    Current Situation - Customer Needs

    FDT RoadshowJakarta 2008

  • 8/9/2019 01 FDT - The Solution - Current Situation - Customer Needs

    2/17

    Current plant landscape

    Typical project in ProcessAutomation and FactoryAutomation:

    > 10 Device suppliers> 100 Device types> 1.000 I/Os

    FDT Roadshow 2Martin Lui

  • 8/9/2019 01 FDT - The Solution - Current Situation - Customer Needs

    3/17

    Current plant landscape

    n mos p an s ev ces are ns a e rom eren ven orswith different functions

    PressureTemperature PLC

    Recorder

    Analysis

    MID

    On/Off

    Flow

    Discrete I/O

    Remote I/O

    FDT Roadshow 3Martin Lui

    Positioner Level Density andconcentration

  • 8/9/2019 01 FDT - The Solution - Current Situation - Customer Needs

    4/17

    All devices have to be

    Current plant landscape

    configured and operated with proprietary software tools

    integrated into many different systems

    FDT Roadshow 4Martin Lui

  • 8/9/2019 01 FDT - The Solution - Current Situation - Customer Needs

    5/17

    Device set-up Today !

    the deviceconfiguration ....

    device an own

    software?

    and all withdifferent

    templates?

    this is TOOcom licated andmuch TOOexpensive!!

    FDT Roadshow 5Martin Lui

  • 8/9/2019 01 FDT - The Solution - Current Situation - Customer Needs

    6/17

    Current plant landscape

    developed over time

    Different communicationprotocols

    Many different tools with

    HSEFOUNDATION

    FDT Roadshow 6Martin Lui

  • 8/9/2019 01 FDT - The Solution - Current Situation - Customer Needs

    7/17

    Current plant landscape

    Complexity of automation system architecture

    Multiple communication protocols

    Market segment specific protocols Many field device suppliers

    Many system suppliers

    Complexity of plant equipment

    Multiple generations of equipment

    Equipment increasingly sophisticated

    Decreasing number of technical staff and technicalknowledge base

    FDT Roadshow 7Martin Lui

    Source: ARC Group

  • 8/9/2019 01 FDT - The Solution - Current Situation - Customer Needs

    8/17

    Freedom of choice

    Your needs

    Products that fit best for your application, not imposed by

    automation system architecture

    Keep price vs. functionality competition among suppliers

    Investment protection New technologies should be compatible with existing

    investments without expensive upgrades

    Transparent data access,

    Engineering Tools

    Independent from device type, supplier, and

    Ease of Use Support over entire life cycle

    En ineerin commissionin o eration maintenance

    FDT Roadshow 8Martin Lui

    and diagnostics

    For systems, devices, and network components

  • 8/9/2019 01 FDT - The Solution - Current Situation - Customer Needs

    9/17

    Your needs - System requirements

    Plant wide data access

    Easy and fast device integration

    System requirements

    Device requirements

    FDT Roadshow 9Martin Lui

  • 8/9/2019 01 FDT - The Solution - Current Situation - Customer Needs

    10/17

    Plant wide data access

    ver e comp e e ne wor

    Communication driver foreach protocol:

    AS-Interface

    DeviceNet FOUNDATION fieldbus

    INTERBUS

    IO-Link

    MODBUS SL/TCP PROFIBUS

    PROFINET I/O

    FDT Roadshow 10Martin Lui

  • 8/9/2019 01 FDT - The Solution - Current Situation - Customer Needs

    11/17

    Each device driver fits to all

    Easy and fast device integration

    systems

    Complete device functionalityin all systems

    Asset Management/ PLCng neer ng oo

    FDT Roadshow 11Martin Lui

  • 8/9/2019 01 FDT - The Solution - Current Situation - Customer Needs

    12/17

    Integrated configuration/documentation

    Access to all device

    parameters

    Online diagnostics

    via graphical view

    Documentation

    Device settings

    Order information

    Tag numbers

    Alarm limits

    FDT Roadshow 12Martin Lui

    .

  • 8/9/2019 01 FDT - The Solution - Current Situation - Customer Needs

    13/17

    Your needs - Device requirements

    System requirements

    Device requirements

    Support of all device specific

    functions (e. g. echo curves)

    FDT Roadshow 13Martin Lui

  • 8/9/2019 01 FDT - The Solution - Current Situation - Customer Needs

    14/17

    Device operation

    Be operated identically in all systems

    Have the same functionality in all systems

    PLCsse anagemenEngineering Tool

    FDT Roadshow 14Martin Lui

  • 8/9/2019 01 FDT - The Solution - Current Situation - Customer Needs

    15/17

  • 8/9/2019 01 FDT - The Solution - Current Situation - Customer Needs

    16/17

    Is there a solution for?

    Investment protection maintain and enhance my

    Transparent data access one interface for all devicesand functions

    Ease of Use identical handling for all devices

    FDT Roadshow 16Martin Lui

  • 8/9/2019 01 FDT - The Solution - Current Situation - Customer Needs

    17/17

    Thank you for your attention

    pen access to ev ce nte gence

    FDT Roadshow 17Martin Luiwww.fdtgroup.org [email protected]