05' | %ncuu cable & equipment: phase 2 3of submittal date: revision dates: project manager:...
TRANSCRIPT
SHEET
3 OF
SUBMITTAL DATE:
REVISION DATES:
PROJECT MANAGER:
CITY OF
THE DRAWINGS, DESIGNS, IDEAS, ARRANGEMENTS AND PLANS
INDICATED OR REPRESENTED ARE THE SOLE PROPERTY OF
TRAFFIC MANAGEMENT, INC (TMI), AND ARE SUBJECT TO THE
COPYRIGHT OF TMI OR ITS ASSIGNS. THEY WERE CREATED,
EVOLVED AND DEVELOPED EXCLUSIVELY FOR USE ON, AND IN
CONJUNCTION WITH, THE SPECIFIED PROJECT. ANY USE OF
THE DRAWINGS, DESIGNS, MATERIALS OR INFORMATION
CONTAINED HEREIN, INCLUDING COPYING, WHICH IS NOT
EXPRESSLY AUTHORIZED BY TMI, IS STRICTLY PROHIBITED AS
AN INFRINGEMENT OF ITS COPYRIGHT AND MAY RESULT IN
LIABILITY.
ACCEPTED BY: DATE:
DATE:
SCE
BADILLO ST &
VINCENT AVE
12/20/13 - SJ
3
Plan Order #: 12112
California · Great Lakes · New York
LICENSE # 785804 · Class 31
Training
EngineeringPermits & Consulting
Sales & RentalsTraffic Control Services
www.trafficmanagement.com
800.763.3999
TRAFFICMANAGEMENT, INC.
SAP NO.:
CIRCUIT:
PROPOSED CONSTRUCTION LOCATION:
SUBSTATION:
TD 682620
CABLE & EQUIPMENT: PHASE 2
VAULT INSTALLATION
LARK ELLEN
TD 682620
SCALE: 1"=
40'20'0' 80'
40'
BADILLO ST &
VINCENT AVE
AARON G.
- HIGH LEVEL WARNING DEVICE
- FLASHING ARROW SIGN (FAS)
- TYPE-I OR II BARRICADE W/ SIGN
- EXISTING SIGN
- CHANNELIZATION DEVICE
- SIGN
- TYPE-III BARRICADE W/ SIGN
- FLAGGER
LEGEND:
- WORK AREA
- 10' CONC K RAIL
- 20' CONC K RAIL
- CRASH CUSHION TU-14
W20-1
ROAD
AHEAD
WORK
W20-2
DETOUR
AHEADCLOSED
AHEAD
ROAD
W20-3
W20-5
AHEAD
RIGHT LANE
CLOSED
AHEAD
W20-5(L)
LEFT LANE
CLOSED
W4-2 W4-2(L)
G20-2
ROAD WORK
END
SC3(CA)
DETOUR
DETOUR
DETOUR
M4-10(L)
M4-10(R)
M4-8a
END
DETOUR
W1-4 (R/L) W12-1
ONLY
R3-5R3-2 R3-4 R4-7a
KEEP
RIGHT
0M-3R0M-3L
C30(CA)
CLOSED
LANE
R3-7
TURN RIGHT
RIGHT LANE
MUST
R9-3 R9-3bP(L)
USE
CROSSWALK
CROSSWALK
USE
R9-3bP(R)
R9-9
SIDEWALK
CLOSED
R9-11 (R/L)
AHEAD
SIDEWALK CLOSED
CROSS HERE
R9-11a (R/L)
SIDEWALK CLOSED
CROSS HERE
M4-10(DBL)
DETOUR
COVINA