0000494487

8
SAP Note Header Data 494487 - Project System: Consulting notes Version 13 Validity: 14.03.2003 - active Language English Released On 14.03.2003 20:24:45 Release Status Released for Customer Component PS Project System BW-BCT-PS Project System CA-TS-PS Integration Project System CS-BS-BI Billing PS-CAF Payments PS-CAF-ACT Actual Payments and Forecast PS-CAF-PLN Planned Payments PS-CAF-PLN-CAL Costings PS-CAF-PLN-PLN Planning PS-CLM Claim Management PS-CON Confirmation PS-CON-CAT Time Sheet PS-CON-EXT Decentralized Confirmation (PDC) PS-CON-NET Confirmation of Network Activities PS-COS Costs PS-COS-ACT Actual Costs and Forecast PS-COS-BUD Budget PS-COS-PER Automatic and Periodic Allocations PS-COS-PER-ABC Process Costs PS-COS-PER-IC Interest PS-COS-PER-OC Overhead PS-COS-PER-PT Periodic Transfer PS-COS-PER-SE Settlement PS-COS-PLN Costs PS-COS-PLN-CAL Costing PS-COS-PLN-PLN Planned Costs PS-CRP Resources PS-CRP-CMP Capacity Leveling PS-CRP-PLN Capacity Planning PS-CRP-PRT Production Resources/Tools PS-CRP-SRV External Services Management PS-CRP-WFP Workforce Planning PS-DAT Dates PS-DAT-NET Network Scheduling PS-DAT-WBS Time Scheduling PS-DOC Documents PS-DOC-DMS Document Processing PS-DOC-TXT Project Text PS-IS Information System PS-IS-ACC Accounting PS-IS-ACC-SUM Project Summarization PS-IS-CON Responsibility Accounting PS-IS-GRF Graphics PS-IS-INT Interfaces and Enhancements PS-IS-INT-EXT Interfaces With External Systems PS-IS-LOG Logistics PS-IS-LOG-CAP Capacities PS-IS-LOG-MAT Material PS-IS-REP Project Reports PS-IS-TRA Trend Analyses PS-MAT Material PS-MAT-DLV Delivery PS-MAT-INT Bill of Material Transfer PS-MAT-PRC Procurement PS-PRG Progress PS-PRG-EVA Progress Analysis PS-PRG-IND Statistical Key Figures Other Components

Upload: vijay-kumar-hebbal

Post on 18-Aug-2015

214 views

Category:

Documents


0 download

TRANSCRIPT

SAP Note Header Data 494487 - Project System: Consulting notes Version 13 Validity: 14.03.2003 - active Language English Released On14.03.2003 20:24:45 Release StatusReleased for Customer ComponentPS Project System BW-BCT-PS Project System CA-TS-PS Integration Project System CS-BS-BI Billing PS-CAF Payments PS-CAF-ACT Actual Payments and Forecast PS-CAF-PLN Planned Payments PS-CAF-PLN-CAL Costings PS-CAF-PLN-PLN Planning PS-CLM Claim Management PS-CON Confirmation PS-CON-CAT Time Sheet PS-CON-EXT Decentralized Confirmation (PDC) PS-CON-NET Confirmation of Network Activities PS-COS Costs PS-COS-ACT Actual Costs and Forecast PS-COS-BUD Budget PS-COS-PER Automatic and Periodic Allocations PS-COS-PER-ABC Process Costs PS-COS-PER-IC Interest PS-COS-PER-OC Overhead PS-COS-PER-PT Periodic Transfer PS-COS-PER-SE Settlement PS-COS-PLN Costs PS-COS-PLN-CAL Costing PS-COS-PLN-PLN Planned Costs PS-CRP Resources PS-CRP-CMP Capacity Leveling PS-CRP-PLN Capacity Planning PS-CRP-PRT Production Resources/Tools PS-CRP-SRV External Services Management PS-CRP-WFP Workforce Planning PS-DAT Dates PS-DAT-NET Network Scheduling PS-DAT-WBS Time Scheduling PS-DOC Documents PS-DOC-DMS Document Processing PS-DOC-TXT Project Text PS-IS Information System PS-IS-ACC Accounting PS-IS-ACC-SUM Project Summarization PS-IS-CON Responsibility Accounting PS-IS-GRF Graphics PS-IS-INT Interfaces and Enhancements PS-IS-INT-EXT Interfaces With External Systems PS-IS-LOG Logistics PS-IS-LOG-CAP Capacities PS-IS-LOG-MAT Material PS-IS-REP Project Reports PS-IS-TRA Trend Analyses PS-MAT Material PS-MAT-DLV Delivery PS-MAT-INT Bill of Material Transfer PS-MAT-PRC Procurement PS-PRG Progress PS-PRG-EVA Progress Analysis PS-PRG-IND Statistical Key FiguresOther ComponentsSymptom Consul t i ngnot esi nPS St r uct ur e:1. Mast er dat a a) Gener all Ar chi vi ngPS_PROJ ECT l Aut hor i zat i oncheck l Val i dat i on/ subst i t ut i on l Cust omer - speci f i cf i el ds l Bat chi nputl User st at us l Edi t i ngmasks l Conver si on a) Net wor k l CO888whennet wor ki scal l edup l Mat er i all Dat es l Del i ver yaddr essf or t hi r d- par t yor dera) WBS l ALEdi st r i but i on PS-REV Revenues and Eamings PS-REV-ACT Actual Revenues and Forecast PS-REV-IO Project-Related Incoming Orders PS-REV-PLN Planned Revenues PS-REV-PLN-CAL Costings PS-REV-PLN-PLN Planning PS-REV-RA Results Analysis PS-REV-TRF Subprojects PS-SIM Simulation PS-ST Structures PS-ST-DEF Project Definition PS-ST-DEF-TMP Standard Project Definition PS-ST-INT Interface to External Project Software PS-ST-INT-BAPI BAPI-interface to PS PS-ST-INT-EXT PS-interface to external systems PS-ST-MIL Milestone PS-ST-MIL-TMP Standard Milestone PS-ST-NET Network and activities PS-ST-NET-SUB Subnetworks PS-ST-NET-TMP Standard Network PS-ST-OPR Operative Structures PS-ST-ORD Orders for Projects PS-ST-PB Project Builder PS-ST-PLN Structure Planning PS-ST-PPB Project Planning Board PS-ST-TMP Templates PS-ST-WBS Work Breakdown Structure PS-ST-WBS-TMP Standard Work Breakdown Structure PS-VER Versions PS-WFL SAP Business Workflow ConnectionPriorityCorrection with high priority CategoryConsulting l Cr eat ewi t ht empl at e l I nconsi st enci es a) Pr oj ect Bui l derb) Pr oj ect pl anni ngboar d c) Mi l est ones d) PSt ext s e) Document sandPS f ) Ver si on/ si mul at i on 2. Cont r ol l i ng a) Gener al i nf or mat i on b) Sal esor der val ueupdat e c) Pr oj ect cashmanagementd) Cost pl anni ng e) Per i odcl osi nggener alf ) Revenues+r esul t3. Pr ogr essanal ysi s 4. Resour ce- r el at edbi l l i ngdocument / sal espr i ci ng/ of f er cr eat i on/ r esul t sanal ysi spr oj ect5. I nf or mat i onsyst ema) Logi cal dat abasePSJb) Logi st i csI nf or mat i onsyst emc) Busi nessI nf or mat i onsyst emd) Summar i zat i on 6. Busi nessI nf or mat i onWar ehouse: PScont ent7. I nt er f acet oext er nal pr oj ect syst ems( OpenPS)8. Conf i r mat i on Not es:1. Mast er dat a a) Gener all Ar chi vi ngPS_PROJ ECT 497986Ar chi vi ng: Pr oj ect s/ net wor ksnot del et ed l Aut hor i zat i oncheck 536428Composi t eSAPnot eonaut hor i zat i oncheck l Val i dat i on/ subst i t ut i on 536461Composi t eSAPnot eonval i dat i on/ subst i t ut i on l Cust omer - speci f i cf i el ds 522581User- def i nedf i el dsar enot di spl ayed l Bat chi nput 370958Consul t i ngnot e: Fr equnt pr obl emsdur i ngbat chi nput 535013CJ 20N: bat chi nput i nbackgr oundmode l User st at us 536464Composi t eSAPnot eonuser st at usesi nPS l Edi t i ngmasks 536471Composi t eSAPnot eonedi t i ngmasks l Conver si on 522246PSconsul t i ng: I nt er nal andext er nal number pr oj ect / WBS a) Net wor k l CO888whennet wor ki scal l edup 536500Composi t eSAPnot eonCO888whencal l i ngnet wor k 391996VA02: BOM expl osi onnumber i snot copi ed 542887Mi ssi ngst at usobj ect sand/ or t empor ar yact i vi t ynumber s l Mat er i al 526252Pr oj ect Syst em, mat er i al : Consul t i ngnot es l Dat es 536487Composi t eSAPnot eondat esi nt henet wor k l Del i ver yaddr essf or t hi r d- par t yor der 536450Composi t eSAPnot eondel i ver yaddr essf or t hi r d- par t yor derl Conf i gur at i on 535189Conf i gur edst andar dnet wor k: Possi bl eobj ect l i nks a) WBS l ALEdi st r i but i on 378888Di st r i but i onof pr oj ect susi ngALE l Cr eat ewi t ht empl at e 536494Composi t eSAPnot eon' Cr eat ebycopyi ng'l I nconsi st enci es 536501Composi t eSAPnot eoni nconsi st enci esi nPS a) Pr oj ect Bui l der 536489Composi t eSAPnot eonPr oj ect Bui l der 596263CJ 20N: consul t i ngnot e: per f or mancei nt hePr oj ect Bui l der 535013Bat chi nput i nbackgr oundmode b) Pr oj ect pl anni ngboar d 500933Pr oj . pl ngboar d: Recomm. , addi t i onal i nf or mat i on, advi ce c) Mi l est ones 328072Posi t i oni ngonmi l est oneover vi ewf or WBSel ementd) PSt ext s 493101PSt ext si nt hePr oj ect Syst eme) Document sandPS 536508Composi t eSAPnot eondocument sandPS f ) Ver si on/ si mul at i on 505113Consul t i ngnot esPS- SI M, PS- VER 2. Cont r ol l i ng a) Gener al i nf or mat i on 397799I NFORMATI ON: CO- OM- OPA( Or der &Pr oj ect Account i ng) 398983I nf or mat i on: I M ( I nvest ment Management )b) Sal esor der val ueupdat e 512353Composi t eSAPnot eonPScashmanagementc) Pr oj ect cashmanagement 417511( FI ) Col l ect i venot ef or PSCashManagementd) Cost pl anni ng 536521Composi t eSAPnot eoncost pl anni ngi nPS e) Per i odcl osi nggener al 536496Composi t eSAPnot eonper i od- endcl osi ng( gener al )f ) Revenues+r esul t 536526Composi t eSAPnot eonr evenuesandr esul t3. Consul t i ngnot ePr ogr essanal ysi s516476 4. Resour ce- r el at edbi l l i ng/ sal espr i ci ng/ of f er cr eat i on/ r esul t sanal ysi spr oj ect 528604PS: SAPnot eonbi l l i ngdoc. / cost i ng/ r esul t sanal ysi s 5. I nf or mat i onsyst ema) Logi cal dat abasePSJ 0528360Composi t eSAPnot ef or l ogi cal dat abasePSJb) Logi st i csi nf or mat i onsyst em516479 c) Busi nessI nf or mat i onsyst em 0526206PSI S: Consul t i ngnot esonbusi nessi nf or mat i onsyst emd) Summar i zat i on 0536524Composi t eSAPnot eonsummar i zat i oni nPS 6. Busi nessI nf or mat i onWar ehouse: PScont ent 0526203PSBW: Consul t i ngnot esonPScont ent i nBW7. I nt er f acet oext er nal pr oj ect syst ems( OpenPS) 0505734Consul t i ngnot esOpenPS 8. Conf i r mat i on 594809Collective consulting note for PS confirmation Other Terms Reason and Prerequisites Solution Taket her el evant not es( l i st edabove) i nt oaccount . Other Attributes Validity BAPI CN21 CN22 CN23 CN33 CN70 KKRP VA02Transaction codesThis document is not restricted to a software component or software component version References This document refers to: SAP Notes 596263 CJ20N: consulting note: performance in the Project Builder 594809 Collective consulting note for PS confirmation 573133 FAQ 2: Call of network 554415 FAQ 2: Authorization check 554139 FAQ 2: Batch input 553832 FAQ 2: Conversion 553661 FAQ 2: Coding masks 542887 Missing status objects and/or temporary activity numbers 535013 CJ20N: batch input in background mode 533434 CN25: Goods Movement via PS Confirmation (Consulting Note) 528604 PS: SAP note on billing doc./costing/results analysis 528360 Composite SAP note for logical database PSJ 526252 Project System, material: Consulting notes 526206 PSIS: Consulting notes on business information system 526203 PSBW: Consulting notes on PS content in BW 522426 Consulting: Authorizations in the Project System 522285 Project creation with template vs. Inclusion 522246 PS consulting: Internal and external number for project/WBS 521625 Apparent inconsistencies during the creation of projects 521483 Input help displayed incorrectly 520944 Problems when/after creating/transporting editing masks 512353 Consulting composite SAP note planned revenues from SD docs 505734 Consulting notes OpenPS 505113 Consulting notes PS-SIM, PS-VER 502459 Copy project via menu entries 502407 F4 for dely address third-party requisitn:Address group PS02 500933 Proj.plng board: Recomm., additional information, consulting 500556 CJB1/CJB2: Information for settlement rule generation 499389 VA01/VF01: Check/derivation of the assigned WBS element 497986 Archiving: Projects/networks not deleted 496963 32-bit source release in upgrades to 620 495269 Poor performance for substitution /mass change/ ... 493101 PS texts in the Project System 491308 Project Builder: Switching from display to change 490916 Project creation with template: Data from project profile 489473 CJ9F/CJ9FS: Automatic determin. of interval for fiscal year 458871 Message 26073 when creating documents 455255 CJ2B: Font in the date bar cannot be changed 454013 CJZ1: Charges of current year not with interest calculation 453280 Editing Mask and Project/WBS Elements Are Not Compatible 441749 Infrastructure for wildcard search of WBS element 434155 Call PS display transactions from CV02N/CV03N 433328 Error messages in SAP enhancement CNEX0002 422558 Message when executing customer exit CNEX0002 418141 Copying customer number proposed (after Note 396340) 417511 (FI) Collective note for PS Cash Management 415367 CN21: Transfer of standard network w/ parameter effectivity 399312 Display transaction for PS objects in CV02N 398983 Information: IM (Investment Management) 398627 INFO: CO-PC-OBJ (Results analysis/WIP calculation) 397799 INFORMATION: CO-OM-OPA (Order & Project Accounting) 397243 Information: CO-OM (period-end closing) 396340 Address for third-party requistn in network despite 'Cancel' 393782 Performance: Results analysis 391996 VA02: BOM explosion number is not copied 390224 CO888 in CN22, CN23 when network is called up 378888 Distribution of projects using ALE 378813 Special development: Partially confirmed activity element 370958 Consulting note:Frequnt problems during batch input 355904 Always read planning board profile from project profile 353130 PS/PM integration: Different scheduling results This document is referenced by: SAP Notes (81) 350868 KKRC: Conversion report RCJCLMIG and standard WBS 338469 Print control in the Project Builder 329038 KKRP: initial NUMC fields for transfer in PS 328072 Positioning on milestone overview for WBS element 313899 Summarization via master data characteristics 311938 Problems w. PS confirmation due to status HCNF 303348 User exits CNEX0025: Example 182244 AM010: F4 help address no. third-party requisition 178110 Short dump when calling Project Builder 171244 Valuation area for networks 170948 Status inconsistency in work breakdown structure 158714 Project coding mask can be transported w/o warning 151551 Consulting: Scheduling of network 150788 Classification inconsistency in project 149698 Hierarchy inconsistency in the project 134752 Error in project interest calculation 123211 CO888 in CN22, CN23 when calling network 88699 Termination message CO888: 'Internal error when creating ITA 61886 SAP enhancement CNEX0002: No authorization 60522 Author.check B_USERSTAT during business transaction 49293 Wildcards during data selection 553661 FAQ 2: Coding masks 458871 Message 26073 when creating documents 453280 Editing Mask and Project/WBS Elements Are Not Compatible 454013 CJZ1: Charges of current year not with interest calculation 311938 Problems w. PS confirmation due to status HCNF 455255 CJ2B: Font in the date bar cannot be changed 329038 KKRP: initial NUMC fields for transfer in PS 338469 Print control in the Project Builder 441749 Infrastructure for wildcard search of WBS element 328072 Positioning on milestone overview for WBS element 313899 Summarization via master data characteristics 303348 User exits CNEX0025: Example 434155 Call PS display transactions from CV02N/CV03N 60522 Author.check B_USERSTAT during business transaction 61886 SAP enhancement CNEX0002: No authorization 350868 KKRC: Conversion report RCJCLMIG and standard WBS 353130 PS/PM integration: Different scheduling results 355904 Always read planning board profile from project profile 433328 Error messages in SAP enhancement CNEX0002 415367 CN21: Transfer of standard network w/ parameter effectivity 553832 FAQ 2: Conversion 573133 FAQ 2: Call of network 554415 FAQ 2: Authorization check 554139 FAQ 2: Batch input 542887 Missing status objects and/or temporary activity numbers 533434 CN25: Goods Movement via PS Confirmation (Consulting Note) 528360 Composite SAP note for logical database PSJ 528604 PS: SAP note on billing doc./costing/results analysis 526252 Project System, material: Consulting notes 526206 PSIS: Consulting notes on business information system 526203 PSBW: Consulting notes on PS content in BW 522426 Consulting: Authorizations in the Project System 522285 Project creation with template vs. Inclusion 522246 PS consulting: Internal and external number for project/WBS 521625 Apparent inconsistencies during the creation of projects 521483 Input help displayed incorrectly 520944 Problems when/after creating/transporting editing masks 596263 CJ20N: consulting note: performance in the Project Builder 594809 Collective consulting note for PS confirmation 512353 Consulting composite SAP note planned revenues from SD docs 178110 Short dump when calling Project Builder 182244 AM010: F4 help address no. third-party requisition 134752 Error in project interest calculation 149698 Hierarchy inconsistency in the project 49293 Wildcards during data selection 398983 Information: IM (Investment Management) 505734 Consulting notes OpenPS 505113 Consulting notes PS-SIM, PS-VER 502459 Copy project via menu entries 502407 F4 for dely address third-party requisitn:Address group PS02 500933 Proj.plng board: Recomm., additional information, consulting 500556 CJB1/CJB2: Information for settlement rule generation 499389 VA01/VF01: Check/derivation of the assigned WBS element 497986 Archiving: Projects/networks not deleted 496963 32-bit source release in upgrades to 620 495269 Poor performance for substitution /mass change/ ... 493101 PS texts in the Project System 491308 Project Builder: Switching from display to change 490916 Project creation with template: Data from project profile 489473 CJ9F/CJ9FS: Automatic determin. of interval for fiscal year 123211 CO888 in CN22, CN23 when calling network 370958 Consulting note:Frequnt problems during batch input 417511 (FI) Collective note for PS Cash Management 418141 Copying customer number proposed (after Note 396340) 88699 Termination message CO888: 'Internal error when creating ITA 422558 Message when executing customer exit CNEX0002 378813 Special development: Partially confirmed activity element 378888 Distribution of projects using ALE 390224 CO888 in CN22, CN23 when network is called up 391996 VA02: BOM explosion number is not copied 393782 Performance: Results analysis 396340 Address for third-party requistn in network despite 'Cancel' 397243 Information: CO-OM (period-end closing) 397799 INFORMATION: CO-OM-OPA (Order & Project Accounting) 398627 INFO: CO-PC-OBJ (Results analysis/WIP calculation) 399312 Display transaction for PS objects in CV02N 150788 Classification inconsistency in project 151551 Consulting: Scheduling of network 158714 Project coding mask can be transported w/o warning 170948 Status inconsistency in work breakdown structure 171244 Valuation area for networks