Level E GA Floor Plan Level E GA Floor Plan UNIVERSITY OF SHEFFIELD job no (category) dwg no revision FACULTY OF ENGINEERING GRADUATE SCHOOL SHEFFIELD This drawing is © Bond Bryan Architects Ltd. If in doubt ASK. Drawing measurements shall not be obtained by scaling. Verify all dimensions prior to construction. Immediately report any discrepancies on this drawing to Architect. This drawing shall be read in conjunction with associated specifications and related consultant's documents. the church studio springvale road sheffield S10 1LP +44 (0)114 266 2040 +44 (0)114 268 7021 T F E [email protected] W www.bondbryan.com 11-003 11-003 (07)006 (07)006 scale date drawn checked revisions notes DESIGN D T D C - - - - - - - design tender construction PL P R planning preliminary record PT pre-tender 5 6 7 8 102 103 104 105 97 98 99 100 101 102 103 1 2 3 4 5 5 6 7 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 1 2 3 4 5 6 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 1,390 7,250 2,895 4,670 1,600 3,237 5 2,765 6,320 6,000 6,640 6,320 1,730 4,595 5,687 5 2,025 CHEM ENG G Disabled Refuge 1400 x 900 2640 x 3390 Clear Shaft 1700 x 2350 Lift Car 2000KG max load 1300mm Door Width Workroom Workroom Workroom Workroom TW movable partition TW water fountain Window to be temporarily changed to door for access to fire escape during construction Position of Temporary External Fire Escape During Construction Serving Floors D, E & F TW N E W C A S T L E S T R E E T B R O A D L A N E Fire rated roller shutter connected to fire alarm to lift door Note Existing door opening to be partially blocked up & replaced with window to match existing adjacent. Flexible Teaching RDS A2-10 A: 159 m2 Occupancy: 69 E05 Flexible Teaching RDS A2-11 A: 83 m2 Occupancy: 36 E06 Stair 1 RDS N20-33 A: 34 m2 E20 Stair 1 Lobby RDS N20-32 A: 31 m2 E18 Lift Elec Riser RDS N21-28 A: 3 m2 E19 Female Toilet RDS N19b-18 A: 11 m2 E21 Access WC incl Bidet RDS N19b-17 A: 3 m2 E22 Store/Future Riser RDS N14-16 A: 4 m2 E03 Mech Riser RDS N21-25 A: 8 m2 E04 PGR/PDRA RDS N12-27 A: 56 m2 Occupancy: 12 E09 Heating Riser RDS N21-29 A: 2 m2 E10 CICS IT RDS N22-06 A: 12 m2 E27 AD Office RDS N12-26 A: 10 m2 Occupancy: 1 E28 Circulation RDS N20-31 A: 46 m2 E29 Circulation RDS N20-30 A: 51 m2 E30 Smoke Shaft E12 Office RDS N12-30 A: 12 m2 E13 Office RDS N12-28 A: 7 m2 E17 PGR RDS N12-29 A: 34 m2 E16 Break Out RDS A2-12 A: 55 m2 Occupancy: 25 E08 CICS Riser RDS N21-27 E26 Mech Riser RDS N21-26 A: 8 m2 E07 PGR/PDRA RDS N12-25 A: 62 m2 Occupancy: 14 E01 Office RDS N12-31 A: 12 m2 E14 Cleaners RDS N19b-16 A: 3 m2 E23 Store RDS N14-18 A: 2 m2 E11 Circulation RDS N20-34 A: 25 m2 E15 Mech Riser RDS N21-38 E25 Break Out RDS A2-14 A: 10 m2 Occupancy: 5 E02 Male Toilet RDS N19b-28 A: 9 m2 E24 A B D C Ca Aa Ab 7 6 5 4 3 2 1 1a 8 5a Riser TW TW Wall Type 1 - 140mm blockwork, plaster finish either side Wall Type 2 - 140mm blockwork, plaster finish to one side, fairface/painted finish to one side Wall Type 3 - 140mm blockwork, fairface/painted finish to either side Wall Type 4 - 250mm concrete shear wall, Fermacell metal frame drylining to either side Wall Type 5 - 250mm concrete shear wall, Fermacell metal frame drylining to one side, fairface/painted to one side Wall Type 5 - 250mm concrete shear wall, fairface/painted to either side Wall Type 6 - Fermacell metal stud partition Existing wall/structure Internal Partition Legend 15.04.11 15.04.11 SP KR KR Revised in accordance with end user comments. Structure updated in accordance with latest SE information D0 SP 19.04.11 SP KR Revised in accordance with end user comments. D1 26.04.11 SP SM Revised in accordance with end user comments. D2 28.04.11 SP SM Revised in accordance with end user comments. D3 06.05.11 SP KR Revised in accordance with end user comments. Stair 1 reconfigured. RDS Numbers added. D4 09.05.11 SP KR Stair 1 reconfigured to suit junction detail to Broad Lane Building D5 13.05.11 CC KR Glazing to Atrium adjusted to suit new roof configuration. Windows added to stair 1. D6 1:100 & A0 24.05.11 SP KR Revised in accordance with latest end user comments. Planning alterations undertaken. D7 31.05.11 SP KR Missing RDS numbers added, occupancy numbers updated D8 13 03.06.11 SP KR Stage D Issue Toilet Cores revised to provide male & female facilities. Client comments incorporated. Site context shown. D9 21.06.11 SP KR Existing locker room removed from Chem Eng and Offices N12-30 & N12-31 enlarged. Male toilet N19b-28 rearranged. D10 12.07.11 SP KR External facades amended to suit vent strategy. Riser N21-25 increased. D11 22.07.11 SP KR Existing building survey information integrated onto plan. External wall & grid position adjusted. D12 Existing connecting adjacent building layouts based on third party survey information dated May 2011 supplied by MET Surveys Ltd on behalf of Sheffield University. The accuracy of existing building layouts cannot be verified by Bond Bryan Architects Ltd. Site dimensions to be checked prior to commencement of work. 16.08.11 SP KR Planning Issue Lift shaft size adjusted. Rooms numbers added. D13

Upload: others

Post on 22-Jan-2021

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: (07)006 Level E GA Floor Plan - University of Sheffield/file/... · 2012. 5. 17. · the church studio springvale road sheffield S10 1LP +44 (0)114 266 2040 +44 (0)114 268 7021 T

Level E GA Floor Plan

Level E GA Floor Plan

UNIVERSITY OF SHEFFIELD

job no (category) dwg no revision

FACULTY OF ENGINEERINGGRADUATE SCHOOLSHEFFIELD

This drawing is © Bond Bryan Architects Ltd. If in doubt ASK. Drawingmeasurements shall not be obtained by scaling. Verify all dimensionsprior to construction. Immediately report any discrepancies on thisdrawing to Architect. This drawing shall be read in conjunction withassociated specifications and related consultant's documents.

the church studio springvale road sheffield S10 1LP

+44 (0)114 266 2040+44 (0)114 268 7021

TF

E [email protected] www.bondbryan.com

11-003

11-003

(07)006 (07)006

scale date drawn checked

revisions

notesD

ESIGN

D

TD

C

- - -

--

--

designtenderconstruction

PLPR

planningpreliminaryrecord

PT pre-tender

5 6 7 8

102103

104105

97 98 99 100 101 102 103

12

34

5

56

7

123456

12

34

56

12

34

56 1

23

45

6

1 2 3 4

106

107

108

109

110

111

112

113

114

115

116

117

118119

120121

122123

124125

126127

128129

1 2 3 4 5 6

104105106107108109110111112113114115116117

118 119 120 121 122 123 124

1,390 7,250 2,895 4,670 1,600 3,2375

2,76

56,

320

6,00

06,

640

6,32

01,

730

4,59

55,

6875

2,02

5

CHEM ENG G

Disabled Refuge1400 x 900

2640 x 3390 Clear Shaft1700 x 2350 Lift Car2000KG max load

1300mm Door Width

Workroom Workroom

Workroom Workroom

TW

mov

able

par

titio

n

TW

waterfountain

Window to be temporarily changedto door for access to fire escapeduring construction

Position of Temporary External Fire EscapeDuring Construction Serving Floors D, E & F

TW

N E

W C

A S

T L

E

S T

R E

E T

B R O A D L A N E

Fire rated roller shutterconnected to fire alarmto lift door

NoteExisting door opening to be partiallyblocked up & replaced with windowto match existing adjacent.

Flexible TeachingRDS A2-10A: 159 m2Occupancy: 69E05

Flexible TeachingRDS A2-11A: 83 m2Occupancy: 36E06

Stair 1RDS N20-33A: 34 m2E20 Stair 1 Lobby

RDS N20-32A: 31 m2E18

Lift

Ele

c R

iser

RD

S N

21-2

8A

: 3 m

2E

19

Female ToiletRDS N19b-18A: 11 m2E21

Access WC incl BidetRDS N19b-17A: 3 m2E22

Sto

re/F

utur

e R

iser

RD

S N

14-1

6A

: 4 m

2E

03

Mech RiserRDS N21-25A: 8 m2E04

PGR/PDRARDS N12-27A: 56 m2Occupancy: 12E09

Heating RiserRDS N21-29A: 2 m2E10

CICS ITRDS N22-06A: 12 m2E27 AD Office

RDS N12-26A: 10 m2Occupancy: 1E28

CirculationRDS N20-31A: 46 m2E29

CirculationRDS N20-30A: 51 m2E30

Smoke ShaftE12

OfficeRDS N12-30A: 12 m2E13

OfficeRDS N12-28A: 7 m2E17

PGRRDS N12-29A: 34 m2E16

Break OutRDS A2-12A: 55 m2Occupancy: 25E08

CICS RiserRDS N21-27E26

Mech RiserRDS N21-26A: 8 m2E07

PGR/PDRARDS N12-25A: 62 m2Occupancy: 14E01

OfficeRDS N12-31A: 12 m2E14

CleanersRDS N19b-16A: 3 m2E23

StoreRDS N14-18A: 2 m2E11

CirculationRDS N20-34A: 25 m2E15

Mech RiserRDS N21-38E25

Break OutRDS A2-14A: 10 m2Occupancy: 5E02

Male ToiletRDS N19b-28A: 9 m2E24

A B DC CaAa Ab

7

6

5

4

3

2

1

1a

8

5a

Ris

er

TW

TW

Wall Type 1 - 140mm blockwork, plaster finisheither side

Wall Type 2 - 140mm blockwork, plaster finishto one side, fairface/painted finish to one side

Wall Type 3 - 140mm blockwork, fairface/paintedfinish to either side

Wall Type 4 - 250mm concrete shear wall,Fermacell metal frame drylining to either side

Wall Type 5 - 250mm concrete shear wall,Fermacell metal frame drylining to one side,fairface/painted to one side

Wall Type 5 - 250mm concrete shear wall,fairface/painted to either side

Wall Type 6 - Fermacell metal stud partition

Existing wall/structure

Internal Partition Legend

15.04.11

15.04.11SP KR

KR

Revised in accordance withend user comments. Structureupdated in accordance withlatest SE information

D0

SP

19.04.11SP KRRevised in accordance withend user comments.

D1

26.04.11SP SMRevised in accordance withend user comments.

D2

28.04.11SP SMRevised in accordance withend user comments.

D3

06.05.11SP KRRevised in accordance withend user comments. Stair 1reconfigured. RDS Numbers added.

D4

09.05.11SP KRStair 1 reconfigured to suitjunction detail to Broad LaneBuilding

D5

13.05.11CC KRGlazing to Atrium adjusted tosuit new roof configuration.Windows added to stair 1.

D6

1:100 & A0

24.05.11SP KRRevised in accordance withlatest end user comments.Planning alterations undertaken.

D7

31.05.11SP KRMissing RDS numbers added,occupancy numbers updated

D8

13

03.06.11SP KRStage D IssueToilet Cores revised to providemale & female facilities. Clientcomments incorporated. Sitecontext shown.

D9

21.06.11SP KRExisting locker room removedfrom Chem Eng and OfficesN12-30 & N12-31 enlarged.Male toilet N19b-28 rearranged.

D10

12.07.11SP KRExternal facades amended tosuit vent strategy. RiserN21-25 increased.

D11

22.07.11SP KRExisting building surveyinformation integrated ontoplan. External wall & gridposition adjusted.

D12

Existing connecting adjacent building layouts based on thirdparty survey information dated May 2011 supplied by METSurveys Ltd on behalf of Sheffield University. The accuracyof existing building layouts cannot be verified by Bond BryanArchitects Ltd. Site dimensions to be checked prior tocommencement of work.

16.08.11SP KRPlanning IssueLift shaft size adjusted. Roomsnumbers added.

D13