Production Operational Procedures Stage – 1 Receiving of tender documents: The minimum information required for a Tender to be returned is as follows: 1.1 Request for Joinery cost estimate form - (Deco-RJCE-01) 1.2 Bill of Quantities 1.3 Material Specification 1.4 Unit codes/references 1.5 Full set of hard copy drawings - (A1 size) 1.6 Full set of soft copy drawings - (DWG Format) 1.7 Return date for Tender - (to which all parties have agreed to) Note: If all the above information is present and the RJCE is signed by a manager, continue with the quotation. If not all the above information is available, discuss tender with a Production team Manager. DECO, P.O. Box 19238, Dubai, UAE, Email: [email protected]

Upload: jotajota10004950

Post on 14-Sep-2015

217 views

Category:

Documents


1 download

DESCRIPTION

Production Procedures - Stage

TRANSCRIPT

Production Operational ProceduresStage 1

Receiving of tender documents:

The minimum information required for a Tender to be returned is as follows:1.1 Request for Joinery cost estimate form - (Deco-RJCE-01)1.2 Bill of Quantities

1.3 Material Specification

1.4 Unit codes/references

1.5 Full set of hard copy drawings - (A1 size)

1.6 Full set of soft copy drawings - (DWG Format)

1.7 Return date for Tender - (to which all parties have agreed to)

Note: If all the above information is present and the RJCE is signed by a manager, continue with the quotation. If not all the above information is available, discuss tender with a Production team Manager.