07 sep-601 pcm 600 1p5 work flow

7
1 © ABB Power Technologies AB, 2007 2007-09-07 Substation Automation and Protection Training PCM 600 Engineering Work Flow Summary Substation Automation and Protection Training 3 © ABB Power Technologies AB, 2007 2007-09-07 Substation Automation and Protection Training The FIRST Way….. The first way

Upload: himdad-tahir

Post on 20-Oct-2015

48 views

Category:

Documents


3 download

DESCRIPTION

Pcm 600 1p5 Work Flow

TRANSCRIPT

Page 1: 07 Sep-601 Pcm 600 1p5 Work Flow

1

©A

BB

Po

we

r T

ech

no

log

ies

AB

, 2

00

7

2007-09-07 Substation Automation and Protection Training

PCM 600Engineering Work FlowSummary

Substation Automation and Protection Training

3

©A

BB

Po

we

r T

ech

no

log

ies

AB

, 2

00

7

2007-09-07 Substation Automation and Protection Training

The FIRST Way…..The first way

Page 2: 07 Sep-601 Pcm 600 1p5 Work Flow

4

©A

BB

Po

we

r T

ech

no

log

ies

AB

, 2

00

7

2007-09-07 Substation Automation and Protection Training

Engineering – From Scratch – CAP 531

5

©A

BB

Po

we

r T

ech

no

log

ies

AB

, 2

00

7

2007-09-07 Substation Automation and Protection Training

Engineering – From Scratch – SMT

Page 3: 07 Sep-601 Pcm 600 1p5 Work Flow

6

©A

BB

Po

we

r T

ech

no

log

ies

AB

, 2

00

7

2007-09-07 Substation Automation and Protection Training

Engineering – From Scratch – PST

7

©A

BB

Po

we

r T

ech

no

log

ies

AB

, 2

00

7

2007-09-07 Substation Automation and Protection Training

Engineering – From Scratch – GDE

Page 4: 07 Sep-601 Pcm 600 1p5 Work Flow

8

©A

BB

Po

we

r T

ech

no

log

ies

AB

, 2

00

7

2007-09-07 Substation Automation and Protection Training

Engineering – From Scratch – CCT

9

©A

BB

Po

we

r T

ech

no

log

ies

AB

, 2

00

7

2007-09-07 Substation Automation and Protection Training

The SECOND Way…..The second way

Page 5: 07 Sep-601 Pcm 600 1p5 Work Flow

10

©A

BB

Po

we

r T

ech

no

log

ies

AB

, 2

00

7

2007-09-07 Substation Automation and Protection Training

Engineering – Order Specific File – PCM 600/Navigator

Define the IEDs YOU DO HAVE :- Order Specific File

Hardware Configuration is automatically entered in CAP 531 by the WIZARD

Software library is automatically entered in CAP 531 by the WIZARD

YOU DO NOT HAVE :- Pre Config File

11

©A

BB

Po

we

r T

ech

no

log

ies

AB

, 2

00

7

2007-09-07 Substation Automation and Protection Training

Engineering – Order Specific File – PCM 600/Tools

The engineering process is similar to the previous one:

- Design CAP531 configuration- Design SMT- Define PST settings- Design Single Line Diagram

- Design GOOSE signals

Advantage:You do not need to have the IED in front of you and run the ONLINE process called “Upload Options”

If you have the “Order Specific File”:

Page 6: 07 Sep-601 Pcm 600 1p5 Work Flow

12

©A

BB

Po

we

r T

ech

no

log

ies

AB

, 2

00

7

2007-09-07 Substation Automation and Protection Training

The 3rd Way (s)…..The third way

13

©A

BB

Po

we

r T

ech

no

log

ies

AB

, 2

00

7

2007-09-07 Substation Automation and Protection Training

CreateA NEW empty project

and upload all information

from the IED

Engineering – On-Line – Upload all

ANOTHER POSSIBILITY:

Page 7: 07 Sep-601 Pcm 600 1p5 Work Flow

14

©A

BB

Po

we

r T

ech

no

log

ies

AB

, 2

00

7

2007-09-07 Substation Automation and Protection Training

Import (decompress)the project file

and you will just get all information in one shot!

Engineering – Import the PCM 600 Project