the assembly and erection of the three freely designed canopies was executed from september until...

3

Upload: others

Post on 18-Mar-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: The assembly and erection of the three freely designed canopies was executed from September until December 2012 by a team consisting of six German assemblers, who were supported
Page 2: The assembly and erection of the three freely designed canopies was executed from September until December 2012 by a team consisting of six German assemblers, who were supported
Page 3: The assembly and erection of the three freely designed canopies was executed from September until December 2012 by a team consisting of six German assemblers, who were supported