0011_bridge_refurbishment_javad_akhtar
TRANSCRIPT
abcBridge Refurbishment Javad Akhtar
Bridge Refurbishment
Bridges Forum November 2000
J Akhtar Bridges Division, Croydon
abcBridge Refurbishment Javad Akhtar
Aims
To illustrate general approach to investigating a refurbishment problem “From Scratch”
Client may not be aware he has a potential problem
Usually reluctant to undertake investigation
Bridge may be a component of a larger scheme: Conflict of interests
Difficult to actually agree solution with all parties
Implementation of solution may not be straightforward
Many defects due to construction original faults
abcBridge Refurbishment Javad Akhtar
Aims
To highlight differences from UK practice
The Nature of Defects Encountered
Construction Practices and Standards
Organisational and “Cultural” Difficulties
abcBridge Refurbishment Javad Akhtar
Investigation and Solution Approach
Correct identification of Cause
Devise Solution
Convince Client and Approving authorities
Obtain Financial Approval
Implement Solution
Monitor Structure following implementation
Install maintenance Regime
abcBridge Refurbishment Javad Akhtar
Motivators For “Fettling”
Defects
During Construction
Arising In Service
Change of Use
Alignment/Layout Change
Increase in Loading
Nature of Loading change
Hazards [Potential Causes of Defects]
Erosion
Settlement
Rockfall
Earthquake
Explosion
abcBridge Refurbishment Javad Akhtar
Sample Schemes
Mozambique
Pakistan Motorway - Salt Range Bridges C5 and C6
Karakoram Highway
Chota Ravi Bridges, Lahore
Brest-Minsk Highway Belarus
Heuston Bridge Dublin
abcBridge Refurbishment Javad Akhtar
Construction Defects
Belarus: Bridge Immediately After Construction
Hollow Columns: Verticality Parapet Welding
Tack welds
to ribbed bar
abcBridge Refurbishment Javad Akhtar
Construction Defects
Pakistan Motorway
65m High Columns out of plumb
abcBridge Refurbishment Javad Akhtar
Defects arising In Service
Brest-Minsk: Deck Damage
Design Deficiency: Absence of deck diaphragm beams
abcBridge Refurbishment Javad Akhtar
Defects arising In Service Mozambique: Settlement caused by
erosion of pier foundations
Mozambique: Road erosion
abcBridge Refurbishment Javad Akhtar
Change of Use
Heuston Bridge Dublin
Cast Iron Arch, built 1827
Introduction of Tramway
abcBridge Refurbishment Javad Akhtar
Hazards [Potential Causes of Defects]
Erosion
Impact
Rockfall
Earthquake
Explosion
Corrosion
Vibration
Overloading
abcBridge Refurbishment Javad Akhtar
Hazards
Erosion
Due to Unusual discharge from Dam
abcBridge Refurbishment Javad Akhtar
Hazards [Potential Causes of Defects]
Belarus: Impact Damage To Hollow Columns
abcBridge Refurbishment Javad Akhtar
Hazards
Mozambique: Bomb Damage
Solution:Replace Structure
abcBridge Refurbishment Javad Akhtar
HazardsKarakoram Highway
Impact Damage by
BouncingRocks, Rock/mudflows
abcBridge Refurbishment Javad Akhtar
Hazards - Karakoram HighwayBailey Bridge replaces RC
arch swept away by rock/mudflow.
Bridges across
terminal moraine of Glacier
abcBridge Refurbishment Javad Akhtar
Investigate Cause
Information Gathering
Records
Loading
Ground Conditions
Environment
Construction Method
Materials
History and Local Knowledge
abcBridge Refurbishment Javad Akhtar
Investigate Cause
Risk Assessment
abcBridge Refurbishment Javad Akhtar
Investigate Cause
Field Investigation Buried Valley
Folded Sandstones /
Mudstone
Buried Valley
Shattered Sandstone
Micaecous Bedding
abcBridge Refurbishment Javad Akhtar
Investigate Cause
Field Investigation
Get Expert Advice!
Gypsum Marl,
surface solution features
develop after exposure to rain
Gypsum Marl,
As excavated
(Grey is anhydrous)
abcBridge Refurbishment Javad Akhtar
Investigate Cause
Drilling
abcBridge Refurbishment Javad Akhtar
Investigate Cause
Initial presumptions may be confirmed
abcBridge Refurbishment Javad Akhtar
Investigate Cause
Interpretation
What does it mean?
Could there be other factors?
Do you need further investigation?
If you must proceed on incomplete information, ensure that the client is aware of the risks
abcBridge Refurbishment Javad Akhtar
Investigate Cause
Things are not always as they seem
abcBridge Refurbishment Javad Akhtar
Investigate Cause
Reality may be worse than expected!
abcBridge Refurbishment Javad Akhtar
Investigate Cause
Analysis
Desk Studies
Specialist Advice
Modelling
Reporting
64
.2
Gantry No. 4 - Euston Station
DEAD, SUPERIMPOSED DEAD LOADINGSTAGE 2 DEFLECTION PLOT
abcBridge Refurbishment Javad Akhtar
Demonstrate Cause
abcBridge Refurbishment Javad Akhtar
Discuss Solutions and Alternatives
Evaluate Consequences
Financial Aspects
Construction Methods
Value Engineering
Risks
Explain what you intend to achieve, may not always be able to restore structure to design condition!
abcBridge Refurbishment Javad Akhtar
Gather Design Team
How will you Communicate?
Where will it be Located?
Mix of Skills
abcBridge Refurbishment Javad Akhtar
Approach to Solution
Remove Cause of Problem
Correct design Deficiency
Strengthen/Restore Structural Elements
Protect Structural Elements against deterioration
Monitor Structure
abcBridge Refurbishment Javad Akhtar
Remove Cause of Problem
Lowering and widening of v-shaped drainage channel tobelow bridge foundation level.
Original intention was todemolish bridge and rebuild.
Hazards included old brickarch culverts at aboutfoundation level.
Solution was to divert drainagechannels around piers in linedchannel, and closed culverts
Chota Ravi Bridges, Lahore:
abcBridge Refurbishment Javad Akhtar
Correct design Deficiency
Brest-Minsk: Absence of deck diaphragm beams
Recommended
Diaphragm Beam
Abutment
Local Wheel loads causing damage
Reinforced Concrete Deck Slab
Maintain access to deck joint
abcBridge Refurbishment Javad Akhtar
Strengthen/Restore Structural Elements and Protect against deterioration
For a “new” structure a “Repair” solution to correct construction defects may not be acceptable to the client.
Should the client accept the “Repair” approach, then the design of the repair will be on a FITNESS FOR PURPOSE basis.
This requires consideration of the Consequences of a Departure from Standards
abcBridge Refurbishment Javad Akhtar
Strengthen/Restore Structural Elements
Heuston Bridge Dublin
abcBridge Refurbishment Javad Akhtar
Strengthen/Restore Structural Elements
Bridge 7, Euston
Arch Rib Strengthening
Working Entirely From Below
abcBridge Refurbishment Javad Akhtar
Agree Solution
Get all Parties “On-Board”
abcBridge Refurbishment Javad Akhtar
Monitor Implementation
abcBridge Refurbishment Javad Akhtar
Monitor Structure
Is the structure behaving as expected?
Aspects monitored may include:
Geometry: Levels, Tilts
Corrosion rates
Strain Guage
Cracks: Pattern, gap opening
Visual Inspection
Environment: Ground water levels, rainfall, river flows
abcBridge Refurbishment Javad Akhtar
Open to Traffic