PROJECT NO. :
WBS NO. : 401
DOCUMENT NO. REQUISITION FOR FITTING/ FLANGE/ GASKET
REV. : 0
XXXX-XX-REQ-XX-XXXX-A4PAGES:1 of 12
OWNER : VITOL iNDONESIACONTRACTOR : LOCATION : EAST JAVA , JAVA ISLANDS, INDONESIA
REQUISITIONFOR
FTITTING/ FLANGE/ GASKET
FOR BID
0 01/07/2014 All Issued for Bid GP/ZR MF
REV. DATE PAGE DESCRIPTION PREP’D CHECKED APPR’D
PROJECT NO. :
WBS NO. : 401
DOCUMENT NO. REQUISITION FOR FITTING/ FLANGE/ GASKET
REV. : 0
XXXX-XX-REQ-XX-XXXX-A4PAGES:2 of 12
CONTENTS1 GENERAL......................................................................................................................................32 MATERIALS...................................................................................................................................33 DOCUMENTATION........................................................................................................................34 TEST AND INSPECTION..................................................................................................................................45 FIELD SERVICE.................................................................................................................................................46 FIELD PRESERVATION...................................................................................................................................47 SHIPPING AND PACKING INSTRUCTIONS................................................................................48 ORDER OF PRECEDENCE............................................................................................................49 SUB-VENDOR LIST.......................................................................................................................5
ATTACHMENT-1 SCOPE OF SUPPLY/WORKS................................................................................6ATTACHMENT-2 RELATED DOCUMENT...........................................................................................7ATTACHMENT-3 VENDOR DATA REQUIREMENT (VDR).................................................................8ATTACHMENT-4 TEST AND INSPECTION......................................................................................10ATTACHMENT-5 DEVIATION AND CLARIFICATION LIST.............................................................12
PROJECT NO. :
WBS NO. : 401
DOCUMENT NO. REQUISITION FOR FITTING/ FLANGE/ GASKET
REV. : 0
XXXX-XX-REQ-XX-XXXX-A4PAGES:3 of 12
After P.O. Electronic File Electronic File
1.Net weight, gross weight and
measurement 1C+1E (1M) 2E 5E
2.Packing, knockdown and transportation procedure (1M) 2E 5E
3. Packing list Before shipping 2E 5E
4. Loose item list
5.Construction and Commissioning
spare parts list
6. Operational spare parts pricelist
7. Special tool list
8. Operational consumables list (if any)
9. Utilities consumption list for operation
10. General arrangement drawing eachequipments
11. Dimensional/Sectional drawing12. Wiring Diagram
13. Foundation Design and Base Anchoring
14. Equipment Data sheet with Loading Data
15. Calculation Sheet
16.Local Control Panel with Detail
Outline Terminal Drawing17. Mechanical Instrumentation Diagram18. Bill of quantity for site erection work19. Installation and commissioning
manual20. Corporate quality manual 1M 2E 5E21. WPS/PQR 1M 2E 5E22. Welder list & Welder Certificate 12M 2E 5E23. Catalogue, Reference List 1M 2E 5E
24. Minutes of meeting 1 W after meeting 2E 5E
25. Manufacturing schedules 1C +1E 2W 2E 5E26. Monthly progress report Monthly
2E 5E27. Lubrication schedule
PROJECT NO. :
WBS NO. : 401
DOCUMENT NO. REQUISITION FOR FITTING/ FLANGE/ GASKET
REV. : 0
XXXX-XX-REQ-XX-XXXX-A4PAGES:4 of 12
No. Documents & DrawingsAt Bid
Proposal
For Info/ For Approval/For Construction AS-BUILT
After P.O. Electronic File
Electronic File
28.
Operation/Maintenance Manual Including Instrument Manufacturer
Documents
29. Inspection and test plan 1M 2E 5E30. Inspection and Test procedure 1M 2E 5E31. WPS/PQR with weld map 1M 2E 5E32. Manufacturing Data Reports Before shipping 2E 5E33. Deviation/Clarification List 1C+1E 2E 5E34. Sub-Vendor list 1C+1E 1M 2E 5E35. Vendor Documents list 1W 2E 5E36. Painting Procedure
37. Rust Prevention & PreservationProcedure 1M 2E 5E
38. MDR Index 1M 2E 5E39. Welder Certificate & Welder List 1M 2E 5E40. NDE Procedure & NDE Map 1M 2E 5E
NOTES:
(1) No of Print after PO and as Built, see Documentation article 3.1
(2) Definitions:
W=Week, M=Month, C=copy original size, E= Electric files.
(3) Electronic Files shall be submitted in Adobe Acrobat PDF format, drawing in PDF and
AutoCad. Electronic file preferably provide in Flash Disk.
(4) Certification and report include in MDR.
PROJECT NO. :
WBS NO. : 401
DOCUMENT NO. REQUISITION FOR FITTING/ FLANGE/ GASKET
REV. : 0
XXXX-XX-REQ-XX-XXXX-A4PAGES:5 of 12
ATTACHMENT-4 TEST & INSPECTION
Test & Inspection
NO TEST AND INSPECTION
INSPECTED BY REMARKS
PURCHASER OWNER VENDORMFR’S
RECORD
PIM W W I
1. Material Inspection
1.1.Chemical Analysis & Mechanical property R R I OR
1.2. Non Destructive Examination R R I OR
2.
2.1. Fit up inspection R R I -
2.2. Welding inspection R R I -
2.3. Visual inspection R R I -
3. Final Inspection
3.1 Dimensional & Flange Facing Finish Check W - I OR
3.2 Visual Inspection & Dimensional Check W - I -
4 Painting inspection R R I OR
5 MDR R R I R
PROJECT NO. :
WBS NO. : 401
DOCUMENT NO. REQUISITION FOR FITTING/ FLANGE/ GASKET
REV. : 0
XXXX-XX-REQ-XX-XXXX-A4PAGES:6 of 12
Abbreviation
(1) Hold Point (H) - VENDOR is not allowed to proceed with the test/inspection unless a
written release is issued by the PURCHASER. VENDOR shall submit Inspection
Notification to PURCHASER.
(2) Witness Point (W) – PURCHASER intends to witness the test/inspection, however
VENDOR can proceed with the test/inspection when the PURCHASER inspector is not
present at the notified time. VENDOR shall submit Inspection Notification to
PURCHASER.
(3) Spot Witness (SW) – Spot Witness specified the operation test/examination where the
Contractor inspector shall be notified in advance and may be present during the
specified activity. VENDOR shall submit inspection notification to contractor.
(4) Surveillance (S) – VENDOR is not requested to notify PURCHASER. The PURCHASER
inspector will monitor work in progress, tests and inspections during his visit or
periodical inspection.
(5) Official Record (OR) - VENDOR is requested to provide the official record to be
submitted as Material Data Report.
(6) Internal record (IR)- VENDOR is requested to provide internal records for PURCHASER
inspector to verify the quality, such as welding consumable control record, etc.
(7) Documents review(R) – VENDOR is requested to submit the documents or records to
PURCHASER for review and approval.
(8) Implementation (I) – Preparation for execution of measurement, observation
examination, and or testing and reporting.
ATTACHMENT-5 DEVIATION AND CLARIFICATION LIST
PSFT Project
Requisition No. Vendor Name:
Specification Specification Requirement Mark Deviation, Clarification and Remarks
Mark D: Deviation, C:Clarification