0- risk managementx
TRANSCRIPT
-
8/9/2019 0- Risk Managementx
1/34
Copyright 2007, , All rights reserved
Risk Management and Control
-
8/9/2019 0- Risk Managementx
2/34
Copyright 2007, , All rights reserved
CAP Rock is a must!CAP Rock is a must!
2
-
8/9/2019 0- Risk Managementx
3/34
Copyright 2007, , All rights reserved
Injection OptionsInjection Options
20
6
5/
4
2
3
1
/
13 3/
20
6
5/
13 3/
4
20
6
5/
13 3/
4
. .
3
-
8/9/2019 0- Risk Managementx
4/34
Copyright 2007, , All rights reserved 4
Why Risk Management?
-
8/9/2019 0- Risk Managementx
5/34
Copyright 2007, , All rights reserved
Assurance ProcessAssurance Process
5
Geology and Data Evaluation
Geomechanics Model & Simulations
Pressure Tests & Model Validation
Operational Procedures
WellFacilitiesRisks
Data Acquisition & Evaluation
FEED
MONITOR
ING
-
8/9/2019 0- Risk Managementx
6/34
Copyright 2007, , All rights reserved
Assurance ProcessAssurance Process
6
Geology and Data Evaluation
Geomechanics Model & Simulations
WellFacilitiesRisks
FEED
-
8/9/2019 0- Risk Managementx
7/34
Copyright 2007, , All rights reserved
Jigsaw Puzzle
-
8/9/2019 0- Risk Managementx
8/34
Copyright 2007, , All rights reserved
Jigsaw Puzzle
-
8/9/2019 0- Risk Managementx
9/34
Copyright 2007, , All rights reserved
Geologic EvaluationGeologic Evaluation
9
-
8/9/2019 0- Risk Managementx
10/34
Copyright 2007, , All rights reserved
Geologic ModelGeologic Model
10
-
8/9/2019 0- Risk Managementx
11/34
Copyright 2007, , All rights reserved
Geologic ModelGeologic Model
Layer Zone Depth Stress GR Young's
Modulus
Poisson
Ratio K Cw Spurt Porosity
(m) (GPa) (GAPI) (GPa) (mD) (ft/min ) (gal/100ft )
1 M xxx 51.8 123.63 2515 0.32 0.10 0.00175 1.68 0.12
2 G- A xxx 41.3 50.89 5488 0.13 2043.55 0.00886 8.85 0.21
3 G- B xxx 42.4 51.46 6772 0.16 953.29 0.00832 8.30 0.18
4 G- C xxx 44.2 66.42 4380 0.17 569.78 0.00795 7.93 0.20
5 G- D xxx 44.7 129.69 5200 0.19 35.78 0.00596 5.93 0.13
6 N xxx 47.5 118.22 5176 0.25 0.05 0.00131 1.23 0.08
7 I xxx 45.3 79.13 5500 0.20 3.40 0.00428 4.23 0.13
8 R xxx 47.7 108.69 5470 0.23 0.02 0.00061 0.53 0.08
11
-
8/9/2019 0- Risk Managementx
12/34
Copyright 2007, , All rights reserved
Where to Inject?Where to Inject?
12
-
8/9/2019 0- Risk Managementx
13/34
Copyright 2007, , All rights reserved
Uncertainties and MitigationUncertainties and Mitigation
Containment Assurance: Stress ProfileSensibility Studies: GeoMechanical Model Parameters
Rate of Injection Design
Input Data for Probabilistic Analysis Well-to-well distance
Capacity
Pressure Increase due to Injection
Operational parameters and surface equipment recommendations
Wellbore Isolation
No Information on well!
13
-
8/9/2019 0- Risk Managementx
14/34
Copyright 2007, , All rights reserved
Sensitivity StudiesSensitivity Studies
Fracture Half-Length (ft)
FractureHeight(ft)
0 200 400 600
-100
0
100
200
300
400
500
3000
6000
9000
12,000
15,000 m3
Shale's frac pressure is 100 psi larger
Fracture Half-Length (ft)
FractureHeight(ft)
0 100 200 300 400 500 600 700
0
100
200
300
400
500
600
3000
6000
9000
12,000
15,000 m3
Shale's frac propagation pressure is 100 psi less.
Fracture Half-Length (ft)
Fracture
Heig
ht(ft)
0 100 200 300 400 500 600
-200
-100
0
100
200
300
3000 m3 60009000
12,000
15,000
Shale's frac propagation pressure is 200 psi larger.
14
-
8/9/2019 0- Risk Managementx
15/34
Copyright 2007, , All rights reserved
Probabilistic AnalysisProbabilistic Analysis
FractureFracture Length & Well SpacingLength & Well Spacing
15
-
8/9/2019 0- Risk Managementx
16/34
Copyright 2007, , All rights reserved
Probabilistic AnalysisProbabilistic Analysis Fracture DimensionsFracture Dimensions
16
-
8/9/2019 0- Risk Managementx
17/34
Copyright 2007, , All rights reserved
Assurance Process :Assurance Process : Continue ValidationContinue Validation
17
Pressure Tests & Model Validation
Operational Procedures
Data Acquisition & Evaluation MON
ITORING
-
8/9/2019 0- Risk Managementx
18/34
Copyright 2007, , All rights reserved
Risk Control Assurance
Comprehensive risk assessment provides the necessary information to reduce risk and mitigate the impact
to the Environment.
Commitment & Leadership
Risk Management
Design and Planning
Implementation and Monitoring
Assessment and Continuous Improvement
Improvement
Control
Corrections
Risk Control Assurance
-
8/9/2019 0- Risk Managementx
19/34
Copyright 2007, , All rights reserved
Actual Domain?
660
680
700
720
740
760
780
800
0 50 100 150 200 250 300 350
Half-Length (m)
FractureHeight(m)
100
200
400
800
2,000
10,000
50,000
150,000
300,000
A
B
19
-
8/9/2019 0- Risk Managementx
20/34
Copyright 2007, , All rights reserved
Jigsaw Puzzle
-
8/9/2019 0- Risk Managementx
21/34
Copyright 2007, , All rights reserved
Adequate Risk Management
Minimizes surprises
21
-
8/9/2019 0- Risk Managementx
22/34
Copyright 2007, , All rights reserved
Multiple Controls
-
8/9/2019 0- Risk Managementx
23/34
Copyright 2007, , All rights reserved
INTERDEPENDENT TEAMS
INTERDEPENDENT TEAMS
-
8/9/2019 0- Risk Managementx
24/34
Copyright 2007, , All rights reserved
Jigsaw Puzzle
-
8/9/2019 0- Risk Managementx
25/34
Copyright 2007, , All rights reserved
PowerSTIM Solution
-
8/9/2019 0- Risk Managementx
26/34
Copyright 2007, , All rights reserved
PowerSTIM Team
Multi-disciplined members with Regional focus
drawing on our Worldwide Technical expertise
-
8/9/2019 0- Risk Managementx
27/34
Copyright 2007, , All rights reserved
PowerSTIM Deliverables
Phase 1 Basin- and reservoir-specific interpretation and
completionmodels developed
Technical solutions and new completiontechniques developed and documented
Brief report, including go-forward plan, delivered
-
8/9/2019 0- Risk Managementx
28/34
Copyright 2007, , All rights reserved
PowerSTIM Deliverables
Phase 2 Delivering solutions in time,every time
for ongoing projects
Based on new interpretation and completionmodels from Phase 1
Models and solutions applicable to futurewell developmentand workover candidates
Deliverable, including reservoircharacterization, completion design,execution, full evaluation with go-forward
plan
-
8/9/2019 0- Risk Managementx
29/34
Copyright 2007, , All rights reserved
PowerSTIM - a performance
driven service
Reservoir
Characterization
-
8/9/2019 0- Risk Managementx
30/34
Copyright 2007, , All rights reserved
Completion
Design
PowerSTIM - a performance
driven service
-
8/9/2019 0- Risk Managementx
31/34
Copyright 2007, , All rights reserved
PowerSTIM - a performance
driven service
Execute
-
8/9/2019 0- Risk Managementx
32/34
Copyright 2007, , All rights reserved
PowerSTIM - a performance
driven service
Evaluate
-
8/9/2019 0- Risk Managementx
33/34
Copyright 2007, , All rights reserved
PowerSTIM - a performance
driven service
Summary
-
8/9/2019 0- Risk Managementx
34/34
Copyright 2007, , All rights reserved
In-Time
Every Time