· social monitoring report this report has been submitted to adb by the project management unit...
TRANSCRIPT
Social Monitoring Report
This report has been submitted to ADB by the Project Management Unit (OIIAWMIP), Bhubaneswar and is made publicly available in accordance with ADB’s Public Communications Policy (2011). It does not necessarily reflect the views of ADB.
This social monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.
Project Number: 38411-043 July 2017 Period: July 2016 – December 2016
IND: Orissa Integrated Irrigated Agriculture and Water Management Investment Program (OIIAWMIP)- Project 2 Subproject: Machhgaon
Submitted by:
Project Management Unit (OIIAWMIP), Bhubaneswar
i
Department of Water Resources (DoWR)
Project Management Unit (PMU)
Orissa Integrated Irrigated Agriculture and
Water Management Investment Programme (OIIAWMIP)
(Loan No. 3265)
Internal Monitoring Report on Implementation of Resettlement Plan of
Machhagaon Subproject
July 2016 to December 2016
assisted by
Institutional Strengthening and Project Management Consultants (ISPMC)
Hydrosult, Division of SNC- Lavalin Inc.
in association with
Sutra Consulting Pvt. Ltd., SBH Consultants Pvt. Ltd and N.K. Buildcon Pvt. Ltd
ii
TABLE OF CONTENTS
LIST OF TABLES ...........................................................................................................................ii LIST OF FIGURES: ........................................................................................................................ii LIST OF ANNEXURE: .................................................................................................................ii
Executive Summary ....................................................................................................................... 4
Chapter-1: Introduction ................................................................................................................. 5
1.1 Project Background and Description ................................................................................. 5
1.2 Objectives of the Report .................................................................................................... 5
1.3 Purpose of the Report ........................................................................................................ 6
1.4 Social Safeguard Categorization ........................................................................................ 6
2.1 Impact on Land, Structure and Livelihood ................................................................... 7
2.2 Impact on Common Property Resources (CPRs) .......................................................... 8
Chapter 3: Compensation & Assistance ................................................................................... 13
3.1 Status of Missing APs and Structures not found during the CSO survey................. 15
3.2 Compensation, relocation or protection of CPRs ........................................................ 15
Chapter 4: Consultations and Disclosures ............................................................................... 17
Chapter 5: Grievances Redress Mechanism ............................................................................ 20
Chapter 6: Institutional Arrangements ..................................................................................... 22
Chapter 7: Compliance of Resettlement Framework, 2015 through CAP ........................ 24
Chapter 8: Conclusion and Recommendations ....................................................................... 25
LIST OF TABLES
Table 1: Package wise Coverage details of APs ............................................................. 8
Table 2: Type of Common Property Resources (CPRs) ................................................. 9
Table 3 : Summary of disbursement of Compensation and Other Allowances ............ 14
Table 4: Disbursements made by Type of Assistance to APs (31 December 2016) .... 15
Table 5: Number of Consultations Organized with APs ................................................ 19
Table 6: Package-wise number and type of Grievances ............................................... 21
Table 7: Component wise Approved and Revised Estimate ......................................... 24
Table 8: Assessment of social safeguards issues and recommendation ..................... 25 LIST OF FIGURES:
Figure 1: Grievance Redress Process ........................................................................... 21
Figure 2: Organizational Chart for Managing the Social Safeguard Issues .................. 23
LIST OF ANNEXURE:
Annexure 1: Summary Status of Disbursement paid to APs-31 December 2016 ........ 26
Annexure 2: Status of Civil Works Contract in Machhagaon Canal Division .............. 120
Internal Monitoring Report-Machhagaon Subproject (Dec 2016)
RS-ISPMC 3
ABBREVIATIONS
ADB- Asian Development Bank AHHs- Affected Households AUs- Affected Units BPL- Below Poverty Line BSR- Basic Schedule of Rates CPSs- Common Property Structures CSO- Civil Society Organisation DC- District Collector DOWR- Department of Water Resources EA- Executing Agency EES- Encroachment Enumeration Survey FGD- Focus Group Discussion GOI- Government of India GRC- Grievance Redress Committee ha- Hectare HH- Household IA- Implementing Agency IMEA- Independent Monitoring and Evaluation Agency NGO- Non-Government Organizations NIA- Net Irrigated Area NRRP- National Rehabilitation and Resettlement Policy, OBC- Other Backward Caste OIIAWMIP- Orissa Integrated Irrigated Agriculture and Water Management Investment Program ORRP- Orissa Resettlement and Rehabilitation Policy OWRCP- Orissa Water Resources Consolidation Project PD- Project Director PIM- Participatory Irrigation Management PMU- Project Management Unit P-P- Public Property PRO- Project Resettlement Officer RF- Resettlement Framework RP- Resettlement Plan RO- Resettlement Officer RS- Resettlement Specialist SC- Scheduled Caste SGO- State Government of Orissa SIA- Social Impact Assessment SIO- Subproject Implementation Office SMR- Social Monitoring Report SPS- Safeguard Policy Statement SRO- Subproject Resettlement Officer ST- Scheduled Tribe ToR- Terms of Reference WB- World Bank WUA- Water Users Association
Internal Monitoring Report-Machhagaon Subproject (Dec 2016)
RS-ISPMC 4
Executive Summary
1. The Government of Orissa (GoO), with the financial assistance from Asian
Development Bank (ADB) in form of a Multitranche Financing Facility (MFF),
decided to strengthen lending approach over a span of eight years, aims to
reduce rural poverty levels in the State by improving agriculture sector
productivity and enhancing rural incomes. It is estimated that the OIIAWMIP
will cover to enhance productivity and sustainability of existing 6 major and
9 medium irrigation schemes covering 190,000 ha (NIA), and about 1,400 minor
lift irrigation schemes covering up to 30,000 ha with participatory irrigation
management (PIM) in four river basin i.e. Subarnarekha, Burhabalanga,
Baitarani and Brahmani basins and part of the Mahanadi delta. Most of the
subproject works will be limited to rehabilitation and improvement of the existing
irrigation system and will not involve acquisition of private land.
2. The Executing Agency (EA) for the Investment Program is the Project
Management Unit (PMU) under the Water Resource Department (DoWR),
Government of Orissa. The Project Management Unit (PMU), headed by a
Project Director, is implementing Resettlement Plans (RP) through the
Executive Engineers (EEs) of the subproject.
3. Survey data revealed that out of 811 Affected Persons (APs), 720 APs accepted
the notice and signed the ID card. Total 89 CPRs enumerated covering all
packages in Machhagaon Canal Division. A total of 91 APs could not be
located/ traced during RP implementation.
4. Out of 720 APs, 718 APs have received their assistance and compensation up
to reporting period while payment for 2 APs are under “no document proof”.
5. Implementation of RP has undertaken in Machhagaon Canal Division mainly
mobilization, motivation, participation and community awareness. Life Academy
of Vocational Studies (LAVS) has been engaged as CSO to implement the
social safeguard requirements and to assist the SIO (EE) in implementing RPs.
6. A grievance redress mechanism has been established in the project and District Level Committee (DLC) set up to monitor project implementation in the subproject. During this reporting period of past 6 months, out of total 67 grievances were received 62 grievances resolved. Rest 2 APs are in the process of submitting legal documents for obtaining compensation and 2 APs demanding for alternate site for resettlement. These grievances were resolved by the EE in a congenial, transparent and impartial manner, as and when received. The grievances submitted to the Sub collector for consideration and decision will be communicated to the APs shortly during the course of implementation. 7. This report covers information/date of the RP implementation up to 31
December 2016.
Internal Monitoring Report-Machhagaon Subproject (Dec 2016)
RS-ISPMC 5
Chapter-1: Introduction
1.1 Project Background and Description 8. The Orissa Integrated Irrigated Agriculture and Water Management Investment
Program (OIIAWMIP), being funded by the Asian Development Bank (ADB)
through the multi-tranche financing facility (MFF) lending approach over a span
of eight years, aims to reduce rural poverty levels in the State by improving
agriculture sector productivity and enhancing rural incomes.
9. It is estimated that the OIIAWMIP will cover to enhance productivity and
sustainability of existing 6 major and 9 medium irrigation schemes covering
190,000 ha (NIA), and about 1,400 minor lift irrigation schemes covering
up to 30,000 ha with participatory irrigation management (PIM) in four river
basin i.e. Subarnarekha, Burhabalanga, Baitarani and Brahmani basins and
part of the Mahanadi delta. Most of the subproject works will be limited to
rehabilitation and improvement of the existing irrigation system and will not
involve acquisition of private land.
10. As all infrastructure works will be implemented within the right-of-way (RoW) of
the canals (and drains), involuntary resettlement impacts will be limited to
losses that may be incurred by squatters. Encroachment in the right-of-way
(RoW) of canal was assessed using field inspections along the main canal,
and discussions with selected affected persons (APs) and DOWR field
staffs. Existing structures along the main canal included huts, shops, sheds
built within the RoW of the main canal.
11. The renovation work under the Machhagaon subproject involves strengthening
and widening of the existing embankment of almost 239.82 kms as well as bank
protection work and aims at addressing the key issues and challenges faced by
the people of the region in terms of loss of life and property caused by the
annual flooding. The total distance under Machhagaon sub-project covering a
distance of 239 km administered by 4 sub-divisions will be strengthened to
provide irrigation to 34,870 ha benefitting 342 villages.
12. The project would entail loss of assets and livelihoods of people settled (all non
titleholders) on either side of the existing embankment. The asset loss to these
affected households is mainly in terms of loss of residential, commercial as
well as Common Property Resources (CPRs). There is no agriculture land
that would be affected by the project.
1.2 Objectives of the Report
13. Main objectives of internal monitoring report is to assess the disbursement
status of compensation and resettlement implementation are: (i) Verifying
Internal Monitoring Report-Machhagaon Subproject (Dec 2016)
RS-ISPMC 6
internal monitoring results; (ii) Checking implementation of actual
compensation and resettlement to examine whether the project RP policies are
complied with or not; (iii) Evaluating efficiency, impacts and stability of
resettlement activities; (iv) Recommending necessary adjustments for
implementation of resettlement for the successive components of the Project.
1.3 Purpose of the Report 14. The purpose of Internal Monitoring Report is to analyse periodically over the
total implementation period of the project to comply with the approved
Involuntary Resettlement (IR) Plan. PMU has the responsibility to oversee the
implementation and monitoring of social safeguards issues of the subproject. As
usual, this report covered resettlement and social safeguard monitoring results
to comply with the spirit of ADB policy to ‘enhance stakeholders trust’ in and
ability to engage with ADB, and thereby increase the development impact (of
projects) in which disclosure of safeguard monitoring is a prominent aspect.
This report covers Social Monitoring, addressing all the issues related with
social safeguards, with reference to the progress achieved and current status of
reporting period.
1.4 Social Safeguard Categorization 15. ADB's classification system: Prior to civil works implementation, all the
subprojects selected for construction or developments are to be screened and
classified using ADB's classification system as follows:
� Category A: Subprojects proposed for construction or development, will
fall under this category, if, it caused a significant involuntary resettlement
impacts with a physical displacement of 200 or more persons from their
residences, or 200 or more persons lose 10% or more of their productive
or income generating assets, or more persons or 200 or more persons
experience a combination of both.
� Category B: Any proposed subproject that includes involuntary
resettlement impacts but are not deemed significant considering loss of
shelter/houses or productive or income generating assets will be
considered for category B.
� Category C: A proposed subproject that has no involuntary resettlement
impact.
16. All the sub projects come under “Category A” based on the definition given in
the ADB’s Safeguard Policy Statement, 2009 (SPS) respectively. It is
confirmed that there are no Indigenous People (IP), no private land acquisition
issues noticed during the survey. The project involves significant displacement
and loss of livelihood, for which they would be compensated as specified in the
approved Resettlement Plan.
Internal Monitoring Report-Machhagaon Subproject (Dec 2016)
RS-ISPMC 7
Chapter-2: Impacts
2.1 Impact on Land, Structure and Livelihood
17. It has been stated earlier that Machhagaon subproject are classified as category
‘A’ for involuntary resettlement in considerations of the ADB’s Involuntary
Resettlement Policy. Resettlement Plan has been prepared for the
subproject having IR impacts. Affected Persons (APs) were identified through
the Encroachment Enumeration Survey (EES) i.e. census survey.
18. It is pertinent to mention here that land acquisition is not within the purview of
Machhagaon subproject. Land acquisition is not required as all construction
work mainly completed within 50 meters of the ROW, which is Government
land. Social impacts are confined to private properties, which exist on within
the Right of way (RoW). These impacts are mainly loss of livelihood due to
displacement from the location of business.
19. All the APs have been validated and verified by the CSO (LAVS), appointed for
RP implementation at their respective subprojects. As per updated list of APs
from approved entitlement matrix, CSO appointed for RP implementation
concluded the task such as field verification of APs (issuing notice, signature,
photos & proof of identification like voter ID, bank details, signing of ID card etc.
were taken) and provide assistance in opening of the bank A/C (if
required) before issuing the ID Cards and disbursement. During verification or
thereafter disbursement of livelihood assistance, few APs could not be located
or traced. Even few APs shown their unwillingness to receive their
assistance because they have no proof of document. Efforts are still being
made by the CSO to trace / convince them.
20. A total 811 APs was enumerated during the time of encroachment enumeration
survey (EES) in January 2013. During RP implementation in March 2016,
a total of 720 APs accepted the evacuation notice and signed the ID cards.
Out of the total 91 APs, 57 APs could not be traced and their structures also
not found on the canal embankment and 34 APs are beyond the RoW and
will not affect the construction. Total 229 APs are affected in Package-6,
whereas 165 APs each are reported in package 3 and 5. A considerable
number of these APs are mainly commercial squatters (58.0%) losing their
livelihood, whereas remaining is falling under Residential category (42.0%).
Particular attention is also being paid to Vulnerable Groups. These APs
reported under vulnerable groups1 are 19.7% of the total APs. Package wise
1 Vulnerable Group include Below Poverty Lin (BPL), Schedule Caste (SC), Schedule Tribe
(ST), Woman Headed Household (WHH), disabled persons, etc
Internal Monitoring Report-Machhagaon Subproject (Dec 2016)
RS-ISPMC 8
details are depicted below in Table 1.
Table 1: Package wise Coverage details of APs
Package
No
As per EES, 2013 2016 RP Implementation Difference Remarks
Res Com Total Res Com Total
Pack-1 10 25 35 7 20 27 8
8 Structure/s not
existing during CSO
verification
Pack-2 0 16 16 0 16 16 0 No Change
Pack-3 64 147 211 38 127 165 46
21 APs beyond RoW; 25
APs Structure/s not
existing during CSO
verification
Pack-4 40 39 79 38 35 73 6
4- Structure/s not
existing during CSO
verification; 2 APs
beyond RoW
Pack-5 97 83 180 91 74 165 15
13- Structure/s not
existing during CSO
verification; 2 APs
beyond RoW
Pack-6 117 127 244 118 111 229 15
6-Structure/s not
existing during CSO
verification; 9 APs
beyond RoW
Pack-7 10 36 46 10 35 45 1 1 Structure not existing
during CSO verification
Total 338 473 811 302 418 720 91
2.2 Impact on Common Property Resources (CPRs)
21. Impact on CPRs is a very critical issue from the point of view of the community.
The community feeling is attached with the common properties especially with
the religious structures. The impact on the number of CPRs reduced because of
protective measures to canal section at the time of implementation. It is also
significant to mention here that some issues related to CPRs has resolved
through community consultation and providing engineering solution by avoiding
impact on common property in the package 5, 12 and Minor and Sub minors.
The status of CPRs remains unchanged during this reporting period. The actual
impacts on CPRs at the time of implementation stage are presented in Table 2.
Internal Monitoring Report-Machhagaon Subproject (Dec 2016)
RS-ISPMC 9
Table 2: Type of Common Property Resources (CPRs)
Package No
No of CPRs
Type of CPR Remarks
Pack-1 6 Hanuman Mandir Protected by providing vertical retaining wall
Hanuman Mandir(Bishnu Charan Behera) Protected by providing vertical retaining wall
Ram Mandir(Rajesh Kumar Dash) Protected by providing vertical retaining wall
Temple Protected by providing vertical retaining wall
Mangala Mandir(Babaji Bhoi) Protected by providing vertical retaining wall
Astasambhu Mandir Protected by providing vertical retaining wall
Pack-2 2 Kali Mandir Protected by providing vertical retaining wall
Youth Club Protected by providing vertical retaining wall
Pack-3 6 Trimurti Youth Federation. Secty :- Prasanta Ku Das
Protected by providing vertical retaining wall
Trinath Mandap(Sudhakar Jena) Protected by providing vertical retaining wall
Shamashyam Satsang Protected by providing vertical retaining wall
Durga Mandap(Rajendra Kumar Mohanty) Protected by providing vertical retaining wall
Taradei Mandir(Nilamani Sahoo) Protected by providing vertical retaining wall
Trinath Tungi(Jagannath Nayak) Protected by providing vertical retaining wall
Pack-4 15 Bhagabat Tungi(Ullas Nayak) Protected by providing vertical retaining wall
Jagannath Mandir Protected by providing vertical retaining wall
Bishnu Mandap Protected by providing vertical retaining wall
Youth Club Protected by providing vertical retaining wall
Trinath Mandir(Arjuni Charan Nayak) Protected by providing vertical retaining wall
Dibyajyoti Youth Club(Biswanath Jena) Protected by providing vertical retaining wall
Paramahans Ashram(Jasabanta Bhoi) Protected by providing vertical retaining wall
Tarini Mandir(Prabhucharan Rath) Protected by providing vertical retaining wall
Public Waiting Room Protected by providing vertical retaining wall
Internal Monitoring Report-Machhagaon Subproject (Dec 2016)
RS-ISPMC 10
Akhandalamani Mandir(Basant Kumar Sahoo
Protected by providing vertical retaining wall
Abhiram Ashram(Nirod Chandra Swain) Protected by providing vertical retaining wall
Trinath Mandap(Bichitrananda Swain) Protected by providing vertical retaining wall
Mahavir Mandir Protected by providing vertical retaining wall
Thakur Ghar(Prasanta Mallik) Protected by providing vertical retaining wall
Pucca Road Protected by providing vertical retaining wall
Pack-5 25 Jagatsinghpur Muncipality Protected by providing vertical retaining wall
Babu Bhutnath Mandir(Sambhu Barik) Protected by providing vertical retaining wall
Trinath Mandir. C/O B.K. Das Protected by providing vertical retaining wall
Electricity sub-station Estimate received from CESU and submitted to PD, PMU for approval; shifting process will initiate soon
Hanuman Mandir Local representatives agreed to relocate the statue
Jagneswar Das Memorial Local representatives agreed to relocate the statue
Karunei Mandir(Bibhuti Shankar Dash) Protected by providing vertical retaining wall
Bhagabat Tungi (C/O Guru Ch Dehuri) (Pravakar Behera)
Protected by providing vertical retaining wall
Jagannath Mandir(Babaji Dash) Protected by providing vertical retaining wall
Ganesh Club(Santosh Kumar Nayak) Protected by providing vertical retaining wall
Laxmi Mandap(Akshaya Ku. Nayak) Protected by providing vertical retaining wall
Mangala Mandap Protected by providing vertical retaining wall
Temple Protected by providing vertical retaining wall
Trinath Mandir(Suresh Chandra Sahoo) Protected by providing vertical retaining wall
Trinath Mandap(Sricharan Bhoi) Protected by providing vertical retaining wall
Niranjan Dwivedi Protected by providing vertical retaining wall
Bhagabat Ghar Protected by providing vertical retaining wall
Gramadebati Protected by providing vertical retaining wall
Youth Club(Diptikanta Jena) Protected by providing vertical retaining wall
Shyamsundar Puja Ghar(Ranjita Biswal) Protected by providing vertical retaining wall
Electricity sub-station To be relocated in close proximity after getting the estimate from CESU,Odisha.
Internal Monitoring Report-Machhagaon Subproject (Dec 2016)
RS-ISPMC 11
Thakur Ghar(Bhikari Charan Mohapatra) Protected by providing vertical retaining wall
Trinath Tungi Protected by providing vertical retaining wall
Gram Debati(Sanatan Bhoi) Protected by providing vertical retaining wall
Electricity sub-station To be relocated in close proximity after getting the estimate from CESU, Odisha.
Pack-6 26 Electricity sub-station To be relocated in close proximity after getting the estimate from CESU, Odisha.
Electricity sub-station To be relocated in close proximity after getting the estimate from CESU, Odisha.
Trinath Mandir(Pratap Kumar Mohapatra) Protected by providing vertical retaining wall
Electricity sub-station To be relocated in close proximity after getting the estimate from CESU, Odisha.
Electricity sub-station To be relocated in close proximity after getting the estimate from CESU, Odisha.
Electricity sub-station To be relocated in close proximity after getting the estimate from CESU, Odisha.
Jagannath Temple Protected by providing vertical retaining wall
Alekh Asram Renubala Ray) Protected by providing vertical retaining wall
Electricity sub-station To be relocated in close proximity after getting the estimate from CESU, Odisha.
Municipal Hospital Protected by providing vertical retaining wall
Electricity sub-station To be relocated in close proximity after getting the estimate from CESU, Odisha.
Trinath Club Protected by providing vertical retaining wall
Trinath Pandal(Pravat Panda) Protected by providing vertical retaining wall
Hanuman Mandir(Pravat Panda) Protected by providing vertical retaining wall
Electricity sub-station To be relocated in close proximity after getting the estimate from CESU, Odisha.
Electricity sub-station To be relocated in close proximity after getting the estimate from CESU, Odisha.
Trinath Temple Protected by providing vertical retaining wall
Trinath Mandir(Rabindra Dash) Protected by providing vertical retaining wall
Dead End Protected by providing vertical retaining wall
Internal Monitoring Report-Machhagaon Subproject (Dec 2016)
RS-ISPMC 12
Mahadev Mandir (Sarat Ch swain) Protected by providing vertical retaining wall
Mandir Protected by providing vertical retaining wall
Thakur Ghar(Gouranga Das) Protected by providing vertical retaining wall
Electricity sub-station To be relocated in close proximity after getting the estimate from CESU, Odisha.
Electricity sub-station To be relocated in close proximity after getting the estimate from CESU, Odisha.
Thakur Ghar(Babuli Bhoi) Protected by providing vertical retaining wall
Electricity sub-station To be relocated in close proximity after getting the estimate from CESU, Odisha.
Pack-7 9 Batamangala Mandira C/O Haladhar Tripathy
Protected by providing vertical retaining wall
Mahaveer Temple C/O Vimsen Mallik and Arjun Satpathy (Pujak)(Arjuna Satpathy)
Protected by providing vertical retaining wall
Basudev TungiC/O Kasinath Mallick Protected by providing vertical retaining wall
Radhakanta Mandir C/O R.K. Rout(Radhakanta Rout)
Protected by providing vertical retaining wall
Trinath Mandir(Dhruba Ch. Parida) Protected by providing vertical retaining wall
Tarini Mandap Protected by providing vertical retaining wall
Srima - Youth Club Protected by providing vertical retaining wall
Village Road Protected by providing vertical retaining wall
Public Road Protected by providing vertical retaining wall
Total 89 CPRs enumerated covering in 7 Packages
Internal Monitoring Report-Machhagaon Subproject (Dec 2016)
RS-ISPMC 13
Chapter 3: Compensation & Assistance
22. As of 31 December 2016 all packages under implementation stage have
updated the entitlement matrix. In accordance with the entitlement matrix,
payment was made to APs for structure cost, livelihood assistance, shifting
assistance, assistance for vulnerable APs and additional assistance to
employees wherever applicable. The total budget for RP implementation was
concurred by ADB and approved by DoWR. The EE have disbursed the
compensation and livelihood assistance as per the approved entitlement matrix.
23. As per as the disbursement of compensation to number of APs in the subproject
is concerned, by 31 December 2016 the progress is about 99.9 %. Remaining
0.1% of APs is still to be paid falling under package-3. These two APs could not
submit their supporting documents for availing the compensation and
allowances. The implementing CSO (LAVS) is pursuing this matter with District
Administration and APs on a regular basis so that payment to APs made
immediately. Prior to commencement of construction activity, all the APs to be
compensated in accordance with the approved entitlement matrix.
24. For further details of AP’s, assistance disbursement date and status refer
Annexure 1. Summary of status of APs whether paid or unpaid, if unpaid with
reasons, are tabulated in as Table 3.
Internal Monitoring Report-Machhagaon Subproject (Dec 2016)
RS-ISPMC 14
Table 3 : Summary of disbursement of Compensation and Other Allowances
Package
No
Affected Persons (APs) Affected area (in Sq. mtr.) Compensation & Livelihood Assistance (Rs.) Reasons
for not
paid
Total Received
full
payment
%
Achieved
Balance Total Acquired
land
Balance Total Disbursed Balance No
Document
proof
1 2 3 4 5 (2-3) 6 7 8 (6-7) 9 10 11 (9-10) 12
Pack-1 27 27 100.0 0 408 408 - 1,60,401 1,60,401 -
Pack-2 16 16 100.0 0 253 253 - 1,25,816 1,25,816 -
Pack-3 165 163 98.8 2 2,473 2,447 26 12,99,849 12,91,247 8,602 2
Pack-4 73 73 100.0 0 1,132 1,132 - 5,35,299 5,35,299 -
Pack-5 165 165 100.0 0 3,006 3,006 - 15,35,091 15,35,091 -
Pack-6 229 229 100.0 0 4,123 4,123 - 19,59,308 19,59,308 -
Pack-7 45 45 100.0 0 910 910 - 4,62,076 4,62,076 -
Total 720 718 2 12,305 12,279 26 60,77,840 60,69,238 8,602 2
% age 100.0 99.7 0.3 0.3 100.0 99.8 0.2 100.0 99.9 0.1
Internal Monitoring Report-Machhagaon Subproject (Dec 2016)
RS-ISPMC 15
25. As mentioned earlier, in all packages are covered with compensation paid to
APs to date. In these packages, 720 APs are reported and out of those 718
APs have been compensated as per the entitlement matrix covering their
livelihood assistance, shifting assistance, vulnerability assistance and
additional assistance to employees at minimum wage level as per the
prescribed norm.
Table 4: Disbursements made by Type of Assistance to APs (31 December 2016)
Package No
APs received compensation
Type of Assistance Disbursed to APs (in Rs.) Total
Amount Disbursed
Structure Cost
Livelihood Assistance
Shifting Allowance
One time Addl. Asst. (VHHs)
Assistance for Employees
Pack-1 27 83,601 7,800 54,000 15,000 - 1,60,401
Pack-2 16 68,816 2,000 32,000 5,000 18,000 1,25,816
Pack-3 163 6,07,447 40,000 3,26,000 2,17,800 1,00,000 12,91,247
Pack-4 73 2,56,299 38,000 1,46,000 95,000 - 5,35,299
Pack-5 165 6,54,591 1,54,000 3,30,000 3,80,000 16,500 15,35,091
Pack-6 229 10,91,308 66,000 4,58,000 1,70,000 1,74,000 19,59,308
Pack-7 45 2,88,076 24,000 90,000 60,000 - 4,62,076
Total 718 30,50,138 3,31,800 14,36,000 9,42,800 3,08,500 60,69,238
3.1 Status of Missing APs and Structures not found during the CSO survey
26. Identification of Missing APs is a major problem; however efforts are being
made by CSO to trace them but it is very difficult to locate these APs. It is
observed that APs who are missing from starting or can’t be located or have
migrated or shifted to some other nearby towns (willingly) well before the
initiation of project implementation as well as mobilization of CSO. In some
packages it was found that few APs deceased so it was decided to make
the payment to their dependents or guardians after submission of supporting
legal documents from the district administration. (Refer to Table 1).
27. In support of Missing APs and other related issues, concerned SDOs are
advised to collect records of written information from surrounding vendors or
shopkeepers or public representatives. The project will address the issues
of missing APs. Such type of APs will be considered as absentee or no longer
eligible by the time of project closure. Actually missing APs who have wilfully
migrated from the site/town well before initiation of this project
implementation work as their livelihood has not been impacted by the project (in
reality).
3.2 Compensation, relocation or protection of CPRs 28. The project would also lead to impacts on the CPRs like temple, religious
platform, hand pumps, electric transformers, and boundary wall of
religious structures. A total of 89 CPRs would be affected along the project. The
Internal Monitoring Report-Machhagaon Subproject (Dec 2016)
RS-ISPMC 16
details of the different type of affected CPRs are already provided in Table 2.
Cash compensation at replacement value in consultation with the community
will be provided wherever it is applicable with proper documentation. In
all packages project will give emphasis to protect the existing CPRs either
through providing vertical retaining wall to protect affected CPR.
Internal Monitoring Report-Machhagaon Subproject (Dec 2016)
RS-ISPMC 17
Chapter 4: Consultations and Disclosures
29. A meaningful consultation with APs, local community and civil society for each
package identified as having involuntary resettlement impacts are conducted by
the project. It begins right from initiation for RP implementation in the following
manner:
� begins early in the project preparation stage and is carried out on an on-going
basis throughout the project cycle;
� provides timely disclosure of relevant and adequate information that is
understandable and readily accessible to affected person about project
impacts and entitlement matrix;
� undertaken in an atmosphere free of intimidation or coercion;
� customized with the disadvantaged such as social and economic backward
group under vulnerable category (Schedule Caste (SC), Indigenous Peoples /
Schedule Caste (ST), Woman Headed Household (WHH), Physically
Disabled People, Below Poverty Line (BPL); and
� incorporation of all relevant views of affected people and other stakeholders
into decision making, such as project design, mitigation measures, the
sharing of development benefits and opportunities, and implementation
issues.
� Procedure for submission of grievances and contact details of the EEs and
SDOs
30. The EA should pay particular attention to the need of disadvantaged under
vulnerable groups. During RP implementation, the officials from LAVS staffs
from EE organise consultation mainly on social safeguard issues. It is found
during consultations that the participants outlined the necessity of the widening
and strengthening of Machhagaon Canal. All participants welcomed the project
and opined to provide all cooperation during civil construction activity. Majority
of participants reported that quality construction and improvement of water flow
to provide better irrigation facility in their locality. The proposed project will in
fact bring lot of benefit to mass people in the district. Since the project is done
mostly in the RoW, which is government land or on the existing alignments, so,
there is no need for additional land for civil works.
31. During July – December 2016, the issues raised in Public Consultation
Meetings were related to R&R Implementation Activities. Opening of Bank A/c,
and Disbursement of Assistance were the prime issues raised, which were
suitably addressed by the concerned SDOs/JEs of the respective irrigation
divisions. It was further communicated that 30 days notice would be provided to
Internal Monitoring Report-Machhagaon Subproject (Dec 2016)
RS-ISPMC 18
APs before Civil Works initiate (in that section) and disbursement would be
completed prior to the mobilization of the contractor in particular package.
Package wise details of Public Consultation Meetings with APs are depicted in
the Table 7 below and status of award of civil packages mentioned in
Annexure-2.
Internal Monitoring Report-Machhagaon Subproject (Dec 2016)
RS-ISPMC 19
Table 5: Number of Consultations Organized with APs
Sl. No Name of Village/Place
Package No
No of APs/other officials
No. of Consultation organized
with APs during-
Reporting Period
No. of Consultation
organized with AHs - 31
Dec 2016
No. of Participants
participated - 31 Dec 2016
Issues Discussed with APs
1 Mahura 1 14 1 1 6 Broadly checked the disbursement figure with entitlement matrix, updated passbook, construction quality and collection of grievances (if any)
2 Barang bazar 2 10 1 1 9 Broadly checked the disbursement figure with entitlement matrix, updated passbook, construction quality and collection of grievances (if any)
3 Thanapati Mandir 3 & 7 25 1 1 11 Broadly checked the disbursement figure with entitlement matrix, updated passbook, construction quality and collection of grievances (if any)
4 Sishu Ashram 3 & 6 23 1 1 9 Broadly checked the disbursement figure with entitlement matrix, updated passbook, construction quality and collection of grievances (if any)
5 Thanapati Mandir 5 & 3 13 1 1 12 Broadly checked the disbursement figure with entitlement matrix, updated passbook, construction quality and collection of grievances (if any)
Total
85 5 5 49
Internal Monitoring Report-Machhagaon Subproject (Dec 2016)
RS, ISPMC
20
Chapter 5: Grievances Redress Mechanism
32. A Grievance Redress Mechanism (GRM) has been established by the project with the
objective of receiving and facilitating the resolution of complaints & grievances by APs.
The GRM is scaled to the risks and adverse impacts of the project. It should address
APs concerns and complaints promptly, using an understandable and transparent
process that is gender responsive, culturally appropriate, and readily accessible to all
segments of the APs at no cost and without retribution.
33. In this regard the District Level Committee (DLC), is acting as a grievance redress
committee (GRC) under the chairmanship of District Collector with representatives from
the Revenue department, Executive Engineer, Machhagaon Canal Division, community-
based organizations (CBOs) and CSO. As a GRC, the DLC meets at regular intervals
based on the availability of the DLC /GRC members and also as per requirement or
pending issues. Grievances not redressed by the GRC will be referred to the PMU for
action. At any stage the AP may take their complaints to a court of law.
34. Concerned SDO along with JEs have been entrusted with the responsibility to maintain
a proper register of the grievance (if any), which will be endorsed by the members
involved in implementation. GRC registers are in place at all sub division level. Further
SDOs have been given instructions to arrange more public consultations and register all
the grievances (including verbal) in writing whether substantial or non substantial and
put them up for the perusal of EE for proper disposal, either at their level or through
GRC/DLC meeting. During this reporting period out of total 67 Grievances were
received, of which 55 grievances are mainly on inclusion of new name in the
entitlement matrix, which was referred to PD, PMU. As suggested by PD, PMU, the
concerned SDO and CSO staffs did a joint field verification asked all APs to submit
supporting documents on or before January 2013 as proof of evidence for inclusion of
their name in the entitlement matrix. Those APs could not produce any authenticated
documents so finally it was decided not to include their name in the entitlement matrix
and it has been communicated in writing. These grievances are resolved by the EE as
and when received with support from district administration. Grievances received from 5
APs on correction of name in the entitlement matrix, out of these 3 APs already
submitted their legal document and received compensation and rest 2 APs are in the
process of submitting legal documents for obtaining compensation. 4 APs
demanding revaluation of the loss property. This issue has been discussed during
consultation meeting with APs and will be compensated through implementation of
corrective action plan. Rest 3 APs suggested alternate site for resettlement that was
forwarded to Sub collector for consideration and decision would be communicated to the
APs shortly during the course of implementation. Overall out of 67 grievances, 62
grievances resolved and rest are in progress. The status of grievances are
mentioned below in Table-6:
Internal Monitoring Report-Machhagaon Subproject (Dec 2016)
RS, ISPMC
21
Table 6: Package-wise number and type of Grievances
Package-No
Name of Tahasil Place New Name Inclusion
Correction of AP Name
Demanding revaluation
Alternative site for
resettlement
Total Grievances
Pack-1 Cuttack Sadar & Biridi Baranga 0
Pack-2 Jagatsinghpur Jagatsinghpur 0
Pack-3 Balikuda & Jagatsinghpur
Jagatsinghpur 2 1 3
Pack-5 Jagatsinghpur Alipingal 1 1
Pack-6 Jagatsinghpur Jagatsinghpur 0 0
Pack-7 Balikuda Balikuda 1 1
Total 2 3 5
Figure 1: Grievance Redress Process
APs
EE/CSO/guided by ISPMC
GRC/DLC
PMU
Internal Monitoring Report-Machhagaon Subproject (Dec 2016)
RS, ISPMC
22
Chapter 6: Institutional Arrangements 35. The Executing Agency (EA) for the Investment Program is PMU under the Water
Resource Department of GoO. To ensure effective implementation of social safeguard
issues, institutional arrangement and capacity is as follows:
� PMU: Staff responsible for look after the safeguard issues of the project includes;
One Executive Engineer as full time Project Officer-Social at PMU is on board and
Assistant Engineer is also sanctioned to assist PO-Social, Project Director
administer the overall activities.
� SIO level: Executive Engineer of each subproject is responsible for overall
activities with well supported by Sub Divisional Officers (SDOs) and Junior
Engineers (JEs) as nodal officers to look after the social safeguard issues and RP
preparation/updating and implementation etc.
� ISPMC: One Resettlement Specialist (part time) from ISPMC has been appointed
to assist the PO-Social at PMU.
� CSO: Main responsibility of implementing the social safeguard requirements and
to assist the SIOs in implementing RPs and community mobilization through
various public meetings, campaign and media means.
36. During the reporting period, safeguard staffs at PMU and SIO are positioned on regular
basis while ISPMC have deployed the Resettlement Specialist on intermittent basis.
37. The concerned SIO (EE) internally monitors the implementation of RPs and looks after
other safeguard issues. SIO at each subproject have been established to assist in the
coordination and day-to-day implementation and management of the Investment
Program. The Executive Engineers are deployed at the field office level and working
closely with the District Collector, Sub Collector, Tahsildar, Local Bodies/Panchayat
Level Committees and CSO, to expedite the payments of compensation to APs. To
implement the RP, the EA engaged LAVS, Bhubaneswar based CSO, who was
mobilized in December 2015 for 4 months to assist SIO in the implementation of RPs.
The delays in disbursement of compensation to APs and keeping in view the urgency of
work the CSO contract has been extended till end of May 2017.
38. The EE-Social of PMU and Resettlement Specialist of the ISPMC were entrusted with
the responsibility of monitoring the implementation of this RP and assess its
performance and effectiveness, on the basis of review of reports, field observations,
consultations with APs, other stakeholders and SIO.
39. Internal monitoring is done on regularly while reporting has been on quarterly basis for
one year and subsequently has been biannually. The monitoring is conducted at field by
the SIO along with CSO team. They verify APs, distribute ID cards, open bank accounts
and conduct public consultations with APs with respect to project implementation, likely
schedule of initiation of civil works etc. Resettlement Specialist, ISPMC collates all
Internal Monitoring Report-Machhagaon Subproject (Dec 2016)
RS, ISPMC
23
information of their activities in the form of a report and submits to PMU on a monthly
basis for onward submission.
40. The organizational arrangements for RP preparation and implementation including
monitoring of different social safeguard issues are depicted in Figure 2.
41. Internal Monitoring and Site Visit: The internal monitoring by PMU and SIOs includes: (i)
administrative monitoring to ensure that all compensation as per RP is whether paid or
still unpaid, implementation is on schedule, and problems/grievances are dealt with on a
timely basis; (ii) restoration of public utilities and common property resources impacted
in the project; and (iii) socio-economic monitoring during and after the relocation
process to ensure that people are settled and are better off at the same or different
locations.
Figure 2: Organizational Chart for Managing the Social Safeguard Issues
ADB DoWR
PMU
SIO (EE)
APs
RS, ISPMC
Internal Monitoring Report-Machhagaon Subproject (Dec 2016)
RS, ISPMC
24
Chapter 7: Compliance of Resettlement Framework, 2015 through CAP 42. The Resettlement Plan (RP) has been implemented in all Subprojects and the
compensation paid to APs as per the entitlement matrix, 2008, which was
approved by DoWR. During the Mission visit in May 2016, ADB raised the issue
of partial payment of compensation to APs as per the approved entitlement matrix
and advised to pay the balance amount to the APs by preparing the Corrective Action
Plan (CAP). The suggestion was accepted and revised budget estimate covering all
enumerated APs in the Subprojects has been prepared. The revised estimates for
implementation of CAP mainly cover Transitional allowance; assistance for shed
construction and transport allowance. Other components have already been paid to APs
under approved budget estimate. The Table-7 below clearly mentions the additional
components to be under covered CAP.
43. The Resettlement Plan (RP) has been implemented in all Subprojects and the
compensation paid to APs as per the entitlement matrix, 2008, which was
approved by DoWR. During the Mission visit in May 2016, ADB raised the issue
of partial payment of compensation to APs as per the approved entitlement matrix
and advised to pay the balance amount to the APs by preparing the Corrective Action
Plan (CAP). The suggestion was accepted and revised budget estimate covering all
enumerated APs in the Subprojects has been prepared. The revised estimate for
implementation of CAP mainly covers Transitional allowance; assistance for shed
construction and transport allowance. Other components have already been paid to
APs under approved budget estimate. The Table-7 below clearly mentions the additional
components to be under covered CAP.
Table 7: Component wise Approved and Revised Estimate
Sl. No
Type of Compensation and Assistance Approved Estimate-Already Paid to APs
Revised Estimate -To be Paid to APs under CAP
1 Structure Cost As per BSR NIL
2 Livelihood Assistance Rs. 2000/Per AP NIL
3 Shifting Allowance Rs. 2000/Per AP NIL
4 Assistance to Employees Rs. 18000/Per AP NIL
5 Assistance to Vulnerable Household Rs. 5000/Per AP NIL
6 Transitional Allowance NIL Rs. 24000/Per AP
7 Assistance for Temporary Shed construction NIL Rs. 10000/Per AP
8 Transport Allowance NIL Rs. 2000/Per AP
44. The approved budget for Machhagaon subproject was Rs. 89,98,547/- and as per RF
2015, the estimated budget for implementation of CAP comes to Rs. 4,06,36,151/-. The
revised estimate has been submitted to the Government for necessary approval. On
receipts of the Government’s approval, the payment to AP’s as per Corrective Action
Plan will be made.
Internal Monitoring Report-Machhagaon Subproject (Dec 2016)
RS, ISPMC
25
Chapter 8: Conclusion and Recommendations
45. During the reporting period, each SIO (EE) and other stakeholders have implemented
the social safeguards requirement for information dissemination adequately, helping
APs and local communities to understand the project clearly. The types of assistance
paid to APs and the amounts disbursed complied with the requirements of the RPs.
Grievances of the APs and local people have been resolved timely and adequately. The
APs expressed their satisfaction with their compensation. Each SIO has assigned
either an Assistant Engineer (SDO) or Junior Engineer as a Nodal Officer to take care of
the Social Safeguards. One EE has been assigned as fulltime staff at PMU for all
subprojects for RP implementation.
46. Disbursement of additional compensation to APs under Implementation of Corrective
Action Plan (CAP) needs to be completed earliest for completion of construction activity
within the timeframe.
47. Assessment of social safeguards planned by the project and recommendations has
been an important initiative to improve performance, illustrated below in Table 8.
Table 8: Assessment of social safeguards issues and recommendation
No Description Problem Recommendation
1 Assistance / Compensation to APs
Assistance/compensation to APs are not disbursed before the commencement of civil works in few packages (due to name mismatch and deceased APs)
Regular follow up by EE with sub collector or Tahsildar and ensured that APs should get their legal documents to receive compensation. PMU made practical efforts to ensure full disbursement of compensation to the remaining APs and these efforts must continue. The progress made should be monitored internally and externally until all APs are fully paid/ compensated.
2
Affected Persons (APs) reported ‘Missing’ or ‘structure not existing’
Generally APs are squatter /mobile vendors and may lose their livelihood temporarily due to project activities. It was noted that in subprojects 101 APs could not be compensated due to their absence to receive compensation.
APs found Missing or structure not existing from their location during CSO verification. The attempt was made to send messages through their friends and relatives or close by APs for collection of compensation. In future if any missing AP submitted supporting document he/she will receive compensation as per the approved entitlement matrix.
Internal Monitoring Report-Machhagaon Subproject (Dec 2016)
RS, ISPMC
26
Annexure 1: Summary Status of Disbursement paid to APs-31 December 2016
Sl. No. Photo No
Main/Dist.
Civil Package No
Category
Name of Affected Person
Caste
Annual Income (Rs)
Area affected (sq. mtr.)
Construction type
Compensation Already paid
Present Status of payment
Compensation and Allowance to be paid (Rs.) as per CAP
Remarks
Transitional Allowance
Tempor
ary shed
Transport Allowance
Livelihood Assistance to APs (APs not paid earlier)
Additional Assistance to vulnerable APs (VHH not paid earlier)
Total Amount to be Paid (Rs.)
1 621 Machhagaon Main Canal (BC)
1 Res Manoj Kumar Behera
Gen 25001-45000
30 Kutcha 7,310 Paid 24,000 10,000 2,000 2,000 38,000
Additional Rs.2000/- paid for LA in addition to Rs.36,000/-
2 622 Machhagaon Main Canal (BC)
1 Res Kishore Kumar Behera
Gen 25001-45000
15 Semi Pucca 8,450 Paid 24,000 10,000 2,000 2,000 38,000
Additional Rs.2000/- paid for LA in addition to Rs.36,000/-
3 626 Machhagaon Main Canal (BC)
1 Res Balaram Sahoo Gen 25001-45000
15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 38,000
Additional Rs.2000/- paid for LA in addition to Rs.36,000/-
4 628 Machhagaon Main Canal (BC)
1 Res Nanda Rath Gen <25000 10 Kutcha 3,770 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
5 632 Machhagaon Main Canal (BC)
1 Res Bishnu Bhoi SC <25000 15 Kutcha 11,655 Paid 24,000 10,000 2,000 36,000
6 635 Machhagaon Main Canal (BC)
1 Res Dharani Bhoi SC <25000 20 Kutcha 12,540 Paid 24,000 10,000 2,000 36,000
Internal Monitoring Report-Machhagaon Subproject (Dec 2016)
RS, ISPMC
27
7 636 Machhagaon Main Canal (BC)
1 Res Siba Bhoi SC <25000 20 Kutcha 12,540 Paid 24,000 10,000 2,000 36,000
8 602 Machhagaon Main Canal (BC)
1 Com Tulia Barik Gen <25000 10 Kutcha 3,770 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
9 605 Machhagaon Main Canal (BC)
1 Com Sura Sethi Gen <25000 10 Kutcha 3,770 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
10 609 Machhagaon Main Canal (BC)
1 Com Dillip Sahoo Gen <25000 15 Semi-pucca 8,450 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
11 610 Machhagaon Main Canal (BC)
1 Com Rabi Narayan Das Gen <25000 12 Kutcha 4,124 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
12 611 Machhagaon Main Canal (BC)
1 Com Rabi Das Gen <25000 12 Kutcha 4,124 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
13 612 Machhagaon Main Canal (BC)
1 Com Parsuram Sil Gen <25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
Internal Monitoring Report-Machhagaon Subproject (Dec 2016)
RS, ISPMC
28
14 613 Machhagaon Main Canal (BC)
1 Com Santosh Behera Gen <25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
15 615 Machhagaon Main Canal (BC)
1 Com Sarat Behera Gen <25000 15 Kutcha 6,455 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
16 616 Machhagaon Main Canal (BC)
1 Com Pravat Behera Gen <25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
17 617 Machhagaon Main Canal (BC)
1 Com Babaji Sethi SC <25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
18 618 Machhagaon Main Canal (BC)
1 Com Udaya Patra Gen <25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
19 623 Machhagaon Main
Canal (BC) 1 Com
Rama Chandra Sahoo
Gen 25001-45000
15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 38,000
Additional Rs.2000/- paid for LA in addition to Rs.36,000/-
20 625 Machhagaon Main
Canal (BC) 1 Com Kabuli Das Gen
25001-45000
15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 38,000
Additional Rs.2000/- paid for LA in addition to Rs.36,000/-
Internal Monitoring Report-Machhagaon Subproject (Dec 2016)
RS, ISPMC
29
21 630 Machhagaon Main Canal (BC)
1 Com Mohan Bagi Gen <25000 15 Semi-pucca 8,450 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
22 637 Machhagaon Main Canal (BC)
1 Com Aruna Kundu Gen <25000 12 Kutcha 4,124 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
23 638 Machhagaon Main Canal (BC)
1 Com Maheswar Anchal Gen <25000 12 Kutcha 4,124 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
24 639 Machhagaon Main Canal (BC)
1 Com Sadananda Barik Gen <25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
25 640 Machhagaon Main Canal (BC)
1 Com Santosh Nayak Gen <25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
26 642 Machhagaon Main Canal (BC)
1 Com Ganeswar Nath Gen <25000 20 Kutcha 5,540 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
27 643 Machhagaon Main Canal (BC)
1 Com Nursingh Nath Gen <25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to
Internal Monitoring Report-Machhagaon Subproject (Dec 2016)
RS, ISPMC
30
Rs.36,000/-
PKG-1 408 1,60,401 6,48,000
2,70,000 54,000 48,000 95,000.00 11,15,000
28 648 Machhagaon Main Canal (BC)
2 Com Dhurba Chran Das Gen <25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
29 649 Machhagaon Main
Canal (BC) 2 Com Bishnu Sahoo Gen <25000 15 Semi-pucca 8,450 Paid 24,000 10,000 2,000 2,000 5,000.00 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
30 650 Machhagaon Main
Canal (BC) 2 Com Arun Kumar Jena Gen
25001-45000
20 Semi-pucca 10,600 Paid 24,000 10,000 2,000 2,000 38,000
Additional Rs.2000/- paid for LA in addition to Rs.36,000/-
31 651 Machhagaon Main
Canal (BC) 2 Com Sukadev Sahoo Gen >100000 20 Kutcha 23,540 Paid 24,000 10,000 2,000 2,000 38,000
Additional Rs.2000/- paid for LA in addition to Rs.36,000/-
32 652 Machhagaon Main
Canal (BC) 2 Com Satrughna Behera Gen
25001-45000
15 Semi-pucca 8,450 Paid 24,000 10,000 2,000 2,000 38,000
Additional Rs.2000/- paid for LA in addition to Rs.36,000/-
33 653 Machhagaon Main Canal (BC)
2 Com Tapan Barik Gen <25000 15 Semi-pucca 8,450 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
Internal Monitoring Report-Machhagaon Subproject (Dec 2016)
RS, ISPMC
31
34 654 Machhagaon Main
Canal (BC) 2 Com Panchanan Behera Gen <25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
35 655 Machhagaon Main Canal (BC)
2 Com Siba Prasad Mallik SC <25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
36 656 Machhagaon Main
Canal (BC) 2 Com Babuni Mallik SC
45001-65000
30 Semi-pucca 14,900 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.2000/- paid for LA in addition to Rs.36,000/-
37 657 Machhagaon Main
Canal (BC) 2 Com Dinabandhu Das Gen
25001-45000
16 Kutcha 4,832 Paid 24,000 10,000 2,000 2,000 38,000
Additional Rs.2000/- paid for LA in addition to Rs.36,000/-
38 658 Machhagaon Main
Canal (BC) 2 Com Natabar Behera Gen
25001-45000
15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 38,000
Additional Rs.2000/- paid for LA in addition to Rs.36,000/-
39 659 Machhagaon Main Canal (BC)
2 Com Sankar Sahoo Gen <25000 12 Kutcha 4,124 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
40 660 Machhagaon Main Canal (BC)
2 Com Gopal Barik Gen <25000 12 Kutcha 4,124 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
Internal Monitoring Report-Machhagaon Subproject (Dec 2016)
RS, ISPMC
32
41 661 Machhagaon Main Canal (BC)
2 Com Pradip Dhada SC <25000 12 Kutcha 4,124 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
42 662 Machhagaon Main Canal (BC)
2 Com Sk. Asraf Muslim
<25000 12 Kutcha 4,124 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
43 663 Machhagaon Main Canal (BC)
2 Com Nurjahan Bibi Muslim
<25000 14 Kutcha 11,478 Paid 24,000 10,000 2,000 36,000
PKG-2 253 1,25,816 3,84,000
1,60,000 32,000 30,000 50,000.00 6,56,000
44 314 Machhagaon Main Canal (BC)
3 Res Sana Singh SC <25000 20 Kutcha 12,540 Paid 24,000 10,000 2,000 36,000
45 315 Machhagaon Main Canal (BC)
3 Res Giris Singh SC <25000 20 Kutcha 12,540 Paid 24,000 10,000 2,000 36,000
46 316 Machhagaon Main Canal (BC)
3 Res Santi Singh Gen <25000 20 Kutcha 5,540 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
47 317 Machhagaon Main Canal (BC)
3 Res Laxman Singh SC <25000 15 Kutcha 11,655 Paid 24,000 10,000 2,000 36,000
48 318 Machhagaon Main Canal (BC)
3 Res Arun Singh SC <25000 20 Kutcha 12,540 Paid 24,000 10,000 2,000 36,000
49 319 Machhagaon Main Canal (BC)
3 Res Annapurna Singh SC <25000 20 Kutcha 12,540 Paid 24,000 10,000 2,000 36,000
50 320 Machhagaon Main Canal (BC)
3 Res Chittaranjan Singh SC <25000 15 Kutcha 11,655 Paid 24,000 10,000 2,000 36,000
51 321 Machhagaon Main Canal (BC)
3 Res Rohia Singh SC <25000 15 Kutcha 11,655 Paid 24,000 10,000 2,000 36,000
52 325 Machhagaon Main Canal (BC)
3 Res Bhim Pradhan SC <25000 15 Kutcha 11,655 Paid 24,000 10,000 2,000 36,000
Internal Monitoring Report-Machhagaon Subproject (Dec 2016)
RS, ISPMC
33
53 334 Machhagaon Main Canal (BC)
3 Res Pyari Bibi Muslim
<25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
54 336 Machhagaon Main Canal (BC)
3 Res Kuni Bibi Muslim
<25000 35 Kutcha 8,195 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
55 338 Machhagaon Main Canal (BC)
3 Res Hasina Bibi Muslim
<25000 30 Kutcha 14,310 Paid 24,000 10,000 2,000 36,000
56 340 Machhagaon Main Canal (BC)
3 Res Parbati & Sabitree Gen <25000 25 Kutcha 6,425 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
57 341 Machhagaon Main Canal (BC)
3 Res Sk. Raja Muslim
<25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
58 342 Machhagaon Main Canal (BC)
3 Res Sk. Hakim Muslim
<25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
59 343 Machhagaon Main Canal (BC)
3 Res Syd. Hakim Muslim
<25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
Internal Monitoring Report-Machhagaon Subproject (Dec 2016)
RS, ISPMC
34
60 344 Machhagaon Main Canal (BC)
3 Res Manju Didi Muslim
<25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
61 345 Machhagaon Main Canal (BC)
3 Res Sk. Munna Muslim
<25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
62 346 Machhagaon Main Canal (BC)
3 Res Sk. Talif Muslim
<25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
63 348 Machhagaon Main Canal (BC)
3 Res Malati Ramdas SC <25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
64 350 Machhagaon Main Canal (BC)
3 Res Kartik Manna SC <25000 15 Kutcha 11,655 Paid 24,000 10,000 2,000 36,000
65 351 Machhagaon Main Canal (BC)
3 Res Manasi Manna SC <25000 15 Kutcha 11,655 Paid 24,000 10,000 2,000 36,000
66 352 Machhagaon Main Canal (BC)
3 Res Atala Manna SC <25000 15 Kutcha 11,655 Paid 24,000 10,000 2,000 36,000
67 353 Machhagaon Main Canal (BC)
3 Res Guru Ramdas SC <25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
68 354 Machhagaon Main Canal (BC)
3 Res Babu Ramdas SC <25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition
Internal Monitoring Report-Machhagaon Subproject (Dec 2016)
RS, ISPMC
35
to Rs.36,000/-
69 355 Machhagaon Main Canal (BC)
3 Res Jyoti Amma SC <25000 10 Kutcha 10,770 Paid 24,000 10,000 2,000 36,000
70 356 Machhagaon Main Canal (BC)
3 Res Brundaban Ramdas
SC <25000 20 Kutcha 5,540 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
71 357 Machhagaon Main Canal (BC)
3 Res Kali Bibi Muslim
<25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
72 358 Machhagaon Main Canal (BC)
3 Res Sk. Naba Muslim
<25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
73 359 Machhagaon Main Canal (BC)
3 Res Prafulla Das SC <25000 15 Kutcha 11,655 Paid 24,000 10,000 2,000 36,000
74 360 Machhagaon Main Canal (BC)
3 Res Kalandi Das SC <25000 15 Kutcha 11,655 Paid 24,000 10,000 2,000 36,000
75 362 Machhagaon Main Canal (BC)
3 Res Babu Singh SC <25000 10 Kutcha 10,770 Paid 24,000 10,000 2,000 36,000
76 366 Machhagaon Main Canal (BC)
3 Res Sk. Kadu Muslim
<25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
77 367 Machhagaon Main Canal (BC)
3 Res Geeta Pradhan Gen <25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition
Internal Monitoring Report-Machhagaon Subproject (Dec 2016)
RS, ISPMC
36
to Rs.36,000/-
78 368 Machhagaon Main Canal (BC)
3 Res R. Arakhit SC <25000 20 Kutcha 5,540 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
79 380 Machhagaon Main Canal (BC)
3 Res Sana Singh SC <25000 15 Kutcha 11,655 Paid - 10,000 2,000 12,000
APs having more than one structure will not entitle for Rs.24,000/-
80 381 Machhagaon Main Canal (BC)
3 Res Pradip Singh SC <25000 25 Kutcha 13,425 Paid 24,000 10,000 2,000 36,000
81 382 Machhagaon Main Canal (BC)
3 Res Bibina Barik OBC <25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
82 4
Machhagaon Main Canal (BKD)
3 Com Sk. Inayat Muslim
<25000 10 Kutcha 3,770 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
83 5
Machhagaon Main Canal (BKD)
3 Com Bishnu Ch Das SC <25000 10 Kutcha 3,770 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
84 6
Machhagaon Main Canal (BKD)
3 Com Manoj Kumar Gochayat
Gen <25000 12 Kutcha 4,124 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition
Internal Monitoring Report-Machhagaon Subproject (Dec 2016)
RS, ISPMC
37
to Rs.36,000/-
85 8
Machhagaon Main Canal (BKD)
3 Com Sk. Kabir Muslim
<25000 10 Kutcha 3,770 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
86 9
Machhagaon Main Canal (BKD)
3 Com Tajmul Hussain Khan
Muslim
<25000 10 Kutcha 3,770 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
87 10
Machhagaon Main Canal (BKD)
3 Com Sahid Fast Food Muslim
<25000 30 Kutcha 7,310 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
88 11
Machhagaon Main Canal (BKD)
3 Com Bana Bihari Sahoo Gen <25000 10 Kutcha 3,770 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
89 12
Machhagaon Main Canal (BKD)
3 Com Nrusingha Behera Gen <25000 20 Kutcha 5,540 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
90 13
Machhagaon Main Canal (BKD)
3 Com Prasanna Sahu Gen <25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
Internal Monitoring Report-Machhagaon Subproject (Dec 2016)
RS, ISPMC
38
91 14
Machhagaon Main Canal (BKD)
3 Com Bunti Fast Food Gen <25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
92 15
Machhagaon Main Canal (BKD)
3 Com Closed Cabin Gen <25000 10 Kutcha 3,770 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
93 16
Machhagaon Main Canal (BKD)
3 Com Kamir Fast Food Gen <25000 20 Kutcha 5,540 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
94 17
Machhagaon Main Canal (BKD)
3 Com Mirja Daher Baig Gen <25000 10 Kutcha 3,770 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
95 18
Machhagaon Main Canal (BKD)
3 Com Abdul Kalam Gen <25000 10 Kutcha 3,770 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
96 20
Machhagaon Main Canal (BKD)
3 Com Bhanumati Bhoi Gen <25000 10 Kutcha 3,770 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
97 22
Machhagaon Main Canal (BKD)
3 Com Hemanta Das Gen <25000 10 Kutcha 3,770 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to
Internal Monitoring Report-Machhagaon Subproject (Dec 2016)
RS, ISPMC
39
Rs.36,000/-
98 23
Machhagaon Main Canal (BKD)
3 Com Prasanta Kumar Sahoo
Gen <25000 10 Kutcha 3,770 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
99 24
Machhagaon Main Canal (BKD)
3 Com Gajendra Parida Gen <25000 20 Kutcha 5,540 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
100 25
Machhagaon Main Canal (BKD)
3 Com Bibhuti Bhusan Das
Gen <25000 10 Kutcha 3,770 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
101 26
Machhagaon Main Canal (BKD)
3 Com Dillip Kumar Biswal Gen <25000 10 Kutcha 3,770 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
102 28
Machhagaon Main Canal (BKD)
3 Com Abhaya Kumar Barik
Gen <25000 12 Kutcha 22,124 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
103 29
Machhagaon Main Canal (BKD)
3 Com Sadhu Sahoo Gen <25000 15 Semi-pucca 8,450 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
Internal Monitoring Report-Machhagaon Subproject (Dec 2016)
RS, ISPMC
40
104 30
Machhagaon Main Canal (BKD)
3 Com Ashok Kumar Biswal
Gen <25000 12 Kutcha 22,124 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
105 31
Machhagaon Main Canal (BKD)
3 Com Surendra Sahoo Gen <25000 12 Kutcha 4,124 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
106 32
Machhagaon Main Canal (BKD)
3 Com Manguli Pradhan Gen <25000 13 Kutcha 4,301 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
107 33
Machhagaon Main Canal (BKD)
3 Com Dillip Kumar Rout Gen <25000 12 Kutcha 22,124 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
108 34
Machhagaon Main Canal (BKD)
3 Com Pramod Nayak Gen <25000 12 Kutcha 4,124 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
109 35
Machhagaon Main Canal (BKD)
3 Com Durga Chran Sahoo
Gen <25000 13 Kutcha 4,301 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
110 36
Machhagaon Main Canal (BKD)
3 Com Bramhananda Rout Gen <25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to
Internal Monitoring Report-Machhagaon Subproject (Dec 2016)
RS, ISPMC
41
Rs.36,000/-
111 37
Machhagaon Main Canal (BKD)
3 Com Sudhakar Sahoo Gen <25000 12 Kutcha 4,124 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
112 38
Machhagaon Main Canal (BKD)
3 Com Debendra Sahoo Gen <25000 16 Kutcha 4,832 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
113 40
Machhagaon Main Canal (BKD)
3 Com Rahamat Ali Gen <25000 12 Kutcha 4,124 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
114 41
Machhagaon Main Canal (BKD)
3 Com Rabindra Behera Gen <25000 10 Kutcha 3,770 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
115 41
Machhagaon Main Canal (BKD)
3 Com Bimbadhar Das Gen <25000 10 Kutcha 3,770 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
116 42
Machhagaon Main Canal (BKD)
3 Com Niranjan Das Gen <25000 12 Kutcha 21,524 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
Internal Monitoring Report-Machhagaon Subproject (Dec 2016)
RS, ISPMC
42
117 42
Machhagaon Main Canal (BKD)
3 Com Lokanath Mallick Gen <25000 12 Semi-pucca 7,160 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
118 43
Machhagaon Main Canal (BKD)
3 Com Chula Mallick Gen <25000 10 Kutcha 3,770 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
119 44
Machhagaon Main Canal (BKD)
3 Com Samir Tarai Gen <25000 10 Kutcha 3,770 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
120 45
Machhagaon Main Canal (BKD)
3 Com Siba Prasad Biswal Gen <25000 10 Kutcha 3,770 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
121 46
Machhagaon Main Canal (BKD)
3 Com Laxmidhar Dalei Gen <25000 10 Kutcha 3,770 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
122 47
Machhagaon Main Canal (BKD)
3 Com Guna Ch. Behera Gen <25000 10 Kutcha 3,770 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
123 48
Machhagaon Main Canal (BKD)
3 Com Karunakar Bhoi Gen <25000 10 Kutcha 3,770 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to
Internal Monitoring Report-Machhagaon Subproject (Dec 2016)
RS, ISPMC
43
Rs.36,000/-
124 49
Machhagaon Main Canal (BKD)
3 Com Suka Sahoo Gen <25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
125 50
Machhagaon Main Canal (BKD)
3 Com Benudhar Mohanty Gen <25000 10 Kutcha 3,770 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
126 51
Machhagaon Main Canal (BKD)
3 Com Bishnu Chran Mohanty
Gen <25000 10 Kutcha 3,770 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
127 53
Machhagaon Main Canal (BKD)
3 Com Prafulla Kumar Das Gen <25000 10 Kutcha 3,770 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
128 54
Machhagaon Main Canal (BKD)
3 Com Bijaya Kumar Rana Gen <25000 12 Kutcha 22,124 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
129 55
Machhagaon Main Canal (BKD)
3 Com Babu Muduli Gen <25000 12 Kutcha 4,124 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
Internal Monitoring Report-Machhagaon Subproject (Dec 2016)
RS, ISPMC
44
130 56
Machhagaon Main Canal (BKD)
3 Com Kailash Mohanty Gen <25000 12 Kutcha 4,124 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
131 59
Machhagaon Main Canal (BKD)
3 Com Jata Kandi Gen <25000 13 Kutcha 4,301 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
132 60
Machhagaon Main Canal (BKD)
3 Com Dilip Nayak Gen <25000 13 Kutcha 4,301 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
133 61
Machhagaon Main Canal (BKD)
3 Com Bibhuti Bhoi Gen <25000 13 Kutcha 4,301 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
134 62
Machhagaon Main Canal (BKD)
3 Com Pratap Mohanty Gen <25000 12 Kutcha 4,124 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
135 63
Machhagaon Main Canal (BKD)
3 Com Chagali Bhoi Gen <25000 13 Kutcha 4,301 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
136 64
Machhagaon Main Canal (BKD)
3 Com Chakradhar Nayak Gen <25000 30 Semi-pucca 32,900 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to
Internal Monitoring Report-Machhagaon Subproject (Dec 2016)
RS, ISPMC
45
Rs.36,000/-
137 65
Machhagaon Main Canal (BKD)
3 Com Somanath Das Gen <25000 40 Semi-pucca 44,200 Paid 24,000 10,000 2,000 36,000
138 67
Machhagaon Main Canal (BKD)
3 Com Narendra Kumar Nayak
Gen <25000 13 Kutcha 4,301 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
139 68
Machhagaon Main Canal (BKD)
3 Com Babaji Muduli Gen <25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
140 69
Machhagaon Main Canal (BKD)
3 Com Dharmananda Barik
Gen <25000 15 Semi-pucca 8,450 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
141 70
Machhagaon Main Canal (BKD)
3 Com Kalandi Biswal Gen <25000 12 Kutcha 4,124 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
142 96
Machhagaon Main Canal (BKD)
3 Com Parthasarathi Das Gen <25000 20 Pucca 44,000 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
143 97
Machhagaon Main Canal (BKD)
3 Com Rabindra Das Gen <25000 15 Semi-pucca 27,650 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition
Internal Monitoring Report-Machhagaon Subproject (Dec 2016)
RS, ISPMC
46
to Rs.36,000/-
144 98
Machhagaon Main Canal (BKD)
3 Com Abhaya Behera Gen <25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
145 98
Machhagaon Main Canal (BKD)
3 Com Akshaya Kumar Behera
Gen <25000 12 Semi-pucca 7,160 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
146 99
Machhagaon Main Canal (BKD)
3 Com Rabindra Pradhan Gen <25000 20 Semi-pucca 10,600 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
147 100
Machhagaon Main Canal (BKD)
3 Com Rasid Khan Gen <25000 10 Kutcha 3,770 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
148 101
Machhagaon Main Canal (BKD)
3 Com Itihas Barik Gen <25000 15 Semi-pucca 8,450 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
149 102
Machhagaon Main Canal (BKD)
3 Com Sukadev Sahu Gen <25000 12 Kutcha 4,124 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
Internal Monitoring Report-Machhagaon Subproject (Dec 2016)
RS, ISPMC
47
150 103
Machhagaon Main Canal (BKD)
3 Com Mahendra Parida Gen <25000 30 Semi-pucca 14,900 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
151 104
Machhagaon Main Canal (BKD)
3 Com Susanta Kumar Aunria
Gen <25000 30 Semi-pucca 32,900 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
152 105
Machhagaon Main Canal (BKD)
3 Com Biswanath Jena Gen <25000 15 Pucca 38,000 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
153 106
Machhagaon Main Canal (BKD)
3 Com Sk. Tafique Ali Gen <25000 20 Semi-pucca 10,600 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
154 107
Machhagaon Main Canal (BKD)
3 Com Abdul Rahim Gen <25000 40 Semi-pucca 38,400 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
155 108
Machhagaon Main Canal (BKD)
3 Com Tarik Saha Gen <25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
156 109
Machhagaon Main Canal (BKD)
3 Com Kulasam Bibi Gen <25000 Kutcha 2,000 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to
Internal Monitoring Report-Machhagaon Subproject (Dec 2016)
RS, ISPMC
48
Rs.36,000/-
157 112
Machhagaon Main Canal (BKD)
3 Com Ashok Samal Gen <25000 20 Kutcha 5,540 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
158 113
Machhagaon Main Canal (BKD)
3 Com Dolagobinda Barik Gen <25000 20 Kutcha 5,540 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
159 114
Machhagaon Main Canal (BKD)
3 Com Saroj Barik Gen <25000 20 Pucca 26,000 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
160 115
Machhagaon Main Canal (BKD)
3 Com Bijay Sethi Gen <25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
161 116
Machhagaon Main Canal (BKD)
3 Com Nilamani Seneapti Gen <25000 15 Pucca 20,000 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
162 117
Machhagaon Main Canal (BKD)
3 Com Harekrushna Parida
Gen <25000 20 Semi-pucca 10,600 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
Internal Monitoring Report-Machhagaon Subproject (Dec 2016)
RS, ISPMC
49
163 118
Machhagaon Main Canal (BKD)
3 Com Jagannath Sahoo Gen <25000 14 Kutcha 4,478 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
164 119
Machhagaon Main Canal (BKD)
3 Com Nakul Charan Jena Gen <25000 30 Semi-pucca 14,900 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
165 120
Machhagaon Main Canal (BKD)
3 Com Bharat Sethi Gen <25000 14 Kutcha 4,478 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
166 121
Machhagaon Main Canal (BKD)
3 Com Madhabananda Sahoo
Gen <25000 20 Semi-pucca 10,600 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
167 123
Machhagaon Main Canal (BKD)
3 Com Bijaya Parida Gen <25000 14 Kutcha 4,478 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
168 134
Machhagaon Main Canal (JSP)
3 Com Salim Khan Gen <25000 14 Kutcha 4,478 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
169 135
Machhagaon Main Canal (JSP)
3 Com Kalim Khan Gen <25000 14 Kutcha 4,478 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to
Internal Monitoring Report-Machhagaon Subproject (Dec 2016)
RS, ISPMC
50
Rs.36,000/-
170 137
Machhagaon Main Canal (JSP)
3 Com Manoj Kumar Singh Gen <25000 14 Kutcha 4,478 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
171 139
Machhagaon Main Canal (JSP)
3 Com Nijam Saha Gen <25000 14 Kutcha 4,478 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
172 142
Machhagaon Main Canal (JSP)
3 Com Mayadhar Behera Gen <25000 12 Kutcha 4,124 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
173 143
Machhagaon Main Canal (JSP)
3 Com Hrusikesh Barik Gen <25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
174 144
Machhagaon Main Canal (JSP)
3 Com Kumud Das Gen <25000 12 Kutcha 4,124 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
175 145
Machhagaon Main Canal (JSP)
3 Com Babuli Behera Gen <25000 12 Kutcha 4,124 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
Internal Monitoring Report-Machhagaon Subproject (Dec 2016)
RS, ISPMC
51
176 146
Machhagaon Main Canal (JSP)
3 Com Akhaya Swain Gen <25000 12 Kutcha 4,124 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
177 147
Machhagaon Main Canal (JSP)
3 Com Karunakar Behera Gen <25000 22 Semi-pucca 11,460 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
178 148
Machhagaon Main Canal (JSP)
3 Com Debendra Sahoo Gen <25000 12 Kutcha 4,124 Paid - 10,000 2,000 2,000 - 14,000
APs having more than one structure will not entitle for Rs.24,000/-
179 149
Machhagaon Main Canal (JSP)
3 Com Abhinna Das Gen <25000 12 Kutcha 4,124 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
180 152
Machhagaon Main Canal (JSP)
3 Com Manguli Pradhan Gen <25000 15 Kutcha 4,655 Paid - 10,000 2,000 2,000 - 14,000
APs having more than one structure will not entitle for Rs.24,000/-
181 153
Machhagaon Main Canal (JSP)
3 Com Krushna Das Gen <25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
182 155
Machhagaon Main Canal (JSP)
3 Com Rabinarayan Das Gen <25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to
Internal Monitoring Report-Machhagaon Subproject (Dec 2016)
RS, ISPMC
52
Rs.36,000/-
183 157
Machhagaon Main Canal (JSP)
3 Com R.N.Das Gen <25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
184 158
Machhagaon Main Canal (JSP)
3 Com Madhabi Nanda Gen <25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
185 324
Machhagaon Main Canal (JSP)
3 Com Bikash Sahoo Gen <25000 20 Semi-pucca 17,600 Paid 24,000 10,000 2,000 36,000
186 372
Machhagaon Main Canal (JSP)
3 Com Sk Munna Muslim
<25000 10 Kutcha 3,770 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
187 374
Machhagaon Main Canal (JSP)
3 Com Jagannath & Dambarudhar
SC <25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
188 375
Machhagaon Main Canal (JSP)
3 Com Durga Chran Sahoo
Gen <25000 15 Kutcha 4,655 Paid - 10,000 2,000 2,000 - 14,000
APs having more than one structure will not entitle for Rs.24,000/-
189 376
Machhagaon Main Canal (JSP)
3 Com Saik Salamat Muslim
<25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition
Internal Monitoring Report-Machhagaon Subproject (Dec 2016)
RS, ISPMC
53
to Rs.36,000/-
190 377
Machhagaon Main Canal (JSP)
3 Com Sk Rahmat Muslim
<25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
191 383
Machhagaon Main Canal (JSP)
3 Com Closed Wood Shop Muslim
<25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
192 384
Machhagaon Main Canal (JSP)
3 Com Gurubari Bhoi SC <25000 10 Kutcha 3,770 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
193 386
Machhagaon Main Canal (JSP)
3 Com Closed Tea Stall Others
<25000 13 Kutcha 4,301 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
194 389
Machhagaon Main Canal (JSP)
3 Com Akhyaya Moharana Gen <25000 13 Kutcha 4,301 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
195 391
Machhagaon Main Canal (JSP)
3 Com Birakishore Behera Gen <25000 13 Kutcha 4,301 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
Internal Monitoring Report-Machhagaon Subproject (Dec 2016)
RS, ISPMC
54
196 392
Machhagaon Main Canal (JSP)
3 Com Mirza R Baig Muslim
<25000 13 Kutcha 4,301 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
197 393
Machhagaon Main Canal (JSP)
3 Com Bamdev Sahu Gen <25000 13 Kutcha 4,301 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
198 394
Machhagaon Main Canal (JSP)
3 Com Sk. Kadir Muslim
<25000 13 Kutcha 4,301 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
199 395
Machhagaon Main Canal (JSP)
3 Com Kartik Sahoo Gen <25000 13 Kutcha 4,301 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
200 396
Machhagaon Main Canal (JSP)
3 Com Pravat Kumar Sahoo
Gen <25000 13 Kutcha 4,301 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
201 400
Machhagaon Main Canal (JSP)
3 Com Sk Muktar Muslim
<25000 13 Kutcha 4,301 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
202 401
Machhagaon Main Canal (JSP)
3 Com Saik Jhar Muslim
<25000 13 Kutcha 4,301 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to
Internal Monitoring Report-Machhagaon Subproject (Dec 2016)
RS, ISPMC
55
Rs.36,000/-
203 402
Machhagaon Main Canal (JSP)
3 Com Kabir Sah Muslim
<25000 13 Kutcha 4,301 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
204 821
Machhagaon Main Canal (JSP)
3 Com Akshaya Barik Gen <25000 12 Kutcha 4,124 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
205 823
Machhagaon Main Canal (JSP)
3 Com Babuli Nayak Gen <25000 12 Kutcha 4,124 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
206 824
Machhagaon Main Canal (JSP)
3 Com Jata Prusti Gen <25000 12 Kutcha 4,124 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
207
136 3
Com Mirja Asif Muslim
<25000 14 Kutcha 4,478 Not Paid
24,000 10,000 2,000 2,000 5,000 43,000
Name mismatch-no document Proof
208
820 3
Com
Paramananda Moharana
Gen <25000 12 Kutcha 4,124 Not Paid 24,000 10,000 2,000 2,000 5,000 43,000
Name mismatch-no document Proof
PKG-3 12,91,247 38,16,000
16,30,000
3,26,000
2,86,000
7,00,000.00
67,58,000
209 704 Bagalpur Disty
4 Res Babaji Bhoi SC <25000 15 Kutcha 11,655 Paid 24,000 10,000 2,000 36,000
210 705 Bagalpur Disty
4 Res Meena Bhoi SC <25000 15 Kutcha 11,655 Paid 24,000 10,000 2,000 36,000
Internal Monitoring Report-Machhagaon Subproject (Dec 2016)
RS, ISPMC
56
211 706 Bagalpur Disty
4 Res Bauribandhu Parida
Gen <25000 15 Semi Pucca 8,450 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
212 229 Disty 19 A 4 Res Jadumani Swain Gen <25000 15 Kutcha 11,655 Paid 24,000 10,000 2,000 36,000
213 230 Disty 19 A 4 Res Ullas Nayak Gen <25000 15 Kutcha 11,655 Paid 24,000 10,000 2,000 36,000
214 231 Disty 19 A 4 Res Nursingh Nayak Gen <25000 15 Kutcha 11,655 Paid 24,000 10,000 2,000 36,000
215 232 Disty 19 A 4 Res Prakash Nayak Gen <25000 15 Kutcha 11,655 Paid 24,000 10,000 2,000 36,000
216 233 Disty 19 A 4 Res Hari Nayak Gen <25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
217 235 Disty 19 A 4 Res Magu Nayak & Subas Nayak
Gen <25000 25 Kutcha 6,425 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
218 236 Disty 19 A 4 Res Jhari Nayak & Hari Nayak
Gen <25000 20 Kutcha 5,540 Paid - 10,000 2,000 2,000 - 14,000
APs having more than one structure will not entitle for Rs.24,000/-
219 237 Disty 19 A 4 Res Judhistir Mallik Gen <25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
220 238 Disty 19 A 4 Res Sarat Mallick Gen <25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
Internal Monitoring Report-Machhagaon Subproject (Dec 2016)
RS, ISPMC
57
221 243 Disty 19 A 4 Res Manjulata Rout Gen <25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
222 245 Disty 19 A 4 Res Babuli Sahoo Gen <25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 - 38,000
Additional Rs.2000/- paid for LA in addition to Rs.36,000/-
223 246 Disty 19 A 4 Res Bijay Kumar Sahoo Gen <25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
224 250 Disty 19 A 4 Res Siba Bhoi Gen <25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
225 252 Disty 19 A 4 Res Amin Bhoi Gen <25000 40 Kutcha 9,080 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
226 253 Disty 19 A 4 Res Siba Bhoi Gen <25000 20 Kutcha 5,540 Paid - 10,000 2,000 2,000 - 14,000
APs having more than one structure will not entitle for Rs.24,000/-
227 254 Disty 19 A 4 Res Kailash Bhoi Gen <25000 20 Kutcha 5,540 Paid 24,000 10,000 2,000 2,000 - 38,000
Additional Rs.2000/- paid for LA in addition to Rs.36,000/-
Internal Monitoring Report-Machhagaon Subproject (Dec 2016)
RS, ISPMC
58
228 255 Disty 19 A 4 Res Kapila Bhoi Gen <25000 20 Kutcha 12,540 Paid 24,000 10,000 2,000 36,000
229 256 Disty 19 A 4 Res Anant Bhoi Gen <25000 20 Kutcha 5,540 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
230 267 Disty 19 A 4 Res Prasanta Ku Jena Gen <25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
231 682 Disty No 2 4 Res Sudarsan Sahoo Gen <25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
232 685 Disty No 2 4 Res Upendra Sahoo Gen <25000 10 Semi Pucca 6,300 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
233 686 Disty No 2 4 Res Sanatan Sahoo Gen <25000 25 Semi Pucca 12,750 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
234 687 Disty No 2 4 Res Sanatan Sahu Gen <25000 10 Semi Pucca 6,300 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
Internal Monitoring Report-Machhagaon Subproject (Dec 2016)
RS, ISPMC
59
235 688 Disty No 2 4 Res Bichitrananda Sahoo
Gen <25000 5 Kutcha 2,885 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
236 689 Disty No 2 4 Res Udayanath Sahu Gen <25000 20 Kutcha 5,540 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
237 692 Disty No 2 4 Res Nirmal Swain Gen <25000 10 Semi Pucca 6,300 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
238 693 Disty No 2 4 Res Pratap Das Gen <25000 15 Kutcha 11,655 Paid 24,000 10,000 2,000 36,000
239 694 Disty No 2 4 Res Rabindra Das Gen <25000 15 Kutcha 4,655 Paid - 10,000 2,000 2,000 - 14,000
APs having more than one structure will not entitle for Rs.24,000/-
240 695 Disty No 2 4 Res Ashok Das Gen <25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
241 696 Disty No 2 4 Res Prasanta Das Gen <25000 15 Semi Pucca 8,450 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
Internal Monitoring Report-Machhagaon Subproject (Dec 2016)
RS, ISPMC
60
242 697 Disty No 2 4 Res Manoj Sahoo Gen <25000 20 Kutcha 5,540 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
243 698 Disty No 2 4 Res Gobinda Das Gen <25000 20 Kutcha 5,540 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
244 699 Disty No 2 4 Res Gandharb Barik Gen <25000 20 Kutcha 5,540 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
245 700 Disty No 2 4 Res Naru Barik Gen <25000 10 Kutcha 3,770 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
246 701 Disty No 2 4 Res Prahallad Kanungo Gen <25000 20 Kutcha 5,540 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
247 707 Bagalpur Disty
4 Com Parbati Mallick SC <25000 12 Kutcha 4,124 Paid 24,000 10,000 2,000 2,000 38,000
Additional Rs.2000/- paid for LA in addition to Rs.36,000/-
248 709 Bagalpur Disty
4 Com Rabindranath Mallik
SC <25000 10 Kutcha 3,770 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,00
Internal Monitoring Report-Machhagaon Subproject (Dec 2016)
RS, ISPMC
61
0/-
249 239 Disty 19 4 Com Redio Nayak Gen <25000 15 Semi-pucca 8,450 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
250 240 Disty 19 4 Com Kalu Nayak Gen <25000 15 Kutcha 11,655 Paid 24,000 10,000 2,000 36,000
251 241 Disty 19 4 Com Pravakar Mohanty Gen <25000 15 Kutcha 11,655 Paid 24,000 10,000 2,000 36,000
252 244 Disty 19 4 Com Batakrushna Swain Gen <25000 15 Kutcha 11,655 Paid 24,000 10,000 2,000 36,000
253 247 Disty 19 4 Com Babuli Sahoo Gen <25000 20 Kutcha 12,540 Paid - 10,000 2,000 12,000
APs having more than one structure will not entitle for Rs.24,000/-
254 251 Disty 19 4 Com Sridhar Bhoi Gen <25000 15 Kutcha 11,655 Paid 24,000 10,000 2,000 36,000
255 257 Disty 19 4 Com Bauribandhu Swain Gen <25000 15 Kutcha 11,655 Paid 24,000 10,000 2,000 36,000
256 258 Disty 19 4 Com Pratap Swain Gen <25000 20 Kutcha 12,540 Paid 24,000 10,000 2,000 36,000
257 262 Disty 19 M 4 Com Adwaita Chran Nayak
Gen <25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
258 263 Disty 19 M 4 Com Bhikari Hati Gen <25000 15 11,655 Paid 24,000 10,000 2,000 36,000
259 264 Disty 19 M 4 Com Balu Sahoo Gen <25000 15 11,655 Paid 24,000 10,000 2,000 36,000
260 265 Disty 19 M 4 Com Gajendra Sahoo Gen <25000 15 11,655 Paid 24,000 10,000 2,000 36,000
261 266 Disty 19 M 4 Com Anu Sahoo Gen <25000 15 11,655 Paid 24,000 10,000 2,000 36,000
262 268 Disty 19 M 4 Com Jasobanta Das Gen <25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
Internal Monitoring Report-Machhagaon Subproject (Dec 2016)
RS, ISPMC
62
263 272 Disty 19 M 4 Com Bigyan Swain Gen <25000 20 Kutcha 5,540 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
264 273 Disty 19 M 4 Com Niranjan Prusti Gen <25000 15 Pucca 20,000 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
265 274 Disty 19 M 4 Com Niranjan Behera Gen <25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
266 664 Disty No 2 4 Com Ananta Sahoo Gen <25000 10 Kutcha 3,770 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
267 666 Disty No 2 4 Com Raj Kishore Barik Gen <25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
268 668 Disty No 2 4 Com Bana Bihari Barik Gen <25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
269 670 Disty No 2 4 Com Ramakanta Behera Gen <25000 10 Pucca 14,000 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to
Internal Monitoring Report-Machhagaon Subproject (Dec 2016)
RS, ISPMC
63
Rs.36,000/-
270 672 Disty No 2 4 Com Krushna Chandra Sahoo
Gen <25000 10 Semi-pucca 6,300 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
271 673 Disty No 2 4 Com Janakinath Mishra Gen <25000 10 Semi-pucca 6,300 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
272 674 Disty No 2 4 Com Basudev Sahoo Gen <25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
273 675 Disty No 2 4 Com Golok Nayak Gen <25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
274 676 Disty No 2 4 Com Siba Prasad Sahoo Gen <25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
275 677 Disty No 2 4 Com Santosh Behera Gen <25000 10 Kutcha 3,770 Paid - 10,000 2,000 2,000 - 14,000
APs having more than one structure will not entitle for Rs.24,000/-
Internal Monitoring Report-Machhagaon Subproject (Dec 2016)
RS, ISPMC
64
276 678 Disty No 2 4 Com Uchhab Sahoo Gen <25000 20 Kutcha 5,540 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
277 679 Disty No 2 4 Com Ajaya Ojha Gen <25000 12 Kutcha 4,124 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
278 680 Disty No 2 4 Com Panchanan Behera Gen <25000 12 Kutcha 4,124 Paid - 10,000 2,000 2,000 5,000 19,000
APs having more than one structure will not entitle for Rs.24,000/-
279 681 Disty No 2 4 Com Sudarsan Sahoo Gen <25000 12 Kutcha 4,124 Paid - 10,000 2,000 2,000 - 14,000
APs having more than one structure will not entitle for Rs.24,000/-
280 684 Disty No 2 4 Com Niranjan Mallick SC <25000 12 Kutcha 4,124 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
281 690 Disty No 2 4 Com Sanatan Bhoi SC <25000 12 Kutcha 4,124 Paid 24,000 10,000 2,000 2,000 - 38,000
Additional Rs.2000/- paid for LA in addition to Rs.36,000/-
PKG-4 5,35,299 15,84,000
7,30,000
1,46,000
1,08,000
2,25,000.00 27,93,000
282 174 Disty 19 A 5 Res Fakir Sahoo Gen <25000 20 Kutcha 5,540 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition
Internal Monitoring Report-Machhagaon Subproject (Dec 2016)
RS, ISPMC
65
to Rs.36,000/-
283 175 Disty 19 A 5 Res Subash Sahoo Gen <25000 20 Kutcha 5,540 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
284 176 Disty 19 A 5 Res Mangu Bhoi Gen <25000 30 Kutcha 7,310 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
285 177 Disty 19 A 5 Res Lokanath Samal Gen <25000 20 Kutcha 5,540 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
286 185 Disty 19 A 5 Res Ranjan Nath Gen <25000 30 Kutcha 14,310 Paid 24,000 10,000 2,000 36,000
287 188 Disty 19 A 5 Res Debendranath Sahoo
Gen <25000 20 Kutcha 5,540 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
288 190 Disty 19 A 5 Res Kapila Das Gen <25000 20 Kutcha 5,540 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
289 275 Disty 19 A 5 Res Susanta Parida Gen <25000 50 Kutcha 10,850 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,00
Internal Monitoring Report-Machhagaon Subproject (Dec 2016)
RS, ISPMC
66
0/-
290 280 Disty 19 A 5 Res Trilochan Jena SC <25000 20 Kutcha 12,540 Paid 24,000 10,000 2,000 36,000
291 281 Disty 19 A 5 Res Chheta Das SC <25000 15 Kutcha 11,655 Paid 24,000 10,000 2,000 36,000
292 282 Disty 19 A 5 Res Babaji Bhoi SC <25000 15 Kutcha 11,655 Paid - 10,000 2,000 12,000
APs having more than one structure will not entitle for Rs.24,000/-
293 283 Disty 19 A 5 Res Rama Bhoi SC <25000 15 Kutcha 11,655 Paid 24,000 10,000 2,000 36,000
294 284 Disty 19 A 5 Res Suka Bhoi SC <25000 20 Kutcha 12,540 Paid 24,000 10,000 2,000 36,000
295 298 Disty 19 A 5 Res Rama Chandra Bhoi
SC <25000 15 Kutcha 11,655 Paid 24,000 10,000 2,000 36,000
296 299 Disty 19 A 5 Res Badal Bhoi SC <25000 15 Kutcha 11,655 Paid 24,000 10,000 2,000 36,000
297 300 Disty 19 A 5 Res Babaji Bhoi SC <25000 15 Kutcha 11,655 Paid - 10,000 2,000 12,000
APs having more than one structure will not entitle for Rs.24,000/-
298 301 Disty 19 A 5 Res Dukha Bhoi SC <25000 15 Kutcha 11,655 Paid 24,000 10,000 2,000 36,000
299 302 Disty 19 A 5 Res Suka Bhoi SC <25000 15 Kutcha 11,655 Paid - 10,000 2,000 12,000
APs having more than one structure will not entitle for Rs.24,000/-
300 303 Disty 19 A 5 Res Kalandi Bhoi SC <25000 15 Kutcha 11,655 Paid 24,000 10,000 2,000 36,000
301 179 Disty 19 A 5 Res Sankar Behera Gen <25000 15 Kutcha 11,655 Paid 24,000 10,000 2,000 36,000
302 184 Disty 19 A 5 Res Jagabandhu Nath Gen <25000 30 Kutcha 14,310 Paid 24,000 10,000 2,000 36,000
303 712 Disty No 7 5 Res Litun Biswal Gen <25000 20 Kutcha 5,540 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
Internal Monitoring Report-Machhagaon Subproject (Dec 2016)
RS, ISPMC
67
304 714 Disty No 7 5 Res Bansidhar Rout Gen <25000 20 Kutcha 5,540 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
305 717 Disty No 7 5 Res Purusottam Rout Gen <25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
306 718 Disty No 7 5 Res Kailash Sahoo Gen <25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
307 719 Disty No 7 5 Res Krushna Chandra Sahoo
Gen <25000 20 Semi Pucca 10,600 Paid - 10,000 2,000 2,000 - 14,000
APs having more than one structure will not entitle for Rs.24,000/-
308 721 Disty No 7 5 Res Purna Chandra Barik
Gen <25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
309 723 Disty No 7 5 Res Hemanta Behera Gen <25000 20 Semi Pucca 10,600 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
310 724 Disty No 7 5 Res Sarojini Nanda Gen <25000 20 Semi Pucca 10,600 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to
Internal Monitoring Report-Machhagaon Subproject (Dec 2016)
RS, ISPMC
68
Rs.36,000/-
311 728 Disty No 7 5 Res Brundaban Dash Gen <25000 10 Semi Pucca 6,300 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
312 730 Disty No 7 5 Res Brundaban Dash Gen <25000 10 Kutcha 3,770 Paid - 10,000 2,000 2,000 - 14,000
APs having more than one structure will not entitle for Rs.24,000/-
313 732 Disty No 7 5 Res Susil Kumar Swain Gen <25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
314 734 Disty No 7 5 Res Batakrushna Nayak Gen <25000 20 Kutcha 5,540 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
315 740 Disty No 7 5 Res Debendra Jena Gen <25000 20 Kutcha 5,540 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
316 742 Disty No 7 5 Res Ajaya Rout Gen <25000 20 Kutcha 5,540 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
Internal Monitoring Report-Machhagaon Subproject (Dec 2016)
RS, ISPMC
69
317 743 Disty No 7 5 Res Sarat Rout Gen <25000 20 Kutcha 5,540 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
318 744 Disty No 7 5 Res Padmachran Muduli
Gen <25000 30 Kutcha 7,310 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
319 745 Disty No 7 5 Res Padmachran Muduli
Gen <25000 40 Kutcha 9,080 Paid - 10,000 2,000 2,000 - 14,000
APs having more than one structure will not entitle for Rs.24,000/-
320 746 Disty No 7 5 Res Birabar Lenka Gen <25000 40 Kutcha 9,080 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
321 747 Disty No 7 5 Res Birabar Lenka Gen <25000 20 Kutcha 5,540 Paid - 10,000 2,000 2,000 - 14,000
APs having more than one structure will not entitle for Rs.24,000/-
322 752 Disty No 7 5 Res Sarat Kathua Gen <25000 12 Kutcha 4,124 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
323 757 Disty No 7 5 Res Dillip Biswal Gen <25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to
Internal Monitoring Report-Machhagaon Subproject (Dec 2016)
RS, ISPMC
70
Rs.36,000/-
324 769 Disty No 7 5 Res Golok Barik OBC <25000 10 Kutcha 5,770 Paid 24,000 10,000 2,000 5,000.00 41,000
Additional Rs.5000/- paid for VA in addition to Rs.36,000/-
325 770 Disty No 7 5 Res Braja Kishor Mohapatra
Gen <25000 10 Kutcha 3,770 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
326 771 Disty No 7 5 Res Chakradhar Mohapatra
Gen <25000 8 Semi Pucca 5,440 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
327 774 Disty No 7 5 Res Premamamda Behera
Gen <25000 20 Kutcha 5,540 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
328 775 Disty No 7 5 Res Muralidhar Pradhan Gen <25000 20 Kutcha 5,540 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
329 776 Disty No 7 5 Res Sasi Mallick SC <25000 40 Kutcha 9,080 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
Internal Monitoring Report-Machhagaon Subproject (Dec 2016)
RS, ISPMC
71
330 788 Disty No 7 5 Res Ghanashyam Moharana
Gen <25000 30 Kutcha 7,310 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
331 789 Disty No 7 5 Res Ashok Parida Gen <25000 40 Kutcha 9,080 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
332 790 Disty No 7 5 Res Akhyaya Parida Gen <25000 40 Kutcha 9,080 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
333 791 Disty No 7 5 Res Manoranjan Parida Gen <25000 40 Kutcha 9,080 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
334 792 Disty No 7 5 Res Padan Pradhan Gen <25000 20 Kutcha 5,540 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
335 793 Disty No 7 5 Res Hadibandhu Parida Gen <25000 40 Kutcha 9,080 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
336 794 Disty No 7 5 Res Niranjan Behera Gen <25000 15 Kutcha 4,655 Paid - 10,000 2,000 2,000 - 14,000
APs having more than one structure will not entitle for
Internal Monitoring Report-Machhagaon Subproject (Dec 2016)
RS, ISPMC
72
Rs.24,000/-
337 797 Disty No 7 5 Res Rustam Khan Muslim
<25000 10 Kutcha 3,770 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
338 810 Disty No 7 5 Res Ranjit Yadv Gen <25000 20 Kutcha 5,540 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
339 811 Disty No 7 5 Res Nabaghan Majhi SC <25000 20 Kutcha 12,540 Paid 24,000 10,000 2,000 36,000
340 813 Disty No 7 5 Res Ramesh Bhoi SC <25000 50 Kutcha 17,850 Paid 24,000 10,000 2,000 36,000
341 802 Disty No 7 5 Res Narayan Bhoi SC <25000 20 Kutcha 12,540 Paid 24,000 10,000 2,000 36,000
342 803 Disty No 7 5 Res Arabind Bhoi SC <25000 10 Kutcha 10,770 Paid 24,000 10,000 2,000 36,000
343 805 Disty No 7 5 Res Dhirendra Bhoi SC <25000 10 Kutcha 10,770 Paid 24,000 10,000 2,000 36,000
344 806 Disty No 7 5 Res Raghu Sethi SC <25000 10 Kutcha 10,770 Paid 24,000 10,000 2,000 36,000
345 807 Disty No 7 5 Res Mituram Bhoi SC <25000 10 Kutcha 10,770 Paid 24,000 10,000 2,000 36,000
346 782 Disty No 7 5 Res Sanatan Bhoi SC <25000 20 Kutcha 12,540 Paid - 10,000 2,000 12,000
APs having more than one structure will not entitle for Rs.24,000/-
347 783 Disty No 7 5 Res Daitari Bhoi SC <25000 15 Kutcha 11,655 Paid 24,000 10,000 2,000 36,000
348 784 Disty No 7 5 Res Sanatan Bhoi SC <25000 25 Kutcha 13,425 Paid - 10,000 2,000 12,000
APs having more than one structure will not entitle for Rs.24,000/-
349 785 Disty No 7 5 Res Kangali Bhoi SC <25000 15 Kutcha 11,655 Paid 24,000 10,000 2,000 36,000
350 786 Disty No 7 5 Res Adikanta Nayak SC <25000 20 Kutcha 12,540 Paid 24,000 10,000 2,000 36,000
351 787 Disty No 7 5 Res Rasananda Nayak SC <25000 15 Kutcha 11,655 Paid 24,000 10,000 2,000 36,000
Internal Monitoring Report-Machhagaon Subproject (Dec 2016)
RS, ISPMC
73
352 737 Disty No 7 5 Res Babuli Gochayat SC <25000 30 Kutcha 14,310 Paid 24,000 10,000 2,000 36,000
353 738 Disty No 7 5 Res Karunakar Jena SC <25000 20 Kutcha 12,540 Paid 24,000 10,000 2,000 36,000
354 739 Disty No 7 5 Res Hata Kishore Jena SC <25000 20 Kutcha 12,540 Paid 24,000 10,000 2,000 36,000
355 741 Disty No 7 5 Res Artatran Jena SC <25000 20 Kutcha 12,540 Paid 24,000 10,000 2,000 36,000
356 713 Disty No 7 5 Res Sarat Bhoi SC <25000 20 Kutcha 12,540 Paid 24,000 10,000 2,000 36,000
357 748 Disty No 7 5 Res Brahmanand Sethi SC <25000 20 Kutcha 12,540 Paid 24,000 10,000 2,000 36,000
358 749 Disty No 7 5 Res Kailash Sethi SC <25000 40 Kutcha 16,080 Paid 24,000 10,000 2,000 36,000
359 750 Disty No 7 5 Res Dhula Sethi SC <25000 20 Kutcha 12,540 Paid 24,000 10,000 2,000 36,000
360 751 Disty No 7 5 Res Prahallad Sethi SC <25000 20 Kutcha 12,540 Paid 24,000 10,000 2,000 36,000
361 759 Disty No 7 5 Res Sukanta Bhoi SC <25000 15 Kutcha 11,655 Paid 24,000 10,000 2,000 36,000
362 767 Disty No 7 5 Res Bhagirsthi Khatua Gen <25000 20 Kutcha 5,540 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
363 768 Disty No 7 5 Res Lingaraj Khatua Gen <25000 10 Pucca 21,000 Paid 24,000 10,000 2,000 36,000
364 808 Disty No 7 5 Res Panab Bhoi SC <25000 10 Kutcha 10,770 Paid 24,000 10,000 2,000 36,000
365 809 Disty No 7 5 Res Kailash Bhoi SC <25000 40 Kutcha 16,080 Paid - 10,000 2,000 12,000
APs having more than one structure will not entitle for Rs.24,000/-
366 795 Disty No 7 5 Res Sriram Sethi SC <25000 10 Kutcha 10,770 Paid 24,000 10,000 2,000 36,000
367 796 Disty No 7 5 Res Anam Sethi SC <25000 12 Kutcha 11,124 Paid 24,000 10,000 2,000 36,000
368 815 Disty No 7 5 Res Swaliah Khatun Muslim
<25000 60 Semi Pucca 27,800 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
369 816 Disty No 7 5 Res Abdul Rajak Muslim
<25000 15 Semi Pucca 8,450 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
Internal Monitoring Report-Machhagaon Subproject (Dec 2016)
RS, ISPMC
74
370 817 Disty No 7 5 Res Abdul Dayan Muslim
<25000 20 Kutcha 5,540 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
371 818 Disty No 7 5 Res Abdul Dayan Muslim
<25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
372 819 Disty No 7 5 Res HaYateen Bibi Muslim
<25000 40 Semi Pucca 19,200 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
373 304 Disty 19 A 5 Com Somanath Barik Gen <25000 15 Kutcha 11,655 Paid 24,000 10,000 2,000 36,000
374 305 Disty 19 A 5 Com Santos Sahoo Gen <25000 15 Kutcha 11,655 Paid 24,000 10,000 2,000 36,000
375 306 Disty 19 A 5 Com Niranjan Nayak Gen <25000 15 Kutcha 11,655 Paid 24,000 10,000 2,000 36,000
376 307 Disty 19 A 5 Com Lingaraj Nayak Gen <25000 15 Kutcha 11,655 Paid 24,000 10,000 2,000 36,000
377 160 Disty 19 A 5 Com Anama Barik Gen <25000 10 Kutcha 10,770 Paid 24,000 10,000 2,000 36,000
378 163 Disty 19 A 5 Com Prasanna Ku. Das Gen <25000 10 Kutcha 10,770 Paid 24,000 10,000 2,000 36,000
379 164 Disty 19 A 5 Com Babu Barik Gen <25000 10 Kutcha 10,770 Paid 24,000 10,000 2,000 36,000
380 165 Disty 19 A 5 Com Rajendra Barik Gen <25000 10 Kutcha 10,770 Paid 24,000 10,000 2,000 36,000
381 180 Disty 19 A 5 Com Guguli Mohanty Gen <25000 15 Kutcha 11,655 Paid 24,000 10,000 2,000 36,000
382 181 Disty 19 A 5 Com Jyotiranjan Mohanty
Gen <25000 15 Kutcha 11,655 Paid 24,000 10,000 2,000 36,000
383 182 Disty 19 A 5 Com Manoj Barik Gen <25000 10 Kutcha 10,770 Paid 24,000 10,000 2,000 36,000
384 183 Disty 19 A 5 Com Jyotiranjan Mohanty
Gen <25000 10 Kutcha 10,770 Paid - 10,000 2,000 12,000
APs having more than one structure will not entitle for Rs.24,000/-
385 189 Disty 19 A 5 Com Jhatu Mishra Gen <25000 15 Kutcha 11,655 Paid 24,000 10,000 2,000 36,000
386 192 Disty 19 A 5 Com Basanta Sethi Gen <25000 15 Kutcha 11,655 Paid 24,000 10,000 2,000 36,000
387 193 Disty 19 A 5 Com Bijoy Sethi Gen <25000 18 Kutcha 12,186 Paid 24,000 10,000 2,000 36,000
Internal Monitoring Report-Machhagaon Subproject (Dec 2016)
RS, ISPMC
75
388 195 Disty 19 A 5 Com Tukuna Behera Gen <25000 10 Kutcha 3,770 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
389 162 Disty 19 A 5 Com Fakir Das Gen <25000 10 Kutcha 3,770 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
390 170 Disty 19 A 5 Com Sukadev Patra Gen <25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
391 172 Disty 19 A 5 Com Ambika Prasad Mohanty
Gen <25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
392 173 Disty 19 A 5 Com Sarada Prasanna Mohanty
Gen <25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
393 196 Disty 19 A 5 Com Bhagabat Behera Gen <25000 10 Kutcha 3,770 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
394 197 Disty 19 A 5 Com Fakir Sahu Gen <25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to
Internal Monitoring Report-Machhagaon Subproject (Dec 2016)
RS, ISPMC
76
Rs.36,000/-
395 225 Disty 19 A 5 Com Pravakar Khuntia Gen <25000 12 Kutcha 11,124 Paid 24,000 10,000 2,000 36,000
396 278 Disty 19 A 5 Com Kelu Charan Behera
Gen <25000 15 Kutcha 11,655 Paid 24,000 10,000 2,000 36,000
397 285 Disty 19 A 5 Com Subas Bhoi SC <25000 15 Kutcha 11,655 Paid 24,000 10,000 2,000 36,000
398 286 Disty 19 A 5 Com Bansidhar Guru Gen <25000 15 Kutcha 11,655 Paid 24,000 10,000 2,000 36,000
399 287 Disty 19 A 5 Com Bipin Guru Gen <25000 15 Kutcha 11,655 Paid 24,000 10,000 2,000 36,000
400 288 Disty 19 A 5 Com Bula Mallick SC <25000 15 Kutcha 11,655 Paid 24,000 10,000 2,000 36,000
401 289 Disty 19 A 5 Com Bhimasena Barik Gen <25000 15 Kutcha 11,655 Paid 24,000 10,000 2,000 36,000
402 290 Disty 19 A 5 Com Jaria Lenka Gen <25000 12 Kutcha 11,124 Paid 24,000 10,000 2,000 36,000
403 198 Disty 19 A 5 Com Sudhir Sahoo Gen <25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
404 199 Disty 19 A 5 Com Jitendra Behera Gen <25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
405 200 Disty 19 A 5 Com Harekrushna Behera
Gen <25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
406 201 Disty 19 A 5 Com Niranjan Behera Gen <25000 15 Kutcha 11,655 Paid - 10,000 2,000 12,000
APs having more than one structure will not entitle for Rs.24,000/-
407 202 Disty 19 A 5 Com Satyabadi Behera Gen <25000 12 Kutcha 11,124 Paid 24,000 10,000 2,000 36,000
408 204 Disty 19 A 5 Com Ramesh Barik Gen <25000 12 Kutcha 11,124 Paid 24,000 10,000 2,000 36,000
Internal Monitoring Report-Machhagaon Subproject (Dec 2016)
RS, ISPMC
77
409 205 Disty 19 A 5 Com Arabind Behera Gen <25000 15 Kutcha 11,655 Paid 24,000 10,000 2,000 36,000
410 208 Disty 19 A 5 Com Ganesh Behera Gen <25000 12 Kutcha 11,124 Paid 24,000 10,000 2,000 36,000
411 209 Disty 19 A 5 Com Ram Barik Gen <25000 15 Kutcha 11,655 Paid 24,000 10,000 2,000 36,000
412 210 Disty 19 A 5 Com Ramesh Lenka Gen <25000 12 Kutcha 11,124 Paid 24,000 10,000 2,000 36,000
413 211 Disty 19 A 5 Com Akshaya Behera Gen <25000 12 Kutcha 11,124 Paid 24,000 10,000 2,000 36,000
414 213 Disty 19 A 5 Com Basanta Sahoo Gen <25000 15 Semi-pucca 8,450 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
415 214 Disty 19 A 5 Com Manoj Parida Gen <25000 10 Kutcha 10,770 Paid 24,000 10,000 2,000 36,000
416 215 Disty 19 A 5 Com Sarat Sahoo Gen <25000 20 Semi-pucca 10,600 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
417 216 Disty 19 A 5 Com Dharmananda Mallick
Gen <25000 10 Kutcha 3,770 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
418 218 Disty 19 A 5 Com Trinath Khandual Gen <25000 10 Kutcha 3,770 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
419 219 Disty 19 A 5 Com Duari Shoo Gen <25000 20 Kutcha 5,540 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
420 222 Disty 19 A 5 Com Tarini Ashram C/O Bhagaban Dash
Gen <25000 Kutcha 2,000 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition
Internal Monitoring Report-Machhagaon Subproject (Dec 2016)
RS, ISPMC
78
to Rs.36,000/-
421 223 Disty 19 A 5 Com Balaram Dash Gen <25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
422 291 Disty 19 A 5 Com Suresh Sahoo Gen <25000 20 Semi-pucca 10,600 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
423 293 Disty 19 A 5 Com Muralidhar Sahoo Gen <25000 12 Kutcha 11,124 Paid 24,000 10,000 2,000 36,000
424 296 Disty 19 A 5 Com Kailash Sahoo Gen <25000 12 Kutcha 4,124 Paid - 10,000 2,000 2,000 - 14,000
APs having more than one structure will not entitle for Rs.24,000/-
425 297 Disty 19 A 5 Com Muralidhar Sahoo Gen <25000 12 Kutcha 4,124 Paid - 10,000 2,000 2,000 - 14,000
APs having more than one structure will not entitle for Rs.24,000/-
426 715 Disty No 7 5 Com Laxmidhar Mohapatra
Gen <25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
427 716 Disty No 7 5 Com Dhaneswar Swain Gen <25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,00
Internal Monitoring Report-Machhagaon Subproject (Dec 2016)
RS, ISPMC
79
0/-
428 720 Disty No 7 5 Com Jairam Swain Gen <25000 25 Kutcha 6,425 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
429 722 Disty No 7 5 Com Abhaya Nayak Gen <25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
430 725 Disty No 7 5 Com Niranjan Mohapatra Gen <25000 20 Kutcha 5,540 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
431 726 Disty No 7 5 Com Buibhuna Barik Gen <25000 12 Kutcha 4,124 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
432 735 Disty No 7 5 Com Rabindra Nayak Gen <25000 20 Kutcha 12,540 Paid 24,000 10,000 2,000 36,000
433 731 Disty No 7 5 Com Padmini Jena Gen <25000 15 Semi-pucca 8,450 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
434 733 Disty No 7 5 Com Padmanav Swain Gen <25000 20 Semi-pucca 10,600 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,00
Internal Monitoring Report-Machhagaon Subproject (Dec 2016)
RS, ISPMC
80
0/-
435 753 Disty No 7 5 Com Pravat Kumar Jena Gen <25000 40 Semi-pucca 35,700 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
436 754 Disty No 7 5 Com Fakir Mallik SC <25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
437 756 Disty No 7 5 Com Khetramohan Biswal
Gen <25000 20 Semi-pucca 10,600 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
438 762 Disty No 7 5 Com Basanta Panda Gen <25000 20 Pucca 26,000 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
439 763 Disty No 7 5 Com Sudam Ch. Sahoo Gen <25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
440 765 Disty No 7 5 Com Rabindra Bastia Gen <25000 12 Kutcha 4,124 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
Internal Monitoring Report-Machhagaon Subproject (Dec 2016)
RS, ISPMC
81
441 766 Disty No 7 5 Com Hemanta Barik OBC <25000 20 Semi-pucca 10,600 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
442 777 Disty No 7 5 Com Kelu Chran Sethi SC <25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
443 778 Disty No 7 5 Com Baladev Mohapatra Gen <25000 12 Kutcha 4,124 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
444 779 Disty No 7 5 Com Babuli Mallick SC <25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
445 780 Disty No 7 5 Com Babaji Mallick SC <25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
446 781 Disty No 7 5 Com Baishnab Bhoi SC <25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
PKG-5 15,35,091 36,00,000
16,50,000
3,30,000
1,76,000
4,10,000.00
61,66,000
Internal Monitoring Report-Machhagaon Subproject (Dec 2016)
RS, ISPMC
82
447 464 Disty No 10
6 Res Lusa Tudu SC <25000 20 Kutcha 5,540 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
448 465 Disty No 10
6 Res Dujhar Murmu SC <25000 20 Kutcha 5,540 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
449 466 Disty No 10
6 Res Bikram Murmu SC <25000 20 Kutcha 5,540 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
450 467 Disty No 10
6 Res Kandan Murmu SC <25000 15 Kutcha 11,655 Paid 24,000 10,000 2,000 36,000
451 468 Disty No 10
6 Res Sita Soren SC <25000 15 Kutcha 11,655 Paid 24,000 10,000 2,000 36,000
452 469 Disty No 10
6 Res Maheswar Hibru SC <25000 25 Kutcha 6,425 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
453 470 Disty No 10
6 Res Sukanta Marandi SC <25000 15 Kutcha 11,655 Paid 24,000 10,000 2,000 36,000
454 471 Disty No 10
6 Res Badu Murmu SC <25000 15 Kutcha 11,655 Paid 24,000 10,000 2,000 36,000
455 472 Disty No 10
6 Res Masa Murmu SC <25000 20 Kutcha 12,540 Paid 24,000 10,000 2,000 36,000
456 473 Disty No 10
6 Res Kalandi Marandi SC <25000 15 Kutcha 11,655 Paid 24,000 10,000 2,000 36,000
457 474 Disty No 10
6 Res Arjun Champia SC <25000 20 Kutcha 12,540 Paid 24,000 10,000 2,000 36,000
458 475 Disty No 10
6 Res Parbat Soren SC <25000 15 Kutcha 11,655 Paid 24,000 10,000 2,000 36,000
459 476 Disty No 10
6 Res Sitaram Tudu SC <25000 15 Kutcha 11,655 Paid 24,000 10,000 2,000 36,000
460 477 Disty No 10
6 Res Thakur Murmu SC <25000 15 Kutcha 11,655 Paid 24,000 10,000 2,000 36,000
461 478 Disty No 10
6 Res Niranjan Das Gen <25000 15 Kutcha 4,655 Paid - 10,000 2,000 2,000 - 14,000
APs having more than one structure will not entitle
Internal Monitoring Report-Machhagaon Subproject (Dec 2016)
RS, ISPMC
83
for Rs.24,000/-
462 479 Disty No 10
6 Res Gumudi Soren SC <25000 15 Kutcha 11,655 Paid 24,000 10,000 2,000 36,000
463 480 Disty No 10
6 Res Sagar Champa SC <25000 15 Kutcha 11,655 Paid 24,000 10,000 2,000 36,000
464 481 Disty No 10
6 Res Kandura Champia SC <25000 15 Kutcha 11,655 Paid 24,000 10,000 2,000 36,000
465 482 Disty No 10
6 Res Chintamani Champia
SC <25000 15 Kutcha 11,655 Paid 24,000 10,000 2,000 36,000
466 484 Disty No 10
6 Res Malli Tudu Gen <25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
467 485 Disty No 10
6 Res Budhia Purtia SC <25000 15 Kutcha 11,655 Paid 24,000 10,000 2,000 36,000
468 492 Disty No 10
6 Res Gulam Rasid Muslim
<25000 20 Kutcha 10,540 Paid 24,000 10,000 2,000 2,000 38,000
Additional Rs.2000/- paid for LA in addition to Rs.36,000/-
469 493 Disty No 10
6 Res Mina Bibi Muslim
<25000 20 Kutcha 5,540 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
470 494 Disty No 10
6 Res Farida Bibi Muslim
<25000 20 Kutcha 12,540 Paid 24,000 10,000 2,000 36,000
471 495 Disty No 10
6 Res Muralidhar Sahoo Gen <25000 10 Semi Pucca 6,300 Paid - 10,000 2,000 2,000 - 14,000
APs having more than one structure will not entitle for Rs.24,000/-
472 496 Disty No 10
6 Res Nilamani Sahoo Gen <25000 20 Semi Pucca 10,600 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to
Internal Monitoring Report-Machhagaon Subproject (Dec 2016)
RS, ISPMC
84
Rs.36,000/-
473 497 Disty No 10
6 Res Sridhar Sahoo Gen <25000 20 Semi Pucca 10,600 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
474 498 Disty No 10
6 Res Rabindra Swain Gen <25000 10 Semi Pucca 6,300 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
475 503 Disty No 10
6 Res Prafulla Moharana Gen <25000 10 Semi Pucca 6,300 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
476 504 Disty No 10
6 Res Krushna Ch. Sahoo Gen <25000 15 Semi Pucca 8,450 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
477 505 Disty No 10
6 Res Bishnu Sahoo Gen <25000 15 Semi Pucca 8,450 Paid - 10,000 2,000 2,000 - 14,000
APs having more than one structure will not entitle for Rs.24,000/-
478 506 Disty No 10
6 Res Rusi Sahoo Gen <25000 15 Semi Pucca 8,450 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
Internal Monitoring Report-Machhagaon Subproject (Dec 2016)
RS, ISPMC
85
479 507 Disty No 10
6 Res Niranjan Sahoo Gen <25000 15 Semi Pucca 8,450 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
480 508 Disty No 10
6 Res Biranchi Sahoo Gen <25000 20 Semi Pucca 10,600 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
481 509 Disty No 10
6 Res Narayan Sahoo Gen <25000 15 Semi Pucca 8,450 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
482 510 Disty No 10
6 Res Baina Sahoo Gen <25000 20 Semi Pucca 10,600 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
483 511 Disty No 10
6 Res Srikanta Sahoo Gen <25000 10 Semi Pucca 6,300 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
484 512 Disty No 10
6 Res Srikanta Sahoo Gen <25000 20 Semi Pucca 10,600 Paid - 10,000 2,000 2,000 - 14,000
APs having more than one structure will not entitle for Rs.24,000/-
485 514 Disty No 10
6 Res Ramakanta Sahoo Gen <25000 20 Semi Pucca 10,600 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to
Internal Monitoring Report-Machhagaon Subproject (Dec 2016)
RS, ISPMC
86
Rs.36,000/-
486 515 Disty No 10
6 Res Usharani Sahoo Gen <25000 60 Kutcha 12,620 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
487 516 Disty No 10
6 Res Bhramarbar Sahoo Gen <25000 10 Semi Pucca 6,300 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
488 517 Disty No 10
6 Res Prasanna Sahoo Gen <25000 15 Semi Pucca 8,450 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
489 518 Disty No 10
6 Res Benudhar Sahoo Gen <25000 30 Semi Pucca 14,900 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
490 519 Disty No 10
6 Res Bhakta Chran Sahoo
Gen <25000 20 Semi Pucca 10,600 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
491 520 Disty No 10
6 Res Bibhu Chran Sahoo Gen <25000 10 Semi Pucca 6,300 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
Internal Monitoring Report-Machhagaon Subproject (Dec 2016)
RS, ISPMC
87
492 521 Disty No 10
6 Res Debendra Sahoo Gen <25000 15 Semi Pucca 8,450 Paid - 10,000 2,000 2,000 - 14,000
APs having more than one structure will not entitle for Rs.24,000/-
493 522 Disty No 10
6 Res Sridhar Sahoo Gen <25000 20 Semi Pucca 10,600 Paid - 10,000 2,000 2,000 - 14,000
APs having more than one structure will not entitle for Rs.24,000/-
494 523 Disty No 10
6 Res Narendra Sahoo Gen <25000 15 Semi Pucca 8,450 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
495 524 Disty No 10
6 Res Anant Sahoo Gen <25000 15 Semi Pucca 8,450 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
496 539 Disty No 10
6 Res Kuni Mallick SC <25000 30 Kutcha 14,310 Paid 24,000 10,000 2,000 36,000
497 540 Disty No 10
6 Res Budhisyam Mallick SC <25000 25 Kutcha 13,425 Paid 24,000 10,000 2,000 36,000
498 541 Disty No 10
6 Res Kalandi Mallick SC <25000 20 Kutcha 12,540 Paid 24,000 10,000 2,000 36,000
499 542 Disty No 10
6 Res Pravat Kumar Behera
Gen <25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
500 543 Disty No 10
6 Res Maheswar Mallick SC <25000 15 Kutcha 11,655 Paid 24,000 10,000 2,000 36,000
501 545 Disty No 10
6 Res Satyabrata Mohapatra
Gen <25000 30 Semi Pucca 14,900 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
Internal Monitoring Report-Machhagaon Subproject (Dec 2016)
RS, ISPMC
88
502 546 Disty No 10
6 Res Satyabrata Mohapatra
Gen <25000 15 Semi Pucca 8,450 Paid - 10,000 2,000 2,000 - 14,000
APs having more than one structure will not entitle for Rs.24,000/-
503 547 Disty No 10
6 Res Satyabrata Mohapatra
Gen <25000 15 Semi Pucca 8,450 Paid - 10,000 2,000 2,000 - 14,000
APs having more than one structure will not entitle for Rs.24,000/-
504 549 Disty No 10
6 Res Satyabrata Mohapatra
Gen <25000 30 Semi Pucca 14,900 Paid - 10,000 2,000 2,000 - 14,000
APs having more than one structure will not entitle for Rs.24,000/-
505 550 Disty No 10
6 Res Susant Samantaray Gen <25000 25 Kutcha 6,425 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
506 551 Disty No 10
6 Res Sakuntala Behera Gen <25000 40 Semi Pucca 19,200 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
507 552 Disty No 10
6 Res Pahali Samal Gen <25000 15 Semi Pucca 8,450 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
508 553 Disty No 10
6 Res Dharitri Khuntia Gen <25000 30 Semi Pucca 14,900 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to
Internal Monitoring Report-Machhagaon Subproject (Dec 2016)
RS, ISPMC
89
Rs.36,000/-
509 555 Disty No 10
6 Res Durga Chran Swain Gen <25000 30 Semi Pucca 14,900 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
510 556 Disty No 10
6 Res Sangram Kishore Das
Gen <25000 30 Semi Pucca 14,900 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
511 557 Disty No 10
6 Res Baishnab Samal Gen <25000 15 Semi Pucca 8,450 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
512 558 Disty No 10
6 Res Krushna Ch. Samal Gen <25000 30 Semi Pucca 14,900 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
513 560 Disty No 10
6 Res Sunil Kumar Ray Gen <25000 30 Semi Pucca 14,900 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
514 561 Disty No 10
6 Res Minatirani Ray Gen <25000 15 Semi Pucca 8,450 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
Internal Monitoring Report-Machhagaon Subproject (Dec 2016)
RS, ISPMC
90
515 562 Disty No 10
6 Res Pradip Ray Gen <25000 15 Semi Pucca 8,450 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
516 586 Disty No 10
6 Res Prahallad Swain Gen <25000 80 Semi Pucca 36,400 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
517 593 Disty No 10
6 Res Purnananda Ojha Gen <25000 25 Semi Pucca 12,750 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
518 594 Disty No 10
6 Res Kailash Matia Gen <25000 10 Semi Pucca 6,300 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
519 595 Disty No 10
6 Res Gobind Ojha Gen <25000 10 Semi Pucca 6,300 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
520 598 Disty No 10
6 Res Paramananda Das Gen <25000 15 Semi Pucca 8,450 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
521 836 Disty No 10
6 Res Sudarsan Mohanty Gen <25000 20 Kutcha 5,540 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to
Internal Monitoring Report-Machhagaon Subproject (Dec 2016)
RS, ISPMC
91
Rs.36,000/-
522 837 Disty No 10
6 Res Kamles Mohanty Gen <25000 12 Semi Pucca 7,160 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
523 840 Disty No 10 - H
6 Res Hari Mallik SC <25000 10 Kutcha 10,770 Paid 24,000 10,000 2,000 36,000
524 841 Disty No 10 - H
6 Res Bira Mallick SC <25000 30 Kutcha 14,310 Paid 24,000 10,000 2,000 36,000
525 843 Disty No 10 - H
6 Res Bhaskar Das SC <25000 20 Kutcha 12,540 Paid 24,000 10,000 2,000 36,000
526 845 Disty No 10 - H
6 Res Sarat Ch swain Gen <25000 20 Semi Pucca 10,600 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
527 846 Disty No 10 - H
6 Res Dhurba Chran Behera
Gen <25000 30 Kutcha 7,310 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
528 851 Disty No 10 - H
6 Res Kartik Sahoo Gen <25000 20 Kutcha 5,540 Paid - 10,000 2,000 2,000 - 14,000
APs having more than one structure will not entitle for Rs.24,000/-
529 852 Disty No 10 - H
6 Res Kartik Sahoo Gen <25000 50 Kutcha 10,850 Paid - 10,000 2,000 2,000 - 14,000
APs having more than one structure will not entitle for Rs.24,000/-
530 853 Disty No 10 - H
6 Res Sarada Sahoo Gen <25000 30 Kutcha 14,310 Paid 24,000 10,000 2,000 36,000
Internal Monitoring Report-Machhagaon Subproject (Dec 2016)
RS, ISPMC
92
531 854 Disty No 10 - H
6 Res Krutibas Sahoo Gen <25000 30 Kutcha 7,310 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
532 855 Disty No 10 - H
6 Res Guru Ojha OBC <25000 20 Kutcha 5,540 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
533 856 Disty No 10 - H
6 Res Bipin Ojha Gen <25000 30 Kutcha 7,310 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
534 858 Disty No 10 - H
6 Res Rama Chandra Beura
Gen <25000 20 Kutcha 5,540 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
535 859 Disty No 10 - H
6 Res Krushna Das Gen <25000 20 Kutcha 5,540 Paid - 10,000 2,000 2,000 - 14,000
APs having more than one structure will not entitle for Rs.24,000/-
536 860 Disty No 10 - H
6 Res Sarada Routray Gen <25000 20 Semi Pucca 17,600 Paid 24,000 10,000 2,000 36,000
537 861 Disty No 10 - H
6 Res Santosh Kumar Mohanty
Gen <25000 50 Kutcha 10,850 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
Internal Monitoring Report-Machhagaon Subproject (Dec 2016)
RS, ISPMC
93
538 873 Disty No 10 - H
6 Res Purna Chandra Mishra
Gen <25000 40 Kutcha 9,080 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
539 879 Disty No 10 - H
6 Res Ekrar Khan Muslim
<25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
540 880 Disty No 10 - H
6 Res Rahamat Khan Muslim
<25000 20 Semi Pucca 10,600 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
541 881 Disty No 10 - H
6 Res Rafiq Khan Muslim
<25000 20 Kutcha 5,540 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
542 882 Disty No 10 - H
6 Res Safique Khan Muslim
<25000 20 Kutcha 5,540 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
543 890 Disty No 10 - H
6 Res Hementa Behera Gen <25000 40 Kutcha 9,080 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
544 891 Disty No 10 - H
6 Res Sridhar Nayak Gen <25000 20 Kutcha 5,540 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to
Internal Monitoring Report-Machhagaon Subproject (Dec 2016)
RS, ISPMC
94
Rs.36,000/-
545 892 Disty No 10 - H
6 Res Sukadev Nayak Gen <25000 20 Kutcha 5,540 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
546 895 Disty No 10 - H
6 Res Babula Bhoi SC <25000 15 Kutcha 11,655 Paid 24,000 10,000 2,000 36,000
547 900 Disty No 10 - H
6 Res Saik Asid Muslim
<25000 20 Semi Pucca 10,600 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
548 901 Disty No 10 - H
6 Res Sk Juma Muslim
<25000 20 Kutcha 5,540 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
549 902 Disty No 10 - H
6 Res Akhyaya Sahoo Gen <25000 20 Kutcha 5,540 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
550 407 Disty No 8 6 Res Niranjan Sen Gen <25000 10 Semi Pucca 6,300 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
551 408 Disty No 8 6 Res Baidhar Sen Gen <25000 15 Semi Pucca 8,450 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,00
Internal Monitoring Report-Machhagaon Subproject (Dec 2016)
RS, ISPMC
95
0/-
552 409 Disty No 8 6 Res Dhadia Sen Gen <25000 10 Semi Pucca 6,300 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
553 410 Disty No 8 6 Res Tuni Dei Gen <25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
554 411 Disty No 8 6 Res Hadibandhu Sen Gen <25000 15 Semi Pucca 8,450 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
555 412 Disty No 8 6 Res Upendra Sen Gen <25000 15 Semi Pucca 8,450 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
556 413 Disty No 8 6 Res Pramod Kumar Das Gen <25000 10 Semi Pucca 6,300 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
557 414 Disty No 8 6 Res Hatakishore Das Gen <25000 10 Semi Pucca 6,300 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
Internal Monitoring Report-Machhagaon Subproject (Dec 2016)
RS, ISPMC
96
558 417 Disty No 8 6 Res Babaji Bhoi SC <25000 20 Kutcha 12,540 Paid - 10,000 2,000 12,000
APs having more than one structure will not entitle for Rs.24,000/-
559 463 Disty No 10
6 Com Ullas Das Gen <25000 15 Kutcha 22,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
560 487 Disty No 10
6 Com Manguli Behera Gen <25000 40 Semi-pucca 19,200 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
561 488 Disty No 10
6 Com Ram Singh Gen <25000 20 Kutcha 5,540 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
562 489 (1)
Disty No 10
6 Com Adwait Swain Gen <25000 20 Semi-pucca 10,600 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
563 489 (2)
Disty No 10
6 Com Budhishyam Ray Gen <25000 12 Semi-pucca 7,160 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
564 489 (3)
Disty No 10
6 Com Lochan Sahoo Gen <25000 20 Semi-pucca 28,600 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to
Internal Monitoring Report-Machhagaon Subproject (Dec 2016)
RS, ISPMC
97
Rs.36,000/-
565 490 Disty No 10
6 Com Baga Nana Gen <25000 10 Semi-pucca 6,300 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
566 499 Disty No 10
6 Com Sk. Azad Gen <25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
567 500 Disty No 10
6 Com Saik Rasid Muslim
<25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
568 501 Disty No 10
6 Com Gobind Das Gen <25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
569 502 Disty No 10
6 Com Tula Das Gen <25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
570 525 Disty No 10
6 Com Sania SC <25000 35 Kutcha 8,195 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
Internal Monitoring Report-Machhagaon Subproject (Dec 2016)
RS, ISPMC
98
571 526 Disty No 10
6 Com Deba Gen <25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
572 527 Disty No 10
6 Com Akmal Gen <25000 15 Semi-pucca 8,450 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
573 528 Disty No 10
6 Com Maguni Barik Gen <25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
574 529 Disty No 10
6 Com Sk. Sadam OBC <25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
575 530 Disty No 10
6 Com Ganesh Das Gen <25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
576 531 Disty No 10
6 Com Tofan Singh SC <25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
577 532 Disty No 10
6 Com Sk. Rahim Gen <25000 12 Kutcha 11,124 Paid 24,000 10,000 2,000 36,000
578 535 Disty No 10
6 Com Un Known Other
s <25000 15 Kutcha 11,655 Paid 24,000 10,000 2,000 36,000
579 536 Disty No 10
6 Com Niranjan Mallik Gen <25000 15 Kutcha 11,655 Paid 24,000 10,000 2,000 36,000
580 537 Disty No 10
6 Com Ajmal Khan SC <25000 15 Kutcha 11,655 Paid 24,000 10,000 2,000 36,000
Internal Monitoring Report-Machhagaon Subproject (Dec 2016)
RS, ISPMC
99
581 548 Disty No 10
6 Com Satyabrata Mohapatra
Gen <25000 15 Kutcha 22,655 Paid - 10,000 2,000 2,000 - 14,000
APs having more than one structure will not entitle for Rs.24,000/-
582 564 Disty No 10
6 Com Md. Mustaq Udin Musli
m <25000 15 Kutcha 22,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
583 565 Disty No 10
6 Com Md. Mustaq Udin Musli
m <25000 20 Kutcha 23,540 Paid - 10,000 2,000 2,000 - 14,000
APs having more than one structure will not entitle for Rs.24,000/-
584 566 Disty No 10
6 Com Bipin Khuntia Gen <25000 15 Kutcha 22,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
585 567 Disty No 10
6 Com Prafulla Biswal Gen <25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
586 568 Disty No 10
6 Com Tapan Barik Gen <25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
587 569 Disty No 10
6 Com Azad Khan (Kalia Auto)
Gen <25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to
Internal Monitoring Report-Machhagaon Subproject (Dec 2016)
RS, ISPMC
100
Rs.36,000/-
588 570 Disty No 10
6 Com Rakesh Das Gen <25000 20 Kutcha 5,540 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
589 571 Disty No 10
6 Com Pradipta Das Gen <25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
590 572 Disty No 10
6 Com Ranjan Barik Gen <25000 10 Kutcha 3,770 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
591 574 Disty No 10
6 Com Sk Gayasudin Muslim
<25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
592 575 Disty No 10
6 Com Sk Kayamudin Muslim
<25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
593 576 Disty No 10
6 Com Gagan Behera Gen <25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
Internal Monitoring Report-Machhagaon Subproject (Dec 2016)
RS, ISPMC
101
594 577 Disty No 10
6 Com Kartik Behera Gen <25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
595 578 Disty No 10
6 Com Gagan Behera Gen <25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
596 579 Disty No 10
6 Com Baban Behera Gen <25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
597 580 Disty No 10
6 Com Ramesh Ch. Sahoo Gen <25000 15 Semi-pucca 33,450 Paid 24,000 10,000 2,000 36,000
598 581 Disty No 10
6 Com Prafulla Behera Gen <25000 10 Kutcha 3,770 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
599 582 Disty No 10
6 Com D. Nira Gen <25000 15 Semi-pucca 8,450 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
600 584 Disty No 10
6 Com Basudev Das Gen <25000 10 Semi-pucca 24,300 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
Internal Monitoring Report-Machhagaon Subproject (Dec 2016)
RS, ISPMC
102
601 585 Disty No 10
6 Com Sanjaya Muduli Gen <25000 10 Kutcha 3,770 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
602 588 Disty No 10
6 Com Madhabananda Swain
Gen <25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
603 589 Disty No 10
6 Com Subasis Swain Gen <25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
604 590 Disty No 10
6 Com Dillip Swain Gen <25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
605 591 Disty No 10
6 Com Purnrnanda Swain Gen <25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
606 592 Disty No 10
6 Com Surendranath Muduli
Gen <25000 25 Semi-pucca 12,750 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
607 600 Disty No 10
6 Com Satyabrata Mohapatra
Gen <25000 25 Semi-pucca 30,750 Paid - 10,000 2,000 2,000 - 14,000
APs having more than one structure will not entitle for
Internal Monitoring Report-Machhagaon Subproject (Dec 2016)
RS, ISPMC
103
Rs.24,000/-
608 601 (1)
Disty No 10
6 Com Bansidhar Sahoo Gen <25000 10 Kutcha 3,770 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
609 601 (2)
Disty No 10
6 Com Prakash Dubey Gen <25000 10 Kutcha 3,770 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
610 601 (3)
Disty No 10
6 Com Pradyumna Lenka Gen <25000 10 Kutcha 3,770 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
611 827 Disty No 10
6 Com Pritiranjan Parida Gen <25000 10 Kutcha 10,770 Paid 24,000 10,000 2,000 36,000
612 830 Disty No 10
6 Com Ramakanta Mohanty
Gen <25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
613 832 Disty No 10
6 Com Kasinath Pani Gen <25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
614 833 Disty No 10
6 Com Tubula Nayak Gen <25000 15 Semi-pucca 8,450 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,00
Internal Monitoring Report-Machhagaon Subproject (Dec 2016)
RS, ISPMC
104
0/-
615 847 Disty No 10 - H
6 Com Rabindra Sahoo Gen <25000 12 Kutcha 4,124 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
616 848 Disty No 10 - H
6 Com Nanda Sahoo Gen <25000 10 Kutcha 3,770 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
617 849 Disty No 10 - H
6 Com Nanda Sahoo Gen <25000 12 Kutcha 4,124 Paid - 10,000 2,000 2,000 - 14,000
APs having more than one structure will not entitle for Rs.24,000/-
618 850 Disty No 10 - H
6 Com Sarada Prassana Acharya
Gen <25000 10 Semi-pucca 6,300 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
619 857 Disty No 10 - H
6 Com Pravat Kumar Beura
Gen <25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
620 863 Disty No 10 - H
6 Com Sarat Chandra Barik
Gen <25000 13 Kutcha 4,301 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
Internal Monitoring Report-Machhagaon Subproject (Dec 2016)
RS, ISPMC
105
621 864 Disty No 10 - H
6 Com Banambar Dash Gen <25000 13 Kutcha 4,301 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
622 865 Disty No 10 - H
6 Com Durga Chran Swain Gen <25000 15 Kutcha 4,655 Paid - 10,000 2,000 2,000 - 14,000
APs having more than one structure will not entitle for Rs.24,000/-
623 866 Disty No 10 - H
6 Com Durga Prasad Dash Gen <25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
624 867 Disty No 10 - H
6 Com Bijay Panda Gen <25000 12 Kutcha 4,124 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
625 868 Disty No 10 - H
6 Com Bijay Panda Gen <25000 12 Kutcha 4,124 Paid - 10,000 2,000 2,000 - 14,000
APs having more than one structure will not entitle for Rs.24,000/-
626 869 Disty No 10 - H
6 Com Tuna Pradhan Gen <25000 12 Kutcha 4,124 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
627 870 Disty No 10 - H
6 Com Dhuna Sahoo Gen <25000 20 Kutcha 5,540 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to
Internal Monitoring Report-Machhagaon Subproject (Dec 2016)
RS, ISPMC
106
Rs.36,000/-
628 872 Disty No 10 - H
6 Com Suryanarayan Das Gen <25000 20 Kutcha 5,540 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
629 874 Disty No 10 - H
6 Com Sarat Samal Gen <25000 20 Kutcha 5,540 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
630 875 Disty No 10 - H
6 Com Nimai Parida Gen <25000 20 Kutcha 5,540 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
631 876 Disty No 10 - H
6 Com Ranjit Mohanty Gen <25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
632 877 Disty No 10 - H
6 Com Sukanta Das Gen <25000 10 Kutcha 3,770 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
633 878 Disty No 10 - H
6 Com Abrar Khan Muslim
<25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
Internal Monitoring Report-Machhagaon Subproject (Dec 2016)
RS, ISPMC
107
634 883 Disty No 10 - H
6 Com Afsar Khan Muslim
<25000 12 Kutcha 4,124 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
635 886 Disty No 10 - H
6 Com Unknown Muslim
<25000 12 Kutcha 4,124 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
636 889 Disty No 10 - H
6 Com Unknown Other
s <25000 12 Kutcha 4,124 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
637 897 Disty No 10 - H
6 Com Prafulla Rana Gen <25000 12 Kutcha 4,124 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
638 898 Disty No 10 - H
6 Com Manoj Rana Gen <25000 12 Kutcha 4,124 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
639 899 Disty No 10 - H
6 Com Samser Khan Muslim
<25000 12 Kutcha 4,124 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
640 418 Disty No 8 6 Com Sankar Dalei Gen <25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to
Internal Monitoring Report-Machhagaon Subproject (Dec 2016)
RS, ISPMC
108
Rs.36,000/-
641 419 Disty No 8 6 Com Susil Swain Gen <25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
642 420 Disty No 8 6 Com Parikhit Parida Gen <25000 20 Kutcha 5,540 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
643 421 Disty No 8 6 Com Sankar Behera SC <25000 20 Kutcha 5,540 Paid - 10,000 2,000 2,000 - 14,000
APs having more than one structure will not entitle for Rs.24,000/-
644 422 Disty No 8 6 Com Bhaskar Behera Gen <25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
645 423 Disty No 8 6 Com Rabindra Sethi SC <25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
646 424 Disty No 8 6 Com Siba Chran Khatua Gen <25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
Internal Monitoring Report-Machhagaon Subproject (Dec 2016)
RS, ISPMC
109
647 425 Disty No 8 6 Com Baluri Das Gen <25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
648 426 Disty No 8 6 Com Narendra Sethi SC <25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
649 428 Disty No 8 6 Com Sarat Barik OBC <25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
650 429 Disty No 8 6 Com Basanta Barik OBC <25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
651 430 Disty No 8 6 Com Michhu Bhoi SC <25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
652 431 Disty No 8 6 Com Bhaskar Sahoo Gen <25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
653 432 Disty No 8 6 Com Basanta Sahoo Gen <25000 15 Kutcha 4,655 Paid - 10,000 2,000 2,000 - 14,000
APs having more than one structure will not entitle for
Internal Monitoring Report-Machhagaon Subproject (Dec 2016)
RS, ISPMC
110
Rs.24,000/-
654 434 Disty No 8 6 Com Purnachandra Sahoo
Gen <25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
655 435 Disty No 8 6 Com Indramani Sahoo Gen <25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
656 436 Disty No 8 6 Com Kailash Sahoo Gen <25000 15 Kutcha 4,655 Paid - 10,000 2,000 2,000 - 14,000
APs having more than one structure will not entitle for Rs.24,000/-
657 437 Disty No 8 6 Com Rajendra Mohapatra
Gen <25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
658 438 Disty No 8 6 Com Dhaneswar Sethi SC <25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
659 439 Disty No 8 6 Com Ramachandra Sahoo
Gen <25000 40 Semi-pucca 19,200 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
Internal Monitoring Report-Machhagaon Subproject (Dec 2016)
RS, ISPMC
111
660 441 Disty No 8 6 Com Sunil Jena Gen <25000 25 Semi-pucca 12,750 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
661 443 Disty No 8 6 Com Babuli Ojha Gen <25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
662 444 Disty No 8 6 Com Khetramohan Sahoo
Gen <25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
663 445 Disty No 8 6 Com Kalandi Sethi SC <25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
664 446 Disty No 8 6 Com Sudam Sethi SC <25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
665 447 Disty No 8 6 Com Narayan Swain Gen <25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
666 450 Disty No 8 6 Com Chandramani Sahoo
Gen <25000 16 Kutcha 4,832 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to
Internal Monitoring Report-Machhagaon Subproject (Dec 2016)
RS, ISPMC
112
Rs.36,000/-
667 451 Disty No 8 6 Com Syamsundar Sahoo Gen <25000 40 Semi-pucca 19,200 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
668 452 Disty No 8 6 Com Shankar Sahoo Gen <25000 15 Semi-pucca 8,450 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
669 453 Disty No 8 6 Com Ashok Swain Gen <25000 20 Semi-pucca 10,600 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
670 454 Disty No 8 6 Com Bipin Das Gen <25000 15 Semi-pucca 26,450 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
671 456 Disty No 8 6 Com Pravat Kumar Sethi SC <25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
672 457 Disty No 8 6 Com Pravakar Sahoo Gen <25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
Internal Monitoring Report-Machhagaon Subproject (Dec 2016)
RS, ISPMC
113
673 458 Disty No 8 6 Com Prasanta Das Gen <25000 15 Kutcha 4,655 Paid - 10,000 2,000 2,000 - 14,000
APs having more than one structure will not entitle for Rs.24,000/-
674 459 Disty No 8 6 Com Dibyajoti Jena Gen <25000 10 Kutcha 3,770 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
675 460 Disty No 8 6 Com Debendra Rout Gen <25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
PKG-6 19,64,777 49,44,000
22,90,000
4,58,000
3,92,000
8,65,000.00
89,49,000
676 79 Disty - 15 7 Res Raj Kishore Das Gen <25000 40 Kutcha 16,080 Paid 24,000 10,000 2,000 36,000
677 83 Disty - 15 7 Res Chittaranjan Moharana
Gen <25000 30 Kutcha 7,310 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
678 84 Disty - 15 7 Res Prahallad Parida Gen <25000 100 Semi Pucca 45,000 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
679 132 Disty 16 7 Res Kuntali Dei Gen <25000 30 Kutcha 14,310 Paid 24,000 10,000 2,000 36,000
680 903 Disty No 13
7 Res Mahadev Nayak Gen <25000 10 Semi Pucca 6,300 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
Internal Monitoring Report-Machhagaon Subproject (Dec 2016)
RS, ISPMC
114
681 904 Disty No 13
7 Res Dolagobinda Mohanty
Gen <25000 30 Kutcha 7,310 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
682 905 Disty No 13
7 Res Nagendra Jena Gen <25000 30 Semi Pucca 14,900 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
683 906 Disty No 13
7 Res Debendranath Jena Gen <25000 40 Semi Pucca 19,200 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
684 921 Disty No 13 C
7 Res Siba Gochhayat SC <25000 10 Kutcha 10,770 Paid 24,000 10,000 2,000 36,000
685 922 Disty No 13 C
7 Res Arjun Chran Lenka Gen <25000 20 Kutcha 5,540 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
686 71 Disty - 15 7 Com Pramod Nayak Gen <25000 20 Semi-pucca 10,600 Paid - 10,000 2,000 2,000 - 14,000
APs having more than one structure will not entitle for Rs.24,000/-
687 72 Disty - 15 7 Com Sanatan Gochayat Gen <25000 15 Semi-pucca 8,450 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
Internal Monitoring Report-Machhagaon Subproject (Dec 2016)
RS, ISPMC
115
688 73 Disty - 15 7 Com Chittaranjan Biswal Gen <25000 15 Semi-pucca 8,450 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
689 74 Disty - 15 7 Com Sukadev Behera Gen <25000 20 Semi-pucca 17,600 Paid 24,000 10,000 2,000 36,000
690 75 Disty - 15 7 Com Narendra Nayak Gen <25000 20 Semi-pucca 17,600 Paid 24,000 10,000 2,000 36,000
691 76 Disty - 15 7 Com Sarimoni Bewa Gen <25000 20 Semi-pucca 17,600 Paid 24,000 10,000 2,000 36,000
692 77 Disty - 15 7 Com Dhruba Chran Sahoo
Gen <25000 20 Semi-pucca 10,600 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
693 78 Disty - 15 7 Com Siddheswar Gochayat
Gen <25000 20 Semi-pucca 17,600 Paid 24,000 10,000 2,000 36,000
694 80 Disty - 15 7 Com Sahadev Nayak Gen <25000 20 Semi-pucca 10,600 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
695 81 Disty - 15 7 Com Naliniprava Dei Gen <25000 20 Semi-pucca 10,600 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
696 87 Disty - 15 A
7 Com Debendra Biswal Gen <25000 10 Kutcha 3,770 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
Internal Monitoring Report-Machhagaon Subproject (Dec 2016)
RS, ISPMC
116
697 88 Disty - 15 A
7 Com Batu Bhatta Gen <25000 10 Kutcha 3,770 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
698 90 Disty - 15 A
7 Com Hadu Muduli Gen <25000 10 Kutcha 10,770 Paid 24,000 10,000 2,000 36,000
699 91 Disty - 15 A
7 Com Dillip Nayak Gen <25000 10 Kutcha 10,770 Paid 24,000 10,000 2,000 36,000
700 92 Disty - 15 A
7 Com Sarat Biswal Gen <25000 10 Kutcha 10,770 Paid 24,000 10,000 2,000 36,000
701 93 Disty - 15 A
7 Com Kalandi Biswal Gen <25000 10 Kutcha 10,770 Paid 24,000 10,000 2,000 36,000
702 94 Disty - 15 A
7 Com Nityananda Parida Gen <25000 17 Kutcha 5,009 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
703 124 Disty 16 7 Com Kapila Sahoo Gen <25000 100 Semi-pucca 45,000 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
704 126 Disty 16 7 Com Arakhita Bhoi Gen <25000 10 Kutcha 3,770 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
705 127 Disty 16 7 Com Baina Barik Gen <25000 10 Kutcha 3,770 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
706 128 Disty 16 7 Com Nalu Bhoi Gen <25000 10 Kutcha 3,770 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
Internal Monitoring Report-Machhagaon Subproject (Dec 2016)
RS, ISPMC
117
707 129 Disty 16 7 Com Kailash Bhoi Gen <25000 10 Kutcha 3,770 Paid - 10,000 2,000 2,000 - 14,000
APs having more than one structure will not entitle for Rs.24,000/-
708 130 Disty 16 7 Com Banchanidhi Sethi Gen <25000 10 Kutcha 10,770 Paid 24,000 10,000 2,000 36,000
709 131 Disty 16 7 Com Tophan Behera Gen <25000 10 Kutcha 3,770 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
710 907 Disty No 13
7 Com Sonu Chicken Gen <25000 20 Kutcha 5,540 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
711 909 Disty No 13
7 Com Rabindra Rout Gen <25000 12 Semi-pucca 7,160 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
712 910 Disty No 13
7 Com Sudarsan Rout Gen <25000 12 Kutcha 4,124 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
713 911 Disty No 13
7 Com Prafulla Biswal Gen <25000 20 Semi-pucca 10,600 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
Internal Monitoring Report-Machhagaon Subproject (Dec 2016)
RS, ISPMC
118
714 912 Disty No 13
7 Com Prafulla Mohanty Gen <25000 12 Kutcha 4,124 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
715 914 Disty No 13
7 Com Gagan Sahu Gen <25000 12 Kutcha 4,124 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
716 915 Disty No 13
7 Com Tukuna Bhoi SC <25000 10 Kutcha 3,770 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
717 916 Disty No 13 C
7 Com Trinath Barik Gen <25000 10 Kutcha 3,770 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
718 917 Disty No 13 C
7 Com Lokanath Das Gen <25000 15 Kutcha 4,655 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to Rs.36,000/-
719 918 Disty No 13 C
7 Com Niranjan Nayak Gen <25000 10 Kutcha 3,770 Paid - 10,000 2,000 2,000 - 14,000
APs having more than one structure will not entitle for Rs.24,000/-
720 920 Disty No 13 C
7 Com Baishnab Behera Gen <25000 10 Kutcha 3,770 Paid 24,000 10,000 2,000 2,000 5,000 43,000
Additional Rs.7000/- paid for LA & VA in addition to
Internal Monitoring Report-Machhagaon Subproject (Dec 2016)
RS, ISPMC
119
Rs.36,000/-
PKG-7 4,62,076 10,08,000
4,50,000 90,000 66,000 1,50,000 17,64,000
Grand Total
60,74,707 -
1,59,84,000
71,80,00
0
14,36,00
0
11,06,00
0 24,95,000
2,82,01,000
-
Internal Monitoring Report-Machhagaon Subproject (Dec 2016)
RS, ISPMC
120
Annexure 2: Status of Civil Works Contract in Machhagaon Canal Division
Package No Status of Compensation Status of Contract
Pack-1 100 % compensation paid Contract Awarded
Pack-2 100 % compensation paid Contract Awarded
Pack-3 99.9 % compensation paid Contract Awarded
Pack-4 100 % compensation paid Contract Awarded
Pack-5 100 % compensation paid Contract Awarded
Pack-6 100 % compensation paid Contract Awarded
Pack-7 100 % compensation paid Contract Awarded