01-ct-session1_r4.4-5.2_ed01
TRANSCRIPT
-
8/2/2019 01-CT-session1_R4.4-5.2_Ed01
1/22
Alcatel University - 8AS 90001 1860 VT ZZA Ed.051.1
1 Equipment view opening
-
8/2/2019 01-CT-session1_R4.4-5.2_Ed01
2/22
1.2
1 Equipment view openingSession presentation
Objective: to be able to start-up the 1320CT and toopen the equipment view
Program:
1.1 Introduction
1.2 1320CT start-up
1.3 NE supervision start-up1.4 NE log in
1.5 NE restart
1.6 Navigation in NE view
1.7 ISA boards supervision
-
8/2/2019 01-CT-session1_R4.4-5.2_Ed01
3/22
Alcatel University - 8AS 90001 1860 VT ZZA Ed.051.3
1 Equipment view opening
1.1 Introduction
-
8/2/2019 01-CT-session1_R4.4-5.2_Ed01
4/22
1.4
1.1 Introduction
RS232cable
F interface
Software productfor management
to install in the PC
Software product fordownload to update
the NE
CD ROM
-
8/2/2019 01-CT-session1_R4.4-5.2_Ed01
5/22 Alcatel University - 8AS 90001 1860 VT ZZA Ed.051.5
1 Equipment view opening
1.2 1320CT start-up
-
8/2/2019 01-CT-session1_R4.4-5.2_Ed01
6/22
1.6
1.2 1320CT start-upNES window opening
1) Connect the RS232 cable2) Click on the 1320CT icon
3) Wait until the NES (Network Element Synthesis) window appears
-
8/2/2019 01-CT-session1_R4.4-5.2_Ed01
7/22
1.7
1.2 1320CT start-upLower Layers Manager (LLM)
At the bottom right of the screen(in the task bar), there is a redtriangle
When you double click on thistriangle, the window AlcatelLower Layers Managerisdisplayed indicating the statusof the connection with the local
NE
-
8/2/2019 01-CT-session1_R4.4-5.2_Ed01
8/22 Alcatel University - 8AS 90001 1860 VT ZZA Ed.051.8
1 Equipment view opening
1.3 NE supervision start-up
-
8/2/2019 01-CT-session1_R4.4-5.2_Ed01
9/22
1.9
1.3 NE supervision start-up
1) Select the NE in the Map
2) Supervision
Start3) Wait for the icon indicating the
supervision is started
Alarms
Highest alarmseverity
-
8/2/2019 01-CT-session1_R4.4-5.2_Ed01
10/22 Alcatel University - 8AS 90001 1860 VT ZZA Ed.05
1.10
1 Equipment view opening
1.4 NE Login
-
8/2/2019 01-CT-session1_R4.4-5.2_Ed01
11/22
1.11
1.4 NE Login
1) Select the supervised NE in the Map
2) Supervision NE Login4) Insert Login & Password
3) Wait for the Equipment View window
Management state
Severityalarm
synthesis
Domainalarm
synthesis
-
8/2/2019 01-CT-session1_R4.4-5.2_Ed01
12/22 Alcatel University - 8AS 90001 1860 VT ZZA Ed.05
1.12
1 Equipment view opening
1.5 NE restart
-
8/2/2019 01-CT-session1_R4.4-5.2_Ed01
13/22
1.13
1.5 NE restart
-
8/2/2019 01-CT-session1_R4.4-5.2_Ed01
14/22
Alcatel University - 8AS 90001 1860 VT ZZA Ed.051.14
1 Equipment view opening
1.6 Navigation in NE view
1 6 Navigation in NE view
-
8/2/2019 01-CT-session1_R4.4-5.2_Ed01
15/22
1.15
1.6 Navigation in NE viewDomain views
To open a particular NE domain view:
Views
Equipment Transmission
1 6 Navigation in NE view
-
8/2/2019 01-CT-session1_R4.4-5.2_Ed01
16/22
1.16
1.6 Navigation in NE viewNavigation principles in Equipment View (1)
To zoom in an object:
Double click on the selected objector
Select the object and:
Views Open Objector Open in Windowor
In the Board View , select the port and:
Board Port Access
1 6 Navigation in NE view
-
8/2/2019 01-CT-session1_R4.4-5.2_Ed01
17/22
1.17
1.6 Navigation in NE viewNavigation principles in Equipment View (2)
To return to the previous view:
Views Backward
To display the equipment supporting an object:
In the Equipment / Board View , select the object and:Equipment / Board Show Supporting Equipment
or
In the Port View , select the port and:
Port Show Supporting Board
-
8/2/2019 01-CT-session1_R4.4-5.2_Ed01
18/22
Alcatel University - 8AS 90001 1860 VT ZZA Ed.051.18
1 Equipment view opening
1.7 ISA boards supervision
-
8/2/2019 01-CT-session1_R4.4-5.2_Ed01
19/22
1.19
1.7 ISA boards supervision
1 Equipment view opening
-
8/2/2019 01-CT-session1_R4.4-5.2_Ed01
20/22
1.20
1 Equipment view openingExercise
Start-up the 1320CTCheck the LLM window
Disconnect the RS232 cableCheck the LLM windowStart-up the supervisionCheck the NE icon
Open the NE viewCheck alarm synthesis andmanagement states
Open the Transmission ViewOpen the Equipment View
Select one board in the subrack anddisplay the Port ViewReturn to the Board View
Time allowed:
35 minutes
1 Equipment view opening
-
8/2/2019 01-CT-session1_R4.4-5.2_Ed01
21/22
1.21
1 Equipment view openingEvaluation
Objective: to be able to start-up the1320CT and to open the equipment
view
Thank you for answeringthe self-assessment
of the objectives sheet
1 Equipment view opening
-
8/2/2019 01-CT-session1_R4.4-5.2_Ed01
22/22
1.22
1 Equipment view openingNotes