007 - perspective views · 11/11/2019  · 24580 70° 24' 00" 24330 70° 24'...

9
DEVELOPMENT APPLICATION PDPLANPMTD-2019/004095 APPLICANT: Smeekes Drafting Pty Ltd PROPOSAL: 3 Warehouses LOCATION: 22 Maxwells Road, CAMBRIDGE RELEVANT PLANNING SCHEME: Clarence Interim Planning Scheme 2015 ADVERTISING EXPIRY DATE: 11 November 2019 In addition to the Application Form(s), Certificate of Title(s) and any associated consent documents the following information is available on request: Nil The relevant plans and documents can be inspected at the Council offices, 38 Bligh Street, Rosny Park, during normal office hours until 11 November 2019. Any person may make representations about the application to the General Manager, by writing to PO Box 96, Rosny Park, 7018 or by electronic mail to [email protected]. Representations must be received by Council on or before 11 November 2019. To enable Council to contact you if necessary, would you please also include a day time contact number in any correspondence you may forward. Any personal information submitted is covered by Council’s privacy policy, available at www.ccc.tas.gov.au or at the Council offices.

Upload: others

Post on 23-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 007 - Perspective Views · 11/11/2019  · 24580 70° 24' 00" 24330 70° 24' 00" s e w e r a g e e a s e m e n t 3 0 0 0 w d r a i n a g e e a n d s e r v i c e e a s e m n t 3 0

DEVELOPMENT APPLICATION

PDPLANPMTD-2019/004095

APPLICANT: Smeekes Drafting Pty Ltd

PROPOSAL: 3 Warehouses

LOCATION: 22 Maxwells Road, CAMBRIDGE

RELEVANT PLANNING SCHEME: Clarence Interim Planning Scheme 2015

ADVERTISING EXPIRY DATE: 11 November 2019

In addition to the Application Form(s), Certificate of Title(s) and any associated

consent documents the following information is available on request:

• Nil

The relevant plans and documents can be inspected at the Council offices, 38 Bligh

Street, Rosny Park, during normal office hours until 11 November 2019.

Any person may make representations about the application to the General

Manager, by writing to PO Box 96, Rosny Park, 7018 or by electronic mail to

[email protected]. Representations must be received by Council on or before

11 November 2019.

To enable Council to contact you if necessary, would you please also include a day

time contact number in any correspondence you may forward.

Any personal information submitted is covered by Council’s privacy policy, available

at www.ccc.tas.gov.au or at the Council offices.

Page 2: 007 - Perspective Views · 11/11/2019  · 24580 70° 24' 00" 24330 70° 24' 00" s e w e r a g e e a s e m e n t 3 0 0 0 w d r a i n a g e e a n d s e r v i c e e a s e m n t 3 0

7840

70° 22' 00"

17250

340° 24'

17720

339° 10'

33470306° 40' 00"

33380307° 48' 00"

37900

340° 38' 00"

39680

340° 38' 00"

24580

70° 24' 00"

24330

70° 24' 00"S E W E R A G E E A S E M E N T 3 0 0 0 W

D R A I N A G E A N D S E R V I C E E A S E M E N T 3 0 0 0 W

D R A I N A G E A N D S E R V I C E E A S E M E N T 3 0 0 0 W

S T O

R M

W A

T E

R A

N D

S E

R V

I C E

E A

S E

M E

N T

3 0 0

0 W

LOT 1

LOT 2

LOT 3SP156327(2570m²)

M A X W E L L S R O A D

R I G H T O F W A Y V A R I A B L E W

I D T H

30.50

30.00

29.50

29.00

29.0029.50

30.00

29.00

29.50

29.00

29.00

30.10

30.20

30.30

30.40

29.60

29.70

29.80

29.90

29.40

29.30

29.20

29.10

28.90

28.80

28.70

28.60

28.50

30.50

30.00

30.10

30.20

30.30

30.40

PROPOSEDWAREHOUSES & STORAGE YARD

FFL 29.30 AHD(1205.60 m²)

36300

160° 14' 40"

55000

250° 24' 00"

36300

340° 24' 20"

SW

LOCATION PLANSCALE 1 : 500 @ A3

LOCATION PLAN D_C_WH-001LPROPOSED SITE PLAN D_C_WH-001PCUT & FILL PLAN D_C_WH-002FLOOR PLAN D_C_WH-003ELEVATIONS 1 OF 2 D_C_WH-004ELEVATIONS 2 OF 2 D_C_WH-005SECTIONAL ELEVATIONS D_C_WH-006PERSPECTIVE VIEW D_C_WH-007

DESCRIPTIONREV. REFERENCE

A3SCALESHT.DRG

TITLECLIENTDRN / DES

A

1 2 3 4

B

C

No.

PTY LTDDRAFTINGSMEEKESABN 89 056 706 640153a Argyle St. Hobart Tas 7000Ph. (03) 6234 6185 Fax (03) 6234 7986Mob. 0418 352 503 Email [email protected]: smeekesdrafting.com

Building Designer Accreditation No. CC4900 A

BUILDINGDESIGNERSAUSTRALIA TAS

DELPERO AND CLEMENTSPROPOSED WAREHOUSE DEVELOPMENT

22 MAXWELLS ROAD, CAMBRIDGE TAS 7170

LOCATION PLAND_C_WH 001L 1 : 500

R. SMEEKES

0

SCALE 1:500

201510 25m55

NOTE: ALL DIMENSIONS IN MILLIMETRES UNLESS NOTED OTHERWISE

SITE DATA:LAND TITLE REF. No. : LOT 3 ON SEALED PLAN 156327

CLIMATE ZONE : ZONE 7

DESIGN WIND SPEED : 'N3'

SOIL CLASSIFICATION : TBA

BAL-RATING : LOW

BUILDING AREAS:

WAREHOUSE No. 1 : 395.7m²

WAREHOUSE No. 2 : 272.8 m²

WAREHOUSE No. 3 : 272.8m²

OUTDOOR STORAGE : 261.3m²

SITE COVERAGE:

LOT SIZE : 2570.0 m²TOTAL FOOTPRINT : 1205.6m²SITE COVERAGE : 46.9 %

GENERAL NOTES:

1. THESE DRAWINGS ARE TO BE READ IN CONJUNCTION WITH SMEEKES DRAFTINGPTY LTD STANDARD BUILDING NOTES, SHEETS STANDARD-001 TO 008.

2. WRITTEN DIMENSIONS TO TAKE PRECEDENCE OVER SCALE.

3. BUILDER TO VERIFY ALL BOUNDARY CLEARANCES AND SITE SET-OUTDIMENSIONS PRIOR TO COMMENCEMENT OF CONSTRUCTION.

4. ALL CONSTRUCTION WORK SHALL BE UNDERTAKEN IN ACCORDANCE WITH THEBUILDING CODE OF AUSTRALIA AND RELEVANT AUSTRALIAN STANDARDS.

5. TIMBER FRAMING SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS OF AS1684.2 "TIMBER FRAMED CONSTRUCTION".

6. FOOTINGS AND SLABS SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS OFAS 2870 "RESIDENTIAL SLABS AND FOOTINGS".

7. PLUMBING AND DRAINAGE SHALL BE IN ACCORDANCE WITH AS 3500.2 AND AS3500.3 "THE NATIONAL PLUMBING AND DRAINAGE CODE". FIT ADJUSTABLETEMPERING VALVES TO ALL BATHROOMS IN ACCORDANCE WITH AS 1529 "CODEOF PRACTICE OF HOUSEHOLD TYPE HOT WATER SUPPLY SYSTEMS".

8. WATER PROOFING OF WET AREAS SHALL BE IN ACCORDANCE WITH THEREQUIREMENTS OF AS 3740 "WATERPROOFING OF WET AREAS IN RESIDENTIALBUILDINGS".

9. ELECTRICAL INSTALLATION SHALL BE IN ACCORDANCE WITH THEREQUIREMENTS OF AS/NZS 3000 "WIRING RULES". SMOKE ALARMS SHALL BEINSTALLED IN ACCORDANCE WITH TASMANIAN FIRE SERVICE AND AS 3786"SMOKE ALARMS".

10. GLAZING SHALL BE IN ACCORDANCE WITH AS 1288 "GLASS IN BUILDINGS -SELECTION AND INSTALLATION", WINDOWS TO COMPLY WITH AS 2047"WINDOWS IN BUILDINGS - SELECTION AND INSTALLATION".

11. ALL STEELWORK SHALL BE IN ACCORDANCE WITH AS 4100 "STEELSTRUCTURES".

0 ISSUED FOR DEVELOPMENT APPROVAL. 30-09-2019

NOT FORCONSTRUCTION

ISSUED FOR INFORMATION ONLY

Page 3: 007 - Perspective Views · 11/11/2019  · 24580 70° 24' 00" 24330 70° 24' 00" s e w e r a g e e a s e m e n t 3 0 0 0 w d r a i n a g e e a n d s e r v i c e e a s e m n t 3 0

OFFICE24 m²

OFFICE24 m²

OFFICE24 m²

2458070° 24' 00"

2433070° 24' 00"

3630

016

00° 1

4' 40

"

S E W E R A G E E A S E M E N T 3 0 0 0 W

LOT 3SP156327(2570m²)

1 2 3 4 5 6 7 8 9 10

3300

0

3003000

1600

0

P P P P P P PB PB PB PB

PB

PB PB

PB

PB P P P P P P P P

PB PBF F

F

F

F F

F

F

PB PBF

11

11-OFF 2750 WIDE x 5500 LONG PARKING SPACESIN ACCORDANCE WITH AS2890.1 AND CLARENCEPLANNING SCHEME REQUIREMENTS

PROPOSED ASPHALT PARKING AREA IN ACCORDANCEWITH THE REQUIREMENTS OF AS2890.1

MULCHED GARDEN BEDS(TYPICAL)

LOT 1SP156327

LOT 2SP156327

SW SW SW

SW

SW

SW

SW

EXISTING STORMWATER MANHOLE

600L x 600W x 600D GRATEDSTORM WATER PIT

600L x 600W x 600D GRATEDSTORM WATER PIT

12

14 13

PB

PB

F

F

F

WAREHOUSE No. 1(INCLUDING OFFICE)

395.7m²FFL 29.30AHD

WAREHOUSE No. 2(INCLUDING OFFICE)

272.8m²FFL 29.30AHD

WAREHOUSE No. 3(INCLUDING OFFICE)

272.8m²FFL 29.30AHD

COVERED OUTDOORSTORAGE AREA

148 m²

300

40400

300

11000 3300

1800

1820

0

300

UNCOVERED OUTDOORSTORAGE AREA

113.3 m²

OUTDOOR EQUIPMENT STORAGE YARD (PART ROOF OVER)NOM. 20mm BLUE METAL GRAVEL SURFACE FINISH

TOTAL AREA = 261.3 m²FSL 29.20AHD

55000250° 24' 00"

3630

034

0° 24

' 20"

PB

F

B B

SITE PLANSCALE 1 : 200 @ A3

0

SCALE 1:200

864 10m22

NOTE: ALL DIMENSIONS IN MILLIMETRES UNLESS NOTED OTHERWISE

LOCATION PLAN D_C_WH-001LPROPOSED SITE PLAN D_C_WH-001PCUT & FILL PLAN D_C_WH-002FLOOR PLAN D_C_WH-003ELEVATIONS 1 OF 2 D_C_WH-004ELEVATIONS 2 OF 2 D_C_WH-005SECTIONAL ELEVATIONS D_C_WH-006PERSPECTIVE VIEW D_C_WH-007

DESCRIPTIONREV. REFERENCE

A3SCALESHT.DRG

TITLECLIENTDRN / DES

A

1 2 3 4

B

C

No.

PTY LTDDRAFTINGSMEEKESABN 89 056 706 640153a Argyle St. Hobart Tas 7000Ph. (03) 6234 6185 Fax (03) 6234 7986Mob. 0418 352 503 Email [email protected]: smeekesdrafting.com

Building Designer Accreditation No. CC4900 A

BUILDINGDESIGNERSAUSTRALIA TAS

DELPERO AND CLEMENTSPROPOSED WAREHOUSE DEVELOPMENT

22 MAXWELLS ROAD, CAMBRIDGE TAS 7170

PROPOSED SITE PLAND_C_WH 001S 1 : 200

R. SMEEKES

LANDSCAPING LEGEND:

F NEW ZEALAND FLAX (PHORMIUM)PB PURPLE HOP BUSH, DODONAEA PURPUREA, SMALL TREE, HEIGHT TO 3.0m (3-OFF)S SAGG, LOMANDRA SPECIES, GRASS, HEIGHT TO 0.8m (8-OFF)

0 ISSUED FOR DEVELOPMENT APPROVAL. 30-09-2019

NOT FORCONSTRUCTION

ISSUED FOR INFORMATION ONLY

COMBINATION SENSOR / FLOOD LIGHT

240VAC BOLLARD LIGHT(DAY/NIGHT AUTO SWITCHING)

EXTERNAL LIGHTING LEGEND:

B

1 EXTERNAL LIGHTING ADDED. 22-10-2019

Page 4: 007 - Perspective Views · 11/11/2019  · 24580 70° 24' 00" 24330 70° 24' 00" s e w e r a g e e a s e m e n t 3 0 0 0 w d r a i n a g e e a n d s e r v i c e e a s e m n t 3 0

2458070° 24' 00"

2433070° 24' 00"

SE

WE

RA

GE

EA

SE

ME

NT

3 0 0 0 W

DRA

INAG

E AN

D S

ERVI

CE

EA

SE

ME

NT

30

00

W

LOT 3SP156327(2570m²)

30.50 30.00 29.50

29.00

29.00

29.50

30.00

29.50

29.00

30.1030.2030.3030.40 29.6029.7029.8029.90 29.40

29.30

29.20

29.10

28.90

28.80

28.70

28.50

30.5030.00

30.1030.20

30.3030.40

CUT / FILLTO 29.00AHD

3630

016

0° 14

' 40"

55000250° 24' 00"

3630

034

0° 24

' 20"

SW

100

100

CUT / FILLTO 28.90AHD

13100

2070

0

100

100

3040

1550

0

2500

9000

0

SCALE 1:200

864 10m22

NOTE: ALL DIMENSIONS IN MILLIMETRES UNLESS NOTED OTHERWISE

LOCATION PLAN D_C_WH-001LPROPOSED SITE PLAN D_C_WH-001PCUT & FILL PLAN D_C_WH-002FLOOR PLAN D_C_WH-003ELEVATIONS 1 OF 2 D_C_WH-004ELEVATIONS 2 OF 2 D_C_WH-005SECTIONAL ELEVATIONS D_C_WH-006PERSPECTIVE VIEW D_C_WH-007

DESCRIPTIONREV. REFERENCE

A3SCALESHT.DRG

TITLECLIENTDRN / DES

A

1 2 3 4

B

C

No.

PTY LTDDRAFTINGSMEEKESABN 89 056 706 640153a Argyle St. Hobart Tas 7000Ph. (03) 6234 6185 Fax (03) 6234 7986Mob. 0418 352 503 Email [email protected]: smeekesdrafting.com

Building Designer Accreditation No. CC4900 A

BUILDINGDESIGNERSAUSTRALIA TAS

DELPERO AND CLEMENTSPROPOSED WAREHOUSE DEVELOPMENT

22 MAXWELLS ROAD, CAMBRIDGE TAS 7170

CUT & FILL PLAND_C_WH 002 1 : 200

R. SMEEKES

0 ISSUED FOR DEVELOPMENT APPROVAL. 30-09-2019

CUT & FILL PLANSCALE 1 : 200 @ A3

NOT FORCONSTRUCTION

ISSUED FOR INFORMATION ONLY

Page 5: 007 - Perspective Views · 11/11/2019  · 24580 70° 24' 00" 24330 70° 24' 00" s e w e r a g e e a s e m e n t 3 0 0 0 w d r a i n a g e e a n d s e r v i c e e a s e m n t 3 0

WAREHOUSE No. 1(INCLUDING OFFICE)

395.7m²

WAREHOUSE No. 2(INCLUDING OFFICE)

272.8m²

WAREHOUSE No. 3(INCLUDING OFFICE)

272.8m²

COVERED OUTDOORSTORAGE AREA

148 m²

GARDEN BED

150

6000 150

4000

90

3770 90

OFFICE(MEZZANINE OVER)

4000W x 4600H OPENING

4000

W x

4600

H OP

ENIN

G

150 12100 150 13850 150 13850 150 11000

40400

150

12400

150

1337

040

0090

2150

9015

0

1820

0

150

150

1970

0

150

2989

02720 272090

6000 90

150

150

90

60009032

700

OFFICE

OFFICE

ACC. WC/SHR

OFFICE

ACC. WC/SHR

OFFI

CE

OFFI

CEAC

C. W

C/SH

R

150

1285

0

28000

1215A

1209F

KITC

HENE

TTE

OFFICE(MEZZANINE OVER)

1215A1215A

1209F

920

KITC

HENE

TTE

920

920 920

OFFICE(MEZZANINE OVER)

4000W x 4600H OPENING

1209F

KITC

HENE

TTE

920920

GARDENBED

150

2720

9015

0AC

C. W

C/SH

R

2861

0

150

150

150

3300

0

2000

0

902150ACC. WC/SHR

150 7760 150 7760

11040 150 11040

COVE

RED

OUTD

OOR

STOR

AGE

AREA

COVERED OUTDOOR STORAGE AREA

5300COVERED OUTDOOR STORAGE AREA

1800

006B

920

920

920

006A

1215

F

1215A1215A

920

920

920

ACC.WC/SHR

ACC.WC/SHR

ACC.WC/SHR

A - AWNING

S - SLIDINGSD - SLIDING DOOR

F - FIXED

1 5 0 9 ATYPEWIDTH (900)HEIGHT (1500)

BF - BIFOLD DOOR

GB - GLASS BRICK

STKSD - STACKING TYPE

H - HINGED DOOR

C - CUSTOM (BUTTED

FR - FROSTED GLAZING

CORNER GLAZING)

SLIDING DOOR

0

SCALE 1:200

864 10m22

NOTE: ALL DIMENSIONS IN MILLIMETRES UNLESS NOTED OTHERWISE

WINDOW LEGEND:

NOTES:1. INSTALL BALUSTRADE (TO OWNERS CHOICE) TO EDGE OF MEZZANINE STORAGE

AREA IN ACCORDANCE WITH THE REQUIREMENTS OF BCA 3.9.2.

2. INSTALL FIXED OR REMOVABLE ACCESS LADDER TO MEZZANINE STORAGEAREA IN ACCORDANCE WITH THE REQUIREMENTS OF AS 1657-2013 "FIXEDPLATFORMS, WALKWAYS AND LADDERS - DESIGN, CONSTRUCTION ANDINSTALLATION" AND AS/NZS 1892.1: 1996 "PORTABLE LADDERS - METAL".

3. BATHROOM / CHANGEROOM CIRCULATION SPACES, FIXTURES AND FITTINGSSHALL BE IN ACCORDANCE WITH THE REQUIREMENTS OF AS 1428.1

LOCATION PLAN D_C_WH-001LPROPOSED SITE PLAN D_C_WH-001PCUT & FILL PLAN D_C_WH-002FLOOR PLAN D_C_WH-003ELEVATIONS 1 OF 2 D_C_WH-004ELEVATIONS 2 OF 2 D_C_WH-005SECTIONAL ELEVATIONS D_C_WH-006PERSPECTIVE VIEW D_C_WH-007

DESCRIPTIONREV. REFERENCE

A3SCALESHT.DRG

TITLE

CLIENTDRN / DES

A

1 2 3 4

B

C

No.

PTY LTDDRAFTINGSMEEKESABN 89 056 706 640153a Argyle St. Hobart Tas 7000Ph. (03) 6234 6185 Fax (03) 6234 7986Mob. 0418 352 503 Email [email protected]: smeekesdrafting.com

Building Designer Accreditation No. CC4900 A

BUILDINGDESIGNERSAUSTRALIA TAS

DELPERO AND CLEMENTSPROPOSED WAREHOUSE DEVELOPMENT

22 MAXWELLS ROAD, CAMBRIDGE TAS 7170

FLOOR PLAND_C_WH 003 1 : 200

R. SMEEKES

0 ISSUED FOR DEVELOPMENT APPROVAL. 30-09-2019

FLOOR PLANSCALE 1 : 200 @ A3

NOT FORCONSTRUCTION

ISSUED FOR INFORMATION ONLY

Page 6: 007 - Perspective Views · 11/11/2019  · 24580 70° 24' 00" 24330 70° 24' 00" s e w e r a g e e a s e m e n t 3 0 0 0 w d r a i n a g e e a n d s e r v i c e e a s e m n t 3 0

FFL 29.30 AHD FFL 29.30 AHD

FFL 32.00 AHDFCL 31.70 AHD

FFL 32.00 AHDFCL 31.70 AHD

FCL 34.20 AHDFCL 34.20 AHD

5635

150 THK PRE-CAST CONCRETE PANELNATURAL FINISH (TYPICAL)

POWDERCOATED ALUMINIUM FRAMED WINDOWSCOLOUR - COLORBOND 'WINDSPRAY' (TYPICAL)

KLIP-LOK 406 ROOF CLADDING @ 2° PITCH,COLOUR - COLORBOND 'WINDSPRAY'

ROLLER DOOR TO SUIT 4000W x 4600H OPENING,COLOUR - COLORBOND 'WINDSPRAY'

FFL 29.30 AHD

FCL 34.20 AHD

FFL 29.30 AHD

FCL 34.20 AHD

150 THK PRE-CAST CONCRETE PANELNATURAL FINISH (TYPICAL)

N.G.L.

N.G.L.

N.G.L.

N.G.L.

MAX.

HEI

GHT

OFBU

ILDIN

G AB

OVE

N.G.

L

FGL 29.20 AHD

FGL 29.20 AHD

5200 x 900SIGNAGE ENVELOPE

5200 x 900SIGNAGE ENVELOPE

LOCATION PLAN D_C_WH-001LPROPOSED SITE PLAN D_C_WH-001PCUT & FILL PLAN D_C_WH-002FLOOR PLAN D_C_WH-003ELEVATIONS 1 OF 2 D_C_WH-004ELEVATIONS 2 OF 2 D_C_WH-005SECTIONAL ELEVATIONS D_C_WH-006PERSPECTIVE VIEW D_C_WH-007

DESCRIPTIONREV. REFERENCE

A3SCALESHT.DRG

TITLECLIENTDRN / DES

A

1 2 3 4

B

C

No.

PTY LTDDRAFTINGSMEEKESABN 89 056 706 640153a Argyle St. Hobart Tas 7000Ph. (03) 6234 6185 Fax (03) 6234 7986Mob. 0418 352 503 Email [email protected]: smeekesdrafting.com

Building Designer Accreditation No. CC4900 A

BUILDINGDESIGNERSAUSTRALIA TAS

DELPERO AND CLEMENTSPROPOSED WAREHOUSE DEVELOPMENT

22 MAXWELLS ROAD, CAMBRIDGE TAS 7170ELEVATIONSSHEET 1 OF 2

D_C_WH 004 1 : 100

R. SMEEKES

0

SCALE 1:200

864 10m22

NOTE: ALL DIMENSIONS IN MILLIMETRES UNLESS NOTED OTHERWISE

0 ISSUED FOR DEVELOPMENT APPROVAL. 30-09-2019

NORTHWEST ELEVATIONSCALE 1 : 200 @ A3

SOUTHEAST ELEVATIONSCALE 1 : 200 @ A3

NOT FORCONSTRUCTION

ISSUED FOR INFORMATION ONLY

1 SIGNAGE ENEVELOPES ADDED. 22-10-2019

Page 7: 007 - Perspective Views · 11/11/2019  · 24580 70° 24' 00" 24330 70° 24' 00" s e w e r a g e e a s e m e n t 3 0 0 0 w d r a i n a g e e a n d s e r v i c e e a s e m n t 3 0

FFL 29.30 AHD

FCL 34.20 AHD

FFL 29.30 AHD

FCL 34.20 AHD

FFL 32.00 AHDFCL 31.70 AHD

FFL 29.30 AHD

FFL 32.00 AHDFCL 31.70 AHD

FCL 34.20 AHD

FFL 29.30 AHD

FCL 34.20 AHD

150 THK PRE-CAST CONCRETE PANELNATURAL FINISH (TYPICAL)

ROLLER DOOR TO SUIT 4000W x 4600H OPENING,COLOUR - COLORBOND 'WINDSPRAY'

150 THK PRE-CAST CONCRETE PANELNATURAL FINISH (TYPICAL)

KLIP-LOK 406 ROOF CLADDING @ 2° PITCH,COLOUR - COLORBOND 'WINDSPRAY'

N.G.L.

N.G.L.

N.G.L.N.G.L.

FCL 31.70 AHDFFL 32.00 AHD

FGL 29.20 AHD

5200 x 900SIGNAGE ENVELOPE

LOCATION PLAN D_C_WH-001LPROPOSED SITE PLAN D_C_WH-001PCUT & FILL PLAN D_C_WH-002FLOOR PLAN D_C_WH-003ELEVATIONS 1 OF 2 D_C_WH-004ELEVATIONS 2 OF 2 D_C_WH-005SECTIONAL ELEVATIONS D_C_WH-006PERSPECTIVE VIEW D_C_WH-007

DESCRIPTIONREV. REFERENCE

A3SCALESHT.DRG

TITLECLIENTDRN / DES

A

1 2 3 4

B

C

No.

PTY LTDDRAFTINGSMEEKESABN 89 056 706 640153a Argyle St. Hobart Tas 7000Ph. (03) 6234 6185 Fax (03) 6234 7986Mob. 0418 352 503 Email [email protected]: smeekesdrafting.com

Building Designer Accreditation No. CC4900 A

BUILDINGDESIGNERSAUSTRALIA TAS

DELPERO AND CLEMENTSPROPOSED WAREHOUSE DEVELOPMENT

22 MAXWELLS ROAD, CAMBRIDGE TAS 7170ELEVATIONSSHEET 2 OF 2

D_C_WH 005 1 : 100

R. SMEEKES

0

SCALE 1:200

864 10m22

NOTE: ALL DIMENSIONS IN MILLIMETRES UNLESS NOTED OTHERWISE

0 ISSUED FOR DEVELOPMENT APPROVAL. 30-09-2019

NORTHEAST ELEVATIONSCALE 1 : 200 @ A3

SOUTHWEST ELEVATIONSCALE 1 : 200 @ A3

NOT FORCONSTRUCTION

ISSUED FOR INFORMATION ONLY

Page 8: 007 - Perspective Views · 11/11/2019  · 24580 70° 24' 00" 24330 70° 24' 00" s e w e r a g e e a s e m e n t 3 0 0 0 w d r a i n a g e e a n d s e r v i c e e a s e m n t 3 0

FFL 29.30 AHD

FCL 34.20 AHD

FFL 32.00 AHD

FCL 31.70 AHD

FFL 29.30 AHD

FCL 34.20 AHD(MIN.)

KLIP-LOK 406 ROOF CLADDING @ 2° PITCH,COLOUR - COLORBOND 'WINDSPRAY'

3255 3395

MAX.

MEZ

ZANI

NE C

LEAR

ANCE

MIN.

MEZ

ZANI

NE C

LEAR

ANCE

100

PARA

PET

FFL 29.30 AHD

FCL 34.20 AHD(MIN.)

FFL 29.30 AHD

FFL 32.00 AHD

FCL 31.70 AHD

FCL 34.20 AHD

FCL 31.70 AHD

FFL 32.00 AHD

FGL 29.20 AHD

2630 28

95MA

X. M

EZZA

NINE

CLE

ARAN

CE

MIN.

MEZ

ZANI

NE C

LEAR

ANCE

FGL 29.20 AHD

555

PARA

PET

KLIP-LOK 406 ROOF CLADDING @ 2° PITCH,COLOUR - COLORBOND 'WINDSPRAY'

LOCATION PLAN D_C_WH-001LPROPOSED SITE PLAN D_C_WH-001PCUT & FILL PLAN D_C_WH-002FLOOR PLAN D_C_WH-003ELEVATIONS 1 OF 2 D_C_WH-004ELEVATIONS 2 OF 2 D_C_WH-005SECTIONAL ELEVATIONS D_C_WH-006PERSPECTIVE VIEW D_C_WH-007

DESCRIPTIONREV. REFERENCE

A3SCALESHT.DRG

TITLECLIENTDRN / DES

A

1 2 3 4

B

C

No.

PTY LTDDRAFTINGSMEEKESABN 89 056 706 640153a Argyle St. Hobart Tas 7000Ph. (03) 6234 6185 Fax (03) 6234 7986Mob. 0418 352 503 Email [email protected]: smeekesdrafting.com

Building Designer Accreditation No. CC4900 A

BUILDINGDESIGNERSAUSTRALIA TAS

DELPERO AND CLEMENTSPROPOSED WAREHOUSE DEVELOPMENT

22 MAXWELLS ROAD, CAMBRIDGE TAS 7170SECTIONAL ELEVATIONS

D_C_WH 006 1 : 100

R. SMEEKES

0

SCALE 1:200

864 10m22

NOTE: ALL DIMENSIONS IN MILLIMETRES UNLESS NOTED OTHERWISE

0 ISSUED FOR DEVELOPMENT APPROVAL. 30-09-2019

SECTION B 003SCALE 1 : 100

@ A3

SECTION A 003SCALE 1 : 100

@ A3NOT FORCONSTRUCTION

ISSUED FOR INFORMATION ONLY

Page 9: 007 - Perspective Views · 11/11/2019  · 24580 70° 24' 00" 24330 70° 24' 00" s e w e r a g e e a s e m e n t 3 0 0 0 w d r a i n a g e e a n d s e r v i c e e a s e m n t 3 0

LOCATION PLAN D_C_WH-001LPROPOSED SITE PLAN D_C_WH-001PCUT & FILL PLAN D_C_WH-002FLOOR PLAN D_C_WH-003ELEVATIONS 1 OF 2 D_C_WH-004ELEVATIONS 2 OF 2 D_C_WH-005SECTIONAL ELEVATIONS D_C_WH-006PERSPECTIVE VIEW D_C_WH-007

DESCRIPTIONREV. REFERENCE

A3SCALESHT.DRG

TITLE

CLIENTDRN / DES

A

1 2 3 4

B

C

No.

PTY LTDDRAFTINGSMEEKESABN 89 056 706 640153a Argyle St. Hobart Tas 7000Ph. (03) 6234 6185 Fax (03) 6234 7986Mob. 0418 352 503 Email [email protected]: smeekesdrafting.com

Building Designer Accreditation No. CC4900 A

BUILDINGDESIGNERSAUSTRALIA TAS

DELPERO AND CLEMENTSPROPOSED WAREHOUSE DEVELOPMENT

22 MAXWELLS ROAD, CAMBRIDGE TAS 7170

PERSPECTIVE VIEWSD_C_WH 007 N.T.S.

R. SMEEKES

0 ISSUED FOR DEVELOPMENT APPROVAL. 30-09-2019

NORTHERN PERSPECTIVE VIEWN.T.S.

WESTERN PERSPECTIVE VIEWN.T.S.

KLIP-LOK 406 ROOF CLADDING @ 2° PITCH,COLOUR - COLORBOND 'WINDSPRAY'

NATURAL GREY CONCRETEWALL PANELS

NOT FORCONSTRUCTION

ISSUED FOR INFORMATION ONLY