© tilitonse 2014 project results by francis matita
TRANSCRIPT
© Tilitonse 2014
Project Results
ByFRANCIS MATITA
© Tilitonse 2014
Presentation Layout
• Tilitonse Approach• Expectations at concept level.
© Tilitonse 2014
M&E ApproachTilitonse Approach places importance on Results and this requires projects to do the following:• Be clear on Results: What is it that the proposed project
intends to achieve: relate to long term and short results of Tilitonse.
• Propose realistic results and means to achieving the results: Changes or solutions that are workable and achievable within the given time, resources and the expected quality.
• Demonstrate a clear and coherent connection and interrelationship moving from the lower level results to higher levels and between the results.
© Tilitonse 2014
Expected Results from the concepts
• Long term: Changes in the behavior, policy, practice and service delivery of the "supply side" i.e. government.
• Intermediary term: Voice- changes in the behavior of Citizens, grantees, CSOs and other intermediary organizations who are facilitating engagement in governance.
© Tilitonse 2014
Tilitonse Short terms Results
• Output One: Change in the capacity of the CBO as an organization to assist local people claim their rights.
• Output Two: Citizens access information on their rights: through activities conducted by the CBO-sensitization, workshops, media, website etc.
• Output Three: CBO undertaking initiatives to monitor implementation of programmes (LDF, CDF) and budget commitments made government (budgets for councils and districts).
• Output Four: Dialogue between citizens and CBOs, on one hand, and the government on the other. in influencing policies, strategies at local and national levels.
© Tilitonse 2014
• Propose process and tools that will be used to monitor the results.
• Risk- demonstrate having taken into consideration internal and external factors will affect the project.
M&E Expectations
© Tilitonse 2014
Thank you very much!