COAL TERMINAL
7
8
9
10
11
12
13
14
15
16 Terminal “Yug – 2” 16
2006 - Construction of an automobile
and railway ferry complex with design
capacity of 2.9 million tons per year is completed.
2008 - Commissioning of the first phase
of the Multi-Purpose Terminal YUG-2 .
The first cargo shipment is received.
2007 -– The automobile and railway
ferry complex is commissioned for
use.
2002 - Foundation of the Ust-
Luga Commercial Sea Port
2010 -– The first ocean vessel
(automobile carrier) enters the
terminal.
2012 - Opening of regular ferry service on
the Sassnitz - Ust-Luga route, the first
direct route between Russia and Germany
with the capability of transporting trains.
2011 - "DFDS" open regular ferry
service from Ust-Luga to-
Germany.
2010 – Handling of general
cargoes started.
June 16, 2015 –
Official commissioning
of Smart Bulk Terminal intended
for fertilizer handling under a joint
project between the Ust-Luga
Commercial Sea Port, Phosagro
and Ultramar.
The design capacity of the terminal
is 1,5 million tons per year
and can be increased to 3 million
tons.
17
18
Total area of 89 hectares
Max. depth 12,8 m
7 deep water berths of total length 1 500 m
3 berths for ships with stern ramp
Adjustable ramp for ro-ro cargoes up to 80 tons
Concrete slip for heavy trailers
Railway ramp load up to 220 tn
Covered warehouse
Federal Customs Service (Kingisepp subsidiary)
Full Wi-Fi coverage
Video control 24 hours / day
19
Mobile Cranes LIEBHERR:
124 tn. (LHM 420) – 1 units
104 tn. (LHM 320S) - 2 units
80 tn. (LHM 280) - 1 units
Reachstacker Kalmar - 5 units
Rolltrailers -15 units
Tugmasters -10 units
Forklifts:
1,8 tn. – 28 tn.- 23 units
20
GLA – 4000 sq. m.
Located at the customs zone area
8 loading gates 5,65 m. wide, 6 m. high
Warehouse is equipped with rolling gates
with automatic lifting
Equipped with vehicle inspection pit
21
Storage area for general cargo - about
20 Ha,
possibility to increase up to 100 Ha
Dangerous goods handling and
storage
Covered storage options
All types of transshipments (vehicles /
railcar /
vessels through warehouse or
directly)
22
Containerships APL Finnlines DFDS
Storage area - 6.5 hectares = more than 4,000TEU
Containers of all ISO types including HC,PW, IMO,
reefer-containers, tank containers, open top
and flat rack containers
Stuffing/re-stuffing operations with containers
Forklift trucks are equipped with low mast to enable
it to be driven into containers
23
Terminal is specialized on finished vehicles handling
Discharging of all types of Ro-Ro vessels
Terminal was designed according to the operation quality rules
approved by major original equipment manufactures and shipping lines
Railway infrastructure inside the terminal
The whole territory is under customs control (Excise customs office is
located at the terminal)
Storage capacity for vehicles – above 18 200 units simultaneously
Covered with asphalt and concrete, regularly cleaned
Surrounded by strong concrete perimeter fence and protected
effectively 24 hours, 7 days a week
Sufficient lighting, full video control and closed-circuit
television 24 hours a day
ULS Ferry DFDS Finnlines UECC KESS HÖEGH AUTOLINERS WWL
24
Russian border control
Federal Customs Service (Kingisepp subsidiary)
Excise Customs Service
Rospotrebnadzor (Federal Service for Surveillance
on Consumer rights protection and Human wellbeing )
Rosselkhoznadzor (Federal Service for Veterinary and
Phytosanitary Surveillance)
Transport police department
25
Acquisition and
assembly of two
gantry cranes.
Extension of the
areas with hard
surface.
Power supply of
LIEBHERR cranes.
2015 – 2016 –
design and construction of Stage 3 and
Stage 4 of the complex that includes non-
public railway track totaling 4,653 km.
Reconstruction of
the rear area of
berths 22 and 23.
Surface
reinforcement at
the back of the
terminal
In the short-term outlook, the focus is
on extension of railway tracks at the
terminal
Ports of the Baltic Sea service European Russia where railways are the main transportation artery. We are planning to construct a new rail transshipping complex in the port in order to strengthen our competitive positions in cargo turnover among market participants. The aim is to increase terminal capacity in loading/unloading of up to 400 wagons per day.