“ unusual interventions ” jenna robertson icota canada roundtable october 14, 2010
TRANSCRIPT
““Unusual InterventionsUnusual Interventions””
Jenna Robertson
ICOTA Canada Roundtable October 14, 2010
OutlineOutline
Introduction Introduction The use of “Unusual Intervention” The use of “Unusual Intervention”
methods to resolve complex well bore methods to resolve complex well bore scenarios.scenarios. Abrasive CuttingAbrasive Cutting Abrasive PerforatingAbrasive Perforating Abrasive SlottingAbrasive Slotting
Case HistoriesCase Histories BHA Design used to execute these BHA Design used to execute these
operationsoperations Abrasive Job Requirements & ProceduresAbrasive Job Requirements & Procedures
Abrasive CuttingAbrasive Cutting Special Port Positioning for directing an abrasive Special Port Positioning for directing an abrasive
fluid jet stream into the ID of the pipe to be fluid jet stream into the ID of the pipe to be severed.severed.
Abrasive fluids combined with a down hole Abrasive fluids combined with a down hole motor create a complete cut of the tubular. motor create a complete cut of the tubular.
The abrasive fluids penetrate and severe the The abrasive fluids penetrate and severe the tubing where the jet stream makes contact.tubing where the jet stream makes contact.
Results in a clean cut without any flaring of the Results in a clean cut without any flaring of the tubular.tubular.
Abrasive CuttingAbrasive Cutting
Abrasive Cutting Case Abrasive Cutting Case HistoriesHistories
Coiled Tubing stuck in holeCoiled Tubing stuck in hole Cut at surface, rigged in 1-1/2” CTCut at surface, rigged in 1-1/2” CT Abrasively Cut 2-3/8” CT down hole – removed Abrasively Cut 2-3/8” CT down hole – removed
string from well.string from well.
Fish Hanging String w/ Internal Capillary Fish Hanging String w/ Internal Capillary LinesLines Utilize a modified Flat Catch Overshot – Utilize a modified Flat Catch Overshot –
capable of cutting CTcapable of cutting CT 2” CT has been tested in OKC, currently working on 2” CT has been tested in OKC, currently working on
a test of 1-1/2” CT with 2 x 3/8” internal capillary a test of 1-1/2” CT with 2 x 3/8” internal capillary lines.lines.
Cut Hanging StringCut Hanging String Currently designing an Abrasive Cutting assembly to cut Currently designing an Abrasive Cutting assembly to cut
a 1-1/2” CT hanging string 10-12” below tubing hangera 1-1/2” CT hanging string 10-12” below tubing hanger
Cut 4-1/2” Non-Magnetic Drill CollarCut 4-1/2” Non-Magnetic Drill Collar Passed thru 50.8mm ID JarPassed thru 50.8mm ID Jar Utilizing 1-1/2” CT w/ 1.95” Cutting HeadUtilizing 1-1/2” CT w/ 1.95” Cutting Head Complete the cut in 60min.Complete the cut in 60min.
Abrasive Cutting Case Abrasive Cutting Case HistoriesHistories
Abrasive PerforatingAbrasive Perforating The Abrasive Perforating System, The Abrasive Perforating System,
allows multiple perforations to be allows multiple perforations to be made in the same trip in the hole.made in the same trip in the hole.
Custom tool designs available (ie: Custom tool designs available (ie: phasing, length, nozzle size)phasing, length, nozzle size)
Alternative to conventional methods:Alternative to conventional methods: Tubing Conveyed Perforating (TCP)Tubing Conveyed Perforating (TCP) Wireline deployed perforatingWireline deployed perforating Mechanical Tubing CuttersMechanical Tubing Cutters Chemical & Explosive Tubing CuttersChemical & Explosive Tubing Cutters
Successful in perforating drill collars, Successful in perforating drill collars, drill pipe and multiple casing strings drill pipe and multiple casing strings in a single trip.in a single trip.
Abrasive PerforatingAbrasive Perforating
Motor HeadAssembly
OrientingSub
AbrasivePerforator
Swivel
Wash Nozzle
Abrasive PerforatingAbrasive Perforating
Abrasive PerforatingAbrasive Perforating
Perforate thru 114.3mm Casing Perforate thru 114.3mm Casing encased in shale rock and encased in shale rock and cementcement
27” + Penetration27” + Penetration
Abrasive Perforating TestAbrasive Perforating Test
Abrasive Perforating Case Abrasive Perforating Case HistoriesHistories
Casing LeaksCasing Leaks Multiple wells with casing leaks that Multiple wells with casing leaks that
need to be squeezed offneed to be squeezed off Dual horizontal cuts with a motor Dual horizontal cuts with a motor
followed by perforating multiple followed by perforating multiple setting between the cuts, utilizing a setting between the cuts, utilizing a piston perforator.piston perforator.
Entire procedure completed in a Entire procedure completed in a single tripsingle trip
Abrasive SlottingAbrasive Slotting The Abrasive Slotting Assembly utilizes a planar The Abrasive Slotting Assembly utilizes a planar
perforator perforator The # of jets can be altered, allowing a variety in phasing. The # of jets can be altered, allowing a variety in phasing.
Slotting can be completed in multiple stages and Slotting can be completed in multiple stages and
various lengths, simply by adjusting your work various lengths, simply by adjusting your work string in the hole.string in the hole.
The planar perforator can be combined in a BHA The planar perforator can be combined in a BHA with a cutting head to form “Coupon” cut-outs with a cutting head to form “Coupon” cut-outs within the tubular of interestwithin the tubular of interest Beneficial for damaged casing, testing purposesBeneficial for damaged casing, testing purposes
Abrasive SlottingAbrasive Slotting
Planar Perforator
Abrasive Slotting Case Abrasive Slotting Case HistoriesHistories Uranium Mine flooded with waterUranium Mine flooded with water
Relief wells were drilled and cement squeeze Relief wells were drilled and cement squeeze performedperformed
Subsequent water influx still present – drill 4 wells Subsequent water influx still present – drill 4 wells and install down hole pumps to remove excess waterand install down hole pumps to remove excess water
Abrasively Slot casing to accommodate extra volume Abrasively Slot casing to accommodate extra volume of water required to operate pumps.of water required to operate pumps.
Parted Casing in steam injection wellParted Casing in steam injection well Perform 6 – 48” Vertical cuts between upper and Perform 6 – 48” Vertical cuts between upper and
lower radial cuts.lower radial cuts. Create “coupons” that will fall in and be fished out Create “coupons” that will fall in and be fished out
later.later. Modified an Abrasive Cutting Head to accommodate the Modified an Abrasive Cutting Head to accommodate the
High Tech Rare Earth Magnet – resulting in the “coupons” High Tech Rare Earth Magnet – resulting in the “coupons” being retrieved on the same trip.being retrieved on the same trip.
Multilateral Jetting w/ Slotted Multilateral Jetting w/ Slotted WindowsWindows
Generate 8 x 18” vertical slotsGenerate 8 x 18” vertical slots Shift piston & Reposition tool Shift piston & Reposition tool stringstring Perform 4 horizontal cuts Perform 4 horizontal cuts (upper and lower) between the (upper and lower) between the slottingslotting
Create 4 x 2.50” ‘windows’ w/ casing Create 4 x 2.50” ‘windows’ w/ casing between between
Maintaining casing integrityMaintaining casing integrity Install a whip stock through the windowInstall a whip stock through the window
31.75mm CT out to high pressure jet the formation31.75mm CT out to high pressure jet the formation
Abrasive Slotting Case Abrasive Slotting Case HistoriesHistories
Abrasive SlottingAbrasive Slotting
Resulting in:Resulting in: 4 windows4 windows
2.5” Wide2.5” Wide Casing Integrity Casing Integrity
IntactIntact Whipstock CapableWhipstock Capable
Abrasive Requirements & Abrasive Requirements & ProcedureProcedure
Coiled Tubing or Threaded PipeCoiled Tubing or Threaded Pipe Fluid Pump Fluid Pump
Minimum Pump Rate 80L/min per nozzleMinimum Pump Rate 80L/min per nozzle 100 Mesh Sand Slurry 100 Mesh Sand Slurry
Mixed 100kg/mMixed 100kg/m33 – 120kg/m – 120kg/m33
ID / Weight of tubular will determine cutting timeID / Weight of tubular will determine cutting time # Nozzles per cutting tool – increase flow rate# Nozzles per cutting tool – increase flow rate Continue pumping sand slurry until cut is complete.Continue pumping sand slurry until cut is complete.
*** Each job scenario is different, we use the above as *** Each job scenario is different, we use the above as guidelines***guidelines***
QuestionsQuestions??