04-24-07 wind power forecasting csd bill blevins
DESCRIPTION
3 Wind Power Forecasting CSD Comments on CSD Data provided by WGRs. Availability of SCADA information to Vendor. Data control from WGR to QSE to ERCOT to AWST back to ERCOT and back to WGRs. Process for inputting into RUC. Interface for LTWPF and more supporting description. Interfaces with integration team to explain the external interfaces. Internet service connection from the Vendor to ERCOT. More description of AWST modules. Static Registration Information (Manufacturers Power Curve) Performance Metrics available. Independence of performance calculations Alternate Met Tower locations (Hub Height)TRANSCRIPT
![Page 1: 04-24-07 Wind Power Forecasting CSD Bill Blevins](https://reader036.vdocuments.us/reader036/viewer/2022081900/5a4d1ad57f8b9ab05997297f/html5/thumbnails/1.jpg)
04-24-07Wind Power Forecasting CSD
Wind Power Forecasting CSD
Bill Blevins
![Page 2: 04-24-07 Wind Power Forecasting CSD Bill Blevins](https://reader036.vdocuments.us/reader036/viewer/2022081900/5a4d1ad57f8b9ab05997297f/html5/thumbnails/2.jpg)
Wind Power Forecasting CSD04-24-07 2
Wind Forecasting system
Page 1
Wind Power Forecasting diagramTuesday, March 27, 2007
Secure FTP orWEB SERVICE
AWST AWSTCom Box
Oracle DBEMS Team
EMS SCADAAREVA Habitat
Forecast and performance Information from AWSTFile or webservice data
from Registration,OS, SCADA to AWST
Outage SchedulerMMS Oracle
Registration
Siebel
Eterra ArchiveEMS team
APIMMS Team
Siebel
MIS EDWLTWPF
Forecast and performance metrics
QSE
LTWPF
WGRPP
WGRPP/ Performance Data
AWST
MIS
EMS
EIP
MMS
REG
EDW
EMS ORACLE
![Page 3: 04-24-07 Wind Power Forecasting CSD Bill Blevins](https://reader036.vdocuments.us/reader036/viewer/2022081900/5a4d1ad57f8b9ab05997297f/html5/thumbnails/3.jpg)
Wind Power Forecasting CSD04-24-07 3
Comments on CSD
• Data provided by WGRs.• Availability of SCADA information to Vendor.• Data control from WGR to QSE to ERCOT to AWST back to
ERCOT and back to WGRs.• Process for inputting into RUC.• Interface for LTWPF and more supporting description.• Interfaces with integration team to explain the external
interfaces.• Internet service connection from the Vendor to ERCOT.• More description of AWST modules.• Static Registration Information (Manufacturers Power Curve)• Performance Metrics available.• Independence of performance calculations• Alternate Met Tower locations (Hub Height)
![Page 4: 04-24-07 Wind Power Forecasting CSD Bill Blevins](https://reader036.vdocuments.us/reader036/viewer/2022081900/5a4d1ad57f8b9ab05997297f/html5/thumbnails/4.jpg)
Wind Power Forecasting CSD04-24-07 4
Posted Comments and Responses (example only)
![Page 5: 04-24-07 Wind Power Forecasting CSD Bill Blevins](https://reader036.vdocuments.us/reader036/viewer/2022081900/5a4d1ad57f8b9ab05997297f/html5/thumbnails/5.jpg)
Wind Power Forecasting CSD04-24-07 5
Plan to address comments
• Create responses to comments April 30.• Post responses to comments May-1.• Meet with TPTF May 7-8 to cover comments
and responses.