Updated: Sept, 09
CONTENTSAgency /Company-Wise
NORTHERN REGIONNEW DELHI Delhi Transco 2
PUNJAB Kalpana Hydro 2
RAJASTHAN Astonfield Renewable Resources 2 Indo Zinc 2
UTTAR PRADESH Uttar Pradesh Power Corporation Limited 3
WEST REGIONCHHATTISGARH Adhunik Power & Natural Resources 3 Spectrum Coal & Power 3
GUJARAT Astonfield Renewable Resources 3 Essar Power 3 Sanghi Cement 4
JHARKHAND Power Grid Corporation of India 4
MADHYA PRADESH Essar Power 4 Revati Cements 4
MAHARASHTRA Adani Power Maharashtra (APML) 5 Ideal Energy Projects 5 Kisan Veer Satara SSK 5 Maharashtra State Electricity Transmission Co 6 Maharashtra Power Generation Corporation 6 Maharashtra State Electricity Distribution 6
Company (MSEDCL) 6 Maharashtra State Electricity Transmission
Company (MAHATRANSCO) 6 Maharashtra State Electricity Transmission
Company Limited 7 Shankar Maharshi Shankarrao Mohite Patel 7
SOUTHERN REGIONANDHRA PRADESH Hinduja Group 8 Keerthi Industries 8 Meenakshi Energy 8 Singaraya Hills 8
KARNATAKA Astonfield Renewable Resources 9 Hare Krishna Metallics 9 Ind-Barath Power (Karwar) 9 Maharashtra Seamless 9 PGM Ferro Steels 9 Siruguppa Sugars & Chemicals 10
KERALA Kerala Sponge Iron 10 Kerala State Electricity Board 10
TAMIL NADU Dharani Sugars & Chemicals 11
EASTERN REGIONBIHAR Astonfield Renewable Resources 12 Bihar State Electricity Board 12
JHARKHAND Adhunik Power & Natural Resources 12 Bokaro Power Supply 12
ORISSA Jindal Steel & Power 13
SIKKIM Lanco Infratech 13
TRIPURA North East Transmission Company 13
WEST BENGAL Astonfield Renewable Resources 14 West Bengal State Electricity Transmission
Company 14
Power Generation Projects Page 1
Updated: Sept, 09
NEW DELHI
STATUS: PLANNING
Promoter: Promoter: Delhi Transco Delhi Transco Proj: Proj: TransmissionTransmission Cost: Cost: Rs. 576.4 millionRs. 576.4 million Loc: Loc: WazirpurWazirpur
Delhi Transco is to set up a Gas-insulate Substation (GIS)
at Wazirpur in New Delhi. The scope of works includes
complete project management, design, engineering,
type testing, manufacture, transportation to site,
insurance, storage, erection, testing and commissioning
of 220 kV GIS having 220 kV and 33 KV outdoor
equipment, 100 MVA power transformers and other
substation equipment. The cost of the project is Rs.
576.4 million. Implementation Schedule: As of August
2009, bids are invited for the project on turnkey basis.
The last date of submission being 25-08-2009. The
project has a completion period of 12-15 months from
the effective date of contract.
Delhi Transco Limited, Office of the DGM (OS),
Room No. 51, 1st Floor, Shakti Deep Building,
Jhandewalan Extension, New Delhi 110055, Delhi.
Website: www.delhitransco.gov.in
PUNJAB
STATUS: PLANNING
Promoter: Promoter: Kalpana Hydro ProjKalpana Hydro Proj: : Gill Aqua Hydro Gill Aqua Hydro Electric PowerElectric Power Cap: Cap: 15 MW15 MW Loc: Loc: PathankotPathankot Dist: Dist: GurdaspurGurdaspur
Kalpana Hydro plans to set up 15 MW Gill Aqua Hydro
Electric Power at Pathankot in Gurdaspur district of
Punjab. Implementation Schedule: As of July 2009, the
preparation of DPR has been completed and project
consultant has been appointed. The project is in its
preliminary stage.
Kalpan Hydro Company India Private Limited,
1st Floor, NCPL Web Tower, A – 4, Sector 9, Noida
Gautam Buddha Nagar 201301, Uttar Pradesh.
India. Tel: +91 120- 4661511. Fax: + 91 120- 421206.
Email [email protected]. Website:
www.kalpanhydro.com
RAJASTHAN
STATUS: PLANNING
Promoter: Astonfield Renewable Resources Proj: Promoter: Astonfield Renewable Resources Proj: Non Conventional Cap: 5 MWNon Conventional Cap: 5 MW
Astonfield Renewable Resources is planning to set up a 5
MW Solar power project in Rajasthan. Implementation
Schedule: As of July 2009, the Government allotment
has been received by the company. The project is in a
nascent stage.
Astonfield Renewable Resource Private
Limited, Room No. 112 & 107, DBS House, 10/ 2,
Hungerford Street. Kolkata 700017, West Bengal,
India. Tel: +91 33-32443981. Fax: + 91 33 -
40509300. Email: [email protected]
Website: www.astonfield.com
STATUS: PLANNING
Promoter: Indo Zinc Proj: Captive Power Plant Cap:Promoter: Indo Zinc Proj: Captive Power Plant Cap: 20 MW Dist: Banswara EDC: Mid-quarter of 201020 MW Dist: Banswara EDC: Mid-quarter of 2010
Indo Zinc plans to set up 20 MW captive power plant in
the premises of its cement unit in Banswara district of
Rajasthan. Implementation Schedule: As of July 2209,
DPR is under progress and clearance is awaited. The
project is scheduled to be completed by mid-quarter of
2010.
Indo Zinc Limited, 405 Apollo Tower M G Road,
Indore 452001, Madhya Pradesh. Tel: +91 731-
4289000 / 2518341. Fax : + 91 731 4058080. Email :
Plt: Mahi Cement, No. 40, Sharada Nagar, Link
Road, Banswara 327001, Rajasthan, India. Tel: +91
2962-250630 / 250551. Fax: 91 2962-250629.
Power Generation Projects Page 2
Updated: Sept, 09
UTTAR PRADESH
STATUS: PLANNING
Promoter: Promoter: Uttar Pradesh Power Corporation Uttar Pradesh Power Corporation Limited (UPPCL) Limited (UPPCL) Proj: Proj: ThermalThermal Cap: Cap: 2x660 MW2x660 MW Loc: Loc: Jawaharpur Jawaharpur Dist: Dist: EtahEtah
UPPCL plans set up Thermal Power Project in Etah
district of UP. Uttar Pradesh Power Corporation Limited
(UPPCL) plans to set up 2x660 MW thermal power
project at Jawaharpur in Etah district of UP.
Implementation Schedule: As of July 2009, bids for
appointment of technical consultants are under
evaluation.
Uttar Pradesh Power Corporation Limited, 3rd
Floor, Shakti Bhawan Extension 14, Ashok Marg,
Lucknow 226001, Uttar Pradesh, India. Tel: +91-
522-2287867 / 2287343. Fax : + 91 522 -2288484/
2287343. Website: www.uppcl.org
CHHATTISGARH
STATUS: PLANNING
Promoter: Promoter: Adhunik Power & Natural Resources Adhunik Power & Natural Resources Proj: Proj: Thermal Thermal Cap: Cap: 2 x 660 MW 2 x 660 MW Dist: Dist: BilaspurBilaspur
Adhunik Power & Natural Resources plans to set up 2 x
660 MW Coal based Super Critical thermal power plant
in Bilaspur district of Chhattisgarh. The company has
signed an MoU with the State Government.
Implementation Schedule: As of July 2009, land
acquisition is under progress and clearances awaited.
Adhunik Power & Natural Resources Limited,
C/o. Adhunik Group Of Industries, Lansdowne
Towers, 2/ 1A, Sarat Bose Road, Kolkata 700020,
West Bengal, India. Tel: +91 33- 30517100. Fax: 91
33- 22890285. Email: [email protected].
Website: www.adhunikgroup.com
STATUS: IMPLEMENTATION
Promoter: Promoter: Spectrum Coal & PowerSpectrum Coal & Power Proj: Proj: ThermalThermal Cap: Cap: 250 MW 250 MW Dist:Dist: Korba Korba EDC:EDC: End of 2011. End of 2011.
Spectrum Coal & Power, a subsidiary of Aryan Coal
Benefication is setting up 250 MW of Coal based power
plant in Korba district of Chhattisgarh. Implementation
Schedule: As of July 2009, civil work is under progress.
The project is scheduled for completion by the end of
2011.
Spectrum Coal & Power Limited, No. 202,
Cyber Heights, Road No. 2, Banjara Hills, Hyderabad
500033, Andhra Pradesh, India. Tel: +91 40-
23545287 / 66625287. Fax: + 91 40- 23544137.
Email: [email protected]. Website:
www.spectrumcoal.com
GUJARAT
STATUS: PLANNING
Promoter: Promoter: Astonfield Renewable Resources Astonfield Renewable Resources Proj: Proj: Non Conventional Non Conventional Cap: Cap: 200 MW200 MW
Astonfield Renewable Resources plans to set up a 200
MW Solar power project in Gujarat. Implementation
Schedule: As of July 2009, the company has signed an
MoU with the State Government. Land acquisition for
the project is under progress.
Astonfield Renewable Resource PVt Ltd, Room
No. 112 & 107, DBS House, 10/ 2, Hungerford
Street , Kolkata700017, West Bengal. Tel: 91 33
32443981. Fax: 40509300. Email:
[email protected]. Website:
www.astonfield.com
STATUS: IMPLEMENTATION
Promoter: Promoter: Essar Power Essar Power Proj: Proj: ThermalThermal Cap: Cap: 2x600 2x600 MW MW Loc:Loc: Salaya Salaya Dist: Dist: Jamnagar Jamnagar EDC:EDC: 2012 2012
Essar Power is setting up a 2x600 MW Coal based
thermal power project at Salaya in Jamnagar district of
Gujarat. Harbin, China has been appointed as the
Power Generation Projects Page 3
Updated: Sept, 09
equipment supplier. Implementation Schedule: As of
July 2009, civil works are under progress. The project is
scheduled for completion by 2012.
Essar Power Limited, Essar House, 11
Keshavrao Khadye Marg, Mahalaxmi, Mumbai City -
400034, Maharashtra, India. Tel: +91-22-66601100.
Fax:+91 22-24954787. Email:
[email protected]. Website: http:
ww.essar.com
Harbin , 170 Guixin St., Harbin-150006, Tel: 86-
451-6231639 China.
STATUS: IMPLEMENTATION
Promoter: Promoter: Sanghi CementSanghi Cement Proj: Proj: Captive Power Captive Power PlantPlant Cap: Cap: 2 X 60 MW Loc: Sanghipuram 2 X 60 MW Loc: Sanghipuram Dist: Dist: Kutch Kutch EDC:EDC: November 2009 (Phase I) November 2009 (Phase I)
Sanghi Cement is setting up 2 X 60 MW captive thermal
power plant in two phases at the existing Sanghipuram
unit in Kutch district of Gujarat. Implementation
Schedule: As of July 2009, Ph I is under implementation
and is scheduled for completion by November 2009.
Sanghi Cement Limited, President House,
Ambawadi Circle, Ahmedabad 380006, Gujarat.
Tel:91-79-26564535/26569939. Fax: 26560408.
Email: [email protected]. Website:
www.sanghicement.com
Plt: P.O. Sanghipuram, Abadasa, Kutch 370511,
Gujarat India. Tel: 02831-274131 / 274132 /
274133/274138/274139. Fax: 274115/
2831274123. Email: [email protected].
Web:www.sanghicement.com
JHARKHAND
STATUS: IMPLEMENTATION
Promoter: Promoter: Power Grid Corporation of India Power Grid Corporation of India Proj: Proj: TransmissionTransmission Cost: Cost: Rs.1,090 millionRs.1,090 million
Power Grid Corporation of India is to construct and
upgrade their 400 KV Bachau and 400 KV Maithon
substations. Siemens has been awarded the turnkey
contract at a cost of Rs.1,090 million. Implementation
Schedule: The projects are scheduled to be
commissioned in the next 12 to 24 months. Siemens
energy sector will construct a new 400/ 220 KV
substation at Bachau and upgrade another two existing
substations of GETCO at Limbdi and Ranchodpura in
Gujarat. This project is a part of the Associated
Transmission System for Ultra Mega Power Project
(UMPP) to transmit the bulk power generated by
Mundra UMPP to the western region. The other contract
received by Siemens is for extension of 400 KV
substations at Maithon in Jharkhand. The scope of work
in both the projects includes designing, engineering,
manufacture, supply, installation, civil works, testing and
commissioning of the complete substations. Siemens
will supply the hi-end technology products such as
circuit breakers, dis-connectors, instrument
Transformers and control & protection equipment
manufactured at its State-of-the-Art factories in
Aurangabad, Kalwa and Hyderabad.
Power Grid Corporation of India Limited,
Saudamini, Plot No. 2, Sector-29, Near IFFCO
Chowk, Gurgaon 122001, Haryana. India. Tel: +91
124-2571700 / 2571719. Fax: 91-124-2571760/
2571761. Website: www.powergridindia.com
Siemens Limited, 130, Pandurang Budhkar
Marg, Worli, Mumbai 400018, Maharashtra India.
Tel: +91 22-24987000. Fax: + 91 22-24987500.
Website: www.siemens.co.in
MADHYA PRADESH
STATUS: IMPLEMENTATION
Promoter: Promoter: Essar Power Essar Power Proj: Proj: ThermalThermal Cap: Cap: 2x600 2x600 MW MW Loc:Loc: Mahan Mahan Dist: Dist: Singrauli Singrauli EDC:EDC: 2012 2012
Essar Power is setting up a 2x600 MW Coal based
Thermal power project at Mahan in Singrauli district of
MP. Harbin, China has been appointed as the equipment
supplier. Implementation Schedule: As of July 2009, civil
works are under progress. The project is scheduled for
completion by 2012.
Essar Power Ltd: Essar House, 11 Keshavrao
Khadye Marg, Mahalaxmi, Mumbai 400034,
Maharashtra. Tel: 91-22-66601100. Fax: 24954787.
Email: [email protected] Website:
www.essar.com
Power Generation Projects Page 4
Updated: Sept, 09
Harbin , 170 Guixin St., Harbin-150006, Tel: 86-
451-6231639 China.
STATUS: PLANNING
Promoter: Promoter: Revati Cements Revati Cements Proj: Proj: Captive Power Captive Power PlantPlant Cap: Cap: 35 MW35 MW Dist: Dist: SatnaSatna
Revati Cements, a group company of Indian Steel
Corporation jointly promoted by Ruchi Group of
Industries and Mitsui & Co, Japan plans to set up a 35
MW coal based captive power plant at its Satna cement
facility in MP. Implementation Schedule: As of June
2009, work on the power plant is to commence after the
completion of the cement unit in the Satna facility.
Revati Cements Pvt Ltd, No. 503, Mahakosh
House, 7/ 5, South Tukoganj, Nath Mandir Road
Indore 452001, Madhya Pradesh. Tel: +91 731
4017509 / 2518124. Fax: +91-731-2518127. Email:
[email protected] Web: www.indiansteels.com
MAHARASHTRA
STATUS: PLANNING
Promoter: Promoter: Adani Power Maharashtra (APML) Adani Power Maharashtra (APML) Proj: Proj: Transmission Loc: Tiroda Dist: GondiaTransmission Loc: Tiroda Dist: Gondia
APML is to implement a Power Transmission Project at
Tiroda in Gondia district of Maharashtra. The project is
for evacuation of Power from the Tiroda Thermal Power
Project. The scope of works includes design, supply,
erection, testing & commissioning of 400 KV Double
circuit Tiroda-Koradi Transmission Line Package.
Implementation Schedule: As of August 2009, tenders
are invited for the project on EPC basis with the last date
of submission being 31-08-2009. The project has a
completion period of 18 months from the date of award
of contract.
Adani Power Maharashtra Private Ltd, 7th
Floor, Sambhav Building, Judges Bungalow Road,
Bokakdev Ahmedabad 380015, Gujarat India. Tel:
+91 79 25556946. Email: [email protected]
Website: www.adanipower.com
STATUS: IMPLEMENTATION
Promoter: Promoter: Ideal Energy ProjectsIdeal Energy Projects Proj: Proj: ThermalThermal Cap: Cap: 1x270 MW 1x270 MW Cost:Cost: Rs. 4,140 million Rs. 4,140 million Loc: Loc: Bela Bela Dist:Dist: NagpurNagpur
Ideal Energy Projects to implement a Coal Based Power
Project in Maharashtra. Ideal Energy Projects
implementing 1x270 MW coal based power project at
Bela in Nagpur district of Maharashtra. The scope of
works includes design, engineering, manufacturing,
supply, erection, testing and commissioning including
civil works. McNally Bharat Engineering Company has
been awarded on EPC basis for balance of plant at a cost
of Rs. 4,140 million. Implementation Schedule: As of
July 2009, the project has been awarded.
Ideal Energy Projects Limited, No. 122,
Telecom Nagar, Pratap Nagar Nagpur 440022
Maharashtra. Tel: +91 712-2295988 / 2295989. Fax:
+91 712-
2295987.
Mc Nally Bharat Engineering Co Ltd, No. 4
Mangoe Lane, 7th Floor, Kolkata 700001, West
Bengal. Tel: +91 33-65500726 / 65500727 /
65500728 / 65500729 / 65500730 / 65500731 /
Fax: 91-33-22480340/ 22485016. Email:
[email protected]. Website:
www.mcnallybharat.com
STATUS: IMPLEMENTATION
Promoter: Promoter: Kisan Veer Satara SSK Kisan Veer Satara SSK Proj: Proj: Thermal Thermal Cap: Cap: 22 MW22 MW Dist: Dist: Satara Satara EDC:EDC: October 2010. October 2010.
Kisan Veer Satara SSK is setting up a 22 MW Bagasse
based co-gen power plant at Satara district in
Maharashtra. Mitcon Consulting Services, Pune has
been appointed as the project consultant. Thyssen
Krupp and Siemens are the major equipment suppliers.
Implementation Schedule: As of July 2009, civil works
are yet to commence. The project is scheduled for
completion by October 2010.
Kisan Veer Satara S S K Limited, Bhuinj, A/p.
Kisanveer Nagar, Taluk Wai, Satara 415515,
Maharashtra, India. Tel: +91 2167 285240. Fax: + 91
2167 285147.
Mitcon Consultancy Services Ltd, MITCON
Kubera Chambers, Shivajinagar Pune 411005,
Maharashtra India. Tel: +91 20 25534322 /
25533309. Fax: +91 20 25533206. Website:
www.mitconindia.com
Thyssen Krupp Industries India Limited, P. O.
Bag No. 22, Pimpri, Pune 411018, Maharashtra. Tel:
Power Generation Projects Page 5
Updated: Sept, 09
+91 2027425461 / 27425462 / 27425463 /
27425464. Fax: 91 20- 27425821/ 27425350. Email:
[email protected]. Website:
www.thyssenkruppindia.com
Siemens Limited: 130, Pandurang Budhkar
Marg, Opposite Doordarshan, Worli, Mumbai
400018, Maharashtra India. Tel: +91 22 24987000 /
24987547. Fax:24987500. Website:
www.siemens.co.in
STATUS: IMPLEMENTATION
Promoter: Promoter: Maharashtra State Electricity Maharashtra State Electricity Transmission Company Transmission Company Proj: Proj: Transmission Transmission Cost: Cost: Rs.1,410 million Rs.1,410 million Loc:Loc: See Below See Below EDC: EDC: 20102010
Maharashtra State Electricity Transmission Company is
implementing 3 Substation projects in the State. The 220
KV and 132 KV subtations are located in Nashik,
Amravati & Nagpur. ABB has been awarded the turnkey
contract at a cost of Rs.1,410 million. The scope of works
includes system design, engineering, civil works, supply,
installation, commissioning and overall project
management. Implementation Schedule: The project is
scheduled for completion by 2010.
Maharashtra State Electricity Transmission
Company Limited, 5th Floor, Plot No. C-19, Bandra-
Kurla Complex, Bandra (E) Mumbai 400051,
Maharashtra. Tel: +91 222 6595130 / 26595164 /
Fax: 26598587. Website: www.mahatransco.in
A B B Limited, 2nd Floor, Khanija Bhavan, East
Wing, 49, Race Course Road, Bangalore 560001,
Karnataka India. Tel: +91 80 22949150 / 22949151 /
22949152 / 22949153 / 22949154. Fax : + 91 80-
22949148.
STATUS: IMPLEMENTATION
Promoter: Promoter: Maharashtra Power Generation Maharashtra Power Generation Corporation (MAHAGENCO)Corporation (MAHAGENCO) Proj: Proj: Thermal Thermal Cap: Cap: 2x500 MW 2x500 MW Cost:Cost: Rs.16,320 million Rs.16,320 million Dist:Dist: Chandrapur.Chandrapur.
Maharashtra Power Generation Corporation
(MAHAGENCO) is implementing 2x500 MW Chandrapur
Super Thermal Power Station in Chandrapur district.
BGR Energy Systems has been awarded the turnkey
contract for balance of plant at a cost of Rs.16,320
million. The scope of work includes design, supply,
engineering, erection, testing and commissioning of all
balance work of the Plant including mechanical,
electrical, civil and structural works. Implementation
Schedule: The project is scheduled for completion in 33
months.
Maharashtra State Power Generation
Corporation Limited, Prakashgad, 3rd Floor, Plot No.
G-9, A. K. Marg, Bandra (E) Mumbai 400051,
Maharashtra India. Tel: +91 22-26474211 /
26475759. Fax: 26475329. Website:
www.mahagenco.in
B G R Energy Systems Limited, A-5,
Pannamgadu Industrial Estate, Ramapuram Post,
Sullurpet Village, Nellore 524401, Andhra Pradesh
India. Tel: +91 44-27900181. Fax: +91 44 27948249.
Website : www.bgrcorp.com
STATUS: IMPLEMENTATION
Promoter: Promoter: Maharashtra State Electricity Maharashtra State Electricity Distribution Company (MSEDCL)Distribution Company (MSEDCL) Proj: Proj: TransmissionTransmission Cost:Cost: Rs. 10188.4 million Rs. 10188.4 million Loc: Loc: See Below See Below
Maharashtra State Electricity Distribution Company
(MSEDCL) is upgrading its distribution networks in
Nashik and Aurangabad divisions of Maharashtra. The
company has awarded an order to Ashoka Buildcon Ltd,
Nashik as part of the power transmission project. The
scope of work includes construction of 72 new
sub-stations, augmentations/enhancement of existing
128 substations, construction of 33 kV overhead lines
(973 Kms), construction of 11 kV overhead lines (5,600
Kms) & construction of 7,200 new distribution
transformers. The order is valued at Rs. 10188.4 million.
Implementation Schedule: As of July 2009, works are
under progress. The order is scheduled for completion in
two years.
Maharashtra State Electricity Distribution
Company Limited, Office Of The Chief Engineer,
Aurangabad Zone, Vidyut Bhavan, Dr. Babasaheb
Ambedkar Road, Aurangabad 431001, Maharashtra.
Tel: +91 240-2331347. Fax: +91 240-2331056.
Website: www.mahadiscom.in
Maharashtra State Electricity Distribution
Company Limited, Office Of The Chief Engineer,
Nasik Zone, Vidyut Bhavan, Nasik Road, Nashik
42210, Maharashtra. Tel: +91 253-2462491 /
2462492 / 2462493. Fax: +91 253 2461581. Web:
www.mahadiscom.in
Ashoka Buildcon Ltd, Registered office 'Ashoka
House', Ashoka Marg, Nashik 422011, Maharashtra.
Tel: +91 253-3011705. Fax: 91-253-2422704. Email:
[email protected]. Web:
www.ashokabuildcon.com
STATUS: PLANNING
Power Generation Projects Page 6
Updated: Sept, 09
Promoter: Promoter: Maharashtra State Electricity Maharashtra State Electricity Transmission Company (MAHATRANSCO) Transmission Company (MAHATRANSCO) Proj: Proj: TTransmissionransmission Loc: Loc: Taharabad Taharabad Dist:Dist: Nashik Nashik
Maharashtra State Electricity Transmission Company
(MAHATRANSCO) is to implement a substation project at
Taharabad in Nashik district of Maharashtra. Package B
(132/33 kV substation) includes • Establishment of 2x25
MVA, 132/33 kV transformers with bays • 132 kV line
bays (2 nos. each at Satana and Taharabad) - 4 Nos. • 33
kV outlets – 8 Nos. The scope of works includes
establishment of the substation with design,
engineering, supply of material, civil works, erection,
testing and commissioning. Implementation Schedule:
As of July 2009, bids are invited for establishment of the
substations on turnkey basis with the last date of
submission being 10-08-2009. The project is scheduled
for completion in 12 months from the date of LOA.
Maharashtra State Electricity Transmission
Company Limited, Office of the Executive Engineer
5th Floor, Plot No. C-19, ‘E’-Block, Bandra Kurla
Complex, Bandra (East), Mumbai 400051
Maharashtra, India Tel: +91 22- 26595173. Fax: + 91
22-26598587. Website: www.mahatransco.in
STATUS: PLANNING
Promoter: Promoter: MSETCL MSETCL Proj: Proj: Transmission Transmission Cost: Cost: Rs. Rs. 100 million 100 million Loc: Loc: See BelowSee Below
MSETCL is to undertake installation of 22 kV GIS
switchgear units at Bhiwandi I and Bhiwandi II (Kamba)
substations in Maharashtra on turnkey basis. The scope
of works includes installation of 22 kV GIS switchgear
units with associated equipment / arrangements at 100
KV Bhiwandi I, 220 KV Kamba II substations with design,
engineering, manufacturing, supply, installation with
civil works, testing and commissioning. The estimated
cost of the project is Rs. 100 million. Implementation
Schedule: As of August 2009, bids have been invited for
installation of GIS switchgear units with associated
works. The last date of submission being 10-08-2009.
The project has a completion schedule of 6 months
(including monsoon period) from the date of letter from
MSETCL for taking over the site for execution.
Maharashtra State Electricity Transmission
Company Limited, Office of the Executive Engineer ,
5th Floor, Plot No. C-19, ‘E’-Block, Bandra Kurla
Complex, Bandra (East), Mumbai 400051
Maharashtra. Tel:+91(22)26595173. Fax: 91-22-
26598587. Website: www.mahatransco.in
STATUS: PLANNING
Promoter: Promoter: MAHATRANSCO MAHATRANSCO Proj: Proj: Transmission Transmission Cost: Cost: Rs. 138.8 million Rs. 138.8 million Loc: Loc: Mahakala Mahakala Dist: Dist: JalnaJalna
MAHATRANSCO is to implement a Substation Project at
Mahakala in Jalna district of Maharashtra. Package C
(132/33 kV substation) includes • Establishment of 2x25
MVA, 132/33 kV transformers with bays. • 132 kV line
bays - 4 Nos. (2 Nos. at Mahakal and one each at Georai
and Ambad) • 33 kV outlets - 8 Nos. The scope of works
includes establishment of the substation with design,
engineering, supply of material, civil works, erection,
testing and commissioning. The cost of the project is Rs.
138.8 million. Implementation Schedule: As of July
2009, bids are invited for establishment of the
substations on turnkey basis with the last date of
submission being 10-08-2009. The project is scheduled
for completion in 12 months from the date of LOA.
Maharashtra State Electricity Transmission
Company Limited, Office of the Executive Engineer,
5th Floor, Plot No. C-19, ‘E’-Block, Bandra Kurla
Complex, Bandra (East), Mumbai 400051,
Maharashtra. Tel: +91-22-26595173. Fax:+91 22-
26598587. Website: www.mahatransco.in
STATUS: PLANNING
Promoter: Promoter: MAHATRANSCO MAHATRANSCO Proj: Proj: TTransmission ransmission Loc:Loc: Kadegaon Kadegaon Dist:Dist: Sangli Sangli
MAHATRANSCO is to implement a Substation Project at
Kadegaon in Sangli district of Maharashtra. Package A
(220/ 132/33 kV substation) includes :
• Establishment of 2x100 MVA, 220/132-110 kV ICT with
bays.• Establishment of 2x50 MVA, 220/33 kV
transformers with bays • 220 kV line bays - 2 Nos. • 132
kV line bays - 4 Nos. • 33 kV outlets - 12 Nos. The scope
of works includes establishment of the substation with
design, engineering, supply of material, civil works,
erection, testing and commissioning. Implementation
Schedule: As of July 2009, bids are invited for
establishment of the substations on turnkey basis with
the last date of submission being 10-08-2009. The
project is scheduled for completion in 18 months from
the date of LOA.
Maharashtra State Electricity Transmission
Company Limited, Office of the Executive Engineer,
5th Floor, Plot No. C-19, ‘E’-Block, Bandra Kurla
Complex, Bandra (East), Mumbai 400051,
Maharashtra. Tel: +91 22 26595173. Fax:+91 22-
26598587. Website: www.mahatransco.in
STATUS: IMPLEMENTATION
Power Generation Projects Page 7
Updated: Sept, 09
Promoter: Promoter: Shankar Maharshi Shankarrao Mohite Shankar Maharshi Shankarrao Mohite Patel S S K Patel S S K Proj: Proj: Thermal Thermal Cap: Cap: 33 MW 33 MW Loc: Loc: Malshiras Malshiras Dist: Dist: Solapur Solapur EDC: EDC: 2010.2010.
Shankar Maharshi Shankarrao Mohite Patel S S K is
setting up 33 MW Bagasse based co gen at Malshiras in
Solapur district of Maharashtra. Avant Garade is the
Technical Consultant. Implementation Schedule: As of
July 2009, civil work is under progress. The project is
scheduled for completion by January 2010.
Maharshi Shankarrao Mohite Patel S S K Ltd,
Corporate Office: Shankar Nagar, Akluj, Malshiras
Taluk Solapur 413118, Maharashtra. Tel: +91 -2185-
222048. Fax: 91-2185-222249.
Avant Garde Engineers & Consultants Private
Limited, No. 68 A, Porur Kundrathur High Road,
Porur, Chennai 600116, Tamil Nadu. Tel: +91 44
24827843 / 24828717 / 24828718 / 24828719 /
24828720. Fax: 91-44-24828531. Email:
[email protected]. Website: www.avantgarde-
india.com
TAMIL NADU
STATUS: PLANNING
Promoter: Promoter: Hinduja Group Hinduja Group Proj: Proj: Thermal Thermal Cap: Cap: 2x520 MW 2x520 MW Loc:Loc: Visakhapatnam Visakhapatnam EDC:EDC: First quarter First quarter of 2013.of 2013.
Hinduja Group plans to set up 2x520 MW Coal based
thermal power plant at Visakhapatnam in AP. Mott Mac
Donald is the technical consultant. Implementation
Schedule: As of July 2009, bids are being received from
EPC contractors and financial closure is awaited. The
project is scheduled for completion by the first quarter
of 2013.
Hinduja Group India Limited, Hinduja House,
171 Dr. Annie Besant Road, Worli 400018, Mumbai
Maharashtra. Tel: 91 22- 24960707. Website:
http://hindujagroup.com.
Mott Mac Donald, 44 Dr R G Thadani Marg,
Worli, 400018 Mumbai, Maharashtra. Tel:
39810100. Fax: +91 22 24950539. Email:
[email protected]. Web:
www.mottmac.in
STATUS: PLANNING
Promoter: Promoter: Keerthi Industries Keerthi Industries Proj: Proj: Thermal Thermal Cap: Cap: 2020 MWMW Cost: Cost: Rs.400 million Rs.400 million Loc: Loc: Balanagar Balanagar Dist:Dist: Ranga Reddy Ranga Reddy EDC:EDC: Last Quarter of 2011. Last Quarter of 2011.
Keerthi Industries plans to set up a 20 MW bagasse
based co-gen power plant at Balanagar in Ranga Reddy
district of AP. The project envisages an investment of
Rs.400 million. Avante Garde is the project consultant.
Implementation Schedule: As of July 2009, certain
clearances are awaited from the State Government. The
project is slated for completion by the last quarter of
2011.
Keerthi Industries Limited, No. 40 IDA,
Balanagar, Ranga Reddy 500037, Andhra Pradesh,
India.
Avant Garde Engineers & Consultants Private
Limited, No. 68 A, Porur Kundrathur High Road,
Porur, Chennai 600 116, Tamil Nadu. Tel: 91-44-
24827843 / 24828717 / 24828718 / 24828719 /
24828720. Fax: +91-44–2482853. Email:
[email protected] Website: www.avantgarde-
india.com
STATUS: IMPLEMENTATION
Promoter: Promoter: Meenakshi EnergyMeenakshi Energy Proj: Proj: Thermal Thermal Cap: Cap: 900 MW900 MW (Phase I & II)(Phase I & II) Loc: Loc: Thammenapatnam Thammenapatnam Dist:Dist: Nellore Nellore
Meenakshi Energy is setting up 900 MW thermal power
plant at Thammenapatnam in Nellore District of AP in a
phased manner. Phase I will comprises of 2x135 MW
power plants and the balance to come up in Phase II.
Implementation Schedule: As of July 2009, EPC
contractors have been appointed and civil works are
under progress.
Meenakshi Energy Private Limited, Meenakshi
House, 8-2-418, Road # 7 Banjara Hills, Hyderabad
500034, Andhra Pradesh. Tel: +91 40- 23358111 /
23358222 / 23358333. Fax: 23351133 / 23351530.
Email: [email protected] Website:
www.meenakshienergy.com
STATUS: PLANNING
Promoter: Promoter: Singaraya Hills Singaraya Hills Proj: Proj: Non Conventional Non Conventional Cap: Cap: 6 MW to6 MW to 8 MW8 MW Loc: Loc: Hasnapur Hasnapur Dist: Dist: PrakasamPrakasam
Singaraya Hills plans to expand its wood chips
based power plant capacity from 6 MW to 8 MW at
Hasnapur power plant in Prakasam district of AP.
Power Generation Projects Page 8
Updated: Sept, 09
Implementation Schedule: As of July 2009, PPA has
been signed with Tata Power and clearances have been
obtained. An agreement is likely to be signed with
NEDCAP & TATA Power. The project will be completed in
24 months from the date of signing the agreement.
Singaraya Hills Green Power Genco Private
Limited, No. 40-1-21/ 21, Catholic Complex, MG
Road, Vijayawada Krishna 520010, Andhra Pradesh
India. Tel: +91 40 23202391.
KARNATAKA
STATUS: PLANNING
Promoter: Promoter: Astonfield Renewable Resources Astonfield Renewable Resources Proj: Proj: Non ConventionalNon Conventional Cap: Cap: 10 MW10 MW
Astonfield Renewable Resources plans to set up 10
MW Solar Power project in Karnataka. Implementation
Schedule: As of July 2009, the Government allocation
has been received by the company. The project is in a
nascent stage.
Astonfield Renewable Resource Private
Limited, Room No. 112 & 107, DBS House, 10/ 2,
Hungerford Street Kolkata 700017, West Bengal,
India. Tel: +91 33- 32443981. Fax: + 91 33 -
40509300. Email: [email protected].
Website: www.astonfield.com
STATUS: COMMISSIONED
Promoter: Promoter: Hare Krishna Metallics Hare Krishna Metallics Proj: Proj: Non Non ConventionalConventional Cap: Cap: 12 MW 12 MW LocLoc: Hirebagnal : Hirebagnal DistDist: : KoppalKoppal
Hare Krishna Metallics has set up 12 MW coal & waste
heat recovery based power plant at Hirebagnal in Koppal
district of Karnataka. The first unit comprises of coal
based 8 MW, the second unit of 2 MW waste heat
recovery based while the third unit of 2 MW waste heat
recovery based. Raghu Engineers, Raipur is the project
consultant and Thermax, Pune is the EPC contractor.
Implementation Schedule: As of July 2009, the first unit
was commissioned in first week of July. The second unit
is under final stages of completion and will be
commissioned in the third week of July. The third unit
will be commissioned in a week thereafter.
Hare Krishna Metallics Private Limited, Survey
No. 20, Kasan Road, Village & Post Hirebangal,
Koppal 583228, Karnataka India. Tel: +91 8539-
264123 / 264124 / 264125 / 264126. Fax: + 91
8539-264122. Email: [email protected]
Website: www.harekrishnametallics.com.
Thermax Limited, Thermax House, 4, Mumbai-
Pune Road, Shivajinagar, Pune 411005,
Maharashtra, India. Tel: +91 20-25542122. Fax: 91-
20-25542122. Email: [email protected].
Website: www.thermaxindia.com
STATUS: PLANNING
Promoter: Promoter: Ind-Barath Power (Karwar) Ind-Barath Power (Karwar) Proj: Proj: Thermal Thermal Cap: Cap: See BelowSee Below Loc Loc: Hankon : Hankon DistDist: Uttar : Uttar KannadaKannada
Ind-Barath Power (Karwar) plans to set up a thermal
power plant in two Phases at Hankon in Uttar Kannada
district of Karnataka. Phase I will comprise of 2x150 MW
and the Phase II of 1x150 MW PPs. Aquatherm
Engineering, Chennai is the project consultant.
Implementation Schedule: As of June 2009, land
development and various clearances are under progress.
The first unit is slated for completion in 2 years.
Ind Barath Power (karwar) Limited, Plot No.
30-A, Road No. 1, Film Nagar, Jubilee Hills
Hyderabad 500033, Andhra Pradesh India. Tel: +91
40 23553459 / 23553460. Fax: + 91 40-23607522.
Email: [email protected]. Website:
www.ibpil.co.in.
Aquatherm Engineering Consultants Private
Limited, St. Thomas Building, 2nd Floor, Western
Wing, New No. 68, Old No. 150, Luz Church Road,
Mylapore, Chennai 600004, Tamil Nadu. Tel: 91-44-
24660462 / 24660464. Fax: 91-44-24996085. Email:
STATUS: PLANNING
Promoter: Promoter: Maharashtra Seamless Maharashtra Seamless Proj: Proj: CCaptive aptive Power Plant Power Plant Cap: Cap: 80 MW 80 MW Loc:Loc: Koppal Koppal
Maharashtra Seamless is planning to set up 80 MW
waste heat recovery based captive power plant at its
Koppal steel unit in Karnataka. Implementation
Schedule: As of July 2009, land acquisition is under
progress and DPR is under preparation. The project
consultant is being finalized.
Power Generation Projects Page 9
Updated: Sept, 09
Maharashtra Seamless Limited, JINDAL
CORPORATE CENTRE, Plot No 30 Sector 44 Gurgaon
122001, Haryana India. Tel: +91 124-4624000. Fax:
+ 91 124- 2574327/ 4624215. Email:
[email protected]. Website: www.jindal.com
STATUS: PLANNING
Promoter: Promoter: PGM Ferro SteelsPGM Ferro Steels Proj: Proj: CCaptive Power aptive Power Plant Plant Cap: Cap: 2x2.5 MW2x2.5 MW Loc Loc: Hariginadoni : Hariginadoni DistDist: : BellaryBellary
PGM Ferro Steels plans to set up 2x2.5 MW WHR based
captive power plant at its Hariginadoni facility in Bellary
district of Karnataka. Implementation Schedule: As of
July 2009, DPR is yet to be prepared. Further
developments are expected in the following months.
P G M Ferro Steel Pvt Ltd, Door No. 271/ A,
Opp Spicy Venue Restaurant Road No. 10, Jubilee
Hills Hyderabad 500033, Andhra Pradesh. Tel: +91
40-23553170. Fax: 91-40-23553187
STATUS: IMPLEMENTATION
Promoter: Promoter: Siruguppa Sugars & Chemicals Siruguppa Sugars & Chemicals Proj: Proj: ThermalThermal Cap: Cap: 28.2 MW 28.2 MW Loc:Loc: Desanur Dist: Bellary Desanur Dist: Bellary EDCEDC: Last quarter of 2010.: Last quarter of 2010.
Siruguppa Sugars & Chemicals is setting up a 28.2 MW
bagasse based power plant at Desanur in Bellary district
of Karanataka. Avant Garde has been appointed as the
project consultant, Gannon Dunkerley as the civil
contractor and BHEL as the major equipment supplier.
Implementation Schedule: As of July 2009, civil works
are under progress. The project is scheduled for
completion by the last quarter of 2010.
Siruguppa Sugars & Chemicals Limited,
Siruguppa Taluk, Desanur Bellary Karnataka 583140.
Tel: +918396-221925 / Fax : + 91 8396221924
Bharat Heavy Electricals Limited, BHEL House,
Siri Fort, New Delhi 110049, Delhi India. Tel: +91 11-
26001010 / 66337000 / Fax : + 91 11-26493021./
26492534. Website: www.bhel.com
Avant Garde Engineers & Consultants Private
Limited, No. 68 A, Porur Kundrathur High Road,
Porur, Chennai 600116, Tamil Nadu, India. Tel: +91
44-24827843 / 24828717 / 24828718 / 24828719 /
24828720. Fax: +91 44-24828531. Email:
[email protected]. Website: www.avantgarde-
india.com
Gannon Dunkerley & Company Ltd, B-228,
Okhla Industrial Area, Phase I, New Delhi 110 020,
Delhi. Tel: +91-11-42785500. Fax:91-11-42785512.
Website: www.gannondunkerley.com
KERALA
STATUS: PLANNING
Promoter: Promoter: Kerala Sponge Iron Kerala Sponge Iron Proj: Proj: Captive Power Captive Power Plant Plant Cap: Cap: 8 MW8 MW Dist Dist: Palakkad: Palakkad
Kerala Sponge Iron is to set up an 8 MW WHR & BFC
based CPP in Palakkad district of Kerala. The project
consultant and EPC contractor have been appointed.
Implementation Schedule: As of July 2009, the financial
closure is awaited and equipment suppliers are on
the verge of being finalised. Civil works are yet to
commence. The project is likely to be completed in 14
to15 months from the commencement of work.
Promoter Company Address Kerala Sponge
Iron Limited, Door No. 29/ 538, 1st Floor, “SREYAS”,
Near Yakkara School Bus Stop, West Yakkara,
Palakkad 678001, Kerala India. Tel: +91 491-
2531698 / 2527956. Fax : + 91491-2530035.
Plt Add: XV-D No. 810, Manthuruthy, Kanjikode
West, Palakkad 678623 Kerala India. Tel: +91 491
2531698 / 2527956. Fax :+ 91-491 2530035.
STATUS: PLANNING
Promoter: Promoter: Kerala State Electricity Board Kerala State Electricity Board Proj: Proj: Karapuzha Dam Hydel Karapuzha Dam Hydel Cap: Cap: 5 MW 5 MW Dist: Dist: WayanadWayanad
Kerala State Electricity Board plans to set up Karapuzha
Dam based 5 MW hydro power project in Wayanad
district. The project is dam based and the main dam is
Karapuzha Irrigation Dam. Implementation Schedule: As
of July 2009, the Board has approved the project and
various clearances are awaited.
Kerala State Electricity Board, Vydyuthi
Bhavanam, Pattom, Thiruvananthapuram 695004,
Kerala India. Tel: +91 471 2448989. Website:
www.kseboard.com
STATUS: PLANNING
Promoter: Promoter: Kerala State Electricity Board Kerala State Electricity Board Proj: Proj: Kuttiyadi Tail Race Hydel Kuttiyadi Tail Race Hydel Cap: Cap: 4 MW4 MW Dist Dist: : Kozhikode.Kozhikode.
Power Generation Projects Page 10
Updated: Sept, 09
Kerala State Electricity Board plans to set up a Rs.240
million, (4 MW) Kuttiyadi Tail Race Hydro Power Project
in Kozhikode district. The main river is Kuttiyadi River.
Implementation Schedule: As of July 2009, the Board
has approved the project and various clearances are
awaited.
Kerala State Electricity Board, Vydyuthi
Bhavanam Pattom Thiruvananthapuram 695004,
Kerala India. Tel: 91 471 2448989. Website:
www.kseboard.com
STATUS: PLANNING
Promoter: Promoter: Kerala State Electricity Board Kerala State Electricity Board Proj: Proj: Pambar Hydel Pambar Hydel Cap: Cap: 40 MW 40 MW Dist: Dist: IdukkiIdukki
Kerala State Electricity Board plans to set up 40 MW
Pambar Hydro Electric Power Project in Idukki district.
The main river is Pambar. Implementation Schedule: As
of June 2009, the preparation of DPR was
completed and approved by the Board and Government
approvals are awaited.
Kerala State Electricity Board ,, Vydyuthi
Bhavanam, Pattom, Thiruvananthapuram 695004,
Kerala India. Tel: +91 471- 2448989. Website:
www.kseboard.com
STATUS: PLANNING
Promoter: Promoter: Kerala State Electricity Board Kerala State Electricity Board Proj: Proj: Peechad Hydel Peechad Hydel Cap: Cap: 3 MW3 MW Cost: Cost: Rs.170 million Rs.170 million DistDist: Idukki: Idukki
Kerala State Electricity Board plans to set up a Rs.170
million, (3 MW) Peechad Hydro Power Project in Idukki
district. The project is run-of-river based and the main
river is Western Kallar. Implementation Schedule : As of
July 2009, the Board has approved the project and
various clearances are awaited.
Kerala State Electricity Board, Vydyuthi
Bhavanam Pattom Thiruvananthapuram 695004,
Kerala India. Tel: 91 471- 2448989. Website:
www.kseboard.com
STATUS: PLANNING
Promoter: Promoter: Kerala State Electricity Board Kerala State Electricity Board Proj: Proj: Porufalls Hydel Porufalls Hydel Cap: Cap: 16 MW16 MW Cost: Cost: Rs.1,630 million Rs.1,630 million DistDist: Ernakulam: Ernakulam
Kerala State Electricity Board plans to set up a Rs.1,630
million, (16 MW) Porufalls Hydro Power Project in
Ernakulam district. The project is run-of-river based and
the main river is Periyar. Implementation Schedule : As
of July 2009, the Board has approved the project and
various clearances are awaited.
Kerala State Electricity Board, Vydyuthi
Bhavanam Pattom Thiruvananthapuram 695004,
Kerala India. Tel: 91 471- 2448989. Website:
www.kseboard.com
STATUS: PLANNING
Promoter: Promoter: Kerala State Electricity Board Kerala State Electricity Board Proj: Proj: Vakkallar Hydro Electric Power Project Vakkallar Hydro Electric Power Project Cap: Cap: 24 MW24 MW DistDist: Patthanamthitta: Patthanamthitta
Kerala State Electricity Board plans to set up Vakkallar
Hydro Electric Power Project (24 MW) in
Patthanamthitta district. The main river is Vakkalar.
Implementation Schedule: As of June 2009, the
preparation of DPR have been completed & approved by
the Bboard and Government approvals are awaited.
Kerala State Electricity Board, Vydyuthi
Bhavanam, Pattom, Thiruvananthapuram 695004,
Kerala India. Tel: 91 471- 2448989. Website:
www.kseboard.com
STATUS: PLANNING
Promoter: Promoter: Kerala State Electricity Board Kerala State Electricity Board Proj: Proj: Upper Kallar Hydel Upper Kallar Hydel Cap: Cap: 2 MW2 MW Cost: Cost: Rs.123 million Rs.123 million DistDist: Idukki.: Idukki.
Kerala State Electricity Board plans to set up a Rs.123
million, (2 MW) Upper Kallar Hydro Power Project in
Idukki district. The project is run-of-river based and the
main river is Kallar. Implementation Schedule: As of July
2009, the Board has approved the project and various
clearances are awaited.
Kerala State Electricity Board, Vydyuthi
Bhavanam, Pattom, Thiruvananthapuram 695004,
Kerala. Tel: 91 471-2448989. Website:
www.kseboard.com
TAMIL NADU
STATUS: IMPLEMENTATION
Power Generation Projects Page 11
Updated: Sept, 09
Promoter: Promoter: Dharani Sugars & Chemicals Dharani Sugars & Chemicals Proj: Proj: Thermal Thermal Cap: Cap: 22MW 22MW Loc: Loc: Kalayanallur Kalayanallur Dist: Dist: Villupuram Villupuram EDC: EDC: End of 2009End of 2009
Dharani Sugars & Chemicals is setting up 22MW bagasse
based co-gen power plant at Kalayanallur in Villupuram
district of Tamil Nadu. Consultants and contractors have
been appointed. Implementation Schedule: As of July
2009, civil works is under progress. The project is
scheduled for completion by end of 2009.
Dharani Sugars and Chemicals Limited, PGP
House, No. 57, Sterling Road Nungambakkam
Chennai 600034 Tamil Nadu India. Tel: +91 44-
28311313 / 28254176 / 28252789. Fax: + 91 44-
28232074.
Plt: Unit II, Kalayanallur, Pallagacharry Post,
Shankarapuram Taluk, Viluppuram 606206, Tamil
Nadu, India
Power Generation Projects Page 12
Updated: Sept, 09
BIHAR
STATUS: PLANNING
Promoter: Promoter: Astonfield Renewable Resources Astonfield Renewable Resources Proj: Proj: Non ConventionalNon Conventional Cap: Cap: 100 MW100 MW
Astonfield Renewable Resources is planning to set up
a 100 MW Biomass based power project in Bihar. Rice
husk will be used as fuel. Implementation Schedule: As
of July 2009, the Government allotment has been
received by the company. The project is in a nascent
stage.
Astonfield Renewable Resource Private
Limited, Room No. 112 & 107, DBS House, 10/ 2,
Hungerford Street, Kolkata 700017, West Bengal,
India. Tel: +91 33- 3244398. Fax: + 91 33 –
40509300. Email: [email protected]
Website: www.astonfield.com/contactus.html
STATUS: IMPLEMENTATION
Promoter: Promoter: Bihar State Electricity Board Bihar State Electricity Board Proj: Proj: PowerPower TransmissionTransmission Cost : Cost : Rs.1,080.2 millionRs.1,080.2 million Dist Dist: Supaul: Supaul
Bihar State Electricity Board is implementing Rural
Eelectrification in Supaul district. Subhash Projects &
Marketing has been awarded the turnkey contract at a
cost of Rs.1,080.2 million. The project details are given
below: a) Supply of materials and equipment for
creation of rural infrastructure and household
electrification in Supaul district on turnkey basis under
Rajiv Gandhi Grameen Vidyutikaran Yojana for a value of
Rs.1,032.6 million. b) Installation / Erection including
associated civil works, testing & commissioning including
performance testing of all equipment supplied under the
supply contract and all other services specified in the
tender documents for creation of rural electricity
infrastructure and household electrification in Supaul
district of Bihar on turnkey basis under Rajiv Gandhi
Grameen Vidyutikaran Yojana for a value of Rs.47.6
million. Implementation Schedule: As of July 2009, the
project is under implementation.
Bihar State Electricity Board, Department Of
Project & Design, Vidyut Bhawan, 4th Floor, J. L.
Nehru Marg, Patna 800021, Bihar, India. Tel:
+91(0612)2235046 / Fax : 91(0612)2227557
Subhash Projects & Marketing Limited, No. 22,
3rd Floor, Block-A, Camac Street, Kolkata 700016,
West Bengal, India. Tel: +91-33-40091200 /
40091201 / 40091202 / 40091203 / 40091204 /
Fax: +91-33-40091303. Website : www.spml.co.in
JHARKHAND
STATUS: IMPLEMENTATION
Promoter: Promoter: Adhunik Power & Natural Resources Adhunik Power & Natural Resources Proj: Proj: Thermal Thermal Cap: Cap: 2 x 270 MW (Each Phase) 2 x 270 MW (Each Phase) Loc: Loc: Jamshedpur Jamshedpur EDC: EDC: See BelowSee Below
Adhunik Power & Natural Resources is setting up 4 x 270
MW Coal based thermal power plant at Jamshedpur in
Jharkhand in two phases. Phase I and II comprise power
plant of 2 x 270 MW each capacity. DCPL, Kolkata is the
project consultant and BHEL is the main equipment
supplier. Implementation Schedule : As of July 2009,
preliminary civil work is under progress. The first unit of
phase I is expected to be completed by January 2012
and the second unit by March 2012. Work on phase II
will follow 12 months thereafter.
Adhunik Power & Natural Resources Limited,
C/o. Adhunik Group Of Industries, Lansdowne
Towers, 2/ 1A, Sarat Bose Road, Kolkata 700020,
west Bengal. Tel: +91(33)30517100. Fax:
91(33)22890285. Email: [email protected]
Bharat Heavy Electricals Limited, BHEL House,
Siri Fort, New Delhi 110049 Tel:
+91(11)26001010 /66337000.
Fax:91(11)26493021/(11)26492534 Website:
www.bhel.com
Development Consultants Private Limited, 24
B, Park Street, Kolkata -700016, West Bengal, India.
Tel: +91(33)22267601 / 22497603. Fax: 91-(33)-
22492340/ 2492897. Email: [email protected]
Website: www.dcpl.net.in
STATUS: PLANNING
Promoter: Promoter: Bokaro Power Supply Bokaro Power Supply Proj: Proj: ThermalThermal Cap: Cap: 302 MW to 500 MW302 MW to 500 MW Loc:Loc: Bokaro. Bokaro.
Bokaro Power Supply is planning to expand its Bokaro
Power Plant capacity from 302 MW to 500 MW in
Jharkhand. Mecon, Ranchi has been appointed as
technical consultant. Implementation Schedule: As of
July 2009, DPR and clearances are under progress.
Power Generation Projects Page 13
Updated: Sept, 09
Bokaro Power Supply Company Private
Limited, Corporate Office: Hall No. M-01, Old ADM
Building Ispat Bhawan, Bokaro Steel City Bokaro
Jharkhand India -827001 Tel: +91(6542)240380 /
246101 Fax: 06542)247062. Web: www.bpscl.in
Bokaro Power Supply Company Private Limited
(Registered office) : Ispat Bhawan, Lodi Road New
Delhi 110003, Delhi. Tel: +91(11)24367461 / Fax :
91(11)24367015.
Mecon Limited , Doranda, Ranchi, Jharkhand,
India. Tel:+91(651)2483000. Fax:+91(651)2482214.
ORISSA
STATUS: IMPLEMENTATION
Promoter: Jindal Steel & Power Proj: Transmission Promoter: Jindal Steel & Power Proj: Transmission Cost: Rs. 1200 million Dist: Angul EDC: December Cost: Rs. 1200 million Dist: Angul EDC: December 20102010
Jindal Steel & Power is setting up a Greenfield integrated
steel plant in Angul district of Orissa. The company has
awarded orders for 400/220 kV substations &
transformers to Areva T&D India. The transformers
order is for design, manufacturing, supply at site,
erection, testing & commissioning of 2x315 MVA,
400/220kV interconnecting transformers and 6x120
MVA, 220/34.5kV power transformers. The substation
order includes major AREVA products like 400/220kV
circuit breakers, instrument transformers and
automation system with control and relay panels on
turnkey basis. The company will also execute design &
engineering, supply, erection & commissioning including
detail engineering for civil works related to this
substation. The orders are valued at Rs. 1200 million.
Implementation Schedule : The project is slated for
completion by December 2010.
Jindal Steel & Power Limited, Jindal Centre, 12
Bhikaiji Cama Place New Delhi 110066 , Delhi. India.
Tel: +91-11-26188340 / 26188341 / 26188342 /
26188345. Fax: +91 11 26161271. Email:
[email protected] Website:
www.jindalsteelpower.com
Areva T & D India Limited, A-7, Sector 65,
Noida Gautam Buddha Nagar201301, Uttar
Pradesh. Tel: +91(120)4790000 / Fax :
91(120)4791140. Website: www.areva-td.co.in
SIKKIM
STATUS: IMPLEMENTATION
Promoter: Promoter: Lanco InfratechLanco Infratech Proj: Proj: Hydel Power Hydel Power Cap: Cap: 500 MW 500 MW Cost:Cost: Rs.2,650 million Rs.2,650 million Loc: Loc: Sikkim Sikkim EDC:EDC: 20132013
Lanco Infratech is setting up a 500 MW hydel Power
Plant in Sikkim. The main river is Teesta river. Alstom
Projects India has been awarded the turnkey contract at
a cost of Rs.2,650 million. The scope of work includes
design, engineering, erection, testing & commissioning.
Implementation Schedule: The project is scheduled to
be completed by 2013.
Lanco Infratech Limited, Plot No. 229, Udyog
Vihar, Phase-I Gurgaon Haryana India -122016 Tel:
+91 124-4691000 / 4691001 / 4691002 / 4691003 /
4691004 / Fax : +91 124-4691112 Website:
www.lancogroup.com
Alstom Projects India Limited, IHDP Building,
Plot No. 7, Sector 127, Noida, Gautam Buddha
Nagar 201301, Uttar Pradesh. Tel: +91 120-4731100
/ Fax: + 91 120- 4731200. Website :
www.in.alstom.com
TRIPURA
Power Generation Projects Page 14
Updated: Sept, 09
STATUS: IMPLEMENTATION
Promoter: Promoter: North East Transmission Company North East Transmission Company Proj: Proj: Transmission Transmission Cap: Cap: 726.6 MW 726.6 MW Cost: Cost: Rs. 3640 millionRs. 3640 million Loc: Loc: Pallatana Pallatana EDC:EDC: February 2012 February 2012
North East Transmission Company (a JV of ONGC, IL&FS
and Govt. of Tripura) is undertaking Power transmission
projects associated with the 726.6 MW gas based power
plant at Pallatana in Tripura. The company has awarded
two orders to KEC International for supply of towers,
hardware, line materials and construction of 1) Package
A3: 400 kV D/C Khelerihat-Byrinhat transmission line
with a route length 119 Kms in the State of Meghalaya.
2) Package A4: 400 kV D/C Byrnihat – Bongaigaon
Transmission line with a route length of 203 Kms in the
State of Assam. The orders are valued at Rs. 3640
million. Implementation Schedule: They are scheduled
for completion by February 2012.
North East Transmission Company Limited, 1st
Floor, Corporate Towers, Ambience Mall Complex,
Ambience Island, NH-8 Highway, Near Toll Plaza
Gurgaon Haryana 122001 Tel: 91(124)4716115 /
4716117 / Fax : 91(124)4716120. Website:
www.tripurapower.com
K E C International Limited (Registered office) :
1st Floor, CEAT Mahal, 463, Dr. Annie Besant Road,
Worli, Mumbai 400030 Maharashtra. Tel:
+91(22)66670200 / Fax : 91(22)66670286 Email:
Website :www.kecrpg.com
K E C International Limited (Branch Office) :
DLF Infinity Towers, 7th Floor, Tower-'B', DLF City,
Phase-II, Gurgaon 122002, Haryana India. Tel: +91
124- 4188777. Fax: +91 124- 4188617. Email:
Website :www.kecrpg.com
WEST BENGAL
STATUS: IMPLEMENTATION
Promoter: Promoter: Astonfield Renewable Resources Astonfield Renewable Resources Proj: Proj: Non Conventional Non Conventional Cap: Cap: 10 MW10 MW Dist Dist: Bankura : Bankura EDCEDC: : December 2009December 2009
Astonfield Renewable Resources is setting up a 10 MW
Solar PV power project in Bankura district of West
Bengal. Implementation Schedule : As of July 2009, civil
works are under progress. The project is slated to be
completed by December 2009.
Astonfield Renewable Resource Private
Limited, Room No. 112 & 107, DBS House, 10/ 2,
Hungerford Street, Kolkata 700017, West Bengal,
India. Tel: 91-33-3244398. Fax: 91 33–40509300.
Email: [email protected] Website:
www.astonfield.com/contactus.html
STATUS: PLANNING
Promoter: Promoter: Astonfield Renewable Resources Astonfield Renewable Resources Proj: Proj: Non Conventional Non Conventional Cap: Cap: 10 MW 10 MW Loc:Loc: Gangarampur Gangarampur DistDist: South Dinajpur: South Dinajpur
Astonfield Renewable Resources plans to set up a 10
MW Biomass based power project at Gangarampur in
South Dinajpur district of WB. Rice husk will be used as
fuel. Implementation Schedule : As of July 2009, the
Government allotment of land has been received by the
company. The project is in its nascent stage.
Astonfield Renewable Resource Private
Limited, Room No. 112 & 107, DBS House, 10/ 2,
Hungerford Street, Kolkata -700017 , West Bengal,
India Tel: +91 33- 3244398. Fax: + 91 33 –
40509300. Email: [email protected]
Website: www.astonfield.com/contactus.html
STATUS: IMPLEMENTATION
Promoter: Promoter: West Bengal State Electricity West Bengal State Electricity Transmission Company Transmission Company Proj: Proj: Transmission Transmission CostCost: Rs.: Rs. 1070 million.1070 million.
West Bengal State Electricity Transmission Company is
implementing two Power transmission projects. The
company has awarded two orders to KEC International
for supply of towers, line materials and construction of
1. 400 kV S/C transmission lines associated with
Kolaghat TPS having a total length of 90.5 Kms. The
duration of the turnkey project is 24 months. 2. 220 KV
DC transmission lines from Kharagpur 400 KV Substation
to Midnapore 220 /132 KV substation and 220 kV DC
transmission lines from 400 KV Subhasgram (PGCIL)
Substation to Saltala. The total route length of the lines
is 58.5 Kms. Implementation Schedule : The duration of
the turnkey project is 18 months. The orders are valued
at Rs. 1070 million.
West Bengal State Electricity Transmission
Company Limited, Vidyut Bhavan, 10th Floor, A-
Block, Salt Lake City, Sector-II, Kolkata 700091, West
Power Generation Projects Page 15
Updated: Sept, 09
Bengal, India. Tel: 91 33-23580065.
Fax : + 91 33-23377957. Website: www.wbsetcl.in
K E C International Limited, DLF Infinity
Towers, 7th Floor, Tower-'B', DLF City, Phase-II,
Gurgaon 122002, Haryana. Tel: +91 124-4188777.
Fax: +91 124- 4188617. Email:
[email protected]. Web: www.kecrpg.com
Power Generation Projects Page 16
Updated: Sept, 09
Brief Note onStatus of Power Projects
We have taken utmost care to present data region-wise and state-wise in this monthly update service. Within each state, we have placed projects in an alphabetical sequence. We have also given great deal of importance to the accuracy of the information. However, dispite our best efforts it is possible that some errors might have crept in, which may kindly be brought to our notice. It may be noted that the projects are discussed under the following categories.
CONCEPTUAL STAGE Scheme identified but yet to be taken up for execution Scheme identified and request for pre-qualification yet to be invited Scouting for technical know-how, fuel and land Expression of interest invited Pre-qualification bids invited/ received Project promoter decides to diversify/ takes investment decision MOU under negotiation/ preparation
PLANNING STAGE DPR under preparation Financial closure being achieved Land being acquired Steps initiated to receive statutory approvals Negotiations initiated with consultants, contractors/ suppliers Implementation schedule announced
UNDER IMPLEMENTATION All clearances received Contracts awarded Financial closure acheived Fuel supply firmed up Land acquired Civil works started/ under progress/ completed Pre-commissioning work started/ under progress
TRIAL RUNS/ COMMISSIONED All equipments installed successfully Plant inaugurated Trial runs started Plant becomes fully operational
UNCERTAIN STATUSProject could not proceed towards implementation due to: Non availability of escrow covers from SEB/ Govt. Paucity of funds Non availability of suitable land Impediments in fuel supply
Project work held up at site due to: Objections raised by local public/ action groups Political interference Natural calamities Change in management/ M&A
Power Generation Projects Page 17
Updated: Sept, 09
ABBREVIATIONS/ ACRONYMS USEDBOOTBOOT : Build Own Operate & Transfer: Build Own Operate & Transfer
BCTBCT : Build Commission & Transfer : Build Commission & Transfer
CAPCAP : Capacity : Capacity
CEACEA : Central Electricity Authority: Central Electricity Authority
CCFICCFI : Cabinet Committee on Foreign Investment: Cabinet Committee on Foreign Investment
CCPPCCPP : Combined Cycle Power Project: Combined Cycle Power Project
CORPCORP : Corporation: Corporation
Cu.MtrsCu.Mtrs : Cubic Meters: Cubic Meters
Dist.Dist. : District : District
EDCEDC : Expected Date of Commissioning/ Completion: Expected Date of Commissioning/ Completion
DPRDPR : Detailed Project Report: Detailed Project Report
EIAEIA : Environment Impact Assessment: Environment Impact Assessment
EPCEPC : Engineering Procurement & Construction: Engineering Procurement & Construction
Eqpt.Eqpt. : Equipment: Equipment
FIPBFIPB : Foreign Investment Promotion Board: Foreign Investment Promotion Board
FSAFSA : Fuel Supply Agreement: Fuel Supply Agreement
HOHO : Head Office: Head Office
KVKV : Kilo Volts: Kilo Volts
KVAKVA : Kilo Volts Amperes: Kilo Volts Amperes
KWKW : Kilo Watts: Kilo Watts
KWHKWH : Kilo Watt Hours: Kilo Watt Hours
LocLoc : Location: Location
LOILOI : Letter of Intent: Letter of Intent
LtrsLtrs : Litres : Litres
MoEFMoEF : Ministry of Environment & Forest: Ministry of Environment & Forest
MNESMNES : Ministry of Non-Conventional Energy Sources: Ministry of Non-Conventional Energy Sources
MWMW : Mega Watts: Mega Watts
MoUMoU : Memorandum of Understanding: Memorandum of Understanding
NANA : Not Available: Not Available
Nos.Nos. : Numbers: Numbers
O&MO&M : Operation & Maintenance: Operation & Maintenance
OffOff : Office: Office
PPAPPA : Power Purchase Agreement: Power Purchase Agreement
P.O.P.O. : Post Office: Post Office
PSSPSS : Pumped Storage Scheme: Pumped Storage Scheme
Plt.Plt. : Plant: Plant
Proj.Proj. : Project: Project
RFQRFQ : Request for Qualification: Request for Qualification
RFPRFP : Request for Proposal: Request for Proposal
RORO : Registered Office: Registered Office
SEBSEB : State Electricity Board: State Electricity Board
SIASIA : Social Impact Assessment : Social Impact Assessment
STPPSTPP : Super Thermal Power Plant: Super Thermal Power Plant
Sq.Mtrs. : Square MetersSq.Mtrs. : Square Meters
TPATPA : tonnes per annum: tonnes per annum
TPDTPD : tonnes per day: tonnes per day
TPSTPS : Thermal Power Station: Thermal Power Station
YrYr : Year: Year
Note: Costs are expressed in Millions of Rupees. (One Million equals Ten Lakhs)Note: Costs are expressed in Millions of Rupees. (One Million equals Ten Lakhs)
Power Generation Projects Page 18