SAP Note
Header Data
Symptom
How does parameter 'Project structure' affect the valuation method of the Customizing of resultsanalysis?
Other Terms
KKA2, KKAJ, OKG3
Reason and Prerequisites
Solution
In general we recommend that you only enter results analysis keys for those WBS elements for whichyou want to carry out results analysis.This way you avoid errors.The actual and plan values of the orders or activities for the WBS element are usually taken intoaccount by the aggregation of results analysis, that is, if this is not prevented by other controlparameters which are not mentioned here.
l Project structure 'A':You use this method if you only want to carry out result analysis in one level of the projecthierarchy.At the time of the calculation, results analysis defines the actual and the plan dataof all WBS elements which are below the WBS element to be defined, including the data of the WBSelement to be defined itself.This way it carries out the calculation and updates the result onthe WBS element to be defined. At the time of the calculation, results analysis checks that onno WBS element there is result analysis data which is above or under the WBS element to bedelimited.
l Project structure 'C':This method works as method 'A' with the difference in the determination of the plan valueswhich are used for calculation.For the WBS elements with status 'Technically completed' at thedate of the aggregation the portion of plan values is replaced by the actual values.
l Project structure 'T':You use this method if you want to carry out result analysis for more than one level of theproject hierarchy.Starting from the WBS element to be defined, the algorithm runs down theproject hierarchy and collects the WBS elements for the aggregation. The algorithm stopscollecting as soon as it finds a WBS element with results analysis key.Here, only the WBS
elements for which result analysis should be carried out may have a results analysis key.
l Project structure 'U':This method works as method 'T', with a difference in determining the plan values which are usedfor calculation.The plan values are calculated as in method 'A'.
l Project structure 'E:Here only the actual and the plan data of the WBS element to be defined are taken into account.
l Project structure 'B':You can only use this method for the WBS elements that are at the top of the result analysishierarchy within the project hierarchy.At the time of the calculation the results analysisaggregates the actual and plan data of all WBS elements that are below the WBS element to bedefined, including the data of the WBS element to be defined itself.Thus it carries out thecalculation.It also aggregates the result analysis data of all WBS elements that are below theWBS element to be defined.It subtracts these from the calculated data and updates the result in the WBS element to bedefined. At the time of the calculation, result analysis checks that there is not resultanalysis data for any WBS element above the WBS element to be delimited.For example, if you have a two-step project, on the WBS elements of level 1 you can carry outresult analysis with a result analysis key that uses project structure 'B' and for WBS elementsof level 2 with a different result analysis key that uses project structure 'T'.
209220 - Valuation method: Project structure
Version 3 Validity: 16.01.2001 - active Language English
Released On 15.01.2001 23:00:00
Release Status Released for Customer
Component PS-REV-RA Results Analysis
Priority Recommendations / Additional InfoCategory Consulting
![Page 2: 0000209220 - Valuation Method - Project Structure](https://reader037.vdocuments.us/reader037/viewer/2022100318/577cd0101a28ab9e78914e71/html5/thumbnails/2.jpg)
8/12/2019 0000209220 - Valuation Method - Project Structure
http://slidepdf.com/reader/full/0000209220-valuation-method-project-structure 2/2
Validity
Support Packages & Patches
References
This document refers to:
SAP Notes
This document is referenced by:
SAP Notes (3)
Software Component From Rel. To Rel. And Subsequent
SAP_APPL 40A 40B 45A 45B 46A 46B 46C 46C 470 470 500 500 600 600 602 602 603 603 604 604 605 605
Support Package Patches
Software Component Support Package Patch Level
SAP KERNEL 4.6D_EXT 32-BIT SP2370 002370
SAP KERNEL 4.6D_EXT 64-BIT SP2370 002370
398627 INFO: CO-PC-OBJ (Results analysis/WIP calculation)
701077 FAQ 2: PS Period End Closing
336172 Collective processing results analysis
398627 INFO: CO-PC-OBJ (Results analysis/WIP calculation)
336172 Collective processing results analysis
701077 FAQ 2: PS Period End Closing