01-ct-session1_r4.4-5.2_ed01

Upload: david-napitupulu

Post on 06-Apr-2018

215 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/2/2019 01-CT-session1_R4.4-5.2_Ed01

    1/22

    Alcatel University - 8AS 90001 1860 VT ZZA Ed.051.1

    1 Equipment view opening

  • 8/2/2019 01-CT-session1_R4.4-5.2_Ed01

    2/22

    1.2

    1 Equipment view openingSession presentation

    Objective: to be able to start-up the 1320CT and toopen the equipment view

    Program:

    1.1 Introduction

    1.2 1320CT start-up

    1.3 NE supervision start-up1.4 NE log in

    1.5 NE restart

    1.6 Navigation in NE view

    1.7 ISA boards supervision

  • 8/2/2019 01-CT-session1_R4.4-5.2_Ed01

    3/22

    Alcatel University - 8AS 90001 1860 VT ZZA Ed.051.3

    1 Equipment view opening

    1.1 Introduction

  • 8/2/2019 01-CT-session1_R4.4-5.2_Ed01

    4/22

    1.4

    1.1 Introduction

    RS232cable

    F interface

    Software productfor management

    to install in the PC

    Software product fordownload to update

    the NE

    CD ROM

  • 8/2/2019 01-CT-session1_R4.4-5.2_Ed01

    5/22 Alcatel University - 8AS 90001 1860 VT ZZA Ed.051.5

    1 Equipment view opening

    1.2 1320CT start-up

  • 8/2/2019 01-CT-session1_R4.4-5.2_Ed01

    6/22

    1.6

    1.2 1320CT start-upNES window opening

    1) Connect the RS232 cable2) Click on the 1320CT icon

    3) Wait until the NES (Network Element Synthesis) window appears

  • 8/2/2019 01-CT-session1_R4.4-5.2_Ed01

    7/22

    1.7

    1.2 1320CT start-upLower Layers Manager (LLM)

    At the bottom right of the screen(in the task bar), there is a redtriangle

    When you double click on thistriangle, the window AlcatelLower Layers Managerisdisplayed indicating the statusof the connection with the local

    NE

  • 8/2/2019 01-CT-session1_R4.4-5.2_Ed01

    8/22 Alcatel University - 8AS 90001 1860 VT ZZA Ed.051.8

    1 Equipment view opening

    1.3 NE supervision start-up

  • 8/2/2019 01-CT-session1_R4.4-5.2_Ed01

    9/22

    1.9

    1.3 NE supervision start-up

    1) Select the NE in the Map

    2) Supervision

    Start3) Wait for the icon indicating the

    supervision is started

    Alarms

    Highest alarmseverity

  • 8/2/2019 01-CT-session1_R4.4-5.2_Ed01

    10/22 Alcatel University - 8AS 90001 1860 VT ZZA Ed.05

    1.10

    1 Equipment view opening

    1.4 NE Login

  • 8/2/2019 01-CT-session1_R4.4-5.2_Ed01

    11/22

    1.11

    1.4 NE Login

    1) Select the supervised NE in the Map

    2) Supervision NE Login4) Insert Login & Password

    3) Wait for the Equipment View window

    Management state

    Severityalarm

    synthesis

    Domainalarm

    synthesis

  • 8/2/2019 01-CT-session1_R4.4-5.2_Ed01

    12/22 Alcatel University - 8AS 90001 1860 VT ZZA Ed.05

    1.12

    1 Equipment view opening

    1.5 NE restart

  • 8/2/2019 01-CT-session1_R4.4-5.2_Ed01

    13/22

    1.13

    1.5 NE restart

  • 8/2/2019 01-CT-session1_R4.4-5.2_Ed01

    14/22

    Alcatel University - 8AS 90001 1860 VT ZZA Ed.051.14

    1 Equipment view opening

    1.6 Navigation in NE view

    1 6 Navigation in NE view

  • 8/2/2019 01-CT-session1_R4.4-5.2_Ed01

    15/22

    1.15

    1.6 Navigation in NE viewDomain views

    To open a particular NE domain view:

    Views

    Equipment Transmission

    1 6 Navigation in NE view

  • 8/2/2019 01-CT-session1_R4.4-5.2_Ed01

    16/22

    1.16

    1.6 Navigation in NE viewNavigation principles in Equipment View (1)

    To zoom in an object:

    Double click on the selected objector

    Select the object and:

    Views Open Objector Open in Windowor

    In the Board View , select the port and:

    Board Port Access

    1 6 Navigation in NE view

  • 8/2/2019 01-CT-session1_R4.4-5.2_Ed01

    17/22

    1.17

    1.6 Navigation in NE viewNavigation principles in Equipment View (2)

    To return to the previous view:

    Views Backward

    To display the equipment supporting an object:

    In the Equipment / Board View , select the object and:Equipment / Board Show Supporting Equipment

    or

    In the Port View , select the port and:

    Port Show Supporting Board

  • 8/2/2019 01-CT-session1_R4.4-5.2_Ed01

    18/22

    Alcatel University - 8AS 90001 1860 VT ZZA Ed.051.18

    1 Equipment view opening

    1.7 ISA boards supervision

  • 8/2/2019 01-CT-session1_R4.4-5.2_Ed01

    19/22

    1.19

    1.7 ISA boards supervision

    1 Equipment view opening

  • 8/2/2019 01-CT-session1_R4.4-5.2_Ed01

    20/22

    1.20

    1 Equipment view openingExercise

    Start-up the 1320CTCheck the LLM window

    Disconnect the RS232 cableCheck the LLM windowStart-up the supervisionCheck the NE icon

    Open the NE viewCheck alarm synthesis andmanagement states

    Open the Transmission ViewOpen the Equipment View

    Select one board in the subrack anddisplay the Port ViewReturn to the Board View

    Time allowed:

    35 minutes

    1 Equipment view opening

  • 8/2/2019 01-CT-session1_R4.4-5.2_Ed01

    21/22

    1.21

    1 Equipment view openingEvaluation

    Objective: to be able to start-up the1320CT and to open the equipment

    view

    Thank you for answeringthe self-assessment

    of the objectives sheet

    1 Equipment view opening

  • 8/2/2019 01-CT-session1_R4.4-5.2_Ed01

    22/22

    1.22

    1 Equipment view openingNotes