03/09/2010. 06:30 - 09:00 Access required for interlock problem on TI2 collimators and pre-cycle 09:00-10:30 No beam from SPS 10:30 Injection: important corrections required because of the ALICE solenoid/spectrometer polarity change (non-closure of the compensator bump) - PowerPoint PPT PresentationTRANSCRIPT
03/09/2010• 06:30 - 09:00 Access required for interlock problem on
TI2 collimators and pre-cycle• 09:00-10:30 No beam from SPS• 10:30 Injection: important corrections required
because of the ALICE solenoid/spectrometer polarity change (non-closure of the compensator bump)
• 11:30 Lost cryo conditions in Sector 67 during orbit investigations Bad manipulation on temperature sensor
• 11:30 – 13:00 Pre-cycle
03/09/2010
• Can be corrected using compensator magnets and MCBX need time to verify corrections to be implemented for each polarity.
03/09/2010• 15:30 Ready to ramp after first iteration orbit clean-up
at injection. ATLAS Toroid trip.• Chromaticity measurement at the beginning of the
ramp (logged). Negative H-chromaticity particularly for beam 2
03/09/2010• Low lifetime for beam 2: low chromaticity. Likely phase
loop not locking correctly due to low intensity
• Finally beams dumped at the end of the squeeze for validation of the dump after technical stop
03/09/2010• 17:30 Dump validation at 3.5 TeV squeezed: OK• Move to 10 A/s hypercycle• Setting-up of capture with all RF cavities ON• 21:40 Transverse damper team swing into action
• 22:23 BLM with fast losses on RS #5 ... looks like a UFO candidate
• re-adjustments for beam 1 done to improve signal/noise. rms noise varies now between 1.4 um and 1.95 um depending on pick-up; before improvement it varied between 1.8 um and 2.8 um. For three of the pick-ups there is a factor ~2 improvement, for one there is no improvement (it was relatively good already and will be looked at again). One feature with Q9H must be looked at: close to zero there is a small glitch observed; for the time being one should run with a small negative offset on Q9H. See RF logbook for details.
The same adjustment should now be carried out for beam 2. The saturation level should then be +/- 2mm @ 1 ns bunch length and 1.3x10**11. Damper gain did not change a lot by the modifications; the calibration factors for the fixed display will be updated after completion of the campaign.
Summary damper
• 03:35 ramp started10A/s ramp & squeeze
Tune & chromaticity in ramp
• flat-top: Q' arrives at about 4/7 (B1) and 2/8 (B2), 4-5 units of Q'-decay visible
10 A/s ramp & squeeze
Chromaticity in squeeze
• 05:36 Cryo just came over. Cold compressor 34 just tripped. We were asked to dump the beams. Arghhhh!!!
• 05:52 S34 tripped due to loss of cryo maintain.
Plan that was…
• ~18:00 recovery, pre-cycle• Evening: 450 GeV crossing angle set-up• Overnight: ramp, squeeze, beating
measurement and correction, K-modulation
Plan that is
Crossing angles• Polarities for ALICE solenoid/spectrometer: + +• Polarity for LHCb spectrometer: -
• External crossing angles:– IR1: -170 mrad at inj./ramp and -100 mrad in squeeze/collision– IR2: ±170 mrad at inj./ramp and ±110 mrad squeeze+collision– IR5: +170 mrad at inj./ramp and +100 mrad in squeeze/collision– IR8: -170 mrad at inj./ramp and -100 mrad in squeeze/collision
– IP2 with parallel separation (3 to 4 sigmas).
on_sep8 := 0;on_x8 := 100/170;on_lhcb := 2;
px = 0.0001699757
Positive internal angleNegative external anglePositive net