SBUTHWdSTf R;"l a ELECTRlC mWER COMPANY January 3,20 13 CERTIFIED MAIL No. 70 1 1 2000 0002 1500 5202 Return Receipt Requested NPDES Permits BranchlStormuater Arkansas Department of Environ~nental Quality 530 1 Northshore Drive North Little Rock, AR 72 1 18-53 17 Re: 20 12 Annual Report, Industrial Stormwater Permit Southwestern Electric Power Company, Flint Creek Power Plant. 21 797 SWEPCO Plant Road, Gentry, AR 72734 Permit Tracking No. ARROOB277 Enclosed is the Annual Report. and associated documents, including the stormwater discharge monitoring reports (DMR's), site inspection reports, and corrective action plan for the referenced stormwater permit covering the period from January 1. 201 2, through December 3 1. 20 12, for the Flint Creek Power Plant in Gentry, Arkansas. Because the recordkeeping practices for the stormwater permit are not conducive to utilizing the Departments Annual Report Form, the required components of the Annual Report are enclosed as separate items (Annual Compliance Evaluation, DMR's. Periodic Visual Inspection Reports. and Corrective Action Plan). Should there be any questions or the need for additional information, please contact Scott Carney at (479) 736-3526. I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system. or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I arn aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. Sincerely, &% Carl andley General Plant ~ a n a ~ e w Cc: Randy Solomon, AEP Environmental Services, Dallas, TX (w) lvaunna Neigler, Lab and CEMS Supervisor, Flint Creek Power Plant (w) File: FLC. 150.20 (w)

Upload: others

Post on 17-Mar-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: &% Sincerely, · 2020-01-07 · Southwestern Electric Power Company, Flint Creek Power Plant. 21 797 SWEPCO Plant Road, Gentry, AR 72734 Permit Tracking No. ARROOB277 Enclosed is

SBUTHWdSTf R;"l a ELECTRlC mWER COMPANY

January 3 ,20 13

CERTIFIED MAIL No. 70 1 1 2000 0002 1500 5202 Return Receipt Requested

NPDES Permits BranchlStormuater Arkansas Department of Environ~nental Quality 530 1 Northshore Drive North Little Rock, AR 72 1 18-53 17

Re: 20 12 Annual Report, Industrial Stormwater Permit Southwestern Electric Power Company, Flint Creek Power Plant. 21 797 SWEPCO Plant Road, Gentry, AR 72734 Permit Tracking No. ARROOB277

Enclosed is the Annual Report. and associated documents, including the stormwater discharge monitoring reports (DMR's), site inspection reports, and corrective action plan for the referenced stormwater permit covering the period from January 1 . 201 2, through December 3 1 . 20 12, for the Flint Creek Power Plant in Gentry, Arkansas. Because the recordkeeping practices for the stormwater permit are not conducive to utilizing the Departments Annual Report Form, the required components of the Annual Report are enclosed as separate items (Annual Compliance Evaluation, DMR's. Periodic Visual Inspection Reports. and Corrective Action Plan).

Should there be any questions or the need for additional information, please contact Scott Carney at (479) 736-3526.

I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system. or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I arn aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations.

Sincerely,

&% Carl andley General Plant ~ a n a ~ e w

Cc: Randy Solomon, AEP Environmental Services, Dallas, TX (w) lvaunna Neigler, Lab and CEMS Supervisor, Flint Creek Power Plant (w) File: FLC. 150.20 (w)

Page 2: &% Sincerely, · 2020-01-07 · Southwestern Electric Power Company, Flint Creek Power Plant. 21 797 SWEPCO Plant Road, Gentry, AR 72734 Permit Tracking No. ARROOB277 Enclosed is

INDUSTRIAL STORMWATER PERMIT - COMPREHENSIVE SITE COMPLIANCE EVALUATION FLINT CREEK POWER PLANT

1. Visual Inspection of Storm Water Pollutant Sources:

Map Source I Material Storage Capacity Containn~ent Volun~e

Reference

Evidence/Potential for Pollutants to Enter Storm Water Drainage Systcrn?

Cootai~~rnentlBMP's Controls Adequate and Properly I Needed?

Implemented? I 604.555 Gal Stcel Tank 1.499.400 Gal \ I )

I I

Bulk Fuel Oil Tank

Sump: 3.800 and Boon,: >I 0.000 Fuel Oil Purge Tnnks

Used Oil and Waste Drun~ Storage -20 Drums -500 Gallons

\ o

Ignitor Fucl Oil Systcrn

( I. I00 Gallons)

Served by bulk Sucl oil tank

- - - -

Srrvtcl hy hulk fuel oil tank ( Fuel Oil Pumps

Sunlp: 3.800 and Boom: > 10.000

19,677 Gal N Sump. 7.900. Boon]: >10,000

\ o

Turbinc Oil Tank

Sump: 3.800 and Boom: >10.000

Dws. M65. Sh. I

Turbine Oil Syslen~ (piping, boiler fcec pumpis). seal oil system. trap drain)

FD Fans ( 2 1 Non-SPCC I 7 Sump: 3.800 and Boonr: >10.000

ID Fans ( 2 ) 200

I Sump: 3,800 and 1 0 0 x 3

R V ~ I I I : > 10.000 1 Primary Air Fans (3)

Air Hcater Supporl Bearing Oil

Surnp: 3.800 and Boom: > 10.000

\I#

ID Fan Hydraulic Systrln (hladc pitch. hearings) (2 )

-

I Non-SPCC 142

I Sump: 3.800 and 160x 2

Boorn: >10.000

Sump: 3.800 and Boom: > 10.000

Page 3: &% Sincerely, · 2020-01-07 · Southwestern Electric Power Company, Flint Creek Power Plant. 21 797 SWEPCO Plant Road, Gentry, AR 72734 Permit Tracking No. ARROOB277 Enclosed is

Additional Controls Needed?

\ ! B

\ < I

\ I )

\ I ,

\ t e

\ t ,

\ ( I

\ I >

\ 1 2

\o

\ i #

\ ( I

\ ( I

\ I #

\ I )

\ I I

\ I S

\ I $

\ c !

\ o

\ i v

\ ( I

\ i i

M a p Reference

19

20

2 1

17 --

23

24

25

26

27

28

29

30(a)

30( b)

30ic)

3 1

32

33

34

35

36

37

38

39

Source / hlaterial

Hulk Fuel Oil U~iload~ng Arca

Clean Turhlne Oil Tank -

Dirty Turbine Oil Tank

Off-Koad Iliesel Tank (Coal Yard)

Unleaded Gasoline Tank (Coal Yard)

Kerosene Tank (Coal Yard)

Diesel 1 Kerosene 1 Gasoline Unloading Arca (Coal Yard)

Used Oil Tank (Coal Yardj

Used Oil Tank (Oil House)

Fire Pump Diesel Tank (Inlake Structure)

Diesel Fuel Tank (Onan Generator)

Hydraulic Fluid Tank (Coal Car Positioning Systelilj

Hydraulic Fluid Tank (Coal Car position in^ System)

Hydraulic Fluid Tank (Coal Car Positionine System1

Coal Conveyor Beh Motors

Coal Conveyor Belt Gcar Box A Bell

Coal Conveyor Rclt Gear Box - B Belt

Coal Conveyor Belt Gear Box - C Bell

Coal Conveyor Belt Gcar Box - D Belt (Tripper Floor)

Coal Conveyor Belt Gear Box - E Bell (Tripper Floor)

Coal Car Truck Lock Gear Box

Coal Car Dumper Drive Gear Box

Circulatinp Water Purlips (3)

Storage Capacity

Various Tanker Truck Volulilc

1 1.500 Gal Steel Tank

11.500 Gal Steel Tank

15.000 Gal Steel Tank

1.500 Gal Slccl Tank

560 Gal Stccl Tank

Various Tanker Truck Volu~rie

1.000 Gal Steel Tank

500 Gal Steel Tank

200 Gal Steel Tank

Non-SPCC 125 Gal Steel Tank

230 Gal Steel Tank

490 Gal Steel Tank

160 Gal Steel Tank

Non-SPCC 1-55

86

52

Non-SPCC I 30

52 w 2

Non-SPCC 18.5 x 2

270

62.5 w 2

Non-SPCC I Upper tank - 32.5

Non-SPCC I Lower tank - 4.5

I<videncelfotenlial fo r Pollutants to Enter S to rm Wate r Drainage System?

\ I ,

\ I )

\ ( I

\ ( I

\ ( I

\ I )

\ I )

\o

\o

\o

\ I ?

\ i e

\ t r

\ l t

\ I ,

\ I )

\ I *

\(&

\ i s

\ i )

\ < I

\ I )

\ I I

Containment Volun~e

2.283 Gal

19.677 Gal

19.677 Gal

15,648 Gal

15.618 Gal

15.648 Gal

0 I > 5.000

15,648 Gal

1.588 Gal

601 Gal

177 Gal

1,497 Gal

703 Gal

1.690 Gal

Boorn > 10,000

Boom > 10.000

Bouln > 10.000

Boom > 10,000

Boom > 10,000

Sump: 3.800 and Boc~m: >I 0.000

Boom > 10,000

Boom > 10.000

0

Containn~ent/BMP's Adequate a n d Properly

Implemented?

\ (...

\ v,

\ v\

\ v,

\ t , ,

\ r\

1 t,.\

\ c..

\.(,\

\ t , \

\ t,.,

\ tL\

v\

1 r \

1 cS\

\ c\

\ 'c\

\ ' t %

\ ti\

\ v,

\ c\

\ c\

\ I , \

Page 4: &% Sincerely, · 2020-01-07 · Southwestern Electric Power Company, Flint Creek Power Plant. 21 797 SWEPCO Plant Road, Gentry, AR 72734 Permit Tracking No. ARROOB277 Enclosed is

Additio~~al Cor~trols Needed?

\ I)

\ I)

\I,

P

\I#

Map Kcfcrencc

40(a)

43

35

36

Sourcc I hlatcrial

Co\ered Uru111 Storage (east side of Oil House)

Working Ilruln Storage (coal yard)

Porrable Tank (Skid Tmk)

Track Greaser for Rail Spur

Coal Yard - Producl Storage Area

Main Power Transforn~cr (Phase A, B, 3 x 5.200 Gal

5 1

52

53

54

55

Storage Capacity

Multiple 55-gallon d r u ~ n

-9 Drums (495 Gallons)

500 Gal

-114

Auxiliary Transforn~rr (P349. P350)

Rrscrve Auxiliary Transforrr~er (P161.33)

Spare Main Power Tr;~nsformer (P161.23)

Pole-Mounted Transfol-mcrs ( 1 50007 18. 10022700. 10022701) for

Wa~er Recovery Pumps (Located below SWEPCO Lake D a ~ n )

Transformer/Rectifier Scts (Precipila~or)

Containrncr~t Volume

792

Hoo~il> 10.000

>500 Gal

NA

Above-Ground Piping

2 x 2.9 13 Gal

7.578 Gal

5.200 Gal

# 150007 18 - 60 pal

Non-SPCC 1 #I0022700 - 48

,qal Non-SPCC I #I0022701 - 48

gal

I6 x 176 Gal

60

6 1

Evidcr~ceNoter~tial for Pollutar~ls to El~ter Storrn Watcr Drairlage Systcrn'!

\ I)

\I!

\I, -

\I!

Contai~mient/BR.IP's Adequate and Propcrly

Implc~ncnted?

) v \

) v\

v+

) c+

Boon1: > 10.000

2 x 2.694 Gal 1 Sump: 3.900

Buom: > 10,000

3.188 Gal I Sump: 3.900

Boom: > 10.000

0

900

Sump: 3,800 and Boom: > 10.000

Fuel Oil Piping (Kef. Dwg. M64)

Turhine Oil Pipins (Ref. Dwg. M u . sh. I )

\ I >

\II

Yes

\ I 1

\II

N A

N A

\ I.?

\ L,\

No

1 r \

) ( ~ \

)'(,\

) ' c3

\ ( I

\ < )

Yes

\ I 1

\I,

\I?

\ I 1

Sump: 3,800 and Boom: > 10.000

Sump: 3.800 and Boom: > 10.000

\ I D

\< I

Page 5: &% Sincerely, · 2020-01-07 · Southwestern Electric Power Company, Flint Creek Power Plant. 21 797 SWEPCO Plant Road, Gentry, AR 72734 Permit Tracking No. ARROOB277 Enclosed is

M a p Reference

62

63

64

Additional Controls Needed?

\ ( I

\ ( I

\ I 1

Source I Material

Enlcrgcncy Fire Pump Piping

Emergency Generator Piping

Lube Oil Piping (Ref. Dwg. M65. sh.

2)

I<videncc/PotcntiaI for Pollutants to Enter Storni Wate r Drainage System?

\ I )

\ ( I

'"11

75

76

77

7 8

7%a)

7%h)

7 % ~ )

8 0

ContainnsntfRRIP's Adequate a n d Properly

Implemented?

1 t,\

'l t,\

'l'<>\

Storage Capacity

NA

NA

NA

Sulfuric Acid

Caustic-Sodium Hydroxide

Ac~d / Causlic Unload~nz Area

Coal Yard Drum Rack (various cleaners)

Surfactant (BT-2 I OW)

Surfactant (AS - 8896)

Surfactant (BT-2 IOW)

Sodium hypochlorite

C o n t a i n m e ~ ~ t Volume

Sump: 3.800 and Boon): > 10.000

Sump: 3.600 and boor^^: > 10.000

Sump: 3.800 and Boom: >10.000

Other Potential Contaminant Sources 1 Areas

90

9 1

92

93

94

95

96

97

98

\ ( I

\ I #

\ ( I

\ ( I

\ I )

\ ( I

\ ( I

\I>

10.000 Gal Srecl Tank

15.000 Gal Steel Tank

Various Tanker Truck Volunie

5 - 10. 5.5-Gal Drums

1.550 Gal Insulated Plastic Tank

1,550 Gal Plastic Tank

1.550 Gal Plastic Tank

275 Gal Plastic Totc

17.897

17.897

0

I 05 1 Boon] > 10.000

>1.550 / Boom >10,000

>1,550 / Boom >10.000

> 1.550 / Boon1 > 10.000

280

\ I #

\ I ,

\ < I

\ ( I

\o

\ I #

\ ( I

\ ( I

\ I ,

Coal Pile (S~oracge)

Fly Ash / Bottom Ash Landfill

Gencl-al Trash Dumpster

General Trash Dumpster

Plant Roads / Parking Lots

Scrap Metal Roll-Off

Railroad Spur

Shipping/Rccciving Dock

Leachate Tanks (SE Corner of Landfill)

\ ( I

\o

\ t ,

\ I )

\ ( I

\ ( I

\o

\ I )

NA

NA

N A

N A

Varies by vehicle

NA

Varies hy trail]

Various Containers and Materials

2 h 9.000

'l v.,

\c.

'l t,,

'l c ,

1 t* \

\ v \

\ <,\

\ c\

0 / Boom > 10,000

0 / Boom > 10,000

0 1 Boo111 > 10.000

0 1 Boom > 10.000

0 1 Boon1 > 10.000

0

0 1 Room > l0.000

> 5.000

>9.000

\ o

\ ( t

\ ( t

\ < I

\ I I

\ I I

\ I ,

\ I I

\ ( I

Y t 3

1 . v ~

1 v,

1 t:\

1.v.

'l e \

'I e \

'I e \

\ c h

Page 6: &% Sincerely, · 2020-01-07 · Southwestern Electric Power Company, Flint Creek Power Plant. 21 797 SWEPCO Plant Road, Gentry, AR 72734 Permit Tracking No. ARROOB277 Enclosed is

2. Comments From Visual Inspection: Clean ancl Dirty Turhinc Oil Tank Containlncn( Structure: ncctl to rcnlovc accun~ulatcd clirtidchris I'rom co~itainmcnt. The drain i;~lvcs ior the co\crcrl t l l - L I ~ s1or;lgc (casc side of Oil House) ncccl rllainagc trenches installed to facilitate bcttcr drainage of storlnwatcr from containment struclurc. DI-ainagc ditches in vicinily ol'coal yard ncccl IO Ilc clcancd o u ~ (builcl-LIP ol'coal clusc). The three Main Power Tr;insformcrs (Phi~scs A, B, ;lnd C ) and thc Sparc Transfonncr cach contain weeping I'illillga, which h:~s 1.csul1ctl in slaining of rhc translori~lcr coillpollcnls hcncatll the wccp silcs, as \\,ell as limited staining o i thc .soil adiaccn~ to the Sparc Translh~mcr.

Thcsc items have hccn. or arc schctlulcd to be I-cmcdictl in the near fulurc.

3. Is Spill Response Equipment Adequate and in Good Condition? Answer: Thc ccluiprncnl wa\ inapcctcd as part of the colnprchcnsi\c site colnpliancc evaluation, and found to he 111 the condition rcllcctcd in thc reccnt monthly inspcclions.

4. Is the Significant Material Inventory Up To Date? ~ n s w e r : ) r Thc significant malerial inventory is up to date. It was recently uprlatcd on J u ~ i e 18, 2012. as past 0 f i 1 roulinc review of the plan. The update incl~ldcd: Iilndl'ill Icachatc tanks i~nrl coal yard surlrictiint change from AS-8896 LO Bcnctcch BT-2 IOW.

5. Were Periodic Inspections Conducted and Documented? Answer: Pcroidic inspcc~ions arc conducted on a ~nonthly hasis, and arc con~bincd with the rcquircmcnls for routine inspcctions rcrluircd by the Spill Prcvcnlion. Conlrol. and Countcrmcasurc (SPCC) plan. Although monthly inspections arc conduclcd, the inspection form for the 111iddle mvnth of cadi cl~lcndar quarter (February, May, A L ~ L I S ~ , and No\clnbcr) I'or 201 1 arc arlachcd lilr rckrcncc. Thc ~nontly inspections alho scrvc as doc~tlncnta~ion of itcrns i n need ol'attcntion, and list the work ordcr nulnhcrs which arc usccl to assign ~ u i r l [rack corrective ~ncasurcs.

6. Were Annual Storm Water Runoff Monitoring Conducted, Documented, and Properly Submitted? Thc stormualcr monitoring wa\ conducted oncc cach during the January - June 201 1 , period, and oncc bclwccn the July - Deccmhcr 701 I , period. The a\socia~cd rlischargc monitoring reports (DMR) arc attached to the annual report.

Page 7: &% Sincerely, · 2020-01-07 · Southwestern Electric Power Company, Flint Creek Power Plant. 21 797 SWEPCO Plant Road, Gentry, AR 72734 Permit Tracking No. ARROOB277 Enclosed is

7. Based on the Annual Site Compliance Evaluation, Does the SWP3 Need to be UpdatedIRevised? Answer: @

No. the SWP? plan is u p to date ant1 clocs not nccd to he ~.c\,iscd as a r c w l t ol ' t l ic ~ o i ~ ~ [ ~ r ~ t i ~ t i s i \ c site ~ o r i i ~ ~ l i ; t i i ~ c evaluation.

Thc sampling data trlblcs for Stoi-rnwatcr Outfal ls SO01 and SOU? \vcrc updated w i t h tl ic i i ioi l i tor ing rcsulls.

Plant Environmental Coordinator Tillc: Date of ~valua~ionilns~ecrivn:

"I certify under penalty of law that this document and all auachments werc prepared under my direction or supervision in accurclancc with a system designed to assure that qualified persnnnel properly gather and evaluate the information submiued. Based on my inquiry of the person or persons who manage the system. or those persons directly responsible for ga~hcring the information. the inforrnalion submiltcd is, to the best of my knowledge and belief, true. accurate, and complete. I am aware that there are significan~ penalties for submitting falsc information. ~ncluding the possibility of fine and imprisonment for knowing violations."

Plan1 Manager

- Date:

Corrective Action to Issues Identified during the Annual Compliance Inspection 1. Comments: The weeps on the three Main Power Transformers (Phases A, B, and C) and the Spare Transformer will be addressed by having the fittings tightened in an effort to reduce or eliminate the weeps. Additionally, the drip pans beneath the fittings on the transformers are being modified to ~nclude oil-sorbing spill pillows and metal cages to keep spill pillows in place during high winds. The stained soil adjacent to the Spare Transformer will be excavated and properly disposed. As previously mentioned in Item No. 2, the other noted items have been, or are scheduled to be remedied in the near future.

Page 8: &% Sincerely, · 2020-01-07 · Southwestern Electric Power Company, Flint Creek Power Plant. 21 797 SWEPCO Plant Road, Gentry, AR 72734 Permit Tracking No. ARROOB277 Enclosed is

Flint Creek Power Plant Corrective Action Plan for Stormwater Outfall SO01

(Drainage from northern portion of plant)

On October 12,20 12, a stormwater sample was collected from stormwater Outfall S001. The sample was analyzed for COD (chemical oxygen demand), TSS (Total Suspended Solids), O&G (Oil & Grease), and pH, and Total Iron. The Total lron parameter exceeded the benchmark value.

Total Iron Analytical result: 1.23 mg/L. Total lron Benchmark parameter: 1.0 mg/L.

The ADEQ Industrial Stormwater Permit (Permit No. ARR000000) requires that a facility experiencing an exceedance of a benchmark parameter comrncnce the following activities within 30 days of the exceedance:

1. Investigate the cause and/or source of the elevated pollutants, 2. Review the SWPPP and make updates if necessary, 3. Determine and document a corrective action plan to address the benchmark exceedance.

Stormwater Outfall SOOI: the source of stormwater flow to Outfall SO01 is a combination of industrial activities and structures, officc buildings, parking areas. laydown areas, rail spur, and vegetated areas, covering an area of approximately 16 acres. Stormwater accumulates in the drainage ditches in these areas until it is manually drained by opening the gate valves on the drainage ditches, allowing flow to the metal culvert which drains into SWEPCO Lake.

Probable cause and/or source of elevated pollutants: beginning in 201 1, Total Iron was monitored at all stormwater outfalls at the plant (not required by previous ADEQ stormwater permits). The three prior sample results for Total lron at Outfall SO01 are as follows:

c April l I , 201 1 : 0.74 mg/L o October 18,20 1 1 : 0.456 mg/L o January 1 1 . 20 12: 0.154 mglL

Each of the previous samples was below the Total lron benchmark of I .O mg/L. Upon receipt of the laboratory report showing that the benchmark parameter for Total lron collected on October 12,201 2, at Outfall SO01 had been exceeded. a visual reconnaissance ofthe area drained by the outfall was made. No structures, activities, rakb materials, or othcr potential sources of elevated Total lron were observed. In fact, no changes in activities, structures, or ground cover have been made to the drainage area of Outfall SO0 I since Total Iron monitoring commenced in April 201 1 .

Corrective Action Plan:

Review of SWPPP: a review of the SWPPP did not identify the need for changes with respect to management of the area drained by Outfall SO0 1.

Corrective Actions: due to the results of the visual rcconnaissance and review of previous analytical results, there are no corrective actions planned. However, an action plan to begin an investigation to determine if this benchmark excursion was an anomaly, or if background concentrations of iron in thc native soils may be contributing to the periodic elevated iron concentrations in stormwater samples has been put in place.

In order to conduct this investigation, the following activities are planned: 1 . Conduct repeat stormwater monitoring for Total lron at Outfall SO01 in order to determine

whether an anomaly occurred on the October 12.20 12 monitoring event. If Total lron

Page 9: &% Sincerely, · 2020-01-07 · Southwestern Electric Power Company, Flint Creek Power Plant. 21 797 SWEPCO Plant Road, Gentry, AR 72734 Permit Tracking No. ARROOB277 Enclosed is

concentrations below the benchmark value of 1.0 mg/L are present in subsequent samples, then evidence of an anomaly will have been found.

2. Conduct background stormwater sampling at one or more sites which consist of stormwater flow not affected or influenced by plant operations or activities. Two such locations have been identified (see attached map). These samples will be conducted concurrently with the repeat stormwater monitoring at SO01 when possible.

3. Results of the above monitoring will guide subsequent actions.

Implementation Schedule: the repeat and background stormwater monitoring will commence immediately, and will be dictated by the availability of qualifying stormwater sampling events.

Dates:

Date investigation of cause/source conducted: November 14,20 12 (lab report received November 12, 20 1 2).

- Date

Page 10: &% Sincerely, · 2020-01-07 · Southwestern Electric Power Company, Flint Creek Power Plant. 21 797 SWEPCO Plant Road, Gentry, AR 72734 Permit Tracking No. ARROOB277 Enclosed is
Page 11: &% Sincerely, · 2020-01-07 · Southwestern Electric Power Company, Flint Creek Power Plant. 21 797 SWEPCO Plant Road, Gentry, AR 72734 Permit Tracking No. ARROOB277 Enclosed is

Flint Cmk Power Plant, Monthly Inspeft(on Checklist SWP3 1 SPCC Plans

--

1 I I ,, ~ F I ~ C Pump B~exl Tank ( a l l I I

Oil House (Umm S W a p I I I

Page 12: &% Sincerely, · 2020-01-07 · Southwestern Electric Power Company, Flint Creek Power Plant. 21 797 SWEPCO Plant Road, Gentry, AR 72734 Permit Tracking No. ARROOB277 Enclosed is

I I TANK, CONTAME& EQUIPMENT. w STORAGE LOCATION I . . . . . - . . . . . . . . . - - SECONDARY CONTAINMENT

PLANT AREA

Ship pin#Roeoivi~ Do& Id=-+

AIL Ponds (Wmq mnd -0ad.v)

Circle appmptiak unwa

circle a ~ ~ u s mtmw ( U m h a m w e s t d ~ 1 . n l a ) mn~ontmnat~~*rR.COHFI~nn~~ mow dam)

A. Storm water dbch8rlhy d a r i y iuprcUon? YES YEP

SIormwater Coolrol M#sur(l Cuek appmpriaw ~ s w a

c rm- n r v t r i ~ SLW h uu O~OUH~IIT , YEs a YEs

D. Dbmlonlbn olwattr or shdlne tnvkhily oromhll? YES YES a

Aeadca?

YES 1 a E S m r w d V m -

IE. ~ u r ~ ~ l t y of c.mnt dlcbrge, or elevated lurbldlty in a m o l ootfmdl YES I CKQ) I YES I I

YE9

A E x a n w C a d h s r & h a ~ M M d ~ ~ ~ D d c h m ' l

YES I G a

F. Odor horn current dhcbmrgc or In a m olouthtl? I YES YES

Actions Rmuked (dcsaibe umblnn/iuue For dl ' A d a Rdkrd ' i m s cnla W a t ORIU number) W ~ ~ ~ ~ l - * P A f n ~ h r ~ ( p u d h ( W s b l u d * ~ -by

W o n ~ m r U n l O c h n p l 0 1 1 o l ~ h M ~ p t

B. c q d f ?

bsuakh

E h ~ b m m i n p o d m d i h n d pecunEvWmndnrpoina? - .

Stormwater 011tfaf.U 0brw.t ic .n~

NO

B E b h g & o r V d b * h I n D ~ D t ~ ?

YES 1 Ga

C.Rcsmcedpilkdorb*dmu**n

YES

8Onr Walu Ou(la11 SOOl

D M n d M

Yes

8(onnWlkr OuUa6 SOW ICont8inmmnt s h p l u n far mh~o*mwn(.d

DI*hd,

m

C D i x o b n t i o l . T ~ , a O d o r m h . u l q * r ~ . ~ ~ ~ ~ c o . l ~ ~ l l a d MI

Ye8

Page 13: &% Sincerely, · 2020-01-07 · Southwestern Electric Power Company, Flint Creek Power Plant. 21 797 SWEPCO Plant Road, Gentry, AR 72734 Permit Tracking No. ARROOB277 Enclosed is

Flint Creek Power Plant, Monthly IlrspecPion Checklist SWP3 / SPCC I LANDFILL

I~~ use check *arks 8 to indicate 'Aaptablc" w "Action Required" for each itan and category. v

49 W a k h Drum ud Drum sww in tnaa ~m I

Page 14: &% Sincerely, · 2020-01-07 · Southwestern Electric Power Company, Flint Creek Power Plant. 21 797 SWEPCO Plant Road, Gentry, AR 72734 Permit Tracking No. ARROOB277 Enclosed is

~ ~ i n t C& Power Plant, Mon& ~ns&ion ~~eck l i s t SWP;)IspCCPlrar

l17ed d a d vcfllabon. Localned dead rcptatlon

Page 15: &% Sincerely, · 2020-01-07 · Southwestern Electric Power Company, Flint Creek Power Plant. 21 797 SWEPCO Plant Road, Gentry, AR 72734 Permit Tracking No. ARROOB277 Enclosed is

I I

A. I*aiaa? B. Anila*cqmiiy? CRcrenctdrpilledak*odn~riJ7 D.I*brbolQaml

Ash Pomda primly and YES 1 G 3 b u n i c i a l YES YFs

-"*v) Cirde appropn8te w w u E S ~ V ~ ?

F . l r f l W h g b D o m m p D o d ~ m d ~Ivuuehodmvrrborpandl

YES I c%3 'CYES I NO

Stormwater Control Mnsuru mh.inmmDacha? Dnhuac Dnchd, Dl9 Cinie nppmprinte w w e r

YBS YES Y e s m I ) Lllorm Wmr OMm SOW

SIonn yu.lrroutfnll 8 0 ~ (Conpinmen urvnun tor p o ~ n r w n ~ d I (L-r**H--) 1 m n r r o m ~ l n m ~ l - . . *-,..... .l--, I IA. Stom water d i r L r g 1 . ~ during iuprtlbn? I YES 1 - I YES I G ? l I

I~Turbidlty olcumotdbrha~*.orcltntrd ~IIrbidiIy la oloalfa~?I YES I I YES 1 I P. Odor from cmrrcnt diiclaqe or in ana orontlal? I YES YE3

h i o a r Requid ( M b e problernllrue for dl 'Ash Rwuld' imr rndlor enter We& Order number):

WOZ. 98740585 TDBFP Outboard Bsamg b ol le& irpocDa by. D& P8lteroon

Page 16: &% Sincerely, · 2020-01-07 · Southwestern Electric Power Company, Flint Creek Power Plant. 21 797 SWEPCO Plant Road, Gentry, AR 72734 Permit Tracking No. ARROOB277 Enclosed is

Flint Crcck P o w c r P lant , h lont l t ly ll~spcction Cllccklist SWP3 I SPCC I L A N D F I L L

ormslon.. Cmcks. ullrvd dead \cgr.iat~o~~. pr bel!tr~n Imk and lon~nd.lt~oe. m.qe caused b\ q c a l l a n rmlr

Ibl-n I I Artrplnble 1 A i d 1 Acrrplablr I r\<riorr Required I A<ceplsble I Artian Rrquircd I

I 26 l ~ s c d 011 Tank I f l I 1 I

C \ c c l l l C Coal ULDI m Ih,tlt;rgr Dllcllcl ~ l o . n ~ n ~ ~ h a c n i l i or Vlrthl? sl~rnl ~n Unlllrgc Ulr:olor2l!oll.'lsrbldu~.or OOai (11 Onslage E ~ I ~ R Coal P L / c n8sS,~ Scnwx COZI Plld Dtlcl>cr S c n w ~ TOJI Pd:

E\ccrrncConl Dttrlknealll (bnl Col~sr\on'

YES N YES YES YES sloTmu'B~cr hl=n-rs '

,\t ICXIOI.~ ,rn !ca??Y Cm81gtC~vGI ,,11511 slonnnnilILr I! bCInS dBCd W. s l o m ~ ~ ~ ~ d ~ ~ h r ~ ~ t s ! l ~ ~ n ~ ~ s 1 1 ~ ~ 1 ~ ~ ~ ~ OI

Page 17: &% Sincerely, · 2020-01-07 · Southwestern Electric Power Company, Flint Creek Power Plant. 21 797 SWEPCO Plant Road, Gentry, AR 72734 Permit Tracking No. ARROOB277 Enclosed is

I . .

I - - I - - No. 2 l'ucl MI Pump Hmur - - x . j , ' x x I '

SOUTHWESYZSIN IL€,lC ,€R

Flint Cmck Powcr Plant, Monthly Inspection Chccklisl C W W N Y SWP3 ISPCC Plans A r * . r A n U m L - P . a hlonthlYenr: Aug.12

Inaructions; use chcck marks [3 to indicare "Acceptable" or "Aclion Required" for each item and category.

I x l I X I I

I I I I IU

upy'-Dnnn U-olkr reed - x-. J- -.- ,-- . x . *- lbrnp " .-. FA...;

% . -2

SECONDARY COSTAINIIEST

Berm n d o r Swndnrv C o n l a i ~ n l Svsttrn. . Lcvcl of pmipilalion in d k c l ~ r d l ~ h l c capxily. * Ikbril: .Erosion;

Pcrmeahilily ollh: cvlhcn noor oldikcd ma . Cnekr, . Discolomion. Prcsence orspilled or leakcrl mxcrial (standing I~quid); Corrosion; and . Condftion oldrain \.alvc

PLANT AREA

TANK. COSTAIRER,

.STOILAC.EU)CATIOX ALUlOR

F4UlpblFhT

42 WniLsng drum slonge uca (nonh of lurhlnc or1 l u l l )

- - . N A - . - X X

i(b) fficl OU g n ~ ~ e r Surge Tnnk " 3 :s$/<; :,:,- -- - ..," x,~ - , t .. - , - . .-, , - - - s - - --*, ---NA-:- - - , (1 1g id) - , * - . A

r u r l 0 ~ 1 lpn~ler Surgc TmL 2(a) rsnn ..I> x I x I - . -h 'A- - -

Accc~lnblc I Aclion Reauimd Acccnmble I Action Rtnulrcd Acccntnble Arllon L q u l d

I Y I I Y I I

TANK,CONTAISER. EQUIPMENT, or STOMGE LOCATION

I I i I I I '. .a .- I 77 hndlCaulic Unlorlmg x I ...N&L-.

hen I

p t c k Innkc conlnimrs, dnrm.nnd enninmcnl. incllldinr rnumlnliors, tor lcaks or slruclural d c l c c l s . 1 ~

I)np rn*,' Lhsco~o~lon; Puddles conlining spillixl or Il&cd

.Cornsion,. Cnck; LocaJizurl dcsd vc~dalion;

-Gaps bclvccn lank md loundalinn. D~IPC cau.wd hy rcpeta~ i~n mols

IYlrF ) I - - I I I --- .- - -- -- C u m n l Drum Slongc (ens1 dde of 011 Ilousc) x x

Chrck nininr br: . Droplcls olsloxd macnd; Drccolomion. . Cormsion. . Dowing of p i p hclwcen suppons: - E~illcncc ols~onxl rnalcrid xcpapc fmm

vd\vs or.wd$. and Locslizcd dcjd vc(cla1ion

I I I I I ' . a -

92 Tmh Dumpslcr @)d3) x ---NA--- - - -N A... . .

Page 18: &% Sincerely, · 2020-01-07 · Southwestern Electric Power Company, Flint Creek Power Plant. 21 797 SWEPCO Plant Road, Gentry, AR 72734 Permit Tracking No. ARROOB277 Enclosed is

, ,

TAVK. CO>T41YEII.

~~oRA.I:E~.I~ . rT l tn . *IL1lP

EOI.IP~IFsT

v u p t

1 4 Y K . COST415ER. EQI'IP>IE>T. or STORAGE L.OC4TIO'i

... .. . q l 1r.rrh I,ump\iur 15 )ill) .x,i.. 5 ,\... )i i

... NA.-.

SECOSD.IRY COSTAIN>IEST

Ilrm a&r Secondpn Ton(PinmM S,~tum. I.c\cl r>lpwclp8;rn!on in dt l r :ndlrblr r.dpatI?. . I>:l.ns . Ihl%ion.

* I'L~II~~AI~~I~I~ v l !I= c&llvdra llsx~r <!I J!Ld awd . ( ' r u b . - I> iwv lo r~r i~>n, ' Itc%:n~c rJ :p~llcd <8r ~ A L J IIIA~CII~ IslanJ~ny Ilqu~Ji. . Crrrum,n. and

l'<indilton 01 dmrn ~ : d \ r

IS^ PO& (Primar? and S*condsr, )

('trrlc appnlpnllt' znwcr

Slorma.a(er Control %leasums Cirr l r nppropnsc anxurr

(hrrk r p n k r o l u r i w r $ , d u r u u i m c 4 . i m l u l i n e kutiadaliorn. for &kc nr $ m r t u r a l dcfwtr'u. inrhnliw

l l n p rnuua. * I>~rc-ol t~r~l t~rn, I'uJdle?,i<tnuntnp spsllcll o r I r d d

m,;ut.":,~, 7 Clim8\illn. + Crsc1.r.

I .~ l r~ I~ r ;Jdu*J ,;'~c~alwn. - Ciapa h , u ~ ~ n rmk and Iwnd;u~nn: * I)rmaru cxsvd hh\ n.cn:l;$on rcxr*

,\ccellbhk

Check oirfinr (or: . I)m~lc l , ~ ~ T s l ~ ~ r c J rnacn*l. l)l.w,~hsru~,n. C'<tn~%-.~on. . luts-ins o f p i p k;ur.r'n 'uppuns. L.+ldcncc ol $!orcd 1ll4lr.lldl xcp.tge Inmm

xd\l .? . o r ?.L-AI~. wld I .~wdircd d:d $~.).r.lil!~nn

Arrrylnhlc ~r11.n R n ( u m d

4 b>wrf i 'J

113 I a I: S C L ~ ~ ! V~x'eual~trn)

ym I a A I C I I h x I h

m Ika,Mer I)Ic~LT'~

)Is j a

4 r c ~ ~ n e h l r Aclion Requircd

S l n r m m a t c r O u t r a l l O b n c r ~ a t i n n s circle nppropriale ansucr

A. Storm ws l r r dircharpinf during inspeclion? --

U. Prcrrrc of floating matcrialr f m m rurrcnl o r n ~ e n l discharge?

C. Prcxncc of t i r ib lc r k n in rma ofoulfvllf

I). Oircobwl ioo of x s l r r a r slx~rrlino in \icinil) ofoulhl l? .- - .-..

Action ilequircd

I1 . \ ~ a ~ l ~ h l ~ ~ ~ p a c ~ ~ ~ '

I Irnu~fictn1

I: 1s fl<u!tq k r ~ n ~n gmd cclhl8licn arrl suurciy a lndrx l l~ . "nlw p r a ~ '

a I SO

R I-ltuling ~UILIIIIP ( v Vt(iblc t l v ~ n ~n ~>ranugu I),Ic~,~

II.5 (a

E. Turbidit! of cwrcn t discharge. or r l r t a l r d l u r l r i d i ~ i n ama of oulTall? Y1.S n l s r2 -

F. Odor I rotn cuncsl discharge or in area of ouUaU'! YI S YI S

C. l ' r c ~ c x s i l l rplllcd gw ltiM n u ~ a n l !

YCS 1 a

Storm Waler Outlall SW1 ILakeshore wcrt of Hydrogen tanks)

1) lkhr~, \<Ckn~~n)?

Y1.s I a

YllS

Y1.S

V1.S

YY.S

Slorm Wabr Ounall SO03 (Conhinmenl sbuslurr for p o l r m o u n l ~ d bnnsformers 11 W.1.r Resovery Pump.

klm &m)

a a a -- Yl:S

Yl.5 ] - Yl S

YI:S

C' I)~w.lixa~l.m. Iurhulllp IW Orkr I" Ihaln~gc Vltrhr '

1LS 1 a

a a a a --

11 1.n. . .V\CI '.,xi I1c:tt k w ~ h r o d ( , r i w ~ li. Ill aid !I:'

Y1.I

Page 19: &% Sincerely, · 2020-01-07 · Southwestern Electric Power Company, Flint Creek Power Plant. 21 797 SWEPCO Plant Road, Gentry, AR 72734 Permit Tracking No. ARROOB277 Enclosed is

\I." "

I t , TrxL Gresra for b l Spur / f . - - > A - . .

'14 C , d > .?rd ['31h111~: I . ~ t i . . . \ ,\ . . . . . . \ \ - - - I c/ i

L C I U I J I : I I?AIIII~ r: . .~ci~ii l . car \ ,xihi_ \li:~n ill i)i-illm*c I)~*:L>,,~~IIIL.~$. :~sibbai!\ (-! Odot 111 LIratnq~ I \..>h,,CC,,31 > ! a , , I~":-,l, ,< 11 I .a;,:\. r< i)ich;r:<pyL~lpil:-__ -.... -

l l c , l I \ .5lomm>%..,t", < " " I v ~ > I \ l ea \ , , r~ \ <, \ \ A ~!,%:r,,.,,,',~, ":%~~I:$!S,,~ d,>r,z$ '.I,< ,,I,,,.::?<,, k !

22

2 :

24

2 < >

25

. Lnrd~ied d e d rcgcmlla,. G a p brruutn I ~ L mJ rwdatt lm

L)mlll;e c u c d h \qaalon :MI?

Ofl.Rod Dtcwl Tm!.

1 ,,Ic,,\>?J l;,l>,,l,~,c l;u,i

YnmcnrTmA

1 ,cJ 081 l&!L

D,ncl,GlvKmme Lnlos*(mng Area

r r r p l a h l r

J

4cllnn Hrgtratpd

Locl l l~cd d e d 1 epolrl~on

/ j

/ I / ; /TI

. Prercnce OIEPIIIC~ OI I cLcJ mzi..nd Iriantllng 11qut31. . Corm-l~an. md Cmdtltm oldran \ a l \ c

4rrrplrhlr

I". r

\c(cl)li~bC \rlien K P ~ ~ I B ~ P ~ 4rlion Hrquimd

/ 1 / - I

/' I

1 j

/

Page 20: &% Sincerely, · 2020-01-07 · Southwestern Electric Power Company, Flint Creek Power Plant. 21 797 SWEPCO Plant Road, Gentry, AR 72734 Permit Tracking No. ARROOB277 Enclosed is

M Jovrmvzsrrnw -ELCCTRIC -A

Flint Creek Powcr Plant, Monthly Inspcction Checklist cwmNr SFW3 / SPCC Plans ~ n t n m . m t r m M o n f W c n r : Nov-12

Inst~ucrions: use check marks lo indica~o "Acccplnblc" or "Action Rcqui red for each ilem and category.

, No 2 R c l Okl Pump

X I House 1 x x

L,

I x ! I X 1 I

x I 1 -- I 1

Umtrnnlc Hydnullc I .--NA-.- Conlml (UIClTulk

PLANT ARE*

TANK. COSTA 1mR.

STORAGELOCATION. ASWOR

EQU'PhlEhT

Mop

X X I I No 2 Fuel Chl Tank

IC\CJI I X I

I 42 I Working drum (nonh of luhin. .,, I X I I

TANK. CONTAINER. EQUIP.\lENT.or STORAGE LOCATION

X

n u , 1 Working drum rlnngc &TI -.-NA.-- ~ C T ~ K ba

-- Fuel Oil lgnilcr Surgc Tank

' X I X +' -.-NA--. 2o 1119 gal)

rucl011 Ignrrcr S u r ~ c Tank X X -.-NA.--

(360 pd)

75 S U I ~ U ~ C &id Tank X . X

Clicck tnnks, conlninra.clrums. ond c n u i m c n n t ~ w ~ o ~ d ~ l i o m . tor Ienks nr s~mrfurnl $rftrtc, i n e l ~ n l i n ~

Drip m u h : . Dircnlomlillim. Puddles con~dning spilld or Icakcd mxCT/JI:

Corrosion; - Cmb; - k d i m l dcd \ c g c l a l i ~ ; G a p s beln'~m lull; and loundaion;

D m ~ p c c a ~ s d by vdrcllion mnls

Arccplabk I Aclion Rcnuircd

SECONDARY CONTAINMENT

p . l rvc l olphcipilalion m J~kclavil&lc cspru~ty. * Debris; . Ension;

I'crmcsbzl~ly oflhc cmhcn f l ~ o r ofd~ked m a Cmb; . DiJcolontion; Prcscncc olspiUcd or Icdcd rnacrial (amding liquid); Corrosion; and . Conditinn oldnin valve

A I

x

$luck piainr for: - Dmplctsof slorcd mucrirl; , Diwalomion:

Conorion, Boring of pipc brlnrcn s~pponn; E\ldcncc of sloml ma~crid sccpqc from

vdvm orscds, md Locdixd d c d vc~clmion

AcceWble I Aclion Rcsuircd Acccplnblc

1

ASlon Rcqulmd

hiotor.Dnven Dollcr FrrJ

51

, Pump I - X i x I . . . N A - - .

Oil Haunc [Drum Stonpc Dldp ) Cmzml Dmrn Slonge (a side ~f Oil I ~ Y w ) Ma~n I 'ourrTr~nslnncrs ( ~ ' h m s A, I), md C)

M u n h u r T n ( P a 4 Y and 350)

X

x X

x

- - - N,\. -.

x I ' X

x

x x X

x

Page 21: &% Sincerely, · 2020-01-07 · Southwestern Electric Power Company, Flint Creek Power Plant. 21 797 SWEPCO Plant Road, Gentry, AR 72734 Permit Tracking No. ARROOB277 Enclosed is

Actions R c q u i d Fddcrcribc prohkrnlissuc fur dl 'Aclion Rcquiwd" isms d lo ren l c r tYurkOnlcr numherp. Walk Repusll687?5281 wgarinn noob.sZtanpd at #cobgyp#. larprnrrl hy Dale Palterson Work Requell 98775289 oil booms need replaced a! ecology pit.

PLANT AREA

Ash Ponds (Primnr). nnd Sccondsry)

Circlc nppmrriatc msurr

Slonnwatcr Conlml hlcxiurcr Circle spprapriwc mswcr

D k b n ~ orcon-!

YES

C. P~cscnc~ 01 sp!llula IuM cdluhl?

Y T S 1 a

S lo rman tc r Ou l ra l l Obser i~s t ions Circle approprinle answer

A. Slorm Haler discharging durinp imprainn?

u. Presence of flo~tingmolmriak I m m current or recent d i l c h ~ r g ~ ?

C. Pmencc o I r is ibk sl~een innma ploulfnll?

D. Discoloralion 01 wnlcr orshorclinc in vicinilg oIoutlaO?

LTurb id i ly o I cumn l diuhnrgc, or elevaed l lrrbidit~ i n nma oIou~Imll?

F. Odor I m m cumn l discharge o r i n rrca oloullnll?

A Erminn?

YES ) 0. Arailahknpacll)?

I lmu~tricru

Slorm Water OuHall SO03 (Contalnrncnl sLructure lor poltrnounlad Lrmn.lormarm at Water Rcsovary Pumps

below dam)

P Sumsul Vcgmdaa?

YE5 1 Cia A. ExccsivcCd I>un, & h a O l l v hferrial

in DninapcDilchcr?

YES 1 Storm Wabr OuHall500l

(Lakcshore west of Hydrogan tanks)

\'I3

w

WS

YES

Y L S

WS

I- Is ffmdng hmm in p d mnlilion and s m r c l y PIIBCM 10 anclm pDinls?

a I NO

U. ISmting t~wlnisls ol Vi'irihk sl- in Dninafc DitcIm?

W 1 a

1 G3

YTS

n?s

WS

w-5

Y E

-

a a a a

C. Dlsrol~31ion.Turhidity. u O h in Ddnagc I l i l dn?

YES 1 a

a a a a

0. Excesrl,r Car! Durr kn?dt Cml Couvqrn 1)) 2nd D??

YQ

Page 22: &% Sincerely, · 2020-01-07 · Southwestern Electric Power Company, Flint Creek Power Plant. 21 797 SWEPCO Plant Road, Gentry, AR 72734 Permit Tracking No. ARROOB277 Enclosed is

Flint Creek Power Plant, h I o n t l ~ l y Inspec l ion Chccklisr SWP3 ISPCC / LANDFILL

5lonthn'enr:

I I I I I 41 Used OJ Tml; ( W & , K T ~ ~

orvarlor born) /- I

worklng orvm sloragc A3 I I I I I

H,dnuln Fluid - Eyl oC 1~4~: ....*.,",.,,c> I -,/ I I ./ I I I I

.I"..,. I I I I

31 Coal CmnorBdt I ht0lon

C d Car Dvrnpr Onra 38 I,.,. . I I I I

r l o n a m c r conlm! nlr3s~rcr'~ - YES NO -

Needs Grrd~ndArh SprcJd~ng? Obrlrui~~ons m Slam> Wucr RunoffChannelP Erorlnn on Pcnntclcr Bcms? Tmr Gmjring on Psnmclcr Bemi! - YES NO YES YES 9 YES

Lnndfill Hc18h10-1sw pcnn'tted F"l Elc'at'on lnulom~nuc Lljlcnd ~ n r n ~ ~ . m d 6 1 1 1 lm%~on or In%~rb~ l l~? o l ~ l h ~ l o p c ~ . .-

I I

E\cnri\e Coal Durl ~n Ormnsgc 01lchcr Floalmg mmennlr or Virlbk rhccn mn Drmapc D~rmloralion.TuhiC~Iy,or Odor ~n Dranasc Smmr CDII hic5 Dttcher Senrnc Con1 Pale' D>leIlcr S r n ~ n x Conl i'llc?

YES YES YES Starmvalcr Conlrol Llenruru

ExrF(I,,C kne,lh Gn,.qon7

YES

Page 23: &% Sincerely, · 2020-01-07 · Southwestern Electric Power Company, Flint Creek Power Plant. 21 797 SWEPCO Plant Road, Gentry, AR 72734 Permit Tracking No. ARROOB277 Enclosed is

FLINT CREEK EOWER PLANT - RESPONSE EOUIPMENT CHECKLIST

Inspector Name: a : 2-6-\? Enter actions taken to correct deficiencies in Comments area beIow or create work order to correct problem.

Rcv. 12/16/2011 Codes: G-zood condition, F-hir cor~djtion, NR-needs rep:ijr/repfncement, Y-.ffes, N-no

Page 24: &% Sincerely, · 2020-01-07 · Southwestern Electric Power Company, Flint Creek Power Plant. 21 797 SWEPCO Plant Road, Gentry, AR 72734 Permit Tracking No. ARROOB277 Enclosed is

FLINT CREEK POWER PLANT - RESPONSE EOUIPMENT CHECKLIST /---

4c iL#j - Inspector Nan~e: . )h [ Date: 3 HZ/- /a Enter actions taken to correct deficiencies in Comments area below or create work order to correct problem.

Spill llesponsc Equipment locatcd in Warehouse #2 ("Brown

Comments:

Codes: G-@ad condidon, F-Bir condition, NR-needs repair/rpllilcement, Y-yes, N-no

Page 25: &% Sincerely, · 2020-01-07 · Southwestern Electric Power Company, Flint Creek Power Plant. 21 797 SWEPCO Plant Road, Gentry, AR 72734 Permit Tracking No. ARROOB277 Enclosed is

FLINT CREEK POWER PLANT - RESPONSE EQUIPMENT CHECKLIST 1

Inspector Name: ~ J u hLb;5 Date: b- / 0 - I 2 Enter actions taken to correct deficiencies in Comments area below or create work order to correct problem.

SpLl Rcsponsc Equipment locntcd in Wweliousc #2 ("Brown

Comments: , I

/ c 2 C s a l h A

Rev. 12/16/2011 Codes: C-good condition, F-fair condition, NR-needs repiui/replacemenr, Y-yes, N-no

Page 26: &% Sincerely, · 2020-01-07 · Southwestern Electric Power Company, Flint Creek Power Plant. 21 797 SWEPCO Plant Road, Gentry, AR 72734 Permit Tracking No. ARROOB277 Enclosed is

FLINT CREEK POWER PLANT - RESPONSE EOUIPMENT CHECKLIST

,- Inspector Name: . )&LC Date: / I - I S - - ( ~ Enter actions taken to correct deficiencies in Comments area below or create work order to correct problem.

Spill Response Izquipment locared in Warchousc #2 ("Brown

Comments:

Rev. 12/16/2011 Codes: G-good condidon, F-lair condidon, NR-needs repair/repJacement, Y-yes, 16-no

Page 27: &% Sincerely, · 2020-01-07 · Southwestern Electric Power Company, Flint Creek Power Plant. 21 797 SWEPCO Plant Road, Gentry, AR 72734 Permit Tracking No. ARROOB277 Enclosed is

ARKANSAS DEPARTMENT OF ENVIRONMENTAL QUALITY STORMWATER DISCHARGE MONITORING REPORT

(DMR)

PERMIT NUMBER: ARROOB277 AMERICAN ELECTRIC PERMITTEE NAME: POWEK/SWEPCO

FLINT CREEK PLANT NAME: 21797 SWEPCO PLANT RD ADDRESS: GENTRY, AR 72734

INDUSTRIAL 01 OUTFALL SOOl REPORTING SECTOR: NO: YEAR: 2012

Sampling Period: JANUARY-JUNE JULY-DECEMBER

PARAMETER

Chemical Oxygen Demand (COD)

Total Suspended Solids (TSS)

Oil arid Grease (O&G)

PH

Total Iron

Date o f Storm Event Sampled: Duration of Event: Estimate o f Rainfall Event: Time Since Last Measurable Event: Estimate o f Total Discharged Volume:

111 1/12 1011 2/12 hours inches

23 (l2119/11) 6 ( 1 0/6/1 2) 15.752.22 92,340.6 alIoris

Benchmark Value

120

100

15

6.0-9.0

I .O

1 CERTIFY UNDER PENALTY O F LAW T H A T 1 HAVE PERSONALLY EXAMINED A N D AM FAMILIAR WITH T H E INFORMATION SUBMITTED HEREIN; A N D BASED O N MY INQUIRY O F T H O S E INDIVIDUALS IMMEDIATELY RESPONSIBLE FOR OBTAINING THE INFORMATION, 1 BELIEVE T H E SUBMITTED INFORMATION IS TRUE, ACCURATE A N D COMPLETE. I AM AWARE T H A T THERE ARE SIGNIFICANT PENALTIES FOR SUBMITTING FALSE INFORMATION, INCLUDING T H E POSSIBILITY O F FINE A N D IMPRISONMENT.

- Plant Manager Printed Name & Title of Official

5301 Nonhbhore Dr~ve, North I.~ttle Rock, AR 721 18 50 1-682-0623 Fax 501 -682-0880

Version 0813012010

UNITS

mg/L

m g/ L

1ng1L

S.U.

mg/L

QUALlTY O R CONCENTRATION

JANUARY-JUNE

48

3 5

<5

7.5

0.154

JULY-DECEMBER

4 6

40

<5

7.9

1.23

Page 28: &% Sincerely, · 2020-01-07 · Southwestern Electric Power Company, Flint Creek Power Plant. 21 797 SWEPCO Plant Road, Gentry, AR 72734 Permit Tracking No. ARROOB277 Enclosed is

ARKANSAS DEPARTMENT OF ENVIRONMENTAL QUALITY STORMWATER DISCHARGE MONITORING REPORT

(DMR)

PERMIT NUMBER: ARROOB277 AMERICAN ELECTRIC PERMITTEE NAME:

FLINT CREEK PLANT NAME: 2 1797 SWEPCO PLANT R D ADDRESS: GENTRY, AR 72734

INDUSTRIAL 01 OUTFALL, S003 REPORTING 20 SECTOR: NO: YEAR:

Sampling Period: JANUARY-JUNE JULY-DECEMBER

Date o f Storm Event Sampled: Duration o f Event: Estimate of Rainfall Event: Time Since Last Measurable Event: Estimate of Total Discharged Volume:

111 1/12 10/12/12 hours

0.29 inches 23 (12/19/1 I ) 6 (10/6/12) dak s

20.40 1 19.56 eallons

1 CERTIFY UNDER PENALTY O F LAW T H A T I HAVE PERSONALLY EXAMINED A N D AM FAMILIAR WITH T H E INFORMATION SUBMITTED HEREIN; AND BASED ON MY INQUIRY O F THOSE INDIVIDUALS IMMEDIATELY RESPONSIBLE FOR OBTAINING T H E INFORMATION, I BELIEVE T H E SUBMITTED INFORMATION IS TRUE, ACCURATE A N D COMPLETE. I AM AWARE T H A T T H E R E A R E SIGNIFICANT PENALTIES FOR SUBMITTING FALSE INFORMATION, INCLLIDING T H E POSSlBlLlTY O F FINE AND IMPRISONMENT.

- Plant Manager Printed Name & Title of Official

5301 Northshore Drive, North L~ttle Rock, i-ZR 721 18 501 -682-0623 Fax 501 -682-0880

Version 08130120 1 0

Page 29: &% Sincerely, · 2020-01-07 · Southwestern Electric Power Company, Flint Creek Power Plant. 21 797 SWEPCO Plant Road, Gentry, AR 72734 Permit Tracking No. ARROOB277 Enclosed is

Permit Number: ARROO 23 3 AFIN 04 -GQIO'+

Industrial Sector: 611

DMR Review Form

Annual Report Received'? a y e s

TIM I< Received'? ~ Y C S N o

Are ill1 Parameters Okay '! Yes qo l'arnmeters exceeding the benchmark values:

Pollutant

I I I I 1 .;I 3nd 1 I 1 o r ,

1 o r ,

Date information was chtered inkdatabase

Date letter was cohblc'ted