40 mtr. But wet scrubber not provided.

• Boiler no. 5, wet scrubber arrangement provided with height of chimney 60 mtr.

• D.G. Sets (400 KVA – 2Nos) with height of chimney 4.0 mtr. Above the roof where it is installed.

• Cess paid upto: December - 2012. • Show cause Notice issued on 12.10.2012, for non compliance of consent

conditions. • SRO recommended to forfeit the Bank Guarantee of Rs. 5.0 Lacs & 2.0 Lacs

and grant renewal of consent with amalgamation and ask fresh Bank Guarantee double the existing.

• CREP partial complied. • B.G. of Rs. 3.0 Lacs may be obtained for providing APC. • Submitted for approval.

JD(WPC)

Page 59: 08.01.2013 at 3.00 P.M. Capital Applied For Page …...27 Tech Mahindra Ltd, Plot No-1, Rajiv Gandhi Infotech Park, Phase-III, Hinjewadi, Pune 502.59 Crs Renewal RO(HQ) 381-388 28

CAC Item No.51 Name of Industry :- Municipal Corporation of Greater Mumbai, Water Treatment Plant, Bhandup Complex, Kjindipada Road, Bhandup (West) Mumbai HOD Remarks

• Applied for consent to 1st Operate for Water Treatemnt Plant. • Previous consent is for consent to establish. • Total Capacity of WTP is 2810 MLD ( Old Plant- 1910 MLD + New Plant- 900

MLD) • SRO/RO has recommended for consent to operate • Recommended for consent to Operate. Fee paid 100000/- for c to O for one

year. Additional fee of Rs. 542000/- may be obtained as per investment or we may grant consent as per fee schedule for corporation i.e. 1.0 Lakh for one year

JD(WPC)

Page 60: 08.01.2013 at 3.00 P.M. Capital Applied For Page …...27 Tech Mahindra Ltd, Plot No-1, Rajiv Gandhi Infotech Park, Phase-III, Hinjewadi, Pune 502.59 Crs Renewal RO(HQ) 381-388 28

CAC Item No.52 Name of Industry :- Bhima SSK Ltd., (Distillery Unit), At Madhukar -Patas, Tal- Daund, Dist-Pune HOD Remarks

• Applied for consent to renewal. • Industry has not provided 25 acres of compost yard as per EC condition. • Industry have provided only 8 acre of compost yard. • Encash of B.G. of Rs. 10 lakh and B.G. of Rs. 20 lakh. • Recommended for grant of renewal.

Page 61: 08.01.2013 at 3.00 P.M. Capital Applied For Page …...27 Tech Mahindra Ltd, Plot No-1, Rajiv Gandhi Infotech Park, Phase-III, Hinjewadi, Pune 502.59 Crs Renewal RO(HQ) 381-388 28

CAC Item No.53 Name of Industry :- Mira Bhyaender Municipal Corporation STP, Chattrapati Shivaji Maharaj Marg, Bhyendar, Dist- Thane. HOD Remarks

• Applied for renewal of consent of STP 2 No. • Previous consent was valid till 31.12.2009 • Under JNRUM Scheme work of new 10 TP i in progress @ 60-70 % work is

completed. • SRO reported that O&M of existing STP is not proper. • RO recommended for renewal of consent subject to bank guarantee of

appropriate amount. • As per revised GR of consent fees of Rs. 3,20,000/- is to be applied. • The application to be placed in CAC • We may call fees from corporation. If approved letter to corporation is

submitted for further orders. • Previous consent was valid up to 31.12.2009 for three STP at Jessal Park,

Shrushti Shantinagar and Silver park • Out of three STP at Jessel Park and Shrusti is operating. • Call additional fees parallel and separate application for C to E of 10 STPs. • Submitted for decision in CAC

JD(WPC)

Page 62: 08.01.2013 at 3.00 P.M. Capital Applied For Page …...27 Tech Mahindra Ltd, Plot No-1, Rajiv Gandhi Infotech Park, Phase-III, Hinjewadi, Pune 502.59 Crs Renewal RO(HQ) 381-388 28

CAC Item No.54 Name of Industry :- Baramati Agro Ltd., (Distillery Unit), Village Shetfal Gade, Tal Indapur, Dist- Pune HOD Remarks

• Applied for consent to establish with expansion of distillery unit for manf. of rectified spirit/ ENA 100 KLPD and Ethanol 100 KLPD.

• Industry has provided part compost yard of 11 acres concrete compost yard of 4 acres provided.

• Industry has provided MEE for reduction of spent wash. Hence 4 acres compost yard is sufficient (7 stage MEE)

• Earlier B.G. of Rs. 2 lakh is valid for continues compliance. • We may grant consent to establish for expansion.

JD(WPC)

Page 63: 08.01.2013 at 3.00 P.M. Capital Applied For Page …...27 Tech Mahindra Ltd, Plot No-1, Rajiv Gandhi Infotech Park, Phase-III, Hinjewadi, Pune 502.59 Crs Renewal RO(HQ) 381-388 28

Review Item:- 6 Name of Industry: Amravati Mun Corporation  Amravati   

1. Letter from Dep. Commissioner Amravati for granting extension for completion of project on MSW till October 2013.

2. Earlier Board has issued authorization vide No. CAC 383 dt. 03/04/2012 valid

upto 02/04/2017 with condition that the corporation shall establish/setup and operate the facility within six months period.

3. B.G. has been obtained form the corporation for compliance of the said

condition.

4. Now the Corporation has requested for extension of the time period of completion of the project till 30/10/2013.

We may consider the request of the corporation for the extension of the time period for completion project upto 30/10/2013. RO(HQ)