0 hazus modernization, phase ii ▸ currently only funded at $1.5m. current estimated requirements...

7
1 HAZUS Modernization, Phase II Currently only funded at $1.5M. Current estimated requirements are over $6M 3 tiers of funding suggested. Tier 1: Fix half of the known defects Defect List: fix the bugs – High Priority for partial (not comprehensive) Don’t fix old code, rather address defects in batched based on enhancements, leveraging work done while enhancing HAZUS and addressing critical defects Try to align with enhancements for Phase II

Upload: gary-hunter

Post on 27-Dec-2015

215 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 0 HAZUS Modernization, Phase II ▸ Currently only funded at $1.5M. Current estimated requirements are over $6M ▸ 3 tiers of funding suggested. Tier 1: ▸

1

HAZUS Modernization, Phase II

▸ Currently only funded at $1.5M. Current estimated requirements are over $6M

▸ 3 tiers of funding suggested. Tier 1:

▸ Fix half of the known defects • Defect List:   fix the bugs – High Priority for partial (not comprehensive) • Don’t fix old code, rather address defects in batched based on

enhancements, leveraging work done while enhancing HAZUS and addressing critical defects

• Try to align with enhancements for Phase II

Page 2: 0 HAZUS Modernization, Phase II ▸ Currently only funded at $1.5M. Current estimated requirements are over $6M ▸ 3 tiers of funding suggested. Tier 1: ▸

2

HAZUS Phase II Tier 1, Cont.

▸ Reduce breaks due to ESRI ArcGIS releases• Solution includes a number of steps to revise and reconfigure HAZUS

code to make revisions to ArcGIS less costly to FEMA and less of a hassle for the user.

▸ Update outdated VB6 code in Shell and EQ model• The VB6 code was replaced in the rest of HAZUS in Phase I.  This

finishes the job, replacing VB6 with C#/.net and replacing ArcObjects calls with stored procedures using SQL Server Spatial SQL

• While the EQ model is being updated, it makes sense to incorporate a recommended update of better integration with the EQ hazard provided by the USGS Shakemap.  This will provide a more “Hurrevac” like experience for the EQ module.

Page 3: 0 HAZUS Modernization, Phase II ▸ Currently only funded at $1.5M. Current estimated requirements are over $6M ▸ 3 tiers of funding suggested. Tier 1: ▸

3

HAZUS Phase II Tier 1, Cont.

▸ Jet Engine Migration• Move away from 32 bit Microsoft Jet engine and implement the 32/63 bit

Microsoft Access database Engine (ACE)

▸ Migrate from Registry settings to use of a Configuration file. • This make installs easier, (i.e. no admin privileges needed)• Store the application information in Configuration file instead of machine’s

Windows Registry

▸ Training • Nine courses need to be updated.

Page 4: 0 HAZUS Modernization, Phase II ▸ Currently only funded at $1.5M. Current estimated requirements are over $6M ▸ 3 tiers of funding suggested. Tier 1: ▸

4

HAZUS Phase II Tier 2

▸ HAZUS online –• Iterative approach• It could be more supportive of a response environment due to faster

speeds and easier use

▸ User Designed Facilities improvements• Modify the Hazus Flood AAL GUI from command to a submenu that now

includes GBS and UDF commands• Adapt the Hazus Flood GBS AAL analysis to work with UDF point data • Modify the Hazus Flood Result GUI menu to include UDF AAL results

command• Modify the Hazus Flood Results / Report dialog to include UDF AAL report

Page 5: 0 HAZUS Modernization, Phase II ▸ Currently only funded at $1.5M. Current estimated requirements are over $6M ▸ 3 tiers of funding suggested. Tier 1: ▸

5

HAZUS Phase II Tier 2, Cont.

▸ Better HAZUS reporting/dashboard• Use open source PDF C# libraries to create templates for PDFs to

replace 100+ reports currently in Crystal Reports• Use combination of ESRI code, SQL stored procedures, and open source

PDF templates to incorporate map graphics and tabular, similar to parcel PDFs

▸ SQL Server update

▸ Web based inventory management system (CDMS)

Page 6: 0 HAZUS Modernization, Phase II ▸ Currently only funded at $1.5M. Current estimated requirements are over $6M ▸ 3 tiers of funding suggested. Tier 1: ▸

6

Tier 3, HAZUS Phase II

▸ Tsunami Model

▸ “What-if?” scenarios• Develop capability for What if scenario.  Start with Freeboard and Sea

Level rise (using authoritative partner data).  Look to hurricane model• Improve ease of import/use of external depth grids.

Page 7: 0 HAZUS Modernization, Phase II ▸ Currently only funded at $1.5M. Current estimated requirements are over $6M ▸ 3 tiers of funding suggested. Tier 1: ▸

7

Questions?