abcBridge Refurbishment Javad Akhtar

Bridge Refurbishment

Bridges Forum November 2000

J Akhtar Bridges Division, Croydon

Page 2: 0011_Bridge_Refurbishment_Javad_Akhtar

abcBridge Refurbishment Javad Akhtar

Aims

To illustrate general approach to investigating a refurbishment problem “From Scratch”

Client may not be aware he has a potential problem

Usually reluctant to undertake investigation

Bridge may be a component of a larger scheme: Conflict of interests

Difficult to actually agree solution with all parties

Implementation of solution may not be straightforward

Many defects due to construction original faults

Page 3: 0011_Bridge_Refurbishment_Javad_Akhtar

abcBridge Refurbishment Javad Akhtar

Aims

To highlight differences from UK practice

The Nature of Defects Encountered

Construction Practices and Standards

Organisational and “Cultural” Difficulties

Page 4: 0011_Bridge_Refurbishment_Javad_Akhtar

abcBridge Refurbishment Javad Akhtar

Investigation and Solution Approach

Correct identification of Cause

Devise Solution

Convince Client and Approving authorities

Obtain Financial Approval

Implement Solution

Monitor Structure following implementation

Install maintenance Regime

Page 5: 0011_Bridge_Refurbishment_Javad_Akhtar

abcBridge Refurbishment Javad Akhtar

Motivators For “Fettling”

Defects

During Construction

Arising In Service

Change of Use

Alignment/Layout Change

Increase in Loading

Nature of Loading change

Hazards [Potential Causes of Defects]

Erosion

Settlement

Rockfall

Earthquake

Explosion

Page 6: 0011_Bridge_Refurbishment_Javad_Akhtar

abcBridge Refurbishment Javad Akhtar

Sample Schemes

Mozambique

Pakistan Motorway - Salt Range Bridges C5 and C6

Karakoram Highway

Chota Ravi Bridges, Lahore

Brest-Minsk Highway Belarus

Heuston Bridge Dublin

Page 7: 0011_Bridge_Refurbishment_Javad_Akhtar

abcBridge Refurbishment Javad Akhtar

Construction Defects

Belarus: Bridge Immediately After Construction

Hollow Columns: Verticality Parapet Welding

Tack welds

to ribbed bar

Page 8: 0011_Bridge_Refurbishment_Javad_Akhtar

abcBridge Refurbishment Javad Akhtar

Construction Defects

Pakistan Motorway

65m High Columns out of plumb

Page 9: 0011_Bridge_Refurbishment_Javad_Akhtar

abcBridge Refurbishment Javad Akhtar

Defects arising In Service

Brest-Minsk: Deck Damage

Design Deficiency: Absence of deck diaphragm beams

Page 10: 0011_Bridge_Refurbishment_Javad_Akhtar

abcBridge Refurbishment Javad Akhtar

Defects arising In Service Mozambique: Settlement caused by

erosion of pier foundations

Mozambique: Road erosion

Page 11: 0011_Bridge_Refurbishment_Javad_Akhtar

abcBridge Refurbishment Javad Akhtar

Change of Use

Heuston Bridge Dublin

Cast Iron Arch, built 1827

Introduction of Tramway

Page 12: 0011_Bridge_Refurbishment_Javad_Akhtar

abcBridge Refurbishment Javad Akhtar

Hazards [Potential Causes of Defects]

Erosion

Impact

Rockfall

Earthquake

Explosion

Corrosion

Vibration

Overloading

Page 13: 0011_Bridge_Refurbishment_Javad_Akhtar

abcBridge Refurbishment Javad Akhtar

Hazards

Erosion

Due to Unusual discharge from Dam

Page 14: 0011_Bridge_Refurbishment_Javad_Akhtar

abcBridge Refurbishment Javad Akhtar

Hazards [Potential Causes of Defects]

Belarus: Impact Damage To Hollow Columns

Page 15: 0011_Bridge_Refurbishment_Javad_Akhtar

abcBridge Refurbishment Javad Akhtar

Hazards

Mozambique: Bomb Damage

Solution:Replace Structure

Page 16: 0011_Bridge_Refurbishment_Javad_Akhtar

abcBridge Refurbishment Javad Akhtar

HazardsKarakoram Highway

Impact Damage by

BouncingRocks, Rock/mudflows

Page 17: 0011_Bridge_Refurbishment_Javad_Akhtar

abcBridge Refurbishment Javad Akhtar

Hazards - Karakoram HighwayBailey Bridge replaces RC

arch swept away by rock/mudflow.

Bridges across

terminal moraine of Glacier

Page 18: 0011_Bridge_Refurbishment_Javad_Akhtar

abcBridge Refurbishment Javad Akhtar

Investigate Cause

Information Gathering

Records

Loading

Ground Conditions

Environment

Construction Method

Materials

History and Local Knowledge

Page 19: 0011_Bridge_Refurbishment_Javad_Akhtar

abcBridge Refurbishment Javad Akhtar

Investigate Cause

Risk Assessment

Page 20: 0011_Bridge_Refurbishment_Javad_Akhtar

abcBridge Refurbishment Javad Akhtar

Investigate Cause

Field Investigation Buried Valley

Folded Sandstones /

Mudstone

Buried Valley

Shattered Sandstone

Micaecous Bedding

Page 21: 0011_Bridge_Refurbishment_Javad_Akhtar

abcBridge Refurbishment Javad Akhtar

Investigate Cause

Field Investigation

Get Expert Advice!

Gypsum Marl,

surface solution features

develop after exposure to rain

Gypsum Marl,

As excavated

(Grey is anhydrous)

Page 22: 0011_Bridge_Refurbishment_Javad_Akhtar

abcBridge Refurbishment Javad Akhtar

Investigate Cause

Drilling

Page 23: 0011_Bridge_Refurbishment_Javad_Akhtar

abcBridge Refurbishment Javad Akhtar

Investigate Cause

Initial presumptions may be confirmed

Page 24: 0011_Bridge_Refurbishment_Javad_Akhtar

abcBridge Refurbishment Javad Akhtar

Investigate Cause

Interpretation

What does it mean?

Could there be other factors?

Do you need further investigation?

If you must proceed on incomplete information, ensure that the client is aware of the risks

Page 25: 0011_Bridge_Refurbishment_Javad_Akhtar

abcBridge Refurbishment Javad Akhtar

Investigate Cause

Things are not always as they seem

Page 26: 0011_Bridge_Refurbishment_Javad_Akhtar

abcBridge Refurbishment Javad Akhtar

Investigate Cause

Reality may be worse than expected!

Page 27: 0011_Bridge_Refurbishment_Javad_Akhtar

abcBridge Refurbishment Javad Akhtar

Investigate Cause

Analysis

Desk Studies

Specialist Advice

Modelling

Reporting

64

.2

Gantry No. 4 - Euston Station

DEAD, SUPERIMPOSED DEAD LOADINGSTAGE 2 DEFLECTION PLOT

Page 28: 0011_Bridge_Refurbishment_Javad_Akhtar

abcBridge Refurbishment Javad Akhtar

Demonstrate Cause

Page 29: 0011_Bridge_Refurbishment_Javad_Akhtar

abcBridge Refurbishment Javad Akhtar

Discuss Solutions and Alternatives

Evaluate Consequences

Financial Aspects

Construction Methods

Value Engineering

Risks

Explain what you intend to achieve, may not always be able to restore structure to design condition!

Page 30: 0011_Bridge_Refurbishment_Javad_Akhtar

abcBridge Refurbishment Javad Akhtar

Gather Design Team

How will you Communicate?

Where will it be Located?

Mix of Skills

Page 31: 0011_Bridge_Refurbishment_Javad_Akhtar

abcBridge Refurbishment Javad Akhtar

Approach to Solution

Remove Cause of Problem

Correct design Deficiency

Strengthen/Restore Structural Elements

Protect Structural Elements against deterioration

Monitor Structure

Page 32: 0011_Bridge_Refurbishment_Javad_Akhtar

abcBridge Refurbishment Javad Akhtar

Remove Cause of Problem

Lowering and widening of v-shaped drainage channel tobelow bridge foundation level.

Original intention was todemolish bridge and rebuild.

Hazards included old brickarch culverts at aboutfoundation level.

Solution was to divert drainagechannels around piers in linedchannel, and closed culverts

Chota Ravi Bridges, Lahore:

Page 33: 0011_Bridge_Refurbishment_Javad_Akhtar

abcBridge Refurbishment Javad Akhtar

Correct design Deficiency

Brest-Minsk: Absence of deck diaphragm beams

Recommended

Diaphragm Beam

Abutment

Local Wheel loads causing damage

Reinforced Concrete Deck Slab

Maintain access to deck joint

Page 34: 0011_Bridge_Refurbishment_Javad_Akhtar

abcBridge Refurbishment Javad Akhtar

Strengthen/Restore Structural Elements and Protect against deterioration

For a “new” structure a “Repair” solution to correct construction defects may not be acceptable to the client.

Should the client accept the “Repair” approach, then the design of the repair will be on a FITNESS FOR PURPOSE basis.

This requires consideration of the Consequences of a Departure from Standards

Page 35: 0011_Bridge_Refurbishment_Javad_Akhtar

abcBridge Refurbishment Javad Akhtar

Strengthen/Restore Structural Elements

Heuston Bridge Dublin

Page 36: 0011_Bridge_Refurbishment_Javad_Akhtar

abcBridge Refurbishment Javad Akhtar

Strengthen/Restore Structural Elements

Bridge 7, Euston

Arch Rib Strengthening

Working Entirely From Below

Page 37: 0011_Bridge_Refurbishment_Javad_Akhtar

abcBridge Refurbishment Javad Akhtar

Agree Solution

Get all Parties “On-Board”

Page 38: 0011_Bridge_Refurbishment_Javad_Akhtar

abcBridge Refurbishment Javad Akhtar

Monitor Implementation

Page 39: 0011_Bridge_Refurbishment_Javad_Akhtar

abcBridge Refurbishment Javad Akhtar

Monitor Structure

Is the structure behaving as expected?

Aspects monitored may include:

Geometry: Levels, Tilts

Corrosion rates

Strain Guage

Cracks: Pattern, gap opening

Visual Inspection

Environment: Ground water levels, rainfall, river flows

Page 40: 0011_Bridge_Refurbishment_Javad_Akhtar

abcBridge Refurbishment Javad Akhtar

Open to Traffic