06_claus tail gas treating units switching to low temperature tail gas operation proceedings.pdf

24
Claus Tail Gas Treating Units: Switching to Low Temperature Tail Gas Operation Eric Roisin

Upload: mujeebtalib

Post on 01-Dec-2015

132 views

Category:

Documents


19 download

DESCRIPTION

TGTU

TRANSCRIPT

Page 1: 06_Claus Tail Gas Treating Units Switching to Low Temperature Tail Gas Operation Proceedings.pdf

Claus Tail Gas Treating Units: Switching to Low Temperature

Tail Gas Operation

Eric Roisin

1

Page 2: 06_Claus Tail Gas Treating Units Switching to Low Temperature Tail Gas Operation Proceedings.pdf

Agenda

2

• Tail Gas Treatment by Hydrogenation

• Industrial Operation Feedback - BP Germany

• Catalyst Drop-in in Existing unit

• New Unit

• Conclusion

Page 3: 06_Claus Tail Gas Treating Units Switching to Low Temperature Tail Gas Operation Proceedings.pdf

• Feed the right amount of air

• Load the most appropriate Claus catalysts

• Implement a Tail Gas Treatment solution

3

> 99.8%

Three Drivers for Maximum Sulfur Recovery

Page 4: 06_Claus Tail Gas Treating Units Switching to Low Temperature Tail Gas Operation Proceedings.pdf

Hydrogenation Based TGTU

4

TG 103/133

air

fuel gas

Claus Tail Gas steam

water

to SWS

to incinerator Recycle to

Claus furnace

Reactor Section Amine Section

Qu

en

ch c

olu

mn

Ab

sorb

er

Reg

ener

ato

r

270-300°C

Page 5: 06_Claus Tail Gas Treating Units Switching to Low Temperature Tail Gas Operation Proceedings.pdf

LT Catalyst Porfolio

Market leading catalysts

TG 107 High density High activity TG 136 Low density Low pressure drop

5

Page 6: 06_Claus Tail Gas Treating Units Switching to Low Temperature Tail Gas Operation Proceedings.pdf

A Revolution for Existing / New Units

6

TG 107/136

air

fuel gas

steam

water

to SWS

to incinerator

Recycle to Claus

furnace

Reactor Section Amine Section

Qu

en

ch c

olu

mn

Ab

sorb

er

Reg

ener

ato

r

Claus Tail Gas

210-240°C

Page 7: 06_Claus Tail Gas Treating Units Switching to Low Temperature Tail Gas Operation Proceedings.pdf

A Revolution for Existing / New Units

7

TG 107/136

air

fuel gas

steam

water

Reactor Section

Steam reheater

Claus Tail Gas

Operation at low temperature

• 40 % savings on energy

• Lower CO2 emissions

• Higher Temp. safety margin

From direct to indirect reheater

• Less risk of misoperations

(soot or excess air)

• Longer catalyst lifetime

• Equipment downsized 10%

• Capex reduction 10-15%

• OpEx reduction 20%

Ref.: Marco van Son, Sept. 15th 2005 Brimstone,

Vail (CO)

210-240°C

Page 8: 06_Claus Tail Gas Treating Units Switching to Low Temperature Tail Gas Operation Proceedings.pdf

Agenda

8

• Tail Gas Treatment by Hydrogenation

• Industrial Operation Feedback - BP Germany

• Catalyst Drop-in in Existing unit

• New Unit

• Conclusion

Page 9: 06_Claus Tail Gas Treating Units Switching to Low Temperature Tail Gas Operation Proceedings.pdf

Industrial Operation Feedback

9

Page 10: 06_Claus Tail Gas Treating Units Switching to Low Temperature Tail Gas Operation Proceedings.pdf

Catalyst Drop-in at BP Germany

• Operating history from BP Gelsenkirchen

• Study undertaken by Jacobs-Comprimo to

revamp SRU & TGTU in 2003

• New SRU/TGTU train required

• Pilot studies demonstrated high performances

of TG 107

• BP decided to install a load of TG 107 in train # 4 TGTU Start up June 2004

• Existing refinery unit with a direct fired reheater

10

Page 11: 06_Claus Tail Gas Treating Units Switching to Low Temperature Tail Gas Operation Proceedings.pdf

SRU 4 – TGTU Performances with Previous Catalyst

11

Page 12: 06_Claus Tail Gas Treating Units Switching to Low Temperature Tail Gas Operation Proceedings.pdf

SRU 4 - Reactor Temperature Profile with Previous Catalyst

12

Temp. in

Temp. bottom

Page 13: 06_Claus Tail Gas Treating Units Switching to Low Temperature Tail Gas Operation Proceedings.pdf

SRU 4 - Reactor Temperature Profile with TG 107

13

-60°C

Temp. in

Temp. bottom

Page 14: 06_Claus Tail Gas Treating Units Switching to Low Temperature Tail Gas Operation Proceedings.pdf

SRU 4 – TGTU performances with TG 107

14

Page 15: 06_Claus Tail Gas Treating Units Switching to Low Temperature Tail Gas Operation Proceedings.pdf

Outcomes of the First Trial

• One year of testing, various temperature,

conditions, H2S/SO2 ratios, burning

stoichiometry...

• 240°C kept as maximum temperature, allowing

the construction of a unit equipped with steam

reheater

15

Catalyst load still in operation after 9 years

Page 16: 06_Claus Tail Gas Treating Units Switching to Low Temperature Tail Gas Operation Proceedings.pdf

New Unit in BP Germany

2006-2007 Erection of SRU 5 plant

New unit with indirect 40 barg steam reheater

16

Page 17: 06_Claus Tail Gas Treating Units Switching to Low Temperature Tail Gas Operation Proceedings.pdf

SRU 5 - Reactor Temperature Profile with TG 107

17

Temp. in

Temp. bottom

Page 18: 06_Claus Tail Gas Treating Units Switching to Low Temperature Tail Gas Operation Proceedings.pdf

SRU 5 – TGTU Performances with TG 107

18

Page 19: 06_Claus Tail Gas Treating Units Switching to Low Temperature Tail Gas Operation Proceedings.pdf

New Unit in BP Germany

• SRU 5 unit is still delivering

• Inlet temperature still @220°C today

“More than 20 years of operating experience with low temperature catalysts” M. Schmidt, Sulphur, Berlin, 28-31/10/2012

130,000 GJ saved on fuel gas

1,000 tpy CO2 reduction

19

TG 107 benefits confirmed by 6 years of operation

TG 107’s performances are widely recognized

Page 20: 06_Claus Tail Gas Treating Units Switching to Low Temperature Tail Gas Operation Proceedings.pdf

TG 107 &TG 136 Always Benefit (1/2)

For existing units:

• Operating cost savings

• Lower CO2 emissions

Case study for a 320 t/day plant in Canada (2009)

• Fuel gas savings: 440 ton/year

• CO2 emission reduction: 1210 ton/year

• Cost savings (excluding CO2 credits):

• Improved operation reliability

20

410 000 $ per year

Page 21: 06_Claus Tail Gas Treating Units Switching to Low Temperature Tail Gas Operation Proceedings.pdf

TG 107 &TG 136 Always Benefit (2/2)

Additional benefit for new units:

• Simplified design

10-15% savings on installation cost

• Minimized risk of misoperation

21

Axens catalyst development

allowed this revolution in the

design of Claus TGTUs

Page 22: 06_Claus Tail Gas Treating Units Switching to Low Temperature Tail Gas Operation Proceedings.pdf

Switching to LT Operation with Axens

TG 136:

• Industrial feedback from Imperial

Sarnia published in LRGCC 2012

22

New LT design widely accepted by

every TGTU stakeholder

TG 107:

• 9 years of continuous operation

for the first reference

Proven Performances at 210-240°C

Page 23: 06_Claus Tail Gas Treating Units Switching to Low Temperature Tail Gas Operation Proceedings.pdf

23

Axens pioneered every catalyst evolution

• Alumina: CR-3S

• TiO2: CRS 31 and now CRS 31 TL

• BTX management: CSM 31

• LT hydrogenation: TG 107 and TG 136

Driving Sulfur Recovery Towards Excellence

Sulfur recovery catalyst world leader

Page 24: 06_Claus Tail Gas Treating Units Switching to Low Temperature Tail Gas Operation Proceedings.pdf

Claus Tail Gas Treating Units Switching to Low Temperature

Tail Gas Operation

Eric Roisin

24