RCSD James Monroe High School Phase 2B CJS ARCHITECTS S.E.D. # 26-16-00-01-0-107-030 Project # 1625 S.E.D. DWT # 26-16-00-01-7-999-019 June 30, 2017 1625 James Monroe High School 00 91 15-1 ADDENDUM NUMBER 5 SECTION 00 91 15 ADDENDUM NUMBER 5 DATE: August 14, 2017 TO: PROSPECTIVE BIDDERS This Addendum forms a part of the Contract Documents and modifies the Bidding Documents dated June 30, 2017, with amendments and additions noted below. Where addendum items below modify a portion of the Bid Documents, the remainder of the Bid Document remains unchanged. ACKNOWLEDGE RECEIPT OF THIS ADDENDUM IN THE SPACE PROVIDED IN THE BID FORM. FAILURE TO DO SO MAY DISQUALIFY THE BIDDER. This addendum consists of 5 page(s), in addition to the following document(s): A. SKETCHES AD-SK-102.2 – Roof Framing Plan ADA-019 – Window Type Revisions – Addendum #5 ADA-020 – Window Revisions - Addendum #5 ADA-021 - Window Revisions - Addendum #5 ADA-022 – Partial Exterior East Elevation - Addendum #5 ADA-023 – Plan Revisions – Addendum #5 ADA-024 – North Wall Old Boys Gym / New Cafeteria Elevation – Addendum #5 ADA-025 – Glazing Revisions – Addendum #5 ADA-026 – Revisions to RCP – Addendum #5 ADP-037 – Plumbing Details – Addendum #4 ADP-038 – Plumbing Details – Addendum #4 ADP-039 – Basement Floor Plan Area C – Addendum #4 B. DRAWINGS (24x36 format) S-100.1 – Foundation and Slab Plan S-100.2 – Foundation and Slab Plan S-100.3 – Foundation and Slab Plan S-100.4 – Foundation and Slab Plan S-101.1 – First Floor Framing Plan S-101.2 – First Floor Framing Plan S-102.3 – Roof Framing Plan S-102.4 – Roof Framing Plan S-200.2 – Enlargements S-300 - Foundation Sections S-400 – Framing Sections S-401 – Framing Sections

Upload: others

Post on 11-Oct-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 00 91 15 Addendum Number 05 Written...S.E.D. DWT # 26-16-00-01-7-999-019 June 30, 2017 1625 James Monroe High School 00 91 15-1 ADDENDUM NUMBER 5 SECTION 00 91 15 . ADDENDUM NUMBER

RCSD James Monroe High School Phase 2B CJS ARCHITECTS S.E.D. # 26-16-00-01-0-107-030 Project # 1625 S.E.D. DWT # 26-16-00-01-7-999-019 June 30, 2017

1625 James Monroe High School 00 91 15-1 ADDENDUM NUMBER 5

SECTION 00 91 15 ADDENDUM NUMBER 5

DATE: August 14, 2017

TO: PROSPECTIVE BIDDERS This Addendum forms a part of the Contract Documents and modifies the Bidding Documents dated June 30, 2017, with amendments and additions noted below. Where addendum items below modify a portion of the Bid Documents, the remainder of the Bid Document remains unchanged. ACKNOWLEDGE RECEIPT OF THIS ADDENDUM IN THE SPACE PROVIDED IN THE BID FORM. FAILURE TO DO SO MAY DISQUALIFY THE BIDDER. This addendum consists of 5 page(s), in addition to the following document(s):

A. SKETCHES AD-SK-102.2 – Roof Framing Plan ADA-019 – Window Type Revisions – Addendum #5 ADA-020 – Window Revisions - Addendum #5 ADA-021 - Window Revisions - Addendum #5 ADA-022 – Partial Exterior East Elevation - Addendum #5 ADA-023 – Plan Revisions – Addendum #5 ADA-024 – North Wall Old Boys Gym / New Cafeteria Elevation – Addendum #5 ADA-025 – Glazing Revisions – Addendum #5 ADA-026 – Revisions to RCP – Addendum #5 ADP-037 – Plumbing Details – Addendum #4 ADP-038 – Plumbing Details – Addendum #4 ADP-039 – Basement Floor Plan Area C – Addendum #4

B. DRAWINGS (24x36 format) S-100.1 – Foundation and Slab Plan S-100.2 – Foundation and Slab Plan S-100.3 – Foundation and Slab Plan S-100.4 – Foundation and Slab Plan S-101.1 – First Floor Framing Plan S-101.2 – First Floor Framing Plan S-102.3 – Roof Framing Plan S-102.4 – Roof Framing Plan S-200.2 – Enlargements S-300 - Foundation Sections S-400 – Framing Sections S-401 – Framing Sections

Page 2: 00 91 15 Addendum Number 05 Written...S.E.D. DWT # 26-16-00-01-7-999-019 June 30, 2017 1625 James Monroe High School 00 91 15-1 ADDENDUM NUMBER 5 SECTION 00 91 15 . ADDENDUM NUMBER

RCSD James Monroe High School Phase 2B CJS ARCHITECTS S.E.D. # 26-16-00-01-0-107-030 Project # 1625 S.E.D. DWT # 26-16-00-01-7-999-019 June 30, 2017

1625 James Monroe High School 00 91 15-2 ADDENDUM NUMBER 5

S-402 – Framing Sections AD-S-403 – Framing Sections AD-S-404 – Framing Sections S-501 – Typical Details S-600 - Schedules S-601 - Schedules A-512 – Vertical Circulation; Plans, Sections and Details A616 – Interior Elevations

C. APPENDIX RFI Log and Responses August 14, 2017.

CHANGES TO ADDENDUM NO 2 S-001 – NOTES

A. Insert the following notes into the Concrete Masonry Unit (CMU) Wall Notes: “10. Brace load resisting (8”, 10”, 12”) CMU walls to the steel structure at the following locations

per the notes below: A. North, South, East and West Gymnasium Walls: Connect CMU to columns with webs

parallel to the CMU wall with Heckmann Building Products #195 Twisted L-Type Column Anchor, 1/8” minimum thickness. Weld column anchor to flange continuously top and bottom of anchor. Connect CMU to columns with webs perpendicular to the beam with Heckmann Building Products #189 L-Type Column Anchor, 1/8” minimum thickness. Column anchors shall be located at each side of each column at each bond beam. Vertical Spacing of anchors shall not exceed 4’-0”. All anchors shall be hot dip galvanized.

B. All Other Load Resisting Walls: Connect CMU to floor and roof beams with 5/8” diameter A307 headed anchor bolts with 4” embedment. Space anchors at 4’-0” on center maximum. Refer to sections for connection angles.

S-100.1 Foundation and Slab Plan

A. Replace drawing in its entirety with attached drawings S-100.1 Rev 2.

S-100.2 Foundation and Slab Plan A. Replace drawing in its entirety with attached drawings S-100.2 Rev 2.

CHANGES TO ADDENDUM NO 3 S-200.2 Enlargements

A. Replace drawing in its entirety with attached drawings S-200.2 Rev 2. A-102.4 Second Level Floor Plan Area D

A. Revised drawing partially with attached drawing ADA-021.

Page 3: 00 91 15 Addendum Number 05 Written...S.E.D. DWT # 26-16-00-01-7-999-019 June 30, 2017 1625 James Monroe High School 00 91 15-1 ADDENDUM NUMBER 5 SECTION 00 91 15 . ADDENDUM NUMBER

RCSD James Monroe High School Phase 2B CJS ARCHITECTS S.E.D. # 26-16-00-01-0-107-030 Project # 1625 S.E.D. DWT # 26-16-00-01-7-999-019 June 30, 2017

1625 James Monroe High School 00 91 15-3 ADDENDUM NUMBER 5

CHANGES TO ADDENDUM NO 4 S-100.4 Foundation and Slab Plan

A. Replace drawing in its entirety with attached drawings S-100.4 Rev 2. CHANGES TO THE PROJECT MANUAL 05 3100 STEEL DECKING

A. Revise section 2.3.A to include the following: “6. Basis of Design Product: New Millennium Building Systems.”

06 1800 GLUED-LAMINATED CONSTRUCTION A. Revise section 2.1 to include the following:

“G. Basis of Design Product: VERSA-LAM 2.0 3100 by Boise Cascade.”

CHANGES TO THE DRAWINGS

S-100.1 – FOUNDATION AND SLAB PLAN

A. Replace drawing in its entirety with the attached drawing.

S-100.2 – FOUNDATION AND SLAB PLAN

A. Replace drawing in its entirety with the attached drawing.

S-100.3 – FOUNDATION AND SLAB PLAN

A. Replace drawing in its entirety with the attached drawing.

S-100.4 – FOUNDATION AND SLAB PLAN

A. Replace drawing in its entirety with the attached drawing.

S-101.1 – FIRST FLOOR FRAMING PLAN

A. Replace drawing in its entirety with the attached drawing.

S-101.2 – FIRST FLOOR FRAMING PLAN

A. Replace drawing in its entirety with the attached drawing.

S-102.2 – ROOF FRAMING PLAN

A. See sketch AD-SK-102.2 for revisions.

S-102.3 – ROOF FRAMING PLAN

A. Replace drawing in its entirety with the attached drawing.

S-102.4 – ROOF FRAMING PLAN

A. Replace drawing in its entirety with the attached drawing.

S-200.2 – ENLARGEMENTS

A. Replace drawing in its entirety with the attached drawing.

S-300 – FOUNDATION SECTIONS

Page 4: 00 91 15 Addendum Number 05 Written...S.E.D. DWT # 26-16-00-01-7-999-019 June 30, 2017 1625 James Monroe High School 00 91 15-1 ADDENDUM NUMBER 5 SECTION 00 91 15 . ADDENDUM NUMBER

RCSD James Monroe High School Phase 2B CJS ARCHITECTS S.E.D. # 26-16-00-01-0-107-030 Project # 1625 S.E.D. DWT # 26-16-00-01-7-999-019 June 30, 2017

1625 James Monroe High School 00 91 15-4 ADDENDUM NUMBER 5

A. Replace drawing in its entirety with the attached drawing.

S-400 – FRAMING SECTIONS

A. Replace drawing in its entirety with the attached drawing.

S-401 – FRAMING SECTIONS

A. Replace drawing in its entirety with the attached drawing.

S-402 – FRAMING SECTIONS

A. Replace drawing in its entirety with the attached drawing.

S-403 – FRAMING SECTIONS

A. Add drawing in its entirety. See attached drawing AS-S-403.

S-404 – FRAMING SECTIONS

A. Add drawing in its entirety. See attached drawing AS-S-404.

S-501 – TYPICAL DETAILS

A. Replace drawing in its entirety with the attached drawing.

S-600 – SCHEDULES

A. Replace drawing in its entirety with the attached drawing.

S-601 – SCHEDULES

A. Replace drawing in its entirety with the attached drawing.

D101.3 – FIRST LEVEL FLOOR PLAN – AREA C

A. See revisions as indicated on attached sketch ADA-023.

A100.2 - BASEMENT LEVEL FLOOR PLAN AREA B

A. See revisions as indicated on attached sketch ADA-019.

A101.3 – FIRST LEVEL FLOOR PLAN – AREA C

A. See revisions as indicated on attached sketch ADA-023 and ADA-025.

A102.4 – SECOND LEVEL FLOOR PLAN AREA D

A. See revisions as indicated on attached sketch ADA-020 and ADA-021.

A202.1 - EXTERIOR ELEVATIONS EAST FAÇADE

A. See revisions as indicated on attached sketch ADA-022.

A401.3 – FIRST LEVEL REFLECTED CEILING PLAN – AREA C

A. See revisions as indicated on attached sketch ADA-026.

A-512 - VERTICAL CIRCULATION; PLANS, SECTIONS AND DETAILS

A. Add drawing in its entirety

A609 – INTERIOR ELEVATIONS

A. See revisions as indicated on attached sketch ADA-024.

A616 – INTERIOR ELEVATIONS

A. Add Drawing in its entirety

A804 – WINDOW SCHEDULE

Page 5: 00 91 15 Addendum Number 05 Written...S.E.D. DWT # 26-16-00-01-7-999-019 June 30, 2017 1625 James Monroe High School 00 91 15-1 ADDENDUM NUMBER 5 SECTION 00 91 15 . ADDENDUM NUMBER

RCSD James Monroe High School Phase 2B CJS ARCHITECTS S.E.D. # 26-16-00-01-0-107-030 Project # 1625 S.E.D. DWT # 26-16-00-01-7-999-019 June 30, 2017

1625 James Monroe High School 00 91 15-5 ADDENDUM NUMBER 5

A. See revisions as indicated on attached sketch ADA-020 and ADA-021.

P100.3 – BASEMENT PLUMBING PLAN – AREA C

A. Revised sanitary piping locations. Refer to Addendum Drawing ADP-039.

P501 – PLUMBING DETAILS

A. Added “TRENCH & PIPE IN LOADING AREA” detail dimensions. Refer to Addendum Drawing ADP-037.

P502 – PLUMBING DETAILS

A. Revised “5000 GALLON GREASE INTERCEPTOR” detail dimensions. Refer to Addendum Drawing ADP-038.

END OF ADDENDUM NUMBER 5

Page 6: 00 91 15 Addendum Number 05 Written...S.E.D. DWT # 26-16-00-01-7-999-019 June 30, 2017 1625 James Monroe High School 00 91 15-1 ADDENDUM NUMBER 5 SECTION 00 91 15 . ADDENDUM NUMBER
Page 7: 00 91 15 Addendum Number 05 Written...S.E.D. DWT # 26-16-00-01-7-999-019 June 30, 2017 1625 James Monroe High School 00 91 15-1 ADDENDUM NUMBER 5 SECTION 00 91 15 . ADDENDUM NUMBER

W21x62W21x62W21x62 (+16'-0")

do do do do do do do do do do

C8x11.5 (+16'-0") C8x11.5 (+14'-7")C8x11.5(+16'-0")

C8x11.5(+14'-7")

AD

-S

K102.2

RS

MP

- JA

ME

S M

ON

RO

E H

IG

H S

CH

OO

L P

HA

SE

2B

PRO

JEC

T:

ww

w.c

jsarc

hite

cts.c

om

Roch

este

r, N

.Y. 1

4607

54 S

outh

Uni

on S

treet

(585

) 24

4.12

94 f

ax.

(585

) 24

4.37

80 t

el.

DRA

WIN

G T

ITLE:

PRO

JEC

T N

O:

DRA

WN

BY:

SCA

LE:

ISSU

E D

ATE

:RE

VIS

ION

DA

TE:

DRA

WIN

G N

UMBE

R:

DRA

WIN

G R

EFER

ENC

E N

UMBE

R(S)

:

RO

OF

F

RA

MIN

G P

LA

N

S-1

02

.2

Ro

ch

este

r C

ity S

ch

oo

l D

istrict

Ja

me

s M

on

ro

e H

ig

h S

ch

oo

l

16

4 A

le

xa

nd

er S

tre

et

Ro

ch

este

r, N

ew

Y

ork

SE

D #

: 2

6-1

6-0

0-0

1-0

-1

07

-0

29

DW

T #

: 2

6-1

6-0

0-0

1-7

-9

99

-0

19

1625

SNP

AS

NO

TED

8/10

/17

8/10

/17

10 118.8 9.5 11.9

H

Page 8: 00 91 15 Addendum Number 05 Written...S.E.D. DWT # 26-16-00-01-7-999-019 June 30, 2017 1625 James Monroe High School 00 91 15-1 ADDENDUM NUMBER 5 SECTION 00 91 15 . ADDENDUM NUMBER
Page 9: 00 91 15 Addendum Number 05 Written...S.E.D. DWT # 26-16-00-01-7-999-019 June 30, 2017 1625 James Monroe High School 00 91 15-1 ADDENDUM NUMBER 5 SECTION 00 91 15 . ADDENDUM NUMBER
Page 10: 00 91 15 Addendum Number 05 Written...S.E.D. DWT # 26-16-00-01-7-999-019 June 30, 2017 1625 James Monroe High School 00 91 15-1 ADDENDUM NUMBER 5 SECTION 00 91 15 . ADDENDUM NUMBER
Page 11: 00 91 15 Addendum Number 05 Written...S.E.D. DWT # 26-16-00-01-7-999-019 June 30, 2017 1625 James Monroe High School 00 91 15-1 ADDENDUM NUMBER 5 SECTION 00 91 15 . ADDENDUM NUMBER
Page 12: 00 91 15 Addendum Number 05 Written...S.E.D. DWT # 26-16-00-01-7-999-019 June 30, 2017 1625 James Monroe High School 00 91 15-1 ADDENDUM NUMBER 5 SECTION 00 91 15 . ADDENDUM NUMBER
Page 13: 00 91 15 Addendum Number 05 Written...S.E.D. DWT # 26-16-00-01-7-999-019 June 30, 2017 1625 James Monroe High School 00 91 15-1 ADDENDUM NUMBER 5 SECTION 00 91 15 . ADDENDUM NUMBER
Page 14: 00 91 15 Addendum Number 05 Written...S.E.D. DWT # 26-16-00-01-7-999-019 June 30, 2017 1625 James Monroe High School 00 91 15-1 ADDENDUM NUMBER 5 SECTION 00 91 15 . ADDENDUM NUMBER
Page 15: 00 91 15 Addendum Number 05 Written...S.E.D. DWT # 26-16-00-01-7-999-019 June 30, 2017 1625 James Monroe High School 00 91 15-1 ADDENDUM NUMBER 5 SECTION 00 91 15 . ADDENDUM NUMBER
Page 16: 00 91 15 Addendum Number 05 Written...S.E.D. DWT # 26-16-00-01-7-999-019 June 30, 2017 1625 James Monroe High School 00 91 15-1 ADDENDUM NUMBER 5 SECTION 00 91 15 . ADDENDUM NUMBER

RSMP - JAMES MONROE HIGH SCHOOL PHASE 2B

PROJECT:

www.cjsarchitects.com

Rochester, N.Y. 1460754 South Union Street

(585) 244.1294 fax.(585) 244.3780 tel.

DRAWING TITLE:

PROJECT NO: DRAWN BY: SCALE: ISSUE DATE: REVISION DATE:

DRAWING REFERENCE NUMBER(S):

DRAWING NUMBER:

SED. #: 26-16-00-01-0-107-030

DWT #: 26-16-00-01-7-999-019

SED CONTROL NUMBERS:

1625 MPC AS NOTED 8/14/17 8/14/17

PLUMBING DETAILS - ADD #4

ADP-037

P-501

PAVEMENT BY GENERAL

CONTRACTION

PARKING LOT BASE BY

GENERAL CONSTRUCTION

2" EXPANDABLE FOAM

INSULATION BOARD

4"

12" 4" 12" 6"6"

No. 1 CRUSHED STONE

12

P-501

TRENCH & PIPE IN LOADING AREA

SCALE: NOT TO SCALE

AutoCAD SHX Text
4
Page 17: 00 91 15 Addendum Number 05 Written...S.E.D. DWT # 26-16-00-01-7-999-019 June 30, 2017 1625 James Monroe High School 00 91 15-1 ADDENDUM NUMBER 5 SECTION 00 91 15 . ADDENDUM NUMBER

RS

MP

- JA

ME

S M

ON

RO

E H

IG

H S

CH

OO

L P

HA

SE

2B

PRO

JEC

T:

ww

w.c

jsarc

hite

cts.c

om

Roch

este

r, N

.Y. 1

4607

54 S

outh

Uni

on S

treet

(585

) 24

4.12

94 f

ax.

(585

) 24

4.37

80 t

el.

DRA

WIN

G T

ITLE:

PRO

JEC

T N

O:

DRA

WN

BY:

SCA

LE:

ISSU

E D

ATE

:RE

VIS

ION

DA

TE:

DRA

WIN

G N

UMBE

R:

DRA

WIN

G R

EFER

ENC

E N

UMBE

R(S)

:

Ro

ch

este

r C

ity S

ch

oo

l D

istrict

Ja

me

s M

on

ro

e H

ig

h S

ch

oo

l

16

4 A

le

xa

nd

er S

tre

et

Ro

ch

re

ste

r, N

ew

Y

ork

SE

D #

: 2

6-1

6-0

0-0

1-0

-1

07

-0

29

DW

T #

: 2

6-1

6-0

0-0

1-7

-9

99

-0

19

1625

MPC

AS

NO

TED

8/14

/17

8/14

/17

PLAN

SECTION A-A

14'-0"

13'-4"

4" 4"

7'-0"

6'-4"

6" PVC PIPE & FITTINGS BYDIVISION 22

9'-1 1

/2"

4'-0"

3'-0"8'-

10 1/

2"

3'-0"

3'-7"

6"

10'-2

1/2"

NOTES:· CONCRETE - 5000 PSI @ 28 DAYS,· PROVIDE H.S. 20 DESIGN LOADING· PROVIDE 12" MIN. COVER

6" PVC PIPE & FITTINGS

HEAVY DUTY FRAME AND COVERWITH "INTERCEPTOR" INSCRIPTIONDESIGNATED (NEENAH FOUNDRYNO. R-1792-FL OR EQUAL.)

FLOW LINE

6"

PRE-CAST CONCRETEGREASE INTERCEPTORKISTNER CONCRETE PRODUCTS OR APPROVED EQUAL BASIS OFDESIGN MODEL NO. GI-KSEP-1000T-1108ALL WATERTIGHT JOINTS

9"

6"14"

VARI

ES

CONCRETE RISER RINGS

6"

TANK RISER (TYP.) ADJUSTHEIGHT AS NEEDED

(4) 2" DIA.HOLES IN PIPING

ZABEL A-100 FILTEROR APPROVED EQUAL

12"PVC

TEEFITTING

PAVEMENT

EXTEND 4" C.I. VENT 3'-0"ABOVE AND PROVIDEDOWNTURNED ELBOW

4" INLET FROMKITCHEN

24" CLEAR OPENING INSPECTIONAND CLEANING MANHOLES

PROVIDE 4" CAST IRON VENT FROMGREASE INTERCEPTOR TOLOCATION ADJACENT TO AREAWAY-REFER TO KITCHEN PLAN.

B

C

A A

4" OUTLET TO SANITARYMANHOLE

FINISH GRADE ELEVATION+519.76'

INVERT ELEVATIONBELOW FINISHEDPAVEMENT. (515.26')

4" SANITARY SEWER OUTLET.INVERT ELEVATION BELOWFINISHED PAVEMENT. +515.11'

LOCATE ADJACENT TO EXTERIORBUILDING WALL. REFER TO PLANSFOR LOCATION.

1

P-502

5000 GALLON

GREASE INTERCEPTOR

SCALE: NOT TO SCALE

AD

P-0

38

PL

UM

BIN

G D

ET

AIL

S - A

DD

#

4

P-5

02

AutoCAD SHX Text
4
Page 18: 00 91 15 Addendum Number 05 Written...S.E.D. DWT # 26-16-00-01-7-999-019 June 30, 2017 1625 James Monroe High School 00 91 15-1 ADDENDUM NUMBER 5 SECTION 00 91 15 . ADDENDUM NUMBER

DN

LOADINGDOCK

2141 SF61

CORRIDORBC-4B

TOOLSTORAGE

829 SF57

GARAGE/ GROUNDS

101

AA

103

BB

X

Y

Z

102

F

E.8

5

10

5

10

2

7

7

11

24

29

33

32

52

G

31

53

8"

G GG

45

44

V

3"

48

41

23

114"

2"

6

6

2"

2"

VVV

47

4"

43

40

22

VV

V

4" FD-B

4" FD-B4" FCO

4"

67

G G

8"

GRADEELEVATION

519.76'

42

G-SA

N

SAN

G-SA

N

V

3"

21

W.H.

75

76

4"

77

77FD-B

4"

4"

4"

BY GENERALCONTRACTOR

BY GENERALCONTRACTOR

INV. 517.17'INV. 517.08'INV. 517.05'

COCOST

80

81

ST

SANST

SAN

82

RIM ELEVATION519.76'

1

P-100.3

PLUMBING BASEMENT FLOOR PLAN AREA C

SCALE: 1/8" = 1'-0"

RSMP - JAMES MONROE HIGH SCHOOL PHASE 2B

PROJECT:

www.cjsarchitects.com

Rochester, N.Y. 1460754 South Union Street

(585) 244.1294 fax.(585) 244.3780 tel.

DRAWING TITLE:

PROJECT NO: DRAWN BY: SCALE: ISSUE DATE: REVISION DATE:

DRAWING NUMBER:

DRAWING REFERENCE NUMBER(S):

Rochester City School District

James Monroe High School

164 Alexander Street

Rochrester, New York

SED #: 26-16-00-01-0-107-029

DWT #: 26-16-00-01-7-999-0191625 MPC AS NOTED 8/14/17 8/14/17

BASEMENT FLOOR PLAN AREA C - ADD #4

ADP-039

P-100.3

KEYED NOTES: #

41. 4" GREASE SEWER. INVERT ELEVATION 517.77 FT.42. 4" STORM SEWER. INVERT ELEVATION 517.77 FT.43. 4" GREASE SEWER. INVERT ELEVATION 517.67 FT.45. 4" GREASE SEWER. INVERT ELEVATION 517.47 FT.47. 4" SANITARY SEWER. INVERT ELEVATION 517.58 FT.80. 4" ST. DN.81. EXTEND SERVICE 5' FROM BUILDING. CONNECTION TO SITE UTILITY BY OTHERS.82. EXTEND SERVICE 5' FROM GREASE INTERCEPTOR. CONNECTION TO SITE UTILITY BY OTHERS.

AutoCAD SHX Text
4
AutoCAD SHX Text
4
Page 19: 00 91 15 Addendum Number 05 Written...S.E.D. DWT # 26-16-00-01-7-999-019 June 30, 2017 1625 James Monroe High School 00 91 15-1 ADDENDUM NUMBER 5 SECTION 00 91 15 . ADDENDUM NUMBER

RSMP Phase 2BJames Monroe High SchoolRFI LOG

Project Owner: RCSDConstruction Manager: The Pike Co.CJS Architects Project No. 1625

RFI # Date Received RFI Subject RFI Response 2017/08/14 Addendum No. 5

1 7/27/2017 MSH RFI

*

1. Exterior elevation drawings call out 3 types of modular brick (Type 1, Type 2 and Type 3). It appears that Type 1 is used for infills on existing building and Types 2 & 3 are used as field and accent brick respectively on the new additions. For the new additions what the mix of Type 3 accent brick in the filed brick Type 2 (ie: how many pcs / sf or percentage of face area, etc...)? Also on A-202 it talks about projects and recesses for the various bricks, is this typical in similar areas of the building? Can you please provide a section for each of these conditions?

Type 1 is also used at Ramp 1C-5, at the Weight Room A101 North Façade and at the Cafeteria 123D South Façade. There are approximately 6000 Brick Type-3 pieces. The projections depicted on A202 only occur on this facade (shown in plan on A101). Sections of this area were issued in Addendum No.1 and details of this area are in Addendum No.2. The Type 3 brick does project on the South Facade. There is a brick corbel detail with 1" projection at the window surround of the East Facade. Furthermore, the pilasters on the East facade project 3" past the window corbel surround.

*

2. Elevation drawing A-204 calls for a parge layer under existing stone watertable, where is this product specified?

Spec Section 03 74 10 Concrete Repairs. This parged layer should also be provided at the existing wall to remain that are being regraded (Existing Boys Gym/Fututer Café, and existing Boiler Room walls.

*

3. Elevation drawing A-204 and others shows exposed CIP concrete walls at stairs and ramps as well as other areas, is exposed concrete to receive a rubbed finish and if so what level of finish is required?

The finish is supposed to be a smoothe finish with recessed joints as indicated on the elevations.

*

4. Elevation drawing A-204 and others appears to show masonry rework around replaced windows in existing opening. Are we required to modify the opening and repair the masonry, if so please provide details?

No modifications required for window types 2, 2A, 12, 16, & 17. For Window Types 11, 11A and 18, the sill condition is modified due to new roofs and in these locations the bottom portion of the windows are infilled with masonry. The jambs and head of these latter types remain intact. See Addendum No. 5.

2 7/27/2017 MSH RFI

*

1. Can you provide top of wall elevations on the exterior elevation drawings so we can determine the actual height of the brick, or you will need to provide a section through each wall area so we can determine from that?

Top of wall elevations have been provided through wall sections. For the sloping façade, the top of wall elevation was provided in Addendum No.4 (ADA-017)

3 7/27/2017 MSH RFI

*1. Drawing A-101.4 Exterior Court #1 South Wall calls out section 1/A-501, is this the correct callout?

No. The correct callout is Similar 4/A501. 1/A500 is a wall section through the windows of the weight room. 1/A501 is a section through the Lobby South Façade.

*2. Can you please provide top of wall elevation for elevations 1&2/A-205?

The brick shelf begins at +6" above the courtyard elevation. Tothe top of the precast cornice from the brick shelf measures 23'-1 3/8".

4 7/27/2017 MSH RFI, RAMAR STEEL

*2/S200.2 calls out W8x60 beams this size does not exist and would seem to be a typo based on the adjacent framing. Please clarify beam profile to use.

The Correct size is Wx24.

5 7/28/2017 Gyptech RFI

*

1. On drawing A-101.1, First Level Floor Plan Area A. At Column line G3 and G4, the plans and structural drawings are showing I-beams. Yet the Column Schedule is calling for HSS 6x6x5/8, tube columns at G3, G4. Drawing S-102.4, Roof Framing shows an I-Beam at G2. Please Clarify.

Column G3, G4:W10X33. Column G2: HSS 6x6x5/8". Refer to Addendum No. 5 for revisions to S-102.4 and S-600.

6 8/4/2017 Gyptech RFI

*1. On Roof Framing Plan, S-102.1. At column line 2,G; 3,G, 4,G; the drawing shows I-Beams but the Column Schedule, S-600, is showing HSS 6x6x5/8 columns at those locations. Please Clarify.

Column G3, G4:W10X33. Column G2: HSS 6x6x5/8". Refer to Addendum No. 5 for revisions to S-102.4 and S-600.

7 8/7/2017 Gyptech RFI

*1. On Roof Framing Plan, S-102.5. There is a Structural section that calls out for 10/S404, 11/S404, 13/S404 but there is not a drawing S-404. Please Clarify. Refer to Addendum No.4

Page 20: 00 91 15 Addendum Number 05 Written...S.E.D. DWT # 26-16-00-01-7-999-019 June 30, 2017 1625 James Monroe High School 00 91 15-1 ADDENDUM NUMBER 5 SECTION 00 91 15 . ADDENDUM NUMBER

8 8/7/2017 SUN Precast Company, Inc.

*

1) On page #5, of the written portion on Addendum #3, it notes to omit specification section ‘034500 Precast Architectural Concrete’ in its entirety. Specification section ‘034500 Precast Architectural Concrete’ includes the Architectural Precast Concrete brise soleil units.

Addendum No. 4 clarified that this spec section shall remain in the bid documents.

*

2) Please reference plans details 1 & 2/ADA-010 from Addendum #3 and wall section 1/A-306, found in Addendum a) Will an exterior elevation be provided to show the outside of the new Security Room Addition? b) If not, is the precast base panel, found on wall section 1/A-306, running the full length of the new wall or is the panel located just below the new windows?

No elevation will be provided. The precast base panel does run the length of the elevation.

9 8/8/2017 FCG

*There is a security screen spec but I do not see notes calling it out on the drawings. Are there any security screens.

There are security screens in both an alternate and base bid. Refer to Addendum No. 5 (ADA-19, ADA-020).

10 8/8/2017 The Whitacre Engineering Co.

* I did not have the drawing A501 and A302.A501 was issued in Addendum No.1. A302 was issued in Addendum No.2.

*

For the ftg's on line 5.5 to 8.5 on drawing S100.4. The ftg width in sections 2/S302 and 3/S302 do not match what is shown on the plan. So could you please provide me the ftg width, reinforcing information and right sections?

Refer to Addendum No.5.

11 8/8/2017 SSMRC

*1. Are there any details of the ladders and steps called out on the roof plan in multiple locations?

There are no details provided. The types of ladders per note 15 and 16 are specified in 05 50 00 Metal Fabrications. The distances in height between adjacent roofs served by ladders are as follows: From Roof 5 to Roof 8 = Approx. 1'-6". From Roof 5 to Roof 6 = Approx. 12'-8". Roof 8 to Roof 1 = Approx. 15'-6". From Roof 8 to Roof 11 = Approx. 2'-0". From Roof 11 to Roof 10 = Approx. 2'-6". From the Existing Boiler Room to Roof 12 = Approx. 3'-6".

*2. Is there another spec for the metal wall panels? The drawings suggest a single skin panel but the only spec calls out a 42” wide 4” thick insulated wall panel.

This was clarified in Addendum No.4. We do not have an insulated metal panel system in this project.

*3. Is the thru wall flashing to be provided by us or the mason? With base bid all we need to achieve warranty is term bar.

At masonry parapets, counter flashing from the roof to the termination bar is by the Roofing subcontractor and through wall flashing into the masonry is by the Masonry subcontractor.Refer to the specifications.

12 8/9/2017 The Whitacre Engineering Co.* First, I did not have the drawing S305,S306. Refer to Addendum No. 4.* Second, in ADD2 S200.1, I can not find section 5,6,7,8/S304. Refer to Addendum No. 4.

*Also, I cannot find the reinforcing in Pier 33 shown S100.2 ADD2 or the thickened slab detail 9/S501.

Refer to Addendum No. 5 for revisions to S-300 and S-501 which include the details for P33 and 9/S-501.