07.metrados obras exteriores impreso

88
METRADO DE ACERO VIGA DE CIMENTACION ELEMENTO DESCRIPCION Ø N° VEC. N° FE. LONG. FE. Ø1/4" 8 mm Ø1/2" Ø5/8" Ø3/4" PRIMER PISO VC-01 LONGITUDINAL 1/2 5 8 6.90 276.00 ESTRIBOS ### 5 38 1.30 247.00 FACTOR 0.25 0.49 1.02 1.60 1.60 TOTAL KG 0 122 282 0 0 404 GRAN TOTAL EN VIGAS DE CIMENTACION 404 METRADO DE ACERO MURO DE CONTENCION ELEMENTO DESCRIPCION Ø N° VEC. N° FE. LONG. FE. Ø1/4" Ø3/8" Ø1/2" Ø5/8" Ø3/4" PAÑO A-B , VERTICAL 1/2 2 14 5.00 140.00 VERTICAL 3/8 2 14 3.10 86.80 HORIZONTAL 1/2 2 24 4.80 230.40 PAÑO B-C VERTICAL 1/2 1 12 5.00 60.00 VERTICAL 3/8 1 12 3.10 37.20 HORIZONTAL 1/2 1 24 4.80 115.20 FACTOR 0.25 0.58 1.02 1.60 1.60 TOTAL KG 0 72 557 0 0 629 GRAN TOTAL EN MURO DE CONTENCION 629 METRADO DE ACERO COLUMNAS DE CONFINAMIENTO COLUMNAS PRIMER PISO DESCRIPCION ELEMENTO Ø N° VECES ° BARRA LONG. BARRA Ø1/4" Ø3/8" Ø1/2" Ø5/8" EJE 1, C-4 LONGITUDINAL 3/8 6 4 3.35 80.40 ESTRIBO 1/4 6 20 0.80 96.00 EJE 1, C-4 LONGITUDINAL 3/8 2 4 3.85 30.80 ESTRIBO 1/4 2 24 0.80 38.40 EJE 2, V-1 LONGITUDINAL 3/8 6 4 2.90 69.60 ESTRIBO 1/4 6 14 0.80 67.20 FACTOR 0.25 0.58 1.02 1.60 TOTAL KG 51 105 0 0 156 METRADO DE ACERO VIGAS DE CONFINAMIENTO VIGAS PRIMER PISO DESCRIPCION ELEMENTO Ø N° VECES ° BARRA LONG. BARRA Ø1/4" Ø3/8" Ø1/2" Ø5/8" EJE 1, V-1 LONGITUDINAL 3/8 2 2 2.85 11.40 ESTRIBO 1/4 2 18 0.40 14.40 LONGITUDINAL 3/8 2 2 1.00 4.00 ESTRIBO 1/4 2 4 0.40 3.20 LONGITUDINAL 3/8 1 2 3.75 7.50 ESTRIBO 1/4 1 21 0.40 8.40 EJE 2, V-1 LONGITUDINAL 3/8 3 2 3.75 22.50 ESTRIBO 1/4 3 21 0.40 25.20 FACTOR 0.25 0.58 1.02 1.60 TOTAL KG 13 27 0 0 40

Upload: richard-perez

Post on 02-Oct-2015

238 views

Category:

Documents


4 download

DESCRIPTION

mestrado fire ... . :D

TRANSCRIPT

PLOT 1METRADO DE ACEROVIGA DE CIMENTACIONELEMENTODESCRIPCIONN VEC.N FE.LONG. FE.1/4"8 mm1/2"5/8"3/4"PRIMER PISOVC-01LONGITUDINAL1/2586.90276.00ESTRIBOS85381.30247.00FACTOR0.250.491.021.601.60TOTAL KG012228200404GRAN TOTAL EN VIGAS DE CIMENTACION404METRADO DE ACEROMURO DE CONTENCIONELEMENTODESCRIPCIONN VEC.N FE.LONG. FE.1/4"3/8"1/2"5/8"3/4"PAO A-B , C-DVERTICAL1/22145.00140.00VERTICAL3/82143.1086.80HORIZONTAL1/22244.80230.40PAO B-CVERTICAL1/21125.0060.00VERTICAL3/81123.1037.20HORIZONTAL1/21244.80115.20FACTOR0.250.581.021.601.60TOTAL KG07255700629GRAN TOTAL EN MURO DE CONTENCION629METRADO DE ACEROCOLUMNAS DE CONFINAMIENTOCOLUMNAS PRIMER PISODESCRIPCIONELEMENTON VECESN BARRASLONG. BARRA1/4"3/8"1/2"5/8"EJE 1, C-4LONGITUDINAL3/8643.3580.40ESTRIBO1/46200.8096.00EJE 1, C-4LONGITUDINAL3/8243.8530.80ESTRIBO1/42240.8038.40EJE 2, V-1LONGITUDINAL3/8642.9069.60ESTRIBO1/46140.8067.20FACTOR0.250.581.021.60TOTAL KG5110500156METRADO DE ACEROVIGAS DE CONFINAMIENTOVIGAS PRIMER PISODESCRIPCIONELEMENTON VECESN BARRASLONG. BARRA1/4"3/8"1/2"5/8"EJE 1, V-1LONGITUDINAL3/8222.8511.40ESTRIBO1/42180.4014.40LONGITUDINAL3/8221.004.00ESTRIBO1/4240.403.20LONGITUDINAL3/8123.757.50ESTRIBO1/41210.408.40EJE 2, V-1LONGITUDINAL3/8323.7522.50ESTRIBO1/43210.4025.20FACTOR0.250.581.021.60TOTAL KG13270040

PLOT 3EXCAVACIONDESCRIPCIONUNDN ELEMN VECESLARGOANCHOALTURAAREAVOLUMENPARCIALMETRADOCIMIENTO CORRIDOM3143.34EJE 1CC-2M3118.890.600.700.423.733.73Z-1M3211.801.801.502.704.869.72EJE 2MC-1M31113.002.054.509.23119.93119.93EJE ACC-1M3116.150.601.250.754.614.61EJE BVC-01M3113.700.250.400.100.370.37EJE CVC-01M3113.700.250.400.100.370.37EJE DCC-1M3116.150.601.250.754.614.61RELLENODESCRIPCIONUNDN ELEMN VECESLARGOANCHOALTURAAREAVOLUMENPARCIALMETRADOCIMIENTO CORRIDOM3101.57EJE 2Z-2M3117.506.5649.2249.22MC-01M3115.508.3445.8745.87Z-1M3211.801.801.001.803.246.48ELIMINACION54.31PERFILADO GENERALDESCRIPCIONELEMENTOUNDN VECESLARGOANCHOALTURAAREAPARCIALMETRADOPERFILADOM2109.66EJE 1ZAPATA 1M221.801.801.5010.8021.60CC-2M225.470.606.5613.13EJE 2ZAPATA 2M222.501.251.5011.2522.50ZAPATA 3M221.251.251.507.5015.00MURO CONT.M215.500.606.606.60EJE A y DCC-1M2212.851.2015.4230.84EXCAVACIONDESCRIPANCHOALTURACC-10.601.25CC-20.600.70MC-12.054.50Z-11.801.50VC-010.250.40

PLOT METRADO GRAL rlc (2)PLANILLA DE METRADOS GENERALPROYECTO: CONSTRUCCION SALA DE COMPUTO I.E. 40124 CIUDAD BLANCAITEMSPARTIDAUND.N VECESLONGITUDANCHOALTURAESPESORAREAPARCIALTOTAL01OBRAS PROVISIONALES01.01CASETA GUARDIANIA Y ALMACEN PROVISIONAL DE OBRAm21.0023.5023.5001.02CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40MUND1.001.001.0001.03CERCO PERIMETRICO PROVISIONALM1.0020.0010.0060.0060.0002OBRAS PRELIMINARES02.01LIMPIEZA DE TERRENO MANUALM21.0020.0010.00200.00200.0002.02TRAZO, NIVELACIN Y REPLANTEOM21.0014.008.00112.00112.0002.03TRANSPORTE DE EQUIPO Y HERRAMIENTASVJE2.002.002.0002.04DEMOLICION DE ALBAILERIAM21.0013.102.5032.7532.7502.05DEMOLICION DE CONCRETO SIMPLEM313.76DEMOLICION DE CONCRETO SIMPLE EN SOBRECIMIENTOSM31.0013.100.201.503.933.93DEMOLICION DE CONCRETO SIMPLE EN CIMIENTOSM31.0013.100.501.509.839.8302.06DEMOLICION DE CONCRETO ARMADOM33.000.300.300.270.2702.07ELIMINACION DE MATERIAL DEMOLIDO CON VOLQUETE DE 4M3M31.0022.5422.5403MOVIMIENTO DE TIERRAS0.0003.01EXCAVACION PARA CIMIENTOS HASTA 1.20 MT TERRENO NORMALM30.0012.96EJE 1 , CC-2M31.008.890.600.703.73EJE A, CC-1M31.006.150.601.254.61EJE D, CC-1M31.006.150.601.254.6103.02EXCAVACION PARA ZAPATAS DE 1.40 MT A 1.70 MT DE PROFUNDIDAD9.72EJE 1 , Z-1M32.001.801.801.509.7203.03EXCAVACION PARA VIGA DE CIMENTACION0.74EJE B, VC-01M31.003.700.250.400.37EJE C, VC-01M31.003.700.250.400.3703.04EXCAVACION EN MUROS DE CONTENCION119.93EJE 2 , MC-01M31.0013.002.054.50119.9303.05PERFILADO EN EXCAVACIONESM21.00109.66109.66109.6603.06RELLENO MANUAL Y COMPACTADO CON MATERIAL PROPIO EN MUROS DE CONTENCION101.57EJE 1 y 2 , Z-1, Z-2, Z-3, MC-01M31.005.508.3445.8703.07ELIMINACION CON TRANSPORTE (CARGUIO A MANO) REN.=25 M3/DIAM31.0054.3154.3103.08NIVELACION INTERIOR APISONADO MANUALM20.0091.62PRIMER PISO0.00SALA DE COMPUTOM22.005.304.0042.40M22.001.200.701.68M22.002.650.552.92M21.005.104.2521.68M22.004.000.352.80VEREDAM21.0013.001.5520.1504CONCRETO SIMPLE0.0004.01SOLADOS EN ZAPATAS DE 2" MEZCLA 1:12 CEMENTO-HORMIGONM215.86EJE 1 Z-1M22.001.801.803.246.48EJE 2 Z-2M22.002.501.253.136.25Z-3M22.001.251.251.563.1304.02CONCRETO 1:10 +30% P.G. PARA CIMIENTOS CORRIDOSM30.0010.71EJE A , CC-1M31.005.800.600.802.78EJE D , CC-1M31.005.800.600.802.78EJE 1 , CC-2M31.0011.600.600.503.48EJE 2, MC-1M31.005.550.500.601.6704.03ENCOFRADO Y DESENCOF. SOBRECIMIENTO DE H=0.25 MTM20.003.37EJE A , CC-1M32.005.800.250.300.87EJE D , CC-1M32.005.800.250.300.87EJE 1 , CC-2M32.0011.600.150.351.22EJE 2, MC-1M32.005.550.150.250.4204.04CONCRETO F'C=140 KG/CM2.+30% PM.PARA SOBRECIMIENTOSM30.001.69EJE A , CC-1M31.005.800.250.300.44EJE D , CC-1M31.005.800.250.300.44EJE 1 , CC-2M31.0011.600.150.350.61EJE 2, MC-1M31.005.550.150.250.2104.05FALSO PISO DE 4" DE CONCRETO 1:8M20.0075.81SALA DE COMPUTOM22.005.304.0042.40M22.001.200.701.68M22.002.650.552.92M21.005.104.2521.68M22.004.000.352.80ESTRADO RESTANTEM21.004.100.104.10M21.000.900.900.300.2404.06VEREDA DE CONCRETO DE 4" DE 140 KG/CM220.15M21.0013.001.5520.1520.1504.07ENCOFRADO Y DESENCOF. VEREDAS3.22M21.0016.100.203.223.2205CONCRETO ARMADO0.0005.01VIGAS DE CIMENTACION0.0005.01.01ACERO EN VIGA DE CIMENTACION GRADO 60KG404.00ACEROKG1.00404.00404.0005.01.02ENCOFRADO Y DESENCOFRADO VIGA DE CIMENTACIONM24.08EJE A , VC-01M32.005.100.250.401.02EJE B , VC-01M32.005.100.250.401.02EJE C , VC-01M32.005.100.250.401.02EJE D , VC-01M32.005.100.250.401.0205.01.03CONCRETO EN VIGAS DE CIMENTACION F'C= 210 KG/CM2M32.04EJE A , VC-01M31.005.100.250.400.51EJE B , VC-01M31.005.100.250.400.51EJE C , VC-01M31.005.100.250.400.51EJE D , VC-01M31.005.100.250.400.5105.02ZAPATAS0.0005.02.01ACERO EN ZAPATASKG0.00ACEROKG1.000.000.0005.02.02ENCOFRADO Y DESENCOFRADO PARA ZAPATAS RECTASM221.67EJE 1 , Z-1M32.007.200.557.92EJE 2 , Z-2M32.007.500.558.25EJE 2, Z-3M32.005.000.555.5005.02.03CONCRETO EN ZAPATAS F'C= 210 KG/CM2M38.72EJE 1 , Z-1M32.001.801.800.553.56EJE 2 , Z-2M32.002.501.250.553.44EJE 2, Z-3M32.001.251.250.551.7205.03MURO DE CONTENCION0.0005.03.01CONCRETO FC=210 KG/CM2 EN MURO DE CONTENCIONM36.44EJE 1, MC-01M31.0011.000.153.906.4405.03.02ENCOFRADO Y DESENCOFRADO DE MURO DE CONTENCIONM212.87EJE 1, MC-01M32.0011.000.153.9012.8705.03.03ACERO DE REFUERZO EN MURO DE CONTENCIONKG629.00ACEROKG1.00629.00629.0005.04COLUMNAS, PLACAS Y TENSORES05.04.01CONCRETO EN COLUMNAS F'C=175 KG/CM2M31.15PRIMER PISOEJE 1, C-4M34.000.250.151.650.25EJE 2, C-4M36.000.250.151.650.37EJE 1, C-4M32.000.250.151.650.12EJE 1, C-4M32.000.250.152.450.18AZOTEAEJE 2, C-4M36.000.250.150.450.10TENSOR T-1M34.000.250.150.800.1205.04.02ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS DE CONFINAMIENTOM218.92PRIMER PISOEJE 1, C-4M34.000.651.654.29EJE 2, C-4M36.000.651.656.44EJE 1, C-4M32.000.501.651.65EJE 1, C-4M32.000.652.453.19AZOTEAEJE 2, C-4M36.000.650.451.76TENSOR T-1M34.000.500.801.6005.04.03ACERO ESTRUCTURAL TRABAJADO PARA COLUMNAS DE CONFINAMIENTOKG156.00PRIMER PISOKG1.00156.00156.0005.04.04CONCRETO EN COLUMNAS F'C=210 KG/CM2M38.65PRIMER PISOEJE1 ,C-1M32.004.700.201.82EJE1 ,C-2M32.004.700.131.19EJE2 ,C-1M32.007.700.203.02EJE2 ,C-2M32.007.700.131.97ENTRE EJE1 Y EJE 2 ,C-3M32.004.700.070.6305.04.05ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNASM297.70PRIMER PISOEJE1 ,C-1M32.002.504.7023.50EJE1 ,C-2M32.001.254.7011.75EJE2 ,C-1M32.002.507.7038.50EJE2 ,C-2M32.001.257.7019.25ENTRE EJE1 Y EJE 2 ,C-3M32.000.504.704.7005.04.06ACERO ESTRUCTURAL TRABAJADO PARA COLUMNASKG0.00872.0005.05VIGAS0.0005.05.01CONCRETO EN VIGAS DE CONFINAMIENTO F'C=175 KG/CM2M30.45PRIMER PISOEJE 1, V-1M22.002.550.150.150.11EJE 1, V-1M21.003.500.150.150.08EJE 2, V-1M22.003.700.150.150.17EJE 2, V-1M21.003.450.150.150.08ENTRE EJE A Y B , V-1M21.000.600.150.150.0105.05.02ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS DE CONF.M26.02PRIMER PISOEJE 1, V-1M24.002.550.151.53EJE 1, V-1M22.003.500.151.05EJE 2, V-1M24.003.700.152.22EJE 2, V-1M22.003.450.151.04ENTRE EJE A Y B , V-1M22.000.600.150.1805.05.03ACERO ESTRUCTURAL TRABAJADO PARA VIGAS DE CONF.KG40.00PRIMER PISOKG1.0040.0040.0005.05.04CONCRETO EN VIGAS F'C=210 KG/CM2M36.41PRIMER PISOEJE A, V-101M31.007.450.250.450.84EJE B, V-101M31.007.450.250.450.84EJE C, V-101M31.007.450.250.450.84EJE D, V-101M31.007.450.250.450.84EJE 1, V-102M31.0012.000.250.401.20EJE 2, V-102M31.0012.000.250.401.20VB-1M31.0012.000.200.200.48VB-2M31.0012.000.150.100.1805.05.05ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS ESTRUCT.M244.41PRIMER PISOEJE A, V-101M21.007.450.705.22EJE B, V-101M21.007.450.755.59EJE C, V-101M21.007.450.755.59EJE D, V-101M21.007.450.705.22EJE 1, V-102M21.0012.000.657.80EJE 2, V-102M21.0012.000.8510.20VB-1M21.0012.000.202.40VB-2M22.0012.000.102.4005.05.06ACERO ESTRUCTURAL TRABAJADO PARA VIGAS Y DINTELESKG0.00PRIMER PISOKG1.000.000.0005.06LOSA ALIGERADA05.06.01CONCRETO EN LOSAS ALIGERADAS F'C=210 KG/CM2M37.09PRIMER PISOPAO A-B / 1-2M31.005.604.000.08751.96PAO A-B / 1-2M31.004.001.150.08750.40PAO B-C / 1-2M31.005.604.000.08751.96PAO B-C / 1-2M31.004.001.150.08750.40PAO C-D / 1-2M31.005.604.000.08751.96PAO C-D / 1-2M31.004.001.150.08750.4005.06.02ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERADASM283.40PRIMER PISOPAO A-B / 1-2M31.005.604.0022.40PAO A-B / 1-2M31.004.001.355.40PAO B-C / 1-2M31.005.604.0022.40PAO B-C / 1-2M31.004.001.355.40PAO C-D / 1-2M31.005.604.0022.40PAO C-D / 1-2M31.004.001.355.4005.06.03ACERO ESTRUCTURAL TRABAJADO PARA LOSAS ALIGERADASKG0.00PRIMER PISOKG1.000.000.0005.06.04LADRILLO HUECO DE ARCILLA 15X30X30 CM PARA TECHO ALIGERADOUND709.00PRIMER PISOPAO A-B / 1-2M31.005.604.008.7500196.00PAO A-B / 1-2M31.004.001.158.750040.25PAO B-C / 1-2M31.005.604.008.7500196.00PAO B-C / 1-2M31.004.001.158.750040.25PAO C-D / 1-2M31.005.604.008.7500196.00PAO C-D / 1-2M31.004.001.158.750040.2505.07VARIOS05.07.01JUNTA DE CONSTRUCCION CON TEKNOPORT6.14M22.009.350.151.402.81M22.009.100.151.372.73M22.002.000.150.300.6005.07.02SELLADO DE JUNTA DE CONSTRUCCIONM1.0040.9040.9040.9005.07.03CURADO DE CONCRETOM1.00251.25251.25251.2505.07.04PRUEBA DE CALIDAD DE CONCRETOM1.009.009.009.0006ALBAILERIA06.01MUROS DE LADRILLO KK DE ARCILLA DE SOGA C/M 1:4 X 1.5CM. CARA VISTA UN LADOM249.98PRIMER PISOEJE 1M22.002.051.706.97EJE 1M21.002.951.705.02EJE 2M22.003.201.7010.88EJE 2M21.003.001.705.10ENTRE EJE A Y BM22.000.552.452.70PARAPETO FACHADAM23.004.000.809.60PARAPETO EJE A Y DM22.006.100.455.49PARAPETO EJE 2M21.009.400.454.2306.02MUROS DE LADRILLO KK DE ARCILLA DE CABEZA C/M 1:5 X 1.5CM.M225.48PRIMER PISOEJE AM22.002.452.6012.74EJE DM22.002.452.6012.7407REVOQUES, ENLUCIDOS Y MOLDADURAS07.01TARRAJEO INTERIOR Y EXTERIOR C/MORTERO 1:5 X1.5 CM.(INC.COLUMNAS EMPOT)M282.40PRIMER PISOEJE 1M22.002.552.0010.20EJE 1M21.003.452.006.90EJE 2M22.003.702.0014.80EJE 2M21.003.452.006.90ENTRE EJE A Y BM22.001.252.807.00EJE AM21.006.103.0018.30EJE DM21.006.103.0018.3007.02TARRAJEO DE SUPERFICIE DE COLUMNAS CON CEMENTO-ARENAM247.87COLUMNASM24.001.453.7021.46COLUMNASM22.001.103.708.14COLUMNASM22.001.253.709.25COLUMNASM212.000.252.006.00COLUMNASM22.000.253.701.85COLUMNASM24.000.250.900.90COLUMNASM22.000.150.900.2707.03TARRAJEO DE SUPERFICIE EN VIGAS CON CEMENTO - ARENAM237.13PRIMER PISOEJE B Y EJE CM22.005.800.758.70EJE 1M21.0012.000.506.00EJE 2M21.0012.000.708.40EJE AM21.006.100.452.75EJE DM21.006.100.452.75VIGA BORDEM21.0013.000.202.60VIGA VOLADOM24.001.350.754.05VIGA VB-2M24.001.350.351.8907.04TARRAJEO DE DERRAMES INCLUYE COLUMNAS Y VIGAS CON CEMENTO - ARENAML33.10PRIMER PISOENTRE EJE A Y EJE BML2.002.805.60EJE 1ML2.004.208.40EJE 1ML1.005.055.05EJE 2ML2.005.3010.60EJE 2ML1.003.453.4507.05TARRAJEO EN VEREDA 1:3ML21.76VEREDAM21.0013.001.5520.15M21.0016.100.101.6108CIELORRASOS08.01CIELORRASOS CON MEZCLA DE CEMENTO-ARENAM283.40PRIMER PISOM2PAO A-B / 1-2M21.005.604.0022.40PAO A-B / 1-2M21.004.001.355.40PAO B-C / 1-2M21.005.604.0022.40PAO B-C / 1-2M21.004.001.355.40PAO C-D / 1-2M21.005.604.0022.40PAO C-D / 1-2M21.004.001.355.4009PISOS Y PAVIMENTOS09.01PISO CERAMICO ANTIDESLIZANTEM271.47PRIMER PISOSALA DE COMPUTOM22.005.304.0042.40M22.001.200.701.68M22.002.650.552.92M21.005.104.2521.68M22.004.000.352.8010CONTRAZOCALOS10.01CONTRAZOCALO DE CERAMICO H=10 CMML39.80PRIMER PISOSALA DE COMPUTOML1.0039.8039.8010.02CONTRAZOCALO DE CERAMICO H=30 CMML7.80PRIMER PISOSALA DE COMPUTOML1.006.006.0011CUBIERTASML1.001.801.8011.01CUBIERTA LADR.PASTELERO 3CM.+FRAGUA C/MOR. 1:5M21.0012.507.1589.3889.3889.3812CARPINTERIA METALICA12.01PUERTA METALICA CON PLANCHA 1/40" C/MARCO 1 1/2"X1 1/2" Y REFUERZOSM26.72PRIMER PISOP-1M22.001.202.806.7212.02VENTANA DE FIERRO C/PERFIL DE 1"X1/8"M28.08PRIMER PISOV-1M21.003.700.802.96V-2M21.003.450.802.76V-3M21.002.950.802.3613CERRAJERIA13.01CHAPA PARA EXTERIOR, CON LLAVES INTERIOR Y EXTERIOR 3 GOLPESPZA2.00PRIMER PISOP-1PZA2.002.0014VIDRIOS, CRISTALES Y SIMILARES14.01VIDRIOS DOBLESP288.88PRIMER PISOV-1M21.003.7011.000.8032.56V-2M21.003.4511.000.8030.36V-3M21.002.9511.000.8025.9615PINTURA15.01PINTURA VINILICA EN CIELO RASO 2 MANOSM295.79TARRAJEO EN CIELORRASOSM21.0067.2067.20TARRAJEO EN SUPERFICIES DE VIGASM21.0028.5928.5915.02PINTURA VINILICA EN MUROS INTERIORES 2 MANOSM2126.22TARRAJEO DE INTERIORESM21.0082.4082.40TARRAJEO DE COLUMNASM21.0038.8538.85TARRAJEO DE DERRAMESM21.0033.100.154.9715.03PINTURA VINILICA EN MUROS EXTERIORES 2 MANOSM267.00COLUMNASM24.000.753.7011.10COLUMNASM24.000.753.7011.10COLUMNASM22.000.753.705.55COLUMNASM212.000.252.006.00COLUMNASM22.000.253.701.85COLUMNASM24.000.250.900.90COLUMNASM22.000.150.900.27VIGAS EJE A Y EJE DM22.006.100.455.49VIGA BORDEM21.0013.000.202.60VIGA VOLADOM24.001.350.754.05VIGA VB-2M24.001.350.351.89LOSA ALIGERADAM23.004.001.3516.2015.04PINTURA EN PUERTAS METALICASM26.72PRIMER PISOP-1M21.006.726.7215.05PINTURA EN VENTANAS METALICASM28.08PRIMER PISOV-1M21.008.088.0815.06PINTURA EN MURO CARAVISTA CON BARNIZM249.98PRIMER PISOMURO CARAVISTAM21.0049.9849.9816INSTALACIONES ELECTRICAS16.01SALIDA DE TECHO C/CABLE AWG TW 2.5 mm2 (14)+ PVC SEL 19 mm (3/4)PTO9.009.009.0016.02SALIDA DE PARED C/CABLE AWG TW 2.5 mm2 (14)+ PVC SEL 19 mm (3/4)PTO4.004.004.0016.03SALIDA PARA TOMACORRIENTE BIPOLAR DOBLE CON PVCPTO51.0051.0051.0016.04SALIDA PARA TELEFONOPTO1.001.001.0016.05SALIDA PARA ANTENA DE TELEVISION CON PVCPTO1.001.001.0016.06TUBERIAS PVC SAP (ELECTRICAS) D=1"M40.0040.0040.0016.07TABLEROS DISTRIBUCION CAJA METALICA CON 8 LLAVESPZA1.001.001.0016.08INTERRUPTOR THERMOMAGNETICO MONOFASICA 2 X 20A-30APZA11.0011.0011.0016.09INTERRUPTOR THERMOMAGNETICO MONOFASICA 2X 60APZA1.001.001.0016.10INTERRUPTOR THERMOMAGNETICO DIFERENCIALPZA3.003.003.0016.11PLACA TOMACORRIENTE DOBLE DE BAKELITAUND51.0051.0051.0016.12PLACA INTERRUPTOR DOBLE DE BAKELITAUND8.008.008.0016.13PLACA INTERRUPTOR TRIPLE DE BAKELITAUND1.001.001.0016.14PLACA SALIDA TELEFONO DE BAKELITAUND1.001.001.0016.15PLACA SALIDA TV-CABLE DE BAKELITAUND1.001.001.0016.16POZO-CONEXION A TIERRA EN SISTEMAUND1.001.001.0016.17FLUORESCENTE RECTO ISPE 2 X 40 W INCLUYENDO EQUIPO Y PANTALLAUND15.0015.0015.0016.18SUMINISTRO Y COLOCACION EN SISTEMAS DE REDGLB3.001.001.0017INSTALACIONES SANITARIAS17.01TUBERIA PVC SAL 3" PARA BAJADAS PRINCIPALESM14.8014.8014.80

OBRAS EXTERIORESHOJA DE METRADOSPROYECTO: CONSTRUCCIN DE PISCINA MUNICIPAL EDIFICADORES MISTI EN EL DISTRITO DE MIRAFLORESSUBPRESUPUESTO: OBRAS EXTERIORESFORMULA 06: OBRAS EXTERIORESOBRAS EXTERIORESITEMSDESCRIPCIONUND.CANT.MEDIDASPARCIALTOTALLARGOANCHOALTURAAREA06.00.00OBRAS EXTERIORES06.01.00OBRAS GENERALES06.01.01.00OBRAS PROVISIONALES0.00.006.01.01.01CASETA DE GUARDIANIAM20.018.00AREAM22.009.0018.0006.01.02.00TRABAJOS PRELIMINARES0.00.006.01.02.01LIMPIEZA DE TERRENO MANUALM20.03,762.02AREA TOTALM21.003,762.023,762.0206.01.02.02REMOCIN DE CERCO DE MALLA METALICA C/PARANTES DE TUBOM0.0100.89TRAMO A,B,C y DM1.00100.89100.890.006.01.02.03REMOCIN DE REJA METALICA DE CERCO PERIMETRICOM0.062.65TRAMO F',F,G,H,I,J y KM1.0062.6562.6506.01.02.04REMOCIN DE JUEGOS INFANTILES Y DEPORTIVOSUND0.07.00REMOCION DE JUEGOS INFANTILES Y DEPORTIVOS ZONA INTERIORUND7.007.0006.01.02.05REMOCION DE ADOQUIN DE CONCRETOM20.0240.39REMOCION DE ADOQUIN DE CONCRETO INGRESO PRINCIPALM21.00240.39240.3906.01.02.06DEMOLICION DE ELEMENTOS DE CONCRETO ARMADO CON EQUIPOM30.063.94COLUMNAS ZONA FRONTAL C1M326.000.300.153.003.51COLUMNAS ZONA FRONTAL C2M32.000.300.303.000.54COLUMNAS ZONA FRONTAL C3M32.000.550.153.000.50COLUMNAS ZONA FRONTAL C4M32.000.450.303.500.95PLATAFORMA DE INGRESOM31.000.25224.9856.25VIGA PUERTA DE INGRESO PRINCIPALM31.004.900.301.502.2106.01.02.07DEMOLICION DE MUROS DE ALBAILERIAM20.0147.49TRAMO F',F,G,H,I,J y KM21.0062.651.1068.92TRAMO F, GM21.006.084.0024.32TRAMO F' Y EM21.0015.503.5054.2506.01.02.08DEMOLICION DE VEREDAS DE CONCRETO C/EQUIPOM20.0115.37DEMOLICION DE VEREDAS INGRESO PRINCIPALM21.0064.8264.82M21.0050.5550.5506.01.02.09TRAZO Y REPLANTEO PRELIMINARM20.03,762.02AREA TOTALM21.003,762.023,762.0206.01.03.00MOVIMIENTO DE TIERRAS0.006.01.03.01CORTE DE TERRENO NATURAL CON EQUIPOM30.01,431.93CORTE EJE A-AM31.0014.8020.57304.44CORTE EJE B-BM31.0034.9615.56543.98CORTE EJE C-CM31.0035.195.79203.75CORTE PROVENIENTE DE ESTACIONAMIENTOS,VEREDAS.INGRESO,PRINCIPAL Y LOSA DEPORTIVAM31.000.152,531.77379.7706.01.03.02RELLENO COMPACTADO CON MATERIAL PROPIO C/EQUIPOM30.030.32CORTE EJE A-AM31.0014.800.172.52CORTE EJE C-CM31.0035.190.7927.8006.01.03.03SUB BASE GRANULAR DE E=0.15 M.M20.02,531.77INGRESO PRINCIPAL0.0AREA TOTAL PLAZA CIVICAM21.00474.89474.89VEREDASAREA DE ZONA EXTERIORM21.00116.81116.81AREA ZONA DE CAMINERIA,ESTACIONAMIENTOM21.00249.30249.30PAVIMENTO RIGIDOINGRESO ZONA DE ESTACIONAMIENTO LADO IZQUIERDOM21.00195.43195.43INGRESO ZONA DE ESTACIONAMIENTO LADO DERECHOM21.00593.62593.62INGRESO ZONA DE CAMINERIA AL FONDO SS.HH. VARONES - DAMASM21.0062.9262.92ESTACIONAMIENTOSINGRESO ZONA DE ESTACIONAMIENTO LADO IZQUIERDOM29.005.002.50112.50INGRESO ZONA DE ESTACIONAMIENTO LADO DERECHOM29.005.002.50112.50LOSA DEPORTIVALOSA DEPORTIVAM21.0033.0018.60613.8006.01.03.04NIVELACION INTERIOR Y COMPACTADO CON EQUIPOM20.03,762.02AREA TOTALM21.003,762.023,762.0206.01.03.05ELIMINACION MATERIAL EXCEDENTE CON MAQUINARIAM3VOL.FACT.0.01,931.23CORTE DE TERRENO NATURAL CON EQUIPOM31.001,401.611.301,822.10DEMOLICION DE ELEMENTOS DE CONCRETO ARMADOM31.0063.941.0063.94DEMOLICION DE MUROS DE ALBAILERIAM31.00147.490.151.0022.12DEMOLICION DE PISOS , VEREDAS Y RAMPAS DE CONCRETOM31.00115.370.201.0023.0706.02.00ESTACIONAMIENTO06.02.01MOVIMIENTO DE TIERRAS06.02.01.01EXCAVACIN MANUAL PARA SARDINELM0.0333.42INGRESO SECUNDARIO LADO IZQUIERDOM1.0012.1612.16INGRESO SECUNDARIO LADO IZQUIERDOM1.009.209.20INGRESO DE SERVICIOM1.0015.5915.59ZONA DE ESTACIONAMIENTOM1.0033.5533.55ZONA DE INGRESO VEHICULARM1.007.307.30PLAZA CIVICA LADO IZQUIERDOM1.0016.6516.65ZONA DE ESTACIONAMIENTO ZONA PRINCIPALM1.0022.6222.62PLAZA CIVICA LADO DERECHOM1.0010.6510.65ZONA PRINCIPAL LADO IZQUIERDOM1.009.109.10ZONA PRINCIPAL LADO DERECHOM1.0035.6535.65ZONA INTERIOR ESTACIONAMIENTO,JUEGOS INFANTILES LADO DERECHOM1.00112.35112.35ZONA DE JUEGOS INFANTILESM1.0030.9530.95ZONA HACIA LOSA DEPORTIVA LADO IZQUIERDOM1.0017.6517.6506.02.01.02ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIAM329.26ELIMINACIN PROVENIENTE DE EXCAVACIN MANUAL P/SARDINELM31.00333.420.150.451.3029.2606.02.02OBRAS DE CONCRETO SIMPLE06.02.02.01FALSO PISO E=4" (MEZCLA 1:10 C:H)M20.0511.37AREA TOTAL PLAZA CIVICAM21.00474.89474.89M21.000.15179.9426.99AREA DE GRADASM23.000.1511.655.24AREA DE GRADASM25.000.155.664.2506.02.02.02CONCRETO F'C=140 KG/CM2 PARA VEREDAS INCLUYE ENCOFRADOM2PERIM.0.0414.60AREA DE ZONA EXTERIOR LADO IZQUIERDOM21.0084.2684.26BORDEM21.0082.920.1512.44AREA DE ZONA EXTERIOR LADO DERECHOM21.0032.5532.55BORDEM21.0056.670.158.50AREA ZONA DE CAMINERIA,ESTACIONAMIENTOM21.00249.30249.30BORDEM21.00183.660.1527.5506.02.02.03CONCRETO F'C=210 KG/CM2 PARA PAVIMENTO RIGIDO INC. ENCOFRADOM3PERIM.0.0152.47INGRESO ZONA DE ESTACIONAMIENTO LADO IZQUIERDOM31.000.15195.4329.31M31.00182.680.035.48INGRESO ZONA DE ESTACIONAMIENTO LADO DERECHOM31.000.15593.6289.04M31.00528.820.0315.86INGRESO ZONA DE CAMINERIA AL FONDO SS.HH. VARONES - DAMASM31.000.1562.929.44M31.00111.000.033.3306.02.02.04CONCRETO F'C=175 KG/CM2 PARA SARDINELM30.016.29INGRESO SECUNDARIO LADO IZQUIERDOM31.0012.160.150.601.09INGRESO SECUNDARIO LADO IZQUIERDOM31.009.200.150.600.83INGRESO DE SERVICIOM31.0015.590.150.250.58ZONA DE ESTACIONAMIENTOM31.0033.550.150.251.26ZONA DE INGRESO VEHICULARM31.007.300.150.600.66PLAZA CIVICA LADO IZQUIERDOM31.0016.650.150.601.50ZONA DE ESTACIONAMIENTO ZONA PRINCIPALM31.0022.620.150.250.85PLAZA CIVICA LADO DERECHOM31.0010.650.150.250.40ZONA PRINCIPAL LADO IZQUIERDOM31.009.100.150.600.82ZONA PRINCIPAL LADO DERECHOM31.0035.650.150.251.34ZONA INTERIOR ESTACIONAMIENTO,JUEGOS INFANTILES LADO DERECHOM31.00112.350.150.254.21ZONA DE JUEGOS INFANTILESM31.0030.950.150.251.16ZONA HACIA LOSA DEPORTIVA LADO IZQUIERDOM31.0017.650.150.601.5906.02.02.05JUNTAS ASFALTICASM0.0725.24AREA TOTAL PLAZA CIVICAM4.0029.06116.24M10.0012.68126.80VEREDAS INTERIOR Y EXTERIORM1.0091.5091.50PAVIMENTO RIGIDOM1.00390.70390.7006.02.02.06PISO DE CONCRETO ESTAMPADO TIPO ADOQUIN DE 10X20 CM.M20.0225.00INGRESO ZONA DE ESTACIONAMIENTO LADO IZQUIERDOM29.005.002.50112.50INGRESO ZONA DE ESTACIONAMIENTO LADO DERECHOM29.005.002.50112.5006.02.02.07PISO DE PIEDRA LAJA TALAMOLLEM20.0480.13AREA TOTAL PLAZA CIVICAM21.00474.89474.89AREA DE GRADASM23.000.1511.655.2406.02.03OBRAS DE CONCRETO ARMADO0.006.02.03.01LOSA REFORZADA EN BANCAS0.006.02.03.01.01CONCRETO EN LOSA REFORZADDA DE BANCAS F'C= 210 KG/CM2M30.01.07LOSA REFORZADA DE BANCAM31.0023.800.450.101.0706.02.03.01.02ENCOFRADO Y DESENCOFRADO EN LOSA REFORZADA DE BANCASM20.013.09ENCOFRADO FONDOM20.4523.8010.71LATERALES DE LOSA DE BANCAM21.0023.800.102.3806.02.03.01.03LOSA REFORZADA BANCAS - ACERO Fy=4200 KG/CM2KG0.097.00ACERO GRADO 60 EN LOSA REFORZADA DE BANCASKG1.0097.0006.02.03.02MUROS REFORZADOS DE BANCAS0.006.02.03.02.01CONCRETO EN MUROS REFORZADOS DE BANCAS F'C= 210 KG/CM2M30.00.51CONCRETO EN APOYO DE LOSA DE BANCAM325.000.450.100.450.5106.02.03.02.01ENCOFRADO Y DESENCOFRADO EN MUROS REFORZADOS DE BANCASM20.012.38ENCOFRADO Y DESENCOFRADO EN MUROS REFORZADOS DE BANCASM225.001.100.4512.3806.02.03.02.01MURO REFORZADO BANCAS - ACERO Fy=4200 KG/CM2KG0.0124.00ACERO GRADO 60 EN MUROS REFORZADOS DE BANCASKG1.00124.0006.02.04REVOQUES ENLUCIDOS Y MOLDURAS06.02.04.01TARRAJEO DE BANCAS DE CONCRETOM224.97LONGITUD DE BANCAM20.5523.8013.09MUROS DE BANCAM224.001.100.4511.8806.02.04.02TARRAJEO DE SARDINELM0.0405.48INGRESO SECUNDARIO LADO IZQUIERDOM2.0012.1624.32INGRESO SECUNDARIO LADO IZQUIERDOM2.009.2018.40INGRESO DE SERVICIOM1.0015.5915.59ZONA DE ESTACIONAMIENTOM1.0033.5533.55ZONA DE INGRESO VEHICULARM2.007.3014.60PLAZA CIVICA LADO IZQUIERDOM2.0016.6533.30ZONA DE ESTACIONAMIENTO ZONA PRINCIPALM1.0022.6222.62PLAZA CIVICA LADO DERECHOM1.0010.6510.65ZONA PRINCIPAL LADO IZQUIERDOM2.009.1018.20ZONA PRINCIPAL LADO DERECHOM1.0035.6535.65ZONA INTERIOR ESTACIONAMIENTO,JUEGOS INFANTILES LADO DERECHOM1.00112.35112.35ZONA DE JUEGOS INFANTILESM1.0030.9530.95ZONA HACIA LOSA DEPORTIVA LADO IZQUIERDOM2.0017.6535.3006.02.05CARPINTERIA METLICA06.02.05.01BANCAS METALICAS - MADERA ORNAMENTALUND11.00PLAZA CIVICAUND1.004.00CAMINERIAUND1.003.00JUEGOS INFANTILESUND1.004.0006.02.05.02BASUREROSUND8.00INGRESO ZONA DE ESTACIONAMIENTO LADO IZQUIERDOUND1.002.00PLAZA CIVICAUND1.003.00CAMINERIAUND1.003.0006.02.05.03ASTA DE BANDERAUND3.00PLAZA CIVICA LADO DERECHOUND3.003.0006.02.05.04JUEGOS INFANTILESGLB1.00SUBE Y BAJAUND1.001.00ARCO TREPADORUND1.001.00TOBOGN TIPO CASTILLOUND1.001.00COLUMPIOSUND1.001.0006.02.05.05BARANDA METLICA CON TUBO NEGRO D=2"M26.10RAMPA DE MINUSVALIDOS ZONA INGRESO PRINCIPALM1.003.603.60PLAZA CIVICA LADO IZQUIERDOM2.008.5017.00ZONA DE ESTACIONAMIENTO LADO IZQUIERDOM1.005.505.5006.02.05.06PERGOLA TIPO IUND1.00ZONA PLAZA CIVICAUND1.001.001.0006.02.05.07PERGOLA TIPO IIUND7.00ZONA DE JUEGOS INFANTILESUND7.001.007.0006.02.06PINTURA06.02.06.01PINTURA EN VEREDAS Y SARDINELM399.72SARDINELINGRESO SECUNDARIO LADO IZQUIERDOM1.0012.1612.16INGRESO SECUNDARIO LADO IZQUIERDOM1.009.209.20INGRESO DE SERVICIOM1.0015.5915.59ZONA DE ESTACIONAMIENTOM1.0033.5533.55ZONA DE INGRESO VEHICULARM1.007.307.30PLAZA CIVICA LADO IZQUIERDOM1.0016.6516.65ZONA DE ESTACIONAMIENTO ZONA PRINCIPALM1.0022.6222.62PLAZA CIVICA LADO DERECHOM1.0010.6510.65ZONA PRINCIPAL LADO IZQUIERDOM1.009.109.10ZONA PRINCIPAL LADO DERECHOM1.0035.6535.65ZONA INTERIOR ESTACIONAMIENTO,JUEGOS INFANTILES LADO DERECHOM1.00112.35112.35ZONA DE JUEGOS INFANTILESM1.0030.9530.95ZONA HACIA LOSA DEPORTIVA LADO IZQUIERDOM1.0017.6517.65VEREDASINGRESO PISCINA LADO IZQUIERDOM1.0039.3039.30INGRESO PISCINA LADO DERECHOM1.0027.0027.0006.02.07JARDINERIA06.02.07.01SEMBRADO DE GRASSM2972.50ZONA DE ESTACIONAMIENTO LADO IZQUIERDOM21.0049.9449.94ZONA DE PLAZA CIVICA LADO DERCHOM31.00454.33454.33ZONA DE INGRESO SECUNDARIOM41.00247.22247.22ZONA DE JUEGOS INFANTILESM51.00119.96119.96ZONA DE CAMINERIA Y SS.HH. DE DAMAS Y VARONESM61.00101.05101.0506.02.07.02SEMBRADO DE ARBOLESUND22.00ZONA DE ESTACIONAMIENTO LADO IZQUIERDOUND7.007.00ZONA DE PLAZA CIVICA LADO DERCHOUND4.004.00ZONA DE INGRESO SECUNDARIOUND3.003.00ZONA DE JUEGOS INFANTILESUND4.004.00ZONA DE CAMINERIA Y SS.HH. DE DAMAS Y VARONESUND4.004.0006.02.08INSTALACIONES ELECTRICAS06.02.08.01EXCAVACION DE ZANJAS PARA TENDIDO DE CABLE DE LUZM379.62ZONA DE JUEGOS INFANTILESM31.001.020.300.500.15M31.006.120.300.500.92M31.002.350.300.500.35M31.005.180.300.500.78M31.005.470.300.500.82ZONA DE JUEGOS INFANTILESM31.002.920.300.500.44M31.003.890.300.500.58M31.004.800.300.500.72M31.0011.960.300.501.79M31.007.100.300.501.07M31.004.550.300.500.68M31.006.980.300.501.05M31.007.500.300.501.13M31.008.550.300.501.28M31.0010.100.300.501.52M31.004.300.300.500.65M31.004.300.300.500.65TABLERO TD-05 A SS.HH. DAMAS Y VARONESM31.0053.200.300.507.98TG A TD-05M32.0017.550.300.505.27ZONA DE INGRESO PRINCIPALM31.0013.300.300.502.00M31.008.650.300.501.30M31.003.250.300.500.49M31.004.550.300.500.68M31.004.700.300.500.71M31.004.550.300.500.68M31.006.200.300.500.93M31.006.400.300.500.96ZONA DE INGRESO PRINCIPALM31.007.350.300.501.10M31.0012.700.300.501.91M31.006.150.300.500.92M31.009.350.300.501.40M31.009.000.300.501.35M31.006.950.300.501.04M31.009.150.300.501.37M31.006.850.300.501.03M31.007.000.300.501.05M31.007.200.300.501.08M31.007.550.300.501.13M31.005.200.300.500.78M31.005.000.300.500.75M31.005.000.300.500.75M31.004.970.300.500.75M31.005.400.300.500.81M31.004.950.300.500.74M31.009.200.300.501.38M31.0011.200.300.501.68M31.008.250.300.501.24M31.006.250.300.500.94M31.004.150.300.500.62EXCAVACIN PARA POSTES METALICOSM345.001.000.500.9020.2506.02.08.02RELLENO Y COMPACTACIN DE ZANJAS PARA TENDIDO DE CABLE DE LUZM359.37ZONA DE JUEGOS INFANTILESM31.001.020.300.500.15M31.006.120.300.500.92M31.002.350.300.500.35M31.005.180.300.500.78M31.005.470.300.500.82M31.002.920.300.500.44M31.003.890.300.500.58M31.004.800.300.500.72M31.0011.960.300.501.79M31.007.100.300.501.07M31.004.550.300.500.68M31.006.980.300.501.05M31.007.500.300.501.13M31.008.550.300.501.28M31.0010.100.300.501.52M31.004.300.300.500.65M31.004.300.300.500.65TABLERO TD-05 A SS.HH. DAMAS Y VARONESM31.0053.200.300.507.98TG A TD-05M32.0017.550.300.505.27ZONA DE INGRESO PRINCIPALM31.0013.300.300.502.00M31.008.650.300.501.30M31.003.250.300.500.49M31.004.550.300.500.68M31.004.700.300.500.71M31.004.550.300.500.68M31.006.200.300.500.93M31.006.400.300.500.96M31.007.350.300.501.10M31.0012.700.300.501.91M31.006.150.300.500.92M31.009.350.300.501.40M31.009.000.300.501.35ZONA DE INGRESO PRINCIPALM31.006.950.300.501.04M31.009.150.300.501.37M31.006.850.300.501.03M31.007.000.300.501.05M31.007.200.300.501.08M31.007.550.300.501.13M31.005.200.300.500.78M31.005.000.300.500.75M31.005.000.300.500.75M31.004.970.300.500.75M31.005.400.300.500.81M31.004.950.300.500.74M31.009.200.300.501.38M31.0011.200.300.501.68M31.008.250.300.501.24M31.006.250.300.500.94M31.004.150.300.500.6206.02.08.03ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIAM344.14ESPONJAMIENTO DE EXCAVACINM31.000.3059.3717.81EXCAVACIN PARA POSTES METALICOSM345.001.000.500.901.3026.3306.02.08.04CONCRETO 1:10 + 30% P.G. PARA CIMIENTOS CORRIDOS DE POSTES METALICOSM320.25CONCRETO PARA POSTES METALICOSM345.001.000.500.9020.2506.02.08.05SALIDA DE CENTRO DE LUZ PAREDPTO7.00INGRESO PRINCIPAL7.007.0006.02.08.06BRAQUET REFLECTOR 1X70 WUND7.00INGRESO PRINCIPAL7.007.0006.02.08.07SUMINISTRO Y TENDIDO DE CABLE DE 3-1X6 MM2 NYYM1,441.59ZONA DE JUEGOS INFANTILESM3.003.5210.56M3.008.6225.86M3.004.8514.55M3.007.6823.04M3.007.7423.22M3.004.9214.76M3.005.8917.67M3.006.8020.40M3.0013.9641.88M3.009.1027.30M3.006.5519.65M3.008.9826.94M3.009.5028.50M3.0010.5531.65M3.0014.1042.30M3.006.3018.90M3.006.3018.90TABLERO TD-05 A SS.HH. DAMAS Y VARONESM3.0055.20165.60M3.0019.5558.65ZONA DE INGRESO PRINCIPALM3.0015.3045.90M3.0010.6531.95M3.005.2515.75M3.006.5519.65M3.006.7020.10M3.006.5519.65M3.008.2024.60M3.008.4025.20M3.009.3528.05M3.0014.7044.10M3.008.1524.45M3.0011.3534.05M3.0011.0033.00M3.008.9526.85M3.0011.1533.45M3.008.8526.55M3.009.0027.00M3.009.2027.60M3.009.5528.65M3.007.2021.60M3.007.0021.00M3.007.0021.00M3.006.9720.91M3.007.4022.20M3.006.9520.85M3.0011.2033.60M3.0013.2039.60M3.0010.2530.75M3.008.2524.75M3.006.1518.4506.02.08.08EMPALME DE DERIVACIN A POSTESUND25.00ZONA DE JUEGOS INFANTILESUND10.0010.00ZONA DE INGRESO PRINCIPALUND15.0015.0006.02.08.09POSTE METLICO FIERRO NEGRO H=4.50 M.UND45.00POSTES METALICOSUND45.0045.0006.02.08.10LUMINARIA CONICA CON LAMPARA DE VAPOR DE SODIO DE 70 WUND45.00LUMINARIA CONICA CON LAMPARA DE VAPOR DE SODIO DE 70 WUND45.0045.0006.02.08.11REFLECTOR VS DE 400 WUND6.00LOSA DEPORTIVAUND6.006.0006.02.08.12TABLERO DE DISTRIBUCIN TD - 05UND1.00TABLERO TD-05UND1.001.0006.02.08.13ALIMENTADOR DE TG A TD - 05M99.00SUMINISTRO Y TENDIDO DE CABLE DE 2-1X16 MM2 NYYM3.0033.0099.0006.02.08.14CAJA DE PASE DE 200X200X100 MM.UND4.00ZONA AREA VERDEUND4.004.0006.02.09INSTALACIONES SANITARIAS06.02.09.01EXCAVACIN DE ZANJAS HASTA H=1.50 M.M30.062.73EXCAVACIN DE ZANJAS PARA AGUA DE LLAVE DE CONTROL A CAJA 1M31.0012.260.300.501.84EXCAVACIN DE ZANJAS PARA AGUA DE CAJA 1 A CAJA 2M31.0013.470.300.502.02EXCAVACIN DE ZANJAS PARA AGUA DE CAJA 2 A CAJA 3M31.0020.000.300.503.00EXCAVACIN DE ZANJAS PARA AGUA DE CAJA 3 A CAJA 4M31.0022.400.300.503.36EXCAVACIN DE ZANJAS PARA AGUA DE MEDIDOR 1 A INGRESOM31.0023.650.300.503.55EXCAVACIN DE ZANJAS PARA AGUA DE RAMAL A CAJA 5M31.0010.100.300.501.52EXCAVACIN DE ZANJAS PARA AGUA DE MEDIDOR 2 A CASA MAQUINASM31.0017.250.300.502.59EXCAVACIN DE ZANJAS PARA DESAGUE DE CAJA 1 A CAJA 2M31.0038.000.400.507.60EXCAVACIN DE ZANJAS PARA DESAGUE DE CAJA 2 A CAJA 3M31.0015.000.400.905.40EXCAVACIN DE ZANJAS PARA DESAGUE DE CAJA 3 A CAJA 4M31.0015.000.401.056.30EXCAVACIN DE ZANJAS PARA DESAGUE DE CAJA 4 A CAJA 5M31.0015.000.401.207.20EXCAVACIN DE ZANJAS PARA DESAGUE DE CAJA 5 A CAJA 6M31.0015.000.401.358.10EXCAVACIN DE ZANJAS PARA DESAGUE DE CAJA 6 A CAJA 7M31.0011.400.601.5010.2606.02.09.02EXCAVACIN DE ZANJAS DE H=1.50 M. A H=3.00 M.M30.0134.46EXCAVACIN DE ZANJAS PARA DESAGUE DE CAJA 7 A CAJA 8M31.0011.400.601.6511.29EXCAVACIN DE ZANJAS PARA DESAGUE DE CAJA 8 A BUZON 2M31.0011.400.601.8012.31EXCAVACIN DE ZANJAS PARA DESAGUE DE CASA MAQ. A BUZON 1M31.0015.850.602.9027.58EXCAVACIN DE ZANJAS PARA DESAGUE DE BUZON 1 A BUZON 2M31.0020.750.603.0037.35EXCAVACIN DE ZANJAS PARA DESAGUE DE BUZON 2 A RED PUBLICAM31.0025.520.603.0045.940.006.02.09.03EXCAVACIN DE BUZN H=3.00 M. DN 1.20 M.M30.06.78EXCAVACIN DE ZANJAS PARA BUZN 1M31.003.001.133.39EXCAVACIN DE ZANJAS PARA BUZN 2M31.003.001.133.3906.02.09.04CAMA PROTECTOR PARA TUBERIA DE DESAGUEM30.017.34EXCAVACIN DE ZANJAS PARA DESAGUE DE CAJA 6 A CAJA 7M31.0011.400.600.302.05EXCAVACIN DE ZANJAS PARA DESAGUE DE CAJA 7 A CAJA 8M31.0011.400.600.302.05EXCAVACIN DE ZANJAS PARA DESAGUE DE CAJA 8 A BUZON 2M31.0011.400.600.302.05EXCAVACIN DE ZANJAS PARA DESAGUE DE CASA MAQ. A BUZON 1M31.0015.850.600.302.85EXCAVACIN DE ZANJAS PARA DESAGUE DE BUZON 1 A BUZON 2M31.0020.750.600.303.74EXCAVACIN DE ZANJAS PARA DESAGUE DE BUZON 2 A RED PUBLICAM31.0025.520.600.304.5906.02.09.05RELLENO COMPACTADO CON MATERIAL PROPIO CON EQUIPO197.19EXCAVACIN DE ZANJAS HASTA H=1.50 M.M31.0062.7362.73EXCAVACIN DE ZANJAS HASTA DE H=1.50 M. A H=3.00 M.M31.00134.46134.4606.02.09.06ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIAM67.97ESPONJAMIENTO DE EXCAVACINM31.000.30197.1959.16EXCAVACIN DE BUZONESM31.001.306.788.8106.02.09.07TUBERIA DE DISTRIBUCIN DE PVC DE 4"M109.40TUBERIA PARA DESAGUE DE CAJA 1 A CAJA 2M1.0038.0038.00TUBERIA PARA DESAGUE DE CAJA 2 A CAJA 3M1.0015.0015.00TUBERIA PARA DESAGUE DE CAJA 3 A CAJA 4M1.0015.0015.00TUBERIA PARA DESAGUE DE CAJA 4 A CAJA 5M1.0015.0015.00TUBERIA PARA DESAGUE DE CAJA 5 A CAJA 6M1.0015.0015.00TUBERIA PARA DESAGUE DE CAJA 6 A CAJA 7M1.0011.4011.4006.02.09.08TUBERIA COLECTORA DE PVC DE 6" DN 160 MMM50.05TUBERIA PARA DESAGUE DE CAJA 6 A CAJA 7M1.0011.4011.40TUBERIA PARA DESAGUE DE CAJA 7 A CAJA 8M1.0011.4011.40TUBERIA PARA DESAGUE DE CAJA 8 A BUZON 2M1.0011.4011.40TUBERIA PARA DESAGUE DE CASA MAQ. A BUZON 1M1.0015.8515.8506.02.09.09TUBERIA COLECTORA DE PVC DE 8" DN 200 MMM46.27TUBERIA PARA DESAGUE DE BUZON 1 A BUZON 2M1.0020.7520.75TUBERIA PARA DESAGUE DE BUZON 2 A RED PUBLICAM1.0025.5225.5206.02.09.10CAJA DE REGISTRO DE CONCRETO DE 0.40X0.60 M.UND5.00CAJA 1 DE DESAGUEUND1.001.001.00CAJA 2 DE DESAGUEUND1.001.001.00CAJA 3 DE DESAGUEUND1.001.001.00CAJA 4 DE DESAGUEUND1.001.001.00CAJA 5 DE DESAGUEUND1.001.001.0006.02.09.11CAJA DE REGISTRO DE CONCRETO DE 0.60X0.60 M.UND3.00CAJA 6 DE DESAGUEUND1.001.001.00CAJA 7 DE DESAGUEUND1.001.001.00CAJA 8 DE DESAGUEUND1.001.001.0006.02.09.12CONTRUCCIN DE BUZN H=2.50 M DN 1.20 MUND2.00BUZON 1UND1.001.001.00BUZON 2UND1.001.001.000.006.02.09.13SALIDA DE AGUA FRIA CON TUBERIA DE PVC - SAP 1/2"PTO5.00CAJA 1 DE AGUAPTO1.001.001.00CAJA 2 DE AGUAPTO1.001.001.00CAJA 3 DE AGUAPTO1.001.001.00CAJA 4 DE AGUAPTO1.001.001.00CAJA 5 DE AGUAPTO1.001.001.0006.02.09.14TUBERIA DE AGUA FRIA DE 3/4"M78.23TUBERIA PARA AGUA DE LLAVE DE CONTROL A CAJA 1M1.0012.2612.26TUBERIA PARA AGUA DE CAJA 1 A CAJA 2M1.0013.4713.47TUBERIA PARA AGUA DE CAJA 2 A CAJA 3M1.0020.0020.00TUBERIA PARA AGUA DE CAJA 3 A CAJA 4M1.0022.4022.40TUBERIA PARA AGUA DE RAMAL A CAJA 5M1.0010.1010.1006.02.09.15TUBERIA DE AGUA FRIA DE 1 1/2"M40.90TUBERIA PARA AGUA DE MEDIDOR 1 A INGRESOM1.0023.6523.65TUBERIA PARA AGUA DE MEDIDOR 2 A CASA MAQUINASM1.0017.2517.2506.02.09.16VALVULA DE COMPUERTA BRONCE DE 3/4"UND6.00MODULO DE SERVICIOSUND1.001.001.00CAJA 1 DE AGUAUND1.001.001.00CAJA 2 DE AGUAUND1.001.001.00CAJA 3 DE AGUAUND1.001.001.00CAJA 4 DE AGUAUND1.001.001.00CAJA 5 DE AGUAUND1.001.001.0006.02.09.17VALVULA DE COMPUERTA BRONCE DE 1 1/2"M2.00MEDIDOR 1 A INGRESOM1.001.00MEDIDOR 2 A CASA MAQUINASM1.001.0006.02.09.18CAJA DE CONCRETO PARA AGUA DE 0.30X0.30 M.UND5.00CAJA 1 DE AGUAUND1.001.001.00CAJA 2 DE AGUAUND1.001.001.00CAJA 3 DE AGUAUND1.001.001.00CAJA 4 DE AGUAUND1.001.001.00CAJA 5 DE AGUAUND1.001.001.0006.03.00CERCO PERIMETRICO06.03.01MOVIMIENTO DE TIERRAS06.03.01.01EXCAVACIN DE ZANJAS PARA CIMIENTOSM30.096.30ZONA DE INGRESO SECUNDARIOM31.003.650.500.901.64ZONA EXTERIOR LADO IZQUIERDOM31.0025.070.500.9011.28ZONA EXTERIOR LADO IZQUIERDOM31.005.750.500.902.59ZONA EXTERIOR LADO IZQUIERDOM31.004.000.500.901.80ZONA DE INGRESO PEATONAL Y VEHICULARM31.0012.551.401.8031.63ZONA EXTERIOR LADO DERECHOM31.0027.500.500.9012.38ZONA DE ESTACIONAMIENTO (LIMITE DE CANHA DE FUTBOL)M31.002.100.450.800.76ZONA DE ESTACIONAMIENTO (LIMITE DE CANHA DE FUTBOL)M31.0089.800.450.8032.33ZONA DE ESTACIONAMIENTO (LIMITE DE CANHA DE FUTBOL)M31.005.300.450.801.9106.03.01.02RELLENO COMPACTADO CON MATERIAL PROPIO CON EQUIPOM30.022.41ZONA DE INGRESO PEATONAL Y VEHICULARM31.0012.551.401.4024.60REA DE COLUMNASM3-6.000.400.651.40-2.1806.03.01.03ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIAM396.06ELIMINACIN PROVENIENTE DE EXCAVACIN DE ZANJASM31.0073.891.3096.0606.03.02OBRAS DE CONCRETO SIMPLE06.03.02.01CONCRETO 1:10 + 30% P.G. PARA CIMIENTOS CORRIDOS DE CERCOM364.68ZONA DE INGRESO SECUNDARIOM31.003.650.500.901.64ZONA EXTERIOR LADO IZQUIERDOM31.0025.070.500.9011.28ZONA EXTERIOR LADO IZQUIERDOM31.005.750.500.902.59ZONA EXTERIOR LADO IZQUIERDOM31.004.000.500.901.80ZONA EXTERIOR LADO DERECHOM31.0027.500.500.9012.38ZONA DE ESTACIONAMIENTO (LIMITE DE CANHA DE FUTBOL)M31.002.100.450.800.76ZONA DE ESTACIONAMIENTO (LIMITE DE CANHA DE FUTBOL)M31.0089.800.450.8032.33ZONA DE ESTACIONAMIENTO (LIMITE DE CANHA DE FUTBOL)M31.005.300.450.801.9106.03.02.02SOBRECIMIENTOS06.03.02.02.01CONCRETO 1:8 + 25% P.M. PARA SOBRECIMIENTOSM39.32ZONA DE INGRESO SECUNDARIOM31.003.650.250.300.27ZONA EXTERIOR LADO IZQUIERDOM31.0025.070.250.301.88ZONA EXTERIOR LADO IZQUIERDOM31.005.750.250.300.43ZONA EXTERIOR LADO IZQUIERDOM31.004.000.250.300.30ZONA EXTERIOR LADO DERECHOM31.0027.500.250.302.06ZONA DE ESTACIONAMIENTO (LIMITE DE CANHA DE FUTBOL)M31.002.100.150.300.09ZONA DE ESTACIONAMIENTO (LIMITE DE CANHA DE FUTBOL)M31.0089.800.150.304.04ZONA DE ESTACIONAMIENTO (LIMITE DE CANHA DE FUTBOL)M31.005.300.150.300.2406.03.02.02.02ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTOSM297.90ZONA DE INGRESO SECUNDARIOM22.003.650.302.19ZONA EXTERIOR LADO IZQUIERDOM22.0025.070.3015.04ZONA EXTERIOR LADO IZQUIERDOM22.005.750.303.45ZONA EXTERIOR LADO IZQUIERDOM22.004.000.302.40ZONA EXTERIOR LADO DERECHOM22.0027.500.3016.50ZONA DE ESTACIONAMIENTO (LIMITE DE CANHA DE FUTBOL)M22.002.100.301.26ZONA DE ESTACIONAMIENTO (LIMITE DE CANHA DE FUTBOL)M22.0089.800.3053.88ZONA DE ESTACIONAMIENTO (LIMITE DE CANHA DE FUTBOL)M22.005.300.303.1806.03.02.02.03JUNTAS ASFALTICASM0.054.39ZONA DE INGRESO SECUNDARIOM1.003.651.221.22ZONA EXTERIOR LADO IZQUIERDOM1.0025.078.368.36ZONA EXTERIOR LADO IZQUIERDOM1.005.751.921.92ZONA EXTERIOR LADO IZQUIERDOM1.004.001.331.33ZONA EXTERIOR LADO DERECHOM1.0027.509.179.17ZONA DE ESTACIONAMIENTO (LIMITE DE CANHA DE FUTBOL)M1.002.100.700.70ZONA DE ESTACIONAMIENTO (LIMITE DE CANHA DE FUTBOL)M1.0089.8029.9329.93ZONA DE ESTACIONAMIENTO (LIMITE DE CANHA DE FUTBOL)M1.005.301.771.7706.03.03OBRAS DE CONCRETO ARMADO06.03.03.01ZAPATAS06.03.03.01.01CONCRETO EN ZAPATAS F'C=210 KG/CM2M30.07.82ZONA DE INGRESO PRINCIPALM31.0012.561.400.407.03ZONA DE INGRESO PRINCIPALM41.001.401.400.400.7806.03.03.01.02ENCOFRADO Y DESENCOFRADO DE ZAPATASM2PERIM.0.013.41ZONA DE INGRESO PRINCIPALM21.0027.920.4011.17ZONA DE INGRESO PRINCIPALM21.005.600.402.2406.03.03.01.03ZAPATAS - ACERO Fy=4200 KG/CM2KG0.0182.00ZONA DE INGRESO PRINCIPALKG1.00182.0006.03.03.02COLUMNAS06.03.03.02.01CONCRETO EN COLUMNAS F'C=210 KG/CM2M30.022.28ZONA DE INGRESO PRINCIPAL C-1M320.000.250.303.304.95ZONA DE INGRESO PRINCIPAL C-3M33.000.250.503.301.24ZONA DE ESTACIONAMIENTO (LIMITE DE CANHA DE FUTBOL) C-2M335.000.150.253.104.07ZONA DE INGRESO PRINCIPAL C-4M37.000.400.654.908.92ZONA EXTERIOR LADO IZQUIERDO VIGUETAM31.0065.970.250.101.65ZONA EXTERIOR LADO DERECHO VIGUETAM31.0097.200.150.101.4606.03.03.02.02ENCOFRADO Y DESENCOFRADO EN COLUMNASM2PERI.0.0247.27ZONA DE INGRESO PRINCIPAL C-1M220.001.103.3072.60ZONA DE INGRESO PRINCIPAL C-3M23.001.603.3015.84ZONA DE ESTACIONAMIENTO (LIMITE DE CANHA DE FUTBOL) C-2M235.000.803.1086.80ZONA DE INGRESO PRINCIPAL C-4M27.002.104.9072.0306.03.03.02.03COLUMNAS - ACERO Fy=4200 KG/CM2KG0.02,264.00ACERO GRADO 60KG1.002,264.0006.03.04MUROS Y TABIQUES DE ALBAILERIA06.03.04.01MURO DE LADRILLO K.K. CABEZA C:A 1:5M20.054.27ZONA DE INGRESO SECUNDARIOM21.003.050.802.44ZONA EXTERIOR LADO IZQUIERDOM29.002.700.8019.44ZONA EXTERIOR LADO IZQUIERDOM21.002.120.801.70ZONA EXTERIOR LADO IZQUIERDOM21.003.510.802.81ZONA EXTERIOR LADO DERECHOM28.002.700.8017.28ZONA EXTERIOR LADO DERECHOM21.003.210.802.57ZONA DE INGRESO PRINCIPALM21.0010.050.808.0406.03.04.02MURO DE LADRILLO K.K. DE SOGA UNA CARAVISTAM20.0ZONA DE ESTACIONAMIENTO (LIMITE DE CANHA DE FUTBOL)M21.001.570.701.1061.82ZONA DE ESTACIONAMIENTO (LIMITE DE CANHA DE FUTBOL)M21.002.300.701.61ZONA DE ESTACIONAMIENTO (LIMITE DE CANHA DE FUTBOL)M229.002.750.7055.83ZONA DE ESTACIONAMIENTO (LIMITE DE CANHA DE FUTBOL)M21.002.450.701.72ZONA DE ESTACIONAMIENTO (LIMITE DE CANHA DE FUTBOL)M21.002.250.701.5806.03.05REVOQUES ENLUCIDOS Y MOLDURAS06.03.05.01TARRAJEO EN EXTERIORES MEZCLA C:A 1:5M2245.51SOBRECIMIENTOZONA DE INGRESO SECUNDARIOM21.003.050.302.001.83ZONA EXTERIOR LADO IZQUIERDOM29.002.700.302.0014.58ZONA EXTERIOR LADO IZQUIERDOM21.002.120.302.001.27ZONA EXTERIOR LADO IZQUIERDOM21.003.510.302.002.11ZONA EXTERIOR LADO DERECHOM28.002.700.302.0012.96ZONA EXTERIOR LADO DERECHOM21.003.210.302.001.93MURO DE LADRILLOZONA DE INGRESO SECUNDARIOM21.003.050.901.002.75ZONA EXTERIOR LADO IZQUIERDOM29.002.700.902.0043.74ZONA EXTERIOR LADO IZQUIERDOM21.002.120.902.003.82ZONA EXTERIOR LADO IZQUIERDOM21.003.510.902.006.32ZONA EXTERIOR LADO DERECHOM28.002.700.902.0038.88ZONA EXTERIOR LADO DERECHOM21.003.210.902.005.78ZONA DE INGRESO PRINCIPALM21.0010.050.902.0018.09SOBRECIMIENTOZONA DE ESTACIONAMIENTO (LIMITE DE CANHA DE FUTBOL)M21.001.570.302.000.94ZONA DE ESTACIONAMIENTO (LIMITE DE CANHA DE FUTBOL)M21.002.300.302.001.38ZONA DE ESTACIONAMIENTO (LIMITE DE CANHA DE FUTBOL)M229.002.750.302.0047.85ZONA DE ESTACIONAMIENTO (LIMITE DE CANHA DE FUTBOL)M21.002.450.302.001.47ZONA DE ESTACIONAMIENTO (LIMITE DE CANHA DE FUTBOL)M21.002.250.302.001.35VIGUETAM22.0088.320.1017.66VIGA VA INGRESO PEATONALM22.0011.560.9020.8106.03.05.02TARRAJEO DE COLUMNASM2PERIM.175.24ZONA DE INGRESO PRINCIPAL C-1M220.001.103.3072.60ZONA DE INGRESO PRINCIPAL C-3M23.001.603.3015.84ZONA DE ESTACIONAMIENTO (LIMITE DE CANHA DE FUTBOL) C-2M235.000.803.1086.8006.03.05.03VESTIDURA DE DERRAMES EN VANOS MEZCLA C:A 1:5M151.46ZONA DE INGRESO SECUNDARIOM1.003.053.05ZONA EXTERIOR LADO IZQUIERDOM9.002.7024.30ZONA EXTERIOR LADO IZQUIERDOM1.002.122.12ZONA EXTERIOR LADO IZQUIERDOM1.003.513.51ZONA EXTERIOR LADO DERECHOM8.002.7021.60ZONA EXTERIOR LADO DERECHOM1.003.213.21ZONA DE INGRESO PRINCIPALM1.0010.0510.05ZONA DE ESTACIONAMIENTO (LIMITE DE CANHA DE FUTBOL)M1.001.571.57ZONA DE ESTACIONAMIENTO (LIMITE DE CANHA DE FUTBOL)M1.002.302.30ZONA DE ESTACIONAMIENTO (LIMITE DE CANHA DE FUTBOL)M29.002.7579.7506.03.05.05ENCHAPE DE PIEDRAM2PERIM.51.45COLUMNASZONA DE INGRESO PRINCIPALM27.002.103.5051.4506.03.06CARPINTERIA METALICA06.03.06.01PUERTA METLICA PESADAM292.49ZONA DE INGRESO SECUNDARIO 1M21.003.503.2011.20ZONA DE INGRESO SECUNDARIO 2M21.003.763.2012.03ZONA DE INGRESO PEATONAL PRINCIPALM22.001.953.5013.65ZONA DE INGRESO PEATONAL PRINCIPALM23.001.753.5018.38ZONA DE INGRESO VEHICULAR PRINCIPALM21.007.203.5025.20ZONA DE INGRESO A ESTADIOM21.003.763.2012.0306.03.06.02REJA CON TUBO METALICOM2121.36ZONA DE INGRESO SECUNDARIOM21.003.052.106.41ZONA EXTERIOR LADO IZQUIERDOM29.002.702.1051.03ZONA EXTERIOR LADO IZQUIERDOM21.002.122.104.45ZONA EXTERIOR LADO IZQUIERDOM21.003.512.107.37ZONA EXTERIOR LADO DERECHOM28.002.702.1045.36ZONA EXTERIOR LADO DERECHOM21.003.212.106.7406.03.06.03REJA CON MALLA METLICAM2176.64ZONA DE ESTACIONAMIENTO (LIMITE DE CANHA DE FUTBOL)M21.001.572.003.14ZONA DE ESTACIONAMIENTO (LIMITE DE CANHA DE FUTBOL)M21.002.302.004.60ZONA DE ESTACIONAMIENTO (LIMITE DE CANHA DE FUTBOL)M229.002.752.00159.50ZONA DE ESTACIONAMIENTO (LIMITE DE CANHA DE FUTBOL)M21.002.452.004.90ZONA DE ESTACIONAMIENTO (LIMITE DE CANHA DE FUTBOL)M21.002.252.004.5006.03.07CERRAJERIA06.03.07.01BISAGRA ALUMINIZADA CAPUCHINA DE 4"X 4"PZA56.00ZONA DE INGRESO SECUNDARIO 1PZA1.006.006.00ZONA DE INGRESO SECUNDARIO 2PZA1.006.006.00ZONA DE INGRESO PEATONAL PRINCIPALPZA5.006.0030.00ZONA DE INGRESO VEHICULAR PRINCIPALPZA1.008.008.00ZONA DE INGRESO A ESTADIOPZA1.006.006.0006.03.07.02CERRADURA TIPO FORTE DE 3 GOLPESPZA9.00ZONA DE INGRESO SECUNDARIO 1PZA1.001.001.00ZONA DE INGRESO SECUNDARIO 2PZA1.001.001.00ZONA DE INGRESO PEATONAL PRINCIPALPZA5.001.005.00ZONA DE INGRESO VEHICULAR PRINCIPALPZA1.001.001.00ZONA DE INGRESO A ESTADIOPZA1.001.001.0006.03.08PINTURA06.03.08.01PINTURA EN MUROS EXTERIORES Y COLUMNASM2450.95SOBRECIMIENTOZONA DE INGRESO SECUNDARIOM21.003.050.302.001.83ZONA EXTERIOR LADO IZQUIERDOM29.002.700.302.0014.58ZONA EXTERIOR LADO IZQUIERDOM21.002.120.302.001.27ZONA EXTERIOR LADO IZQUIERDOM21.003.510.302.002.11ZONA EXTERIOR LADO DERECHOM28.002.700.302.0012.96ZONA EXTERIOR LADO DERECHOM21.003.210.302.001.93MURO DE LADRILLOZONA DE INGRESO SECUNDARIOM21.003.050.901.002.75ZONA EXTERIOR LADO IZQUIERDOM29.002.700.902.0043.74ZONA EXTERIOR LADO IZQUIERDOM21.002.120.902.003.82ZONA EXTERIOR LADO IZQUIERDOM21.003.510.902.006.32ZONA EXTERIOR LADO DERECHOM28.002.700.902.0038.88ZONA EXTERIOR LADO DERECHOM21.003.210.902.005.78ZONA DE INGRESO PRINCIPALM21.0010.050.902.0018.09SOBRECIMIENTOZONA DE ESTACIONAMIENTO (LIMITE DE CANHA DE FUTBOL)M21.001.570.302.000.94ZONA DE ESTACIONAMIENTO (LIMITE DE CANHA DE FUTBOL)M21.002.300.302.001.38ZONA DE ESTACIONAMIENTO (LIMITE DE CANHA DE FUTBOL)M229.002.750.302.0047.85ZONA DE ESTACIONAMIENTO (LIMITE DE CANHA DE FUTBOL)M21.002.450.302.001.47ZONA DE ESTACIONAMIENTO (LIMITE DE CANHA DE FUTBOL)M21.002.250.302.001.35VIGUETAM22.0088.320.1017.66TARRAJEO EN COLUMNASM2PERI.ZONA DE INGRESO PRINCIPAL C-1M220.001.103.3072.60ZONA DE INGRESO PRINCIPAL C-3M23.001.603.3015.84ZONA DE ESTACIONAMIENTO (LIMITE DE CANHA DE FUTBOL) C-2M235.000.803.1086.80VESTIDURA DE DERRAMESZONA DE INGRESO SECUNDARIOM21.003.050.250.76ZONA EXTERIOR LADO IZQUIERDOM29.002.700.256.08ZONA EXTERIOR LADO IZQUIERDOM21.002.120.250.53ZONA EXTERIOR LADO IZQUIERDOM21.003.510.250.88ZONA EXTERIOR LADO DERECHOM28.002.700.255.40ZONA EXTERIOR LADO DERECHOM21.003.210.250.80ZONA DE INGRESO PRINCIPALM21.0010.050.252.51ZONA DE ESTACIONAMIENTO (LIMITE DE CANHA DE FUTBOL)M21.001.570.150.24ZONA DE ESTACIONAMIENTO (LIMITE DE CANHA DE FUTBOL)M21.002.300.150.35ZONA DE ESTACIONAMIENTO (LIMITE DE CANHA DE FUTBOL)M229.002.750.1511.96ZONA DE ESTACIONAMIENTO (LIMITE DE CANHA DE FUTBOL)M21.002.450.150.37ZONA DE ESTACIONAMIENTO (LIMITE DE CANHA DE FUTBOL)M21.002.250.150.34VIGA VA INGRESO PEATONALM22.0011.560.9020.8106.04.00LOSA DEPORTIVA06.04.01MOVIMIENTO DE TIERRAS06.04.01.01EXCAVACIN DE ZANJAS PARA CIMIENTOSM30.07.20ZONA DE GRADERIASM31.0036.000.500.407.2006.04.01.02ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIAM39.36ELIMINACIN PROVENIENTE DE EXCAVACIN DE ZANJASM31.007.201.309.3606.04.02OBRAS DE CONCRETO SIMPLE06.04.02.01SOBRECIMIENTOS06.04.02.01.01CONCRETO 1:8 + 25% P.M. PARA SOBRECIMIENTOSM32.45ZONA DE GRADERIASM31.0036.000.150.402.16GRADAS DE GRADERIASM34.001.200.300.200.2906.04.02.01.02ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTOSM230.12ZONA DE GRADERIASM22.0036.000.4028.80M22.000.400.150.12GRADAS DE GRADERIASM24.001.500.201.2006.04.02.02GRADERIAS SOBRE TERRENO06.04.02.02.01CONCRETO EN GRADERIAS SOBRE TERRENO F'C=175 KG/CM2M379.20ZONA DE GRADERIASM31.0036.002.2079.2006.04.02.02.02ENCOFRADO Y DESENCOFRADO PARA GRADERIAS SOBRE TERRENOM2148.40TAPA POSTERIOR GRADERIASM21.0036.001.6057.60TAPA INTERIOR DE GRADERIASM22.0036.000.4028.80CONTRAPASO DE GRADERIASM22.0036.000.4028.80CONTRAPASO DE GRADERIASM21.0036.000.8028.80LATERALES DE GRADERIASM22.002.204.4006.04.02.03LOSA MACIZA SOBRE EL SUELO F'C=210 KG/CM206.04.02.03.01CONCRETO EN LOSA MACIZA SOBRE EL SUELO F'C=210 KG/CM2M392.07ZONA DE GRADERIASM31.0033.0018.600.1592.0706.04.02.03.02ENCOFRADO Y DESENCOFRADO PARA LOSA MACIZA SOBRE EL SUELOM267.05PAO DE 4 LADOSM233.0012.000.1559.40PAO DE 2 LADOSM22.006.000.151.80PAO DE 1 LADOSM213.003.000.155.850.006.04.02.03.03JUNTAS DE DILATACINM345.00LONGITUDINALESM5.0033.00165.00TRANSVERSALESM10.0018.00180.0006.04.03REVOQUES ENLUCIDOS Y MOLDURAS06.04.03.01TARRAJEO DE GRADERIAS MEZCLA C:A 1:5212.36SOBRECICIMIENTOZONA DE GRADERIASM22.0036.000.4028.80M22.000.400.150.12M21.0036.000.155.40GRADAS DE GRADERIASM24.001.500.201.20M24.001.200.301.44GRADERIASTAPA POSTERIOR GRADERIASM21.0036.001.6057.60PASO DE GRADERIASM21.0036.000.7527.00PASO DE GRADERIASM22.0036.000.6043.20CONTRAPASO DE GRADERIASM23.0036.000.4043.20LATERALES DE GRADERIASM22.002.204.4006.04.04CARPINTERIA METALICA06.04.04.01COLUMNA METALICA PARA COBERTURA DE LOSA DEPORTIVAUND14.00COLUMNA METALICA PARA COBERTURA DE LOSA DEPORTIVAUND2.007.0014.0006.04.04.02ARCO Y TABLERO DE LOSA DEPORTIVAPAR1.00ARCO Y TABLERO DE LOSA DEPORTIVAPAR1.001.0006.04.04.03MALLA DE PROTECCIN METALICA PARA LOSA DEPORTIVAM2138.18LOSA DEPORTIVAM22.0016.402.1068.88LOSA DEPORTIVAM21.0033.002.1069.3006.04.04.04MALLA RACHELLM2688.05MALLA RACHELL PARA LOSA DEPORTIVAM21.0033.0020.85688.0506.04.05PINTURA06.04.04.01PINTURA ESMALTE EN LOSA DEPORTIVAM348.03AREA DE ZONA DE FULBITO PERIMETROM2.0086.40172.80AREA DE ZONA DE BASQUET CIRCULOSM2.0022.8545.70AREA DE ZONA DE BASQUET CIRCULOSM4.005.9023.60AREA DE ZONA DE BASQUET CIRCULOSM3.0011.3133.93AREA DE ZONA DE VOLEY PERIMETROM1.0054.0054.00AREA DE ZONA DE VOLEY TRANSVERSALESM2.009.0018.0006.05MODULO DE SERVICIOS06.05.01MOVIMIENTO DE TIERRAS0.00.006.05.01.01EXCAVACION DE ZANJAS PARA CIMIENTOS HASTA 1.00 M.M30.026.31EXCAVACION PARA CIMIENTOS CORRIDOS0.0CC-01M30.0EJE AM31.003.880.501.001.94EJE BM31.005.920.501.002.96EJE B'M31.003.760.501.001.88EJE B''M31.004.100.501.002.05EJE CM31.002.100.501.001.05M31.002.350.501.001.18EJE DM31.007.320.501.003.66EJE 1'M31.001.550.501.000.78EJE 2M31.002.010.501.001.01M31.002.050.501.001.03M31.002.050.501.001.03EJE 3M31.005.710.501.002.86CC-02M3EJE 1'M31.001.550.501.000.78M31.008.260.501.004.130.006.05.01.02RELLENO COMPACTADO CON MATERIAL PROPIO CON EQUIPOM30.05.27MATERIAL PROVENIENTE DE EXCAVACIONESM31.005.275.270.006.05.01.03ELIMINACION MATERIAL EXCEDENTE CON MAQUINARIAM3VOL.FACT.0.027.35EXCAVACIONM31.0021.041.3027.350.006.05.02OBRAS DE CONCRETO SIMPLE0.00.006.05.02.01CONCRETO 1:10 + 30 % P. G. PARA CIMIENTOS CORRIDOS0.021.04CIMIENTOS CORRIDOS0.0CC-01M30.0EJE AM31.003.880.500.801.55EJE BM31.005.920.500.802.37EJE B'M31.003.760.500.801.50EJE B''M31.004.100.500.801.64EJE CM31.002.100.500.800.84M31.002.350.500.800.94EJE DM31.007.320.500.802.93EJE 1'M31.001.550.500.800.62EJE 2M31.002.010.500.800.80M31.002.050.500.800.82M31.002.050.500.800.82EJE 3M31.005.710.500.802.28CC-02M30.0EJE 1'M31.001.550.500.800.62M31.008.260.500.803.3006.05.02.02FALSO PISO E=4" (MEZCLA 1:10 C:H)M20.042.62SS. HH. VARONESM21.0025.3225.32SS. HH. DAMASM21.0017.3017.3006.05.02.03SOBRECIMIENTOS0.006.05.02.03.01CONCRETO 1:8 + 25 % P. M. PARA SOBRECIMIENTOSM20.03.53SOBRECIMIENTOS 14 CMCARAS0.0EJE AM21.003.710.150.450.25EJE BM21.005.500.150.450.37EJE B'M21.003.260.150.450.22EJE B''M21.003.600.150.450.24EJE CM21.001.770.150.450.12M21.001.780.150.450.12EJE DM21.007.150.150.450.48EJE 1M21.0010.960.150.450.74EJE 1'M21.000.550.150.450.04M21.000.450.150.450.03EJE 2M21.002.360.150.450.16M21.002.400.150.450.16M21.002.400.150.450.16EJE 3M21.006.360.150.450.4306.05.02.03.02ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTOSM20.047.03SOBRECIMIENTOS 14 CMCARAS0.0EJE AM21.003.712.000.453.34EJE BM21.005.502.000.454.95EJE B'M21.003.262.000.452.93EJE B''M21.003.602.000.453.24EJE CM21.001.772.000.451.59M21.001.782.000.451.60EJE DM21.007.152.000.456.44EJE 1M21.0010.962.000.459.86EJE 1'M21.000.552.000.450.50M21.000.452.000.450.41EJE 2M21.002.362.000.452.12M21.002.402.000.452.16M21.002.402.000.452.16EJE 3M21.006.362.000.455.720.006.05.03OBRAS DE CONCRETO ARMADO0.00.006.05.03.01COLUMNAS0.00.006.05.03.01.01CONCRETO EN COLUMNAS F'C=210 KG/CM2M30.01.98C-010.0EJE AM31.000.150.302.700.12EJE BM32.000.150.302.700.24EJE CM34.000.150.302.700.49EJE DM32.000.150.302.700.24EJE 1M31.000.150.302.700.12EJE 2M32.000.150.302.700.24EJE 3M31.000.150.302.700.12C-02EJE AM31.000.150.502.700.20EJE BM31.000.150.502.700.200.006.05.03.01.02ENCOFRADO Y DESENCOFRADO PARA COLUMNASM20.025.65C-010.0EJE AM21.000.602.701.62EJE BM22.000.602.703.24EJE CM21.000.752.702.033.000.452.703.65EJE DM22.000.602.703.24EJE 1M21.000.602.701.62EJE 2M22.000.602.703.24EJE 3M21.000.602.701.62C-020.0EJE AM21.001.002.702.70EJE BM21.001.002.702.700.006.05.03.01.03COLUMNAS - ACERO FY=4200 KG/CM2KG0.0448.00ACERO DE REFUERZOKG1.00448.00448.000.006.05.03.02COLUMNAS DE CONFINAMIENTO06.05.03.02.01CONCRETO EN COLUMNAS DE CONFINAMIENTO F'C=175 KG/CM2M30.00.61C-A0.0EJE BM31.000.150.252.700.10EJE B'M32.000.150.252.700.20EJE B''M32.000.150.252.700.20EJE DM31.000.150.252.700.100.006.05.03.02.02ENCOFRADO Y DESENCOFRADO EN COLUMNAS DE CONFINAMIENTOM20.09.63C-A0.0EJE BM21.000.652.701.76EJE B'M22.000.652.703.51EJE B''M22.000.652.703.51EJE DM21.000.501.700.8506.05.03.02.03COLUMNAS DE CONFINAMIENTO - ACERO FY=4200 KG/CM2KG0.075.00ACERO DE REFUERZOKG1.0075.0075.000.006.05.03.03VIGAS0.00.006.05.03.03.01CONCRETO EN VIGAS FC=210 KG/CM2M30.03.04PRIMER NIVEL0.0VS-010.0EJE AM31.003.710.250.200.19EJE BM31.007.150.250.200.36EJE B'M31.007.150.250.200.36EJE CM31.007.150.250.200.36EJE DM31.001.930.250.200.10VS-02EJE DM31.003.220.200.150.10VA-01EJE 1M31.002.300.300.200.14M31.002.730.300.200.16M31.002.730.300.200.16M31.001.800.300.200.11EJE 2M31.002.300.300.200.14M31.002.730.300.200.16M31.002.730.300.200.16EJE 3M31.002.730.300.200.16M31.002.730.300.200.16VA-02EJE 1'M31.001.750.250.200.09DINTELM32.001.000.150.300.09M31.000.900.150.300.0406.05.03.03.02ENCOFRADO Y DESENCOFRADO NORMAL EN VIGASM20.028.73PRIMER NIVEL0.0VS-01CARASPER.0.0EJE AM21.003.711.000.351.30EJE BM21.003.711.000.301.11M21.003.441.000.501.72EJE B'M21.007.151.000.302.15EJE CM21.001.931.000.350.68M21.003.301.000.501.65M21.001.931.000.350.68EJE DM21.001.931.000.350.68VS-02EJE DM21.003.221.000.401.29VA-01CARASPER.EJE 1M21.002.302.000.351.61M21.002.732.000.351.91M21.002.732.000.351.91M21.001.802.000.351.26EJE 2M21.002.302.000.351.61M21.002.732.000.351.91M21.002.731.000.350.96EJE 3M21.002.730.350.96M21.002.732.000.351.91VA-020.0M21.001.752.000.451.58DINTELM22.002.150.301.29M21.001.950.300.5906.05.03.03.03VIGAS - ACERO FY=4200 KG/CM2KG0.01,208.00VIGASKG1.001,208.001,208.000.006.05.03.04LOSAS ALIGERADAS H: 0.20 M.0.00.006.05.03.04.01CONCRETO EN LOSAS ALIGERADAS F'C=210 KG/CM2M30.03.84PRIMER NIVELFACT.0.0SS. HH. VARONESM31.000.08757.110.62M32.000.08758.611.51SS. HH. DAMASM32.000.08758.561.50LIMPIEZAM31.000.08752.410.210.006.05.03.04.02ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERADASM20.043.86PRIMER NIVEL0.0SS. HH. VARONESM21.007.117.11M22.008.6117.22SS. HH. DAMASM22.008.5617.12LIMPIEZAM21.002.412.410.006.05.03.04.03LOSAS ALIGERADAS - ACERO FY=4200 KG/CM2KG0.0225.00PRIMER NIVELKG1.00225.00225.000.006.05.03.04.04LADRILLO HUECO DE ARCILLA 15X30X30 CM PARA TECHO ALIGERADOUND0.0361.85PRIMER NIVELFACT.0.0SS. HH. VARONESM21.008.25007.1158.66M22.008.25008.61142.07SS. HH. DAMASM22.008.25008.56141.24LIMPIEZAM21.008.25002.4119.8806.05.04MUROS Y TABIQUES DE ALBANILERIA06.05.04.01MUROS DE LADRILLO K.K. SOGA C:A 1:5125.19PRIMER NIVELEJE AM21.003.412.709.21EJE BM21.001.612.704.35M21.003.292.708.88EJE B'M21.002.762.707.45EJE B''M21.001.532.704.13M21.001.422.703.83EJE CM21.001.622.704.37M21.001.472.703.97EJE DM21.001.622.704.37MURO INCLINADOM21.007.387.38EJE 1M21.002.252.706.08M21.002.732.707.37M21.002.882.707.78M21.001.602.704.32EJE 2M21.002.052.705.54M21.002.732.707.37M21.001.582.704.27EJE 3M21.002.532.706.83M21.002.732.707.37AZOTEAEJE AM21.003.710.301.11EJE BM21.003.440.301.03EJE CM21.005.230.301.57EJE DM21.001.930.300.58EJE 1M21.0010.960.303.29EJE 2M21.002.700.300.81EJE 3M21.006.430.301.9306.05.05REVOQUES ENLUCIDOS Y MOLDURAS06.05.05.01TARRAJEO PRIMARIOM258.44SS. HH. VARONESM21.0017.252.0034.50SS. HH. DAMASM21.0011.972.0023.9406.05.05.02TARRAJEO EN INTERIORES MEZCLA C:A 1:5M288.73SS. HH. VARONESM21.0012.142.7032.78M21.0017.250.7012.08SS. HH. DAMASM21.009.492.7025.62M21.001.200.700.84LIMPIEZAM21.006.452.7017.4206.05.05.03TARRAJEO EN EXTERIORES MEZCLA C:A 1:5M2123.31PRIMER NIVELTARRAJEO EXTERIORM21.0031.573.20101.02PRIMER NIVELM21.000.603.201.92M22.008.3616.72VIGASPRIMER NIVELEJE CHALLM21.003.300.652.15EJE 1'LIMPIEZAM21.000.900.650.59EJE DM21.006.130.150.9206.05.05.04VESTIDURA DE DERRAMES EN PUERTAS, VENTANAS Y VANOS E=15 CM.M19.10PRIMER NIVELSS. HH. VARONESM1.006.406.40SS. HH. DAMASM1.006.406.40LIMPIEZAM1.006.306.3006.05.06CIELORRASOS06.05.06.01CIELORRASOS CON MEZCLA DE CEMENTO-ARENAM243.86PRIMER NIVELSS. HH. VARONESM21.007.117.11M22.008.6117.22SS. HH. DAMASM22.008.5617.12LIMPIEZAM21.002.412.4106.05.07PISOS Y PAVIMENTOS06.05.07.01PISO DE CERAMICO ANTIDESLIZANTE 30X30 CM.M258.70SS. HH. VARONESM21.0025.3225.32SS. HH. DAMASM21.0017.3017.30LIMPIEZAM21.002.882.88HALLM21.0013.2013.2006.05.07.02PISO CEMENTO FROTACHADO Y BRUADO E=4"M216.08LIMPIEZAM21.002.882.88HALLM21.0013.2013.2006.05.08CONTRAZOCALOS Y ZOCALOS06.05.08.01CONTRAZOCALOS DE CERAMICO DE 10X30 CM.M40.08SS. HH. VARONESM1.0012.1412.14M1.0017.2517.25SS. HH. DAMASM1.009.499.49M1.001.201.2006.05.08.02ZOCALO DE CERAMICO DE 30X30 CM.M58.44SS. HH. VARONESM21.0017.252.0034.50SS. HH. DAMASM21.0011.972.0023.9406.05.09COBERTURAS06.05.09.01CUBIERTAS DE LADRILLO PASTELERO ASENTADO CON MEZCLA 1:5 E=2"M53.55AZOTEAM1.0053.5553.5506.05.10CARPINTERIA METALICAM206.05.10.01PUERTAS METALICAS6.96PRIMER NIVELSS. HH. VARONESM21.001.002.402.40SS. HH. DAMASM21.001.002.402.40LIMPIEZAM21.000.902.402.1606.05.10.02DIVISIONES PARA SERVICIOS HIGIENICOS10.34PRIMER NIVELSS. HH. VARONES CASETA DE INODOROM22.000.602.102.52SS. HH. DAMAS CASETA DE INODOROM22.000.602.102.52PRIMER NIVELSS. HH. VARONESM21.001.002.602.60SS. HH. DAMASM21.001.002.702.7006.05.10.03REJAS DE PROTECCION DE VENTANAS1.96PRIMER NIVELSS. HH. VARONESM21.000.380.38M22.000.200.40SS. HH. DAMASM21.000.380.38M23.000.200.60LIMPIEZAM21.000.200.2006.05.11CERRAJERIA06.05.11.01BISAGRA ALUMINIZADA CAPUCHINA DE 4"x4"PZA9.00SS. HH. VARONESPZA3.003.00SS. HH. DAMASPZA3.003.00LIMPIEZAPZA3.003.0006.05.11.02CERRADURA TIPO FORTE DE 3 GOLPES3.00SS. HH. VARONESPZA1.001.00SS. HH. DAMASPZA1.001.00LIMPIEZAPZA1.001.0006.05.12VIDRIOS, CRISTALES Y SIMILARESPIE206.05.10.01VIDRIO GRIS DE 4 MM.14.64PRIMER NIVELSS. HH. VARONESPIE21.000.384.09PIE21.000.202.15SS. HH. VARONESPIE21.000.384.09PIE21.000.202.15LIMPIEZAPIE21.000.202.1506.05.13PINTURA06.05.13.01PINTURA LATEX EN MUROS INTERIORESM288.73SS. HH. VARONESM21.0012.142.7032.78M21.0017.250.7012.08SS. HH. DAMASM21.009.492.7025.62M21.001.200.700.84LIMPIEZAM21.006.452.7017.4206.05.13.02PINTURA LATEX EN MUROS EXTERIORESM2119.66PRIMER NIVELTARRAJEO EXTERIORM21.0031.573.20101.02PRIMER NIVELM21.000.603.201.92M22.008.3616.7206.05.13.03PINTURA PARA CARPINTERIA METALICA 2 MANOSM238.52PUERTAS METALICAS INTERIORESPRIMER NIVELSS. HH. VARONESM22.001.002.404.80SS. HH. DAMASM22.001.002.404.80LIMPIEZAM22.000.902.404.32DIVISIONES METALICASPRIMER NIVELSS. HH. VARONES CASETA DE INODOROM22.001.202.105.04SS. HH. DAMAS CASETA DE INODOROM22.001.202.105.04PRIMER NIVELSS. HH. VARONESM22.001.002.605.20SS. HH. DAMASM22.001.002.705.40PROTECCION VENTANASPRIMER NIVELSS. HH. VARONESM22.000.380.76M24.000.200.80SS. HH. DAMASM22.000.380.76M26.000.201.20LIMPIEZAM22.000.200.4006.05.14INSTALACIONES ELECTRICAS06.05.14.01SALIDA DE CENTRO DE LUZ TECHOPTO7.00SS. HH. VARONESPTO1.003.003.00SS. HH. DAMASPTO1.002.002.00LIMPIEZAPTO1.001.001.00HALLPTO1.001.001.0006.05.14.02ARTEFACTO FLUORESCENTE DE 2X36 W INCLUYE EQUIPO Y PANTALLAUND5.00SS. HH. VARONESUND1.003.003.00SS. HH. DAMASUND1.002.002.0006.05.14.03ARTEFACTO FLUORESCENTE CIRCULARUND2.00LIMPIEZAUND1.001.001.00HALLUND1.001.001.0006.05.14.04INSTALACIN DE ARTEFACTOS DE ILUMINACINPTO7.00SS. HH. VARONESPTO1.003.003.00SS. HH. DAMASPTO1.002.002.00LIMPIEZAPTO1.001.001.00HALLPTO1.001.001.0006.05.15INSTALACIONES SANITARIAS06.05.15.01INODORO BLANCO TANQUE BAJO INCLUYE ACCESORIOSPZA4.00SS. HH. VARONES1.002.002.00SS. HH. DAMAS1.002.002.0006.05.15.02URINARIO COLOR BLANCO CON GRIFERIAPZA3.00SS.HH VARONES1.003.003.0006.05.15.03OVALIN DE LOSA BLANCO CON GRIFERIAPZA4.00SS. HH. VARONES1.002.002.00SS. HH. DAMAS1.002.002.0006.05.15.04PAPELERA DE LOZA DE 15 X 15 CMPZA4.00SS. HH. VARONES1.002.002.00SS. HH. DAMAS1.002.002.0006.05.15.05COLOCACION DE APARATOS SANITARIOSPZA11.00INODORO TANQUE BAJO COLOR1.004.004.00URINARIOS DE LOZA DE PICO COLOR1.003.003.00LAVATORIO DE LOZA CON PEDESTAL1.004.004.0006.05.15.06COLOCACION DE ACCESORIOS SANITARIOSPZA4.00SS. HH. VARONES1.002.002.00SS. HH. DAMAS1.002.002.0006.05.15.07SALIDAS DE PVC SAL PARA DESAGUE DE 2"PTO11.00SS. HH. VARONES1.007.007.00SS. HH. DAMAS1.004.004.0006.05.15.08SALIDAS DE PVC SAL PARA DESAGUE DE 3"PTO2.00SS. HH. VARONES1.001.001.00SS. HH. DAMAS1.001.001.0006.05.15.09SALIDAS DE PVC SAL PARA DESAGUE DE 4"PTO8.00SS. HH. VARONES1.004.004.00SS. HH. DAMAS1.004.004.0006.05.15.10TUBERIA DE PVC SAL DE 3"M6.00BAJADA DE LLUVIA 11.003.003.00BAJADA DE LLUVIA 21.003.003.0006.05.15.11TUBERIA DE DISTRIBUCION PVC DE 4"M14.75SS. HH. VARONES1.008.708.70SS. HH. DAMAS1.006.056.0506.05.15.12EXCAVACION DE ZANJAM14.75SS. HH. VARONES1.008.708.70SS. HH. DAMAS1.006.056.0506.05.15.13SUMIDEROS DE 2"PZA4.00SS. HH. VARONES1.002.002.00SS. HH. DAMAS1.002.002.0006.05.15.14REGISTRO ROSCADO DE BRONCE DE 4"UND2.00SS. HH. VARONES1.001.001.00SS. HH. DAMAS1.001.001.0006.05.15.15CAJA DE REGISTRO DE CONCRETO DE 0.40 X 0.60 M.UND1.00HALL1.001.001.0006.05.15.16SALIDA DE AGUA FRIA CON TUBERIA DE PVC SAP 1/2"PTO11.00SS. HH. VARONES1.007.007.00SS. HH. DAMAS1.004.004.0006.05.15.17TUBERIA DE AGUA FRIA DE 1/2"M11.00SS. HH. VARONES1.007.007.00SS. HH. DAMAS1.004.004.0006.05.15.18VALVULA DE COMPUERTA DE 1/2"UND2.00SS.HH VARONES1.001.001.00SS.HH DAMAS1.001.001.00

ACEROMETRADO DE ACEROPROYECTO: CONSTRUCCIN DE PISCINA MUNICIPAL EDIFICADORES MISTI EN EL DISTRITO DE MIRAFLORESSUBPRESUPUESTO: ESTRUCTURAFORMULA 01: ESTRUCTURAELEMENTO - DESCRIPCIONN VECESN BARRASLONG. BARRALONGITUD X DIAMETRO1/4"3/8"1/2"5/8"3/4"LOSA REFORZADA EN BANCALOSA DE BANCA REFORZADAMALLA SUP. LONG.3/81.004.0023.8095.20MALLA SUP. TRANSV.3/81.000.45159.0071.55Longitud (m)0.0166.750.00.00.0Peso (Kg/m)0.250.581.021.602.26Peso (Kg)0.097.000.00.00.0TOTAL (kg)97.00ELEMENTO - DESCRIPCIONN VECESN BARRASLONG. BARRALONGITUD X DIAMETRO1/4"3/8"1/2"5/8"3/4"MURO REFORZADO EN BANCAPAREDES DE APOYOMALLA VERT.1/225.004.000.9595.00MALLA HOR.3/825.004.000.4545.00Longitud (m)0.045.0095.000.00.0Peso (Kg/m)0.250.581.021.602.26Peso (Kg)0.027.0097.000.00.0TOTAL (kg)124.00ELEMENTO - DESCRIPCIONN VECESN BARRASLONG. BARRALONGITUD X DIAMETRO1/4"3/8"1/2"5/8"3/4"ZAPATAINGRESO PRINCIPALMALLA VERT.1/21.0051.001.4071.40MALLA HORIZ.1/21.007.0012.5687.92COLUMNA C-4MALLA VERT.1/21.006.001.408.40MALLA HORIZ.1/21.007.001.409.80Longitud (m)0.00.0177.520.00.0Peso (Kg/m)0.250.581.021.602.26Peso (Kg)0.00.0182.000.00.0TOTAL (kg)182.00ELEMENTO - DESCRIPCIONN VECESN BARRASLONG. BARRALONGITUD X DIAMETRO1/4"3/8"1/2"5/8"3/4"COLUMNASPRIMER NIVELC-1LONGITUDINAL1/220.004.004.50360.00ESTRIBOS1/420.0022.001.10484.00C-2LONGITUDINAL1/235.004.004.30602.00ESTRIBOS1/435.0020.000.80560.00C-3LONGITUDINAL1/23.008.004.50108.00ESTRIBOS1/43.0020.001.5090.00C-4LONGITUDINAL1/27.0010.005.85409.50ESTRIBOS1/47.0038.002.10558.60C-4LONGITUDINAL1/26.004.001.5036.00ESTRIBOS1/46.006.000.8028.80VIGUETA INGRESO PRINCIPALLONGITUDINAL3/81.002.0011.5523.10ESTRIBOS1/41.0077.000.2519.25VIGUETA LADO IZQUIERDOLONGITUDINAL3/81.002.0065.97131.94ESTRIBOS1/41.00440.000.35154.00VIGUETA LADO DERECHOLONGITUDINAL3/81.002.0097.20194.40ESTRIBOS1/41.00648.000.25162.00Longitud (m)2,056.65349.441,515.500.00.0Peso (Kg/m)0.250.581.021.602.26Peso (Kg)515.00203.001,546.000.00.0TOTAL (kg)2,264.00ELEMENTO - DESCRIPCIONN VECESN BARRASLONG. BARRALONGITUD X DIAMETRO1/4"3/8"1/2"5/8"3/4"COLUMNAS ESTRUCTURALESPRIMER NIVELC-01EJE ALONGITUDINAL1/21.004.004.2517.00ESTRIBOS3/81.0023.000.9020.70EJE BLONGITUDINAL1/22.004.004.2534.00ESTRIBOS3/82.0023.000.9041.40EJE CLONGITUDINAL1/24.004.004.2568.00ESTRIBOS3/84.0023.000.9082.80EJE DLONGITUDINAL1/22.004.004.2534.00ESTRIBOS3/82.0023.000.9041.40EJE 1LONGITUDINAL1/21.004.004.2517.00ESTRIBOS3/81.0023.000.9020.70EJE 2LONGITUDINAL1/22.004.003.7530.00ESTRIBOS3/82.0023.000.9041.40EJE 3LONGITUDINAL1/21.004.004.2517.00ESTRIBOS3/81.0023.000.9020.70C-02EJE ALONGITUDINAL1/21.004.004.2517.00ESTRIBOS3/81.0023.001.3029.90EJE BLONGITUDINAL1/21.004.004.2517.00ESTRIBOS3/81.0023.001.3029.90Longitud (m)0.0328.90251.000.00.0Peso (Kg/m)0.250.581.021.602.26Peso (Kg)0.0191.00257.000.00.0TOTAL (kg)448.00ELEMENTO - DESCRIPCIONN VECESN BARRASLONG. BARRALONGITUD X DIAMETRO1/4"3/8"1/2"5/8"3/4"COLUMNAS DE CONFINAMIENTOPRIMER NIVELC - AEJE BLONGITUDINAL3/81.004.003.7515.00ESTRIBOS1/41.0018.000.8014.40EJE B'LONGITUDINAL3/82.004.003.7530.00ESTRIBOS1/42.0018.000.8028.80EJE B''LONGITUDINAL3/82.004.003.7530.00ESTRIBOS1/42.0018.000.8028.80EJE DLONGITUDINAL3/81.004.003.7515.00ESTRIBOS1/41.0018.000.8014.40Longitud (m)86.4090.000.00.00.0Peso (Kg/m)0.250.581.021.602.26Peso (Kg)22.0053.000.00.00.0TOTAL (kg)75.00ELEMENTO - DESCRIPCIONN VECESN BARRASLONG. BARRALONGITUD X DIAMETRO1/4"3/8"1/2"5/8"3/4"VIGAS ESTRUCTURALESPRIMER NIVELVS-101EJE ALONGITUDINAL1/24.004.003.7560.00ESTRIBOS TIPO I3/81.0024.001.0024.00EJE BLONGITUDINAL1/24.004.007.20115.20ESTRIBOS TIPO I3/81.0048.001.0048.00EJE B'LONGITUDINAL1/24.004.007.20115.20ESTRIBOS TIPO I3/81.0048.001.0048.00EJE CLONGITUDINAL1/24.004.007.20115.20ESTRIBOS TIPO I3/81.0055.001.0055.00EJE DLONGITUDINAL1/24.004.001.9831.68ESTRIBOS TIPO I3/81.0015.001.0015.00VS-102EJE DLONGITUDINAL1/24.004.003.3052.80ESTRIBOS TIPO I3/81.0020.001.0020.00VA-01EJE 1LONGITUDINAL1/24.004.0011.11177.76ESTRIBOS TIPO I3/81.0017.001.0017.00ESTRIBOS TIPO I3/82.0022.001.0044.00ESTRIBOS TIPO I3/81.0019.001.0019.00EJE 2LONGITUDINAL1/24.004.009.06144.96ESTRIBOS TIPO I3/81.0019.001.0019.00ESTRIBOS TIPO I3/82.0022.001.0044.00ESTRIBOS TIPO I3/81.0016.001.0016.00ESTRIBOS TIPO I3/81.0012.001.0012.00EJE 3LONGITUDINAL1/24.004.006.51104.16ESTRIBOS TIPO I3/81.0021.001.0021.00ESTRIBOS TIPO I3/82.0022.001.0044.00VA-02EJE 01'LONGITUDINAL1/21.004.002.5010.00ESTRIBOS TIPO III1/41.0013.000.709.10Longitud (m)9.10446.00926.960.00.0Peso (Kg/m)0.250.581.021.602.26Peso (Kg)3.00259.00946.000.00.0TOTAL (kg)1,208.00ELEMENTO - DESCRIPCIONN VECESN BARRASLONG. BARRALONGITUD X DIAMETRO1/4"3/8"1/2"5/8"3/4"LOSA ALIGERADA C/LADRILLOPRIMER NIVELSS. HH. VARONESPOSITIVO1/25.001.003.6118.05NEGATIVO3/810.002.001.3727.40TEMPERATURA1/410.001.0010.50105.00SS. HH. VARONES - SS. HH. DAMASPOSITIVO1/212.001.007.0584.60NEGATIVO3/824.001.001.3732.88NEGATIVO3/812.001.002.2627.12TEMPERATURA1/448.001.002.73131.04HALLPOSITIVO3/84.001.001.957.80NEGATIVO3/84.001.001.807.20Longitud (m)236.04102.40102.650.00.0Peso (Kg/m)0.250.581.021.602.26Peso (Kg)60.0060.00105.000.00.0TOTAL (kg)225.00

CAL ESTRIBOSCALCULO DE ESTRIBOS TIPO ILONGITUD CARA-CARA3.1N ACEROS8RESTOTOTALNUMERO DE FIERROS1327.2019.220ESPACIAMIENTO0.050.10.150.2516413330.71.31.81441331CALCULO DE ESTRIBOS IILONGITUD CARA-CARA2.4N ACEROS10RESTOTOTALNUMERO DE FIERROS1441.5019.5201612ESPACIAMIENTO0.050.10.150.213130.9442.10.33329CALCULO DE ESTRIBOS IIILONGITUD CARA-CARA2.9N ACEROS8RESTOTOTALNUMERO DE FIERROS1335.2019.220ESPACIAMIENTO0.050.10.150.250.71.61.3CALCULO DE ESTRIBOS IVLONGITUD CARA-CARA2.9N ACEROS8RESTOTOTALNUMERO DE FIERROS1317.6017.618ESPACIAMIENTO0.050.10.150.250.711.9

VCMETRADO DE ACEROVIGA DE CIMENTACIONELEMENTODESCRIPCIONN VEC.N FE.LONG. FE.1/4"8 mm1/2"5/8"3/4"PRIMER PISOVC-01LONGITUDINAL1/2586.90276.00ESTRIBOS85381.30247.00FACTOR0.250.491.021.601.60TOTAL KG012228200404GRAN TOTAL EN VIGAS DE CIMENTACION4042.050.852.172.5CALCULO DE ESTRIBOSLONGITUD CARA-CARA5.1N ACEROSRESTOTOTALNUMERO DE FIERROS14311.6027.628ESPACIAMIENTO0.050.150.150.25LONG. PERMITIDA2.22.9ALTURA PARAPETO0XNUMERO DE FIERROS000ESPACIAMIENTO0.2ALTURA LOSA0NUMERO DE FIERROS0.0000ESPACIAMIENTO0.07528

MURO CONT.METRADO DE ACEROMURO DE CONTENCIONELEMENTODESCRIPCIONN VEC.N FE.LONG. FE.1/4"3/8"1/2"5/8"3/4"PAO A-B , C-DVERTICAL1/22145.00140.00VERTICAL3/82143.1086.80HORIZONTAL1/22244.80230.40PAO B-CVERTICAL1/21125.0060.00VERTICAL3/81123.1037.20HORIZONTAL1/21244.80115.20FACTOR0.250.581.021.601.60TOTAL KG07255700629GRAN TOTAL EN MURO DE CONTENCION629CALCULO DE ESTRIBOSLONGITUD CARA-CARA2.5N ACEROSRESTOTOTALNUMERO DE FIERROS1117.2013.214ESPACIAMIENTO0.050.150.150.25LONG. PERMITIDA0.71.8ALTURA PARAPETO0XNUMERO DE FIERROS000ESPACIAMIENTO0.2ALTURA LOSA0NUMERO DE FIERROS0.0000ESPACIAMIENTO0.07514

COL. CONF.METRADO DE ACEROCOLUMNAS DE CONFINAMIENTOCOLUMNAS PRIMER PISODESCRIPCIONELEMENTON VECESN BARRASLONG. BARRA1/4"3/8"1/2"5/8"EJE 1, C-4LONGITUDINAL3/8643.3580.40ESTRIBO1/46200.8096.00EJE 1, C-4LONGITUDINAL3/8243.8530.80ESTRIBO1/42240.8038.40EJE 2, V-1LONGITUDINAL3/8642.9069.60ESTRIBO1/46140.8067.20FACTOR0.250.581.021.60TOTAL KG5110500156CALCULO DE ESTRIBOSLONGITUD CARA-CARA3.45N ACEROSRESTOTOTALNUMERO DE FIERROS1328.6020.621ESPACIAMIENTO0.050.10.150.251.32.15ALTURA PARAPETO0X0NUMERO DE FIERROS000ESPACIAMIENTO0.2ALTURA LOSA0NUMERO DE FIERROS0.0000ESPACIAMIENTO0.1521181818862

VIG. CONF.METRADO DE ACEROVIGAS DE CONFINAMIENTOVIGAS PRIMER PISODESCRIPCIONELEMENTON VECESN BARRASLONG. BARRA1/4"3/8"1/2"5/8"EJE 1, V-1LONGITUDINAL3/8222.8511.40ESTRIBO1/42180.4014.40LONGITUDINAL3/8221.004.00ESTRIBO1/4240.403.20LONGITUDINAL3/8123.757.50ESTRIBO1/41210.408.40EJE 2, V-1LONGITUDINAL3/8323.7522.50ESTRIBO1/43210.4025.20FACTOR0.250.581.021.60TOTAL KG13270040CALCULO DE ESTRIBOSLONGITUD CARA-CARA3.45N ACEROSRESTOTOTALNUMERO DE FIERROS1328.6020.621ESPACIAMIENTO0.050.10.150.251.32.15ALTURA PARAPETO0X0NUMERO DE FIERROS000ESPACIAMIENTO0.2ALTURA LOSA0NUMERO DE FIERROS0.0000ESPACIAMIENTO0.1521181818862

COLCOLUMNASDESCRIPCIONELEMENTON VECESN BARRASLONG. BARRA1/4"3/8"1/2"5/8"EJE 1C-15/8285.8593.601/2245.8546.803/82211.5063.001/42201.8072.00C-25/8285.5588.803/82211.5063.00EJE 2-BAJOC-15/8284.8076.801/2244.8038.403/82251.5075.001/42241.8086.40C-25/8284.8076.803/82251.5075.00EJE A y DC-31/2245.5544.40FACTOR0.250.581.021.60TOTAL KG40161133538872

EXCAVACIONEXCAVACIONDESCRIPCIONUNDN ELEMN VECESLARGOANCHOALTURAAREAVOLUMENPARCIALMETRADOCIMIENTO CORRIDOM3143.34EJE 1CC-2M3118.890.600.700.423.733.73Z-1M3211.801.801.502.704.869.72EJE 2MC-1M31113.002.054.509.23119.93119.93EJE ACC-1M3116.150.601.250.754.614.61EJE BVC-01M3113.700.250.400.100.370.37EJE CVC-01M3113.700.250.400.100.370.37EJE DCC-1M3116.150.601.250.754.614.61RELLENODESCRIPCIONUNDN ELEMN VECESLARGOANCHOALTURAAREAVOLUMENPARCIALMETRADOCIMIENTO CORRIDOM3101.57EJE 2Z-2M3117.506.5649.2249.22MC-01M3115.508.3445.8745.87Z-1M3211.801.801.001.803.246.48ELIMINACION54.31EXCAVACIONDESCRIPANCHOALTURACC-10.601.25CC-20.600.70MC-12.054.50Z-11.801.50VC-010.250.40

PERFILADOPERFILADO GENERALDESCRIPCIONELEMENTOUNDN VECESLARGOANCHOALTURAAREAPARCIALMETRADOPERFILADOM2109.66EJE 1ZAPATA 1M221.801.801.5010.8021.60CC-2M225.470.606.5613.13EJE 2ZAPATA 2M222.501.251.5011.2522.50ZAPATA 3M221.251.251.507.5015.00MURO CONT.M215.500.606.606.60EJE A y DCC-1M2212.851.2015.4230.84

METRADO GRALPLANILLA DE METRADOS GENERALPROYECTO: CONSTRUCCION SALA DE COMPUTO I.E. 40124 CIUDAD BLANCAITEMSPARTIDAUND.N VECESLONGITUDANCHOALTURAESPESORAREAPARCIALTOTAL01OBRAS PROVISIONALES01.01CASETA GUARDIANIA Y ALMACEN PROVISIONAL DE OBRAm21.0023.5023.5001.02CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40MUND1.001.001.0001.03CERCO PERIMETRICO PROVISIONALM1.0020.0010.0060.0060.0002OBRAS PRELIMINARES02.01LIMPIEZA DE TERRENO MANUALM21.0020.0010.00200.00200.0002.02TRAZO, NIVELACIN Y REPLANTEOM21.0014.008.00112.00112.0002.03TRANSPORTE DE EQUIPO Y HERRAMIENTASVJE2.002.002.0002.04DEMOLICION DE ALBAILERIAM21.0013.102.5032.7532.7502.05DEMOLICION DE CONCRETO SIMPLEM313.76DEMOLICION DE CONCRETO SIMPLE EN SOBRECIMIENTOSM31.0013.100.201.503.933.93DEMOLICION DE CONCRETO SIMPLE EN CIMIENTOSM31.0013.100.501.509.839.8302.06DEMOLICION DE CONCRETO ARMADOM33.000.300.300.270.2702.07ELIMINACION DE MATERIAL DEMOLIDO CON VOLQUETE DE 4M3M31.0022.5422.5403MOVIMIENTO DE TIERRAS0.0003.01EXCAVACION PARA CIMIENTOS HASTA 1.25 MT TERRENO NORMALM30.0012.96EJE 1 , CC-2M31.008.890.600.703.73EJE A, CC-1M31.006.150.601.254.61EJE D, CC-1M31.006.150.601.254.6103.02EXCAVACION PARA ZAPATAS DE 1.40 MT A 1.70 MT DE PROFUNDIDAD9.72EJE 1 , Z-1M32.001.801.801.509.7203.03EXCAVACION PARA VIGA DE CIMENTACION0.74EJE B, VC-01M31.003.700.250.400.37EJE C, VC-01M31.003.700.250.400.3703.04EXCAVACION EN MUROS DE CONTENCION119.93EJE 2 , MC-01M31.0013.002.054.50119.9303.05PERFILADO EN EXCAVACIONESM21.00109.66109.66109.6603.06RELLENO MANUAL Y COMPACTADO CON MATERIAL PROPIO EN MUROS DE CONTENCION101.57EJE 1 y 2 , Z-1, Z-2, Z-3, MC-01M31.005.508.3445.8703.07ELIMINACION CON TRANSPORTE (CARGUIO A MANO) REN.=25 M3/DIAM31.0054.3154.3103.08NIVELACION INTERIOR APISONADO MANUALM20.0091.62PRIMER PISO0.00SALA DE COMPUTOM22.005.304.0042.40M22.001.200.701.68M22.002.650.552.92M21.005.104.2521.68M22.004.000.352.80VEREDAM21.0013.001.5520.1504CONCRETO SIMPLE0.0004.01SOLADOS EN ZAPATAS DE 2" MEZCLA 1:12 CEMENTO-HORMIGONM215.86EJE 1 Z-1M22.001.801.803.246.48EJE 2 Z-2M22.002.501.253.136.25Z-3M22.001.251.251.563.1304.02CONCRETO 1:10 +30% P.G. PARA CIMIENTOS CORRIDOSM30.0010.71EJE A , CC-1M31.005.800.600.802.78EJE D , CC-1M31.005.800.600.802.78EJE 1 , CC-2M31.0011.600.600.503.48EJE 2, MC-1M31.005.550.500.601.6704.03ENCOFRADO Y DESENCOF. SOBRECIMIENTO DE H=0.25 MTM20.003.37EJE A , CC-1M32.005.800.250.300.87EJE D , CC-1M32.005.800.250.300.87EJE 1 , CC-2M32.0011.600.150.351.22EJE 2, MC-1M32.005.550.150.250.4204.04CONCRETO F'C=140 KG/CM2.+30% PM.PARA SOBRECIMIENTOSM30.001.69EJE A , CC-1M31.005.800.250.300.44EJE D , CC-1M31.005.800.250.300.44EJE 1 , CC-2M31.0011.600.150.350.61EJE 2, MC-1M31.005.550.150.250.2104.05FALSO PISO DE 4" DE CONCRETO 1:8M20.0075.81SALA DE COMPUTOM22.005.304.0042.40M22.001.200.701.68M22.002.650.552.92M21.005.104.2521.68M22.004.000.352.80ESTRADO RESTANTEM21.004.100.104.10M21.000.900.900.300.2404.06VEREDA DE CONCRETO DE 4" DE 140 KG/CM220.15M21.0013.001.5520.1520.1504.07ENCOFRADO Y DESENCOF. VEREDAS3.22M21.0016.100.203.223.2205CONCRETO ARMADO0.0005.01VIGAS DE CIMENTACION0.0005.01.01ACERO EN VIGA DE CIMENTACION GRADO 60KG404.00ACEROKG1.00404.00404.0005.01.02ENCOFRADO Y DESENCOFRADO VIGA DE CIMENTACIONM24.08EJE A , VC-01M32.005.100.250.401.02EJE B , VC-01M32.005.100.250.401.02EJE C , VC-01M32.005.100.250.401.02EJE D , VC-01M32.005.100.250.401.0205.01.03CONCRETO EN VIGAS DE CIMENTACION F'C= 210 KG/CM2M32.04EJE A , VC-01M31.005.100.250.400.51EJE B , VC-01M31.005.100.250.400.51EJE C , VC-01M31.005.100.250.400.51EJE D , VC-01M31.005.100.250.400.5105.02ZAPATAS0.0005.02.01ACERO EN ZAPATASKG0.00ACEROKG1.000.000.0005.02.02ENCOFRADO Y DESENCOFRADO PARA ZAPATAS RECTASM221.67EJE 1 , Z-1M32.007.200.557.92EJE 2 , Z-2M32.007.500.558.25EJE 2, Z-3M32.005.000.555.5005.02.03CONCRETO EN ZAPATAS F'C= 210 KG/CM2M38.72EJE 1 , Z-1M32.001.801.800.553.56EJE 2 , Z-2M32.002.501.250.553.44EJE 2, Z-3M32.001.251.250.551.7205.03MURO DE CONTENCION0.0005.03.01CONCRETO FC=210 KG/CM2 EN MURO DE CONTENCIONM36.44EJE 1, MC-01M31.0011.000.153.906.4405.03.02ENCOFRADO Y DESENCOFRADO DE MURO DE CONTENCIONM212.87EJE 1, MC-01M32.0011.000.153.9012.8705.03.03ACERO DE REFUERZO EN MURO DE CONTENCIONKG629.00ACEROKG1.00629.00629.0005.04COLUMNAS, PLACAS Y TENSORES05.04.01CONCRETO EN COLUMNAS F'C=175 KG/CM2M31.15PRIMER PISOEJE 1, C-4M34.000.250.151.650.25EJE 2, C-4M36.000.250.151.650.37EJE 1, C-4M32.000.250.151.650.12EJE 1, C-4M32.000.250.152.450.18AZOTEAEJE 2, C-4M36.000.250.150.450.10TENSOR T-1M34.000.250.150.800.1205.04.02ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS DE CONFINAMIENTOM218.92PRIMER PISOEJE 1, C-4M34.000.651.654.29EJE 2, C-4M36.000.651.656.44EJE 1, C-4M32.000.501.651.65EJE 1, C-4M32.000.652.453.19AZOTEAEJE 2, C-4M36.000.650.451.76TENSOR T-1M34.000.500.801.6005.04.03ACERO ESTRUCTURAL TRABAJADO PARA COLUMNAS DE CONFINAMIENTOKG156.00PRIMER PISOKG1.00156.00156.0005.04.04CONCRETO EN COLUMNAS F'C=210 KG/CM2M38.65PRIMER PISOEJE1 ,C-1M32.004.700.201.82EJE1 ,C-2M32.004.700.131.19EJE2 ,C-1M32.007.700.203.02EJE2 ,C-2M32.007.700.131.97ENTRE EJE1 Y EJE 2 ,C-3M32.004.700.070.6305.04.05ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNASM297.70PRIMER PISOEJE1 ,C-1M32.002.504.7023.50EJE1 ,C-2M32.001.254.7011.75EJE2 ,C-1M32.002.507.7038.50EJE2 ,C-2M32.001.257.7019.25ENTRE EJE1 Y EJE 2 ,C-3M32.000.504.704.7005.04.06ACERO ESTRUCTURAL TRABAJADO PARA COLUMNASKG0.00872.0005.05VIGAS0.0005.05.01CONCRETO EN VIGAS DE CONFINAMIENTO F'C=175 KG/CM2M30.45PRIMER PISOEJE 1, V-1M22.002.550.150.150.11EJE 1, V-1M21.003.500.150.150.08EJE 2, V-1M22.003.700.150.150.17EJE 2, V-1M21.003.450.150.150.08ENTRE EJE A Y B , V-1M21.000.600.150.150.0105.05.02ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS DE CONF.M26.02PRIMER PISOEJE 1, V-1M24.002.550.151.53EJE 1, V-1M22.003.500.151.05EJE 2, V-1M24.003.700.152.22EJE 2, V-1M22.003.450.151.04ENTRE EJE A Y B , V-1M22.000.600.150.1805.05.03ACERO ESTRUCTURAL TRABAJADO PARA VIGAS DE CONF.KG40.00PRIMER PISOKG1.0040.0040.0005.05.04CONCRETO EN VIGAS F'C=210 KG/CM2M36.41PRIMER PISOEJE A, V-101M31.007.450.250.450.84EJE B, V-101M31.007.450.250.450.84EJE C, V-101M31.007.450.250.450.84EJE D, V-101M31.007.450.250.450.84EJE 1, V-102M31.0012.000.250.401.20EJE 2, V-102M31.0012.000.250.401.20VB-1M31.0012.000.200.200.48VB-2M31.0012.000.150.100.1805.05.05ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS ESTRUCT.M244.41PRIMER PISOEJE A, V-101M21.007.450.705.22EJE B, V-101M21.007.450.755.59EJE C, V-101M21.007.450.755.59EJE D, V-101M21.007.450.705.22EJE 1, V-102M21.0012.000.657.80EJE 2, V-102M21.0012.000.8510.20VB-1M21.0012.000.202.40VB-2M22.0012.000.102.4005.05.06ACERO ESTRUCTURAL TRABAJADO PARA VIGAS Y DINTELESKG0.00PRIMER PISOKG1.000.000.0005.06LOSA ALIGERADA05.06.01CONCRETO EN LOSAS ALIGERADAS F'C=210 KG/CM2M37.09PRIMER PISOPAO A-B / 1-2M31.005.604.000.08751.96PAO A-B / 1-2M31.004.001.150.08750.40PAO B-C / 1-2M31.005.604.000.08751.96PAO B-C / 1-2M31.004.001.150.08750.40PAO C-D / 1-2M31.005.604.000.08751.96PAO C-D / 1-2M31.004.001.150.08750.4005.06.02ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERADASM283.40PRIMER PISOPAO A-B / 1-2M31.005.604.0022.40PAO A-B / 1-2M31.004.001.355.40PAO B-C / 1-2M31.005.604.0022.40PAO B-C / 1-2M31.004.001.355.40PAO C-D / 1-2M31.005.604.0022.40PAO C-D / 1-2M31.004.001.355.4005.06.03ACERO ESTRUCTURAL TRABAJADO PARA LOSAS ALIGERADASKG0.00PRIMER PISOKG1.000.000.0005.06.04LADRILLO HUECO DE ARCILLA 15X30X30 CM PARA TECHO ALIGERADOUND709.00PRIMER PISOPAO A-B / 1-2M31.005.604.008.7500196.00PAO A-B / 1-2M31.004.001.158.750040.25PAO B-C / 1-2M31.005.604.008.7500196.00PAO B-C / 1-2M31.004.001.158.750040.25PAO C-D / 1-2M31.005.604.008.7500196.00PAO C-D / 1-2M31.004.001.158.750040.2505.07VARIOS05.07.01JUNTA DE CONSTRUCCION CON TEKNOPORT6.14M22.009.350.151.402.81M22.009.100.151.372.73M22.002.000.150.300.6005.07.02SELLADO DE JUNTA DE CONSTRUCCIONM1.0040.9040.9040.9006ALBAILERIA06.01MUROS DE LADRILLO KK DE ARCILLA DE SOGA C/M 1:4 X 1.5CM.M249.98PRIMER PISOEJE 1M22.002.051.706.97EJE 1M21.002.951.705.02EJE 2M22.003.201.7010.88EJE 2M21.003.001.705.10ENTRE EJE A Y BM22.000.552.452.70PARAPETO FACHADAM23.004.000.809.60PARAPETO EJE A Y DM22.006.100.455.49PARAPETO EJE 2M21.009.400.454.2306.02MUROS DE LADRILLO KK DE ARCILLA DE CABEZA C/M 1:5 X 1.5CM.M225.48PRIMER PISOEJE AM22.002.452.6012.74EJE DM22.002.452.6012.7407REVOQUES, ENLUCIDOS Y MOLDADURAS07.01TARRAJEO INTERIOR Y EXTERIOR C/MORTERO 1:5 X1.5 CM.(INC.COLUMNAS EMPOT)M282.40PRIMER PISOEJE 1M22.002.552.0010.20EJE 1M21.003.452.006.90EJE 2M22.003.702.0014.80EJE 2M21.003.452.006.90ENTRE EJE A Y BM22.001.252.807.00EJE AM21.006.103.0018.30EJE DM21.006.103.0018.3007.02TARRAJEO DE SUPERFICIE DE COLUMNAS CON CEMENTO-ARENAM247.87COLUMNASM24.001.453.7021.46COLUMNASM22.001.103.708.14COLUMNASM22.001.253.709.25COLUMNASM212.000.252.006.00COLUMNASM22.000.253.701.85COLUMNASM24.000.250.900.90COLUMNASM22.000.150.900.2707.03TARRAJEO DE SUPERFICIE EN VIGAS CON CEMENTO - ARENAM237.13PRIMER PISOEJE B Y EJE CM22.005.800.758.70EJE 1M21.0012.000.506.00EJE 2M21.0012.000.708.40EJE AM21.006.100.452.75EJE DM21.006.100.452.75VIGA BORDEM21.0013.000.202.60VIGA VOLADOM24.001.350.754.05VIGA VB-2M24.001.350.351.8907.04TARRAJEO DE DERRAMES INCLUYE COLUMNAS Y VIGAS CON CEMENTO - ARENAML33.10PRIMER PISOENTRE EJE A Y EJE BML2.002.805.60EJE 1ML2.004.208.40EJE 1ML1.005.055.05EJE 2ML2.005.3010.60EJE 2ML1.003.453.4507.05TARRAJEO EN VEREDA 1:3ML21.76VEREDAM21.0013.001.5520.15M21.0016.100.101.6108CIELORRASOS08.01CIELORRASOS CON MEZCLA DE CEMENTO-ARENAM283.40PRIMER PISOM2PAO A-B / 1-2M21.005.604.0022.40PAO A-B / 1-2M21.004.001.355.40PAO B-C / 1-2M21.005.604.0022.40PAO B-C / 1-2M21.004.001.355.40PAO C-D / 1-2M21.005.604.0022.40PAO C-D / 1-2M21.004.001.355.4009PISOS Y PAVIMENTOS09.01PISO CERAMICO ANTIDESLIZANTEM271.47PRIMER PISOSALA DE COMPUTOM22.005.304.0042.40M22.001.200.701.68M22.002.650.552.92M21.005.104.2521.68M22.004.000.352.8010CONTRAZOCALOS10.01CONTRAZOCALO DE CERAMICO H=10 CMML39.80PRIMER PISOSALA DE COMPUTOML1.0039.8039.8010.02CONTRAZOCALO DE CERAMICO H=30 CMML7.80PRIMER PISOSALA DE COMPUTOML1.006.006.0011CUBIERTASML1.001.801.8011.01CUBIERTA LADR.PASTELERO 3CM.+FRAGUA C/MOR. 1:5M21.0012.507.1589.3889.3889.3812CARPINTERIA METALICA12.01PUERTA METALICA CON PLANCHA 1/40" C/MARCO 1 1/2"X1 1/2" Y REFUERZOSM26.72PRIMER PISOP-1M22.001.202.806.7212.02VENTANA DE FIERRO C/PERFIL DE 1"X1/8"M28.08PRIMER PISOV-1M21.003.700.802.96V-2M21.003.450.802.76V-3M21.002.950.802.3613CERRAJERIA13.01CHAPA PARA EXTERIOR, CON LLAVES INTERIOR Y EXTERIOR 3 GOLPESPZA2.00PRIMER PISOP-1PZA2.002.0014VIDRIOS, CRISTALES Y SIMILARES14.01VIDRIOS DOBLESP288.88PRIMER PISOV-1M21.003.7011.000.8032.56V-2M21.003.4511.000.8030.36V-3M21.002.9511.000.8025.9615PINTURA15.01PINTURA VINILICA EN CIELO RASO 2 MANOSM295.79TARRAJEO EN CIELORRASOSM21.0067.2067.20TARRAJEO EN SUPERFICIES DE VIGASM21.0028.5928.5915.02PINTURA VINILICA EN MUROS INTERIORES 2 MANOSM2126.22TARRAJEO DE INTERIORESM21.0082.4082.40TARRAJEO DE COLUMNASM21.0038.8538.85TARRAJEO DE DERRAMESM21.0033.100.154.9715.03PINTURA VINILICA EN MUROS EXTERIORES 2 MANOSM267.00COLUMNASM24.000.753.7011.10COLUMNASM24.000.753.7011.10COLUMNASM22.000.753.705.55COLUMNASM212.000.252.006.00COLUMNASM22.000.253.701.85COLUMNASM24.000.250.900.90COLUMNASM22.000.150.900.27VIGAS EJE A Y EJE DM22.006.100.455.49VIGA BORDEM21.0013.000.202.60VIGA VOLADOM24.001.350.754.05VIGA VB-2M24.001.350.351.89LOSA ALIGERADAM23.004.001.3516.2015.04PINTURA EN PUERTAS METALICASM26.72PRIMER PISOP-1M21.006.726.7215.05PINTURA EN VENTANAS METALICASM28.08PRIMER PISOV-1M21.008.088.0815.06PINTURA EN MURO CARAVISTA CON BARNIZM249.98PRIMER PISOMURO CARAVISTAM21.0049.9849.9816INSTALACIONES ELECTRICAS16.01SALIDA DE TECHO C/CABLE AWG TW 2.5 mm2 (14)+ PVC SEL 19 mm (3/4)PTO9.009.009.0016.02SALIDA DE PARED C/CABLE AWG TW 2.5 mm2 (14)+ PVC SEL 19 mm (3/4)PTO4.004.004.0016.03SALIDA PARA TOMACORRIENTE BIPOLAR DOBLE CON PVCPTO51.0051.0051.0016.04SALIDA PARA TELEFONOPTO1.001.001.0016.05SALIDA PARA ANTENA DE TELEVISION CON PVCPTO1.001.001.0016.06TUBERIAS PVC SAP (ELECTRICAS) D=1"M40.0040.0040.0016.07TABLEROS DISTRIBUCION CAJA METALICA CON 8 LLAVESPZA1.001.001.0016.08INTERRUPTOR THERMOMAGNETICO 2 X 20APZA11.0011.0011.0016.09INTERRUPTOR THERMOMAGNETICO 2X 50APZA1.001.001.0016.10INTERRUPTOR THERMOMAGNETICO DIFERENCIALPZA3.003.003.0016.11PLACA TOMACORRIENTE DOBLE DE BAKELITAUND51.0051.0051.0016.12PLACA INTERRUPTOR DOBLE DE BAKELITAUND8.008.008.0016.13PLACA INTERRUPTOR TRIPLE DE BAKELITAUND1.001.001.0016.14PLACA SALIDA TELEFONO DE BAKELITAUND1.001.001.0016.15PLACA SALIDA TV-CABLE DE BAKELITAUND1.001.001.0016.16POZO-CONEXION A TIERRA EN SISTEMAUND1.001.001.0016.17FLUORESCENTE RECTO ISPE 2 X 40 W INCLUYENDO EQUIPO Y PANTALLAUND15.0015.0015.0016.18ESTABILZADORUND3.003.003.00