« quasar » vlbi-network - present and future: 2010-2015
DESCRIPTION
« Quasar » VLBI-Network - Present and Future: 2010-2015. A ndrey Finkelstein Institute of Applied Astronomy Russian Academy of Sciences. « Quasar » VLBI-Network - 20 1 0. Svetloe (Sv). St. Petersburg. 2 0 1 4 .7 km. 4281.7 km. 6185.1 km. 6521 . 3 km. Zelenchukskaya (Zc). - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: « Quasar » VLBI-Network - Present and Future: 2010-2015](https://reader036.vdocuments.us/reader036/viewer/2022062423/56814d23550346895dba568f/html5/thumbnails/1.jpg)
NRAO 27-28 January 2011
![Page 2: « Quasar » VLBI-Network - Present and Future: 2010-2015](https://reader036.vdocuments.us/reader036/viewer/2022062423/56814d23550346895dba568f/html5/thumbnails/2.jpg)
NRAO 27-28 January 2011
«Quasar» VLBI-Network -
Present and Future:
2010-2015
Andrey Finkelstein
Institute of Applied Astronomy
Russian Academy of Sciences
![Page 3: « Quasar » VLBI-Network - Present and Future: 2010-2015](https://reader036.vdocuments.us/reader036/viewer/2022062423/56814d23550346895dba568f/html5/thumbnails/3.jpg)
NRAO 27-28 January 2011
4281.7 km
4281.7 km
44404404..9 9 kmkm
22001144
.7 k
m.7
km
6185.1 km
6185.1 km
UssurijskUssurijsk
65216521..3 3 kmkm
23372337..0 0 kmkm
«Quasar» VLBI-Network - 2010
Svetloe (Sv)Svetloe (Sv)
Zelenchukskaya (Zc)Zelenchukskaya (Zc)
Badary (Bd)Badary (Bd)
St. PetersburgSt. Petersburg
2
![Page 4: « Quasar » VLBI-Network - Present and Future: 2010-2015](https://reader036.vdocuments.us/reader036/viewer/2022062423/56814d23550346895dba568f/html5/thumbnails/4.jpg)
NRAO 27-28 January 2011
Observatory «Svetloe» (Sv)http://195.131.14.60
Observatory «Zelenchukskaya» (Zc)http://83.239.123.252
Observatory «Badary» (Bd)http://90.188.52.253
Login: guest, Password: guest
3
![Page 5: « Quasar » VLBI-Network - Present and Future: 2010-2015](https://reader036.vdocuments.us/reader036/viewer/2022062423/56814d23550346895dba568f/html5/thumbnails/5.jpg)
NRAO 27-28 January 2011
G -, C - and Kq - band receivers
S/X - band receivers
L - band receiver
Low Noise Receivers with Dual Polarization Channels
4
![Page 6: « Quasar » VLBI-Network - Present and Future: 2010-2015](https://reader036.vdocuments.us/reader036/viewer/2022062423/56814d23550346895dba568f/html5/thumbnails/6.jpg)
NRAO 27-28 January 2011
Receivers and Antenna Parameters of the VLBI-Network «Quasar»
Wavelength, cm
Frequency Range,
GHz
Receiver Temp.,
K
System Temp.,
K
SEFD, Jy
Efficiency
21/18 1.38-1.72 8 43 240 0.62
13 2.15-2.50 10 48 330 0.50
6 4.60-5.10 8 27 140 0.65
3.5 8.18-9.08 11 34 200 0.59
1.3 22.02-22.52 20 80 710 0.40
5
![Page 7: « Quasar » VLBI-Network - Present and Future: 2010-2015](https://reader036.vdocuments.us/reader036/viewer/2022062423/56814d23550346895dba568f/html5/thumbnails/7.jpg)
NRAO 27-28 January 2011
H-maser
6
![Page 8: « Quasar » VLBI-Network - Present and Future: 2010-2015](https://reader036.vdocuments.us/reader036/viewer/2022062423/56814d23550346895dba568f/html5/thumbnails/8.jpg)
NRAO 27-28 January 2011
VLBI Data Acquisition System and Recording Terminals in «Svetloe» Observatory
I - Mark 5B Recording Terminal Rack, II – Mark IV DAS, III – Time-Frequency Output Units Rack,
IV – Four Channel Radiometer Output Units Rack
7
![Page 9: « Quasar » VLBI-Network - Present and Future: 2010-2015](https://reader036.vdocuments.us/reader036/viewer/2022062423/56814d23550346895dba568f/html5/thumbnails/9.jpg)
NRAO 27-28 January 2011
Central Control Room of «Svetloe» Observatory
8
![Page 10: « Quasar » VLBI-Network - Present and Future: 2010-2015](https://reader036.vdocuments.us/reader036/viewer/2022062423/56814d23550346895dba568f/html5/thumbnails/10.jpg)
NRAO 27-28 January 2011
Correlator Center of RAS(IAA, Sankt-Petersburg)
6-sites correlator
Computer on the basis of workstation Sun Fire X4600
9
![Page 11: « Quasar » VLBI-Network - Present and Future: 2010-2015](https://reader036.vdocuments.us/reader036/viewer/2022062423/56814d23550346895dba568f/html5/thumbnails/11.jpg)
NRAO 27-28 January 2011
S/X - receiver
R1002 DataAcquisition System
Recording terminal Mark5B
H-maser
Phase CalibrationSystem (P-cal)
GPS/GLONASS receiver
Main computer
RT-70
Integration of «Quasar» VLBI-Network with Radio Telescope RT-70 (Ussurijsk, Far East)
10
![Page 12: « Quasar » VLBI-Network - Present and Future: 2010-2015](https://reader036.vdocuments.us/reader036/viewer/2022062423/56814d23550346895dba568f/html5/thumbnails/12.jpg)
NRAO 27-28 January 2011
Main International Programs with IVS
IVS-R1, IVS-R4 – sessions carried out twice per week on Monday and Thursday for obtaining EOP;IVS-T2 ‑ sessions carried out once per two or three months for monitoring stations coordinates of the global VLBI-Network;IVS-Intensive ‑ sessions carried out twice per month for obtaining the Universal Time;EURO – sessions organized not rare than once per year; the purpose of this experiment is to determine station coordinates and their evolution in the European geodetic VLBI Network;VLBI-RDV – few sessions during a year for the aim of geodetic source mapping in collaboration with VLBA-Network;CONT – one session every four years for interdaily EOP effects determination
http://www.ipa.nw.ru/PAGE/rusipa.htm
11
![Page 13: « Quasar » VLBI-Network - Present and Future: 2010-2015](https://reader036.vdocuments.us/reader036/viewer/2022062423/56814d23550346895dba568f/html5/thumbnails/13.jpg)
NRAO 27-28 January 2011
Contribution of «Quasar» VLBI-Network in IVS Programs
2008-2009
50 session per year
50 intensive session per year
less then 10 session per year
12
![Page 14: « Quasar » VLBI-Network - Present and Future: 2010-2015](https://reader036.vdocuments.us/reader036/viewer/2022062423/56814d23550346895dba568f/html5/thumbnails/14.jpg)
NRAO 27-28 January 2011
Main Domestic Space Geodesy Programs
RU-E – 24-hour sessions carried out once per 2 weeks for determining all EOPs (Universal Time, pole coordinates, Celestial pole coordinates) using three observatories of the VLBI-Network «Quasar»
RU-U – 1-hour sessions once per 1 week for determining Universal Time using «Badary» – «Svetloe» or «Badary» - «Zelenchukskaya» baselines
http://www.ipa.nw.ru/PAGE/rusipa.htm
13
![Page 15: « Quasar » VLBI-Network - Present and Future: 2010-2015](https://reader036.vdocuments.us/reader036/viewer/2022062423/56814d23550346895dba568f/html5/thumbnails/15.jpg)
NRAO 27-28 January 2011
EOP Differences of IAA (RU-E) and IERS 05 C04 60 sessions
Red ― S2 recording system, green ― Mark 5B recording systemrms: Xp, Yp – 1.1 mas, UT1-UTC – 45 μs, Xc, Yc – 0.6 mas
xp yp
UT1-UTC
xc yc
14
![Page 16: « Quasar » VLBI-Network - Present and Future: 2010-2015](https://reader036.vdocuments.us/reader036/viewer/2022062423/56814d23550346895dba568f/html5/thumbnails/16.jpg)
NRAO 27-28 January 2011
Baseline Length Time Series and Velocities
«Badary»–«Svetloe», L ― 4281660.537 m (94 sessions)
L = 4281660.537 ± 0.001 m (2007.98)V = 0.005 ± 0.001 m/year
«Svetloe»–«Zelenchukskaya», L ― 2014661.045 m (120 sessions)
«Badary»–«Zelenchukskaya», L ― 4404836.203 (95 sessions)
L = 2014661.045 ± 0.002 m (2007.98)V = 0.002 ± 0.001 m/year
L = 4404836.203 ± 0.002 m (2007.73)V = 0.004 ± 0.001 m/year
-0 .06-0 .04-0 .02
0 0 .02 0 .04 0 .06
2007 2008 2009 2010 2011
m
tim e , ye ar
B adary-S ve tlo e , B -4281660 .537 , m
-0 .06-0 .04-0 .02
0 0 .02 0 .04 0 .06
2006 2007 2008 2009 2010 2011
m
tim e , ye ar
S ve tlo e -Z e le nc huks kaya, B - 2014661 .045 , m
-0 .06-0 .04-0 .02
0 0 .02 0 .04 0 .06
2007 2008 2009 2010 2011
m
tim e , ye ar
B adary-Z e le nc huks kaya, B - 4404836 .203 , m
15
![Page 17: « Quasar » VLBI-Network - Present and Future: 2010-2015](https://reader036.vdocuments.us/reader036/viewer/2022062423/56814d23550346895dba568f/html5/thumbnails/17.jpg)
NRAO 27-28 January 2011
Optical Fiber Lines of «Quasar» VLBI-Networkfor e-VLBI Mode - 2011
Network channel equipment
1 GbsNetwork channel
equipment 1 Gbs
Network channel equipment
1 Gbs
Backbone 10 Gbs
Маrk 5B Terminals
Маrk 5B
Маrk 5B
Маrk 5B
“Svetloe”
“Zelenchukskaya”
“Badary”
Sankt-Petersburg, IAA Correlator Center
19 км
100 Мbs
8 km
100 Мbs
5kм
1 Gbs
32 km
100 Мbs
16
![Page 18: « Quasar » VLBI-Network - Present and Future: 2010-2015](https://reader036.vdocuments.us/reader036/viewer/2022062423/56814d23550346895dba568f/html5/thumbnails/18.jpg)
NRAO 27-28 January 2011
rms (UT1-UTC) = 60 μs
UT1-UTC Differences of IAA (RU-U) and IERS 05 C04 66 Sessions of e-VLBI Mode (Mark 5B, 1 hour)
UT1-UTC
17
![Page 19: « Quasar » VLBI-Network - Present and Future: 2010-2015](https://reader036.vdocuments.us/reader036/viewer/2022062423/56814d23550346895dba568f/html5/thumbnails/19.jpg)
NRAO 27-28 January 2011
Satellite Laser Ranging System «Sazhen’-TM»
of «Quasar» VLBI-Netrwork: 2011
Satellites orbits – 400 – 23 000 kmNormal points accuracy – 1 cmAngular measurements accuracy – 1-2”Mirror diameter – 25 cmFrequency – 300 HzPulses energy – 2.5 mJMass – 120 kg
18
![Page 20: « Quasar » VLBI-Network - Present and Future: 2010-2015](https://reader036.vdocuments.us/reader036/viewer/2022062423/56814d23550346895dba568f/html5/thumbnails/20.jpg)
NRAO 27-28 January 2011
Main Domestic Astrophysical Programs (single dishes)
Multifrequency monitoring of close double systems;
Observation of micro quasars and variable extragalactic radio sources;
Research of flux variability of geodetic radio sources;
Research of inter-diurnal flux variations of extragalactic radio sources;
Multifrequency monitoring of relativistic objects including γ-bursts;
Calibration of radio sources for radio astronomy flux scale.
http://www.ipa.nw.ru/PAGE/rusipa.htm
19
![Page 21: « Quasar » VLBI-Network - Present and Future: 2010-2015](https://reader036.vdocuments.us/reader036/viewer/2022062423/56814d23550346895dba568f/html5/thumbnails/21.jpg)
NRAO 27-28 January 2011
European VLBI-Network
20
![Page 22: « Quasar » VLBI-Network - Present and Future: 2010-2015](https://reader036.vdocuments.us/reader036/viewer/2022062423/56814d23550346895dba568f/html5/thumbnails/22.jpg)
NRAO 27-28 January 2011
Main Astrophysical Programs (VLBI)
Mapping of extragalactic and galactic radio sources («Quasar»+EVN)
Mapping of geodetic radio sources(«Quasar» +EVN)
Ground-based Support of RADIOASTRON Mission(«Quasar»+others radio telescopes )
21
![Page 23: « Quasar » VLBI-Network - Present and Future: 2010-2015](https://reader036.vdocuments.us/reader036/viewer/2022062423/56814d23550346895dba568f/html5/thumbnails/23.jpg)
NRAO 27-28 January 2011
«Quasar» VLBI Network Development: 2013-2015
Equipment of Ussurijsk 70-meter radio telescope with
L-, C-, G-, Kq-band recievers 2011
Installation of 2 new 12-meter diameter radio telescopes at «Zelenchukskaya» and «Badary» observatories 2013-2014
Installation of 3 absolute gravimeters at «Quasar» observatories 2014-2015
Equipment of «Quasar» VLBI-Network with transportable collocated station (VLBI, SLR, GNSS, AG) 2015
22
![Page 24: « Quasar » VLBI-Network - Present and Future: 2010-2015](https://reader036.vdocuments.us/reader036/viewer/2022062423/56814d23550346895dba568f/html5/thumbnails/24.jpg)
NRAO 27-28 January 2011
St. Petersburg
4281.7 km
4281.7 km
44404404..99 km km
22001144
.7km
.7km
6185.1 km
6185.1 km
65216521..33 km km
23372337..00 кмкм
«Quasar» VLBI-Network - 2015
Svetloe
Zelenchukskaya
BadaryUssurijsk
Transportable colocated station
23
![Page 25: « Quasar » VLBI-Network - Present and Future: 2010-2015](https://reader036.vdocuments.us/reader036/viewer/2022062423/56814d23550346895dba568f/html5/thumbnails/25.jpg)
NRAO 27-28 January 2011
Thank You for Your Attention