FREE MEDICAL CHECKUP ORGANISED BY M/S TOPCEM INDIA
Health Camp organized by M/s Topcem India in association with GNRC Hospitals
. Association benefits more than 200 villagers of Gauripur and surroundings
. Free medicines distributed to the patients
Guwahati, 3rd Sept, 2016: Living up to its motto ‘ Caring, Sharing and bringing Smiles’ and in Occasion of “GANDHI JAYANTI” 2016, Topcem Cement in association with GNRC Hospitals, organized a free health check up camp in Gauripur, Changsari. The free health check up camp was organized on 2nd Sept, 2016 in 1051 Gauripur Prathomik Bidyalaya, Gauripur, Changsari in the district of Kamrup.
The company geared itself in preparation for the free health checked up camp by intimating the camp through discussions and consultations with senior citizens of the village and word of mouth publicity.
The aim of the health check up camp was to reach out to the local population and spread awareness about basic cleanliness and health care which will enable people of Gauripur and its surrounding villages to lead more healthy life.
A team of eight doctors from different segments – Medicine, Dermatology, Cardiology, PMRD, Neurology and Pediatrics examined different types of patients of various age groups and provided free medical treatments and medicines to them. More than 200 nos. of patients were examined from Gauripur and its surrounding villages. Investigations like Ultra Sonography, ECG, Echo tests were also extended free to those required.
The local villagers showed lots of interest in the medical camp and appreciated the efforts of Topcem Cement.
The Photographs of the Medical camp is shown below:
Photos of Crimination Ground created in Tilingaon by M/s TOPCEM INDIA
Photos of Gauripur village Temple created by M/s TOPCEM INDIA
Photos of paddle boats(4 nos) donated by M/s TOPCEM INDIA for public use in Amingaon lake
Environmental Statement for
i) Name and address of
owner ,/ occupier of the
industry, Operation or
process,
Industry category
Primary- (STC Code)
Secondary- (SIC Code)
Production capacity u
Year of Establishment
Date of the last
environmental audit
submitted.
ii)
iii)
iv)
v)
FORM - V
financial year ending
PARTs A
M/s.
vill:Kamrup,
Orange
2000 MT
2017
18.05.2016
oay
31s( Mqrch 2017
r, Colleg€ Nagar, Amingaon' Dist:
PART : BWater and Raw Material
(1) Water Consumption m3/day.
- Nil(Only 30000 litre/day for the Cooti
- Nil
- 10000 Litre/day (Domestic)
Gardening : - 10000 Litres/day (from STp Treated ater)Details of raw material consumption are encl as Annexure-r,
Name of Products Process w r consumption per unit of products.Du ring th
Financiprevtous During the cu rren t
Financial Vear.(r) (2)
Process
Boiler
Domestic
( ii) Raw Materjal consumption
Na me of Rawlvlateria ls Name of Products
Clinker PPC and OPC
PPC a nd OPC
PPC and OPC
Fly Ash
Slag
Gypsum
(Parameter as specified in the
(i) Polluta nts
Consumpti n of raw material per unit of output.lvlT
Du ring prevtous During the cu rrentFinanci Financial year.
nsumption
Purpose)
Not Applicable
Not Appiicable
r.
73,66
zt,//
Nil
o.:t7
ntlUnit of outputncenf ic<rra.l\
lrs of Percentage of variationin -/_-^^ / rrom prescnD{_ro
sta nda rds with
rea so n s.
oPc
(1)
(2)
Quantity of
polluta nts
d ischa rged
( mass/day)
Not
Not
77,7L
27.7L
Nil
0.58
Concentratpolluta ntsd ischa rgesvolume)
Details of raw material consumption are enclosed as nexure-ILPART : c
Pollution Discha rged to Environ
NOT APPLICABLE, AS THGENERTION.
IS NO WASTEWATER
There is no waste water gene on due to the process, Only 10KL/Day domestic wastewater ismechanically and biologically jn
ting. Which is being treatedmmon sewage treatment pla nt
su ppression..)/.
d<\ +/t\r i
(a) Water
and uslng in plantation and d
PRESCRIBED BY THE BOA
PART : D
Hazardous Wa
(as soecified under Hazardous Wastes (Manage nt and Handling) Rules, 1989)
Hazardous Wastes Total Qua
DuringFina
e previousal vea r.
Du ring the cu rrentFinancial Yea r.
Used spent 70 Li
oil
N.A
PART : E
Solid Wastes
Total Ouanti
Durin p revio u s Du ring the cu rrentFi Fina lcial Vear.
(a) From Process N'A
(b) From Pollution N'Acontrol facilities
(c) (1) Quantity recycled Discarded 2
or re-utilised Bags63 Nu mbers 1000€r Numbers
ALL PARAMETERS ARE
N.A
N,A
WITHIN THE(b) Air
(a) From Process
(b)From Pollutioncontrol facilities
(2) Sold
(3) Disposed
120 Litres
N.A
ncial
Details of solid wastes generation is enc as Annexure-III'
Please specify the characteristics (in te s of concentration and cluantum) of
Hazardous as well as solid wastes and indicate isoosal practice adopted for both these
catego ries of wastes.
All the HDPE Discarded Bags generated are rn to supPliers. Usedl oil drained
lubricationfrom equipments and machineries is
purpose.
For details please refer Annexure-III'
cled in the Plant for
Consuftancy & Rs 244926/- Rs Two Lac Forty ur Thousand nine hundred twentySix for dust collection bag replacement in bag Fi
Following measures have been adopted for abanatural resources:-
1. Utilization of fly ash for the manufacturin of cement:We are consuming approx 400 MT of fly per day from d ifferent NTPC pla nts
it has beentransported in closed container and stored in covered sheds from wherepneumatically conveyed to cement mjll for ce nt grinding process.
purpose:
PART : GImpact of the pollution control measures
consequently on the cost of production.
Cost of consultancy & recurring cost of annLLA45O/- Rs One Lac Eighteen Thousand
connected with Pollution Control Board, Assa
to PCB, Assam server as well as CpCB, Delhi.
Schedule maintenance monitoring of poll
conservation of natural resources and
monitoring include electricityi Rs.
our Hundred Fifty only for Env.
rs.
of pollution, con!;ervation of
2. Use of STP treated water for the plantatioWe have latest and advance Sewage Treatme
The treated water is being reused in greenbel
Plant. The capacity of STP is
activity and dust su ppression.
sludge (after drying) is being used as addi e in cement manufactunnosiliceous material.
3. Rain water Harvesting measures:Rain water Harvesting system have been
recha rge of ground water.
4. Plantation in and around the plant:
nstructed at the plant Dremises for
Green belt development and tree plantation is
plantation to increase the bio-diversity of the
11517 meter2 area have been planted.
r ongoing process. We are doinq new
area. Presently 34982 no. of plants in
5. Continuous Stack Emission MonitoringContinuous Online stack monitorina svstem e been installed and presently server is
. Monitoring data is beinE transmitting
50 KLD.
The STP
as it is
6. n Control Devices:All the pollution control devices have been ntained as per scheduled maintenanceby environmental management team which is prlses of mechanical, electrical andenvlronmental officers and monitorinq of all th have been done regularly as per pCB
norms.
The list of major Pollution Control Devices insta ed is attached in the Anne)(ure IV,
Add itional measures/abatement of pollution.
investment proposal for nvironmental protection including
The budget details of plantation activities is
Thousand Seven Hundred FiftY Six'
Installation of online stack monitoring device
Two Thousand Three hundred Twenty Six only)
Construction of Rain water Harvesting System
Fifty Nine Thousand Four Hundred Seventeen'
None.
Submitted to:1. The Member Secretary
Pollution Control Boa rd AssamBamunimaidam, Guwahati-21
2. To, Additional Principal Chief ConservatorMinistry of Environment, Forest and ClimaNorth Eastern Regional Office,Law-U-Sib, Lumbatngen,Nea r MTC Workshop, Shillong-793021.lYeghalaya.
From : M/S TOPCEM INDIAVill: Ga u ripu r, College Nagar,Amingaon. Dist: KamruP,Assam.
pees 9O2756/ -(Rs Niine Lac Two
Rs 4,32326/ -(Rs Four Lac Thirty
is Rupees 459417 / -l:,Rs Four lac
aa>tt tro ' '/
me : AMIT AGARWAL
ignation: PARTNER
Forests(c)change,
PART : IMiscellaneo
Any other particulates for improving the qual of the environment.
.. r. \!
Part E
Water Requirement in the Plant
. Total water requirement of the Plant is 50
water using Bore Well.Water requirement will be mainly for the cooli
For Domestic use 10 KL/DaY
For Plantation & ga rden ing/othersSTP is used for the Plantation and
Annexure- I
which shall be met through ground
30 KLlDay (Make up quantity).
10 KL/Day if louire because now treated water in
Dust Su ron Pu rpose.
Note: All the domestic waste water is being treatedroads and plantation Purpose.
and reuse for water sPraYing on
WASTE WATERGENERATION
CONSUMPTIONKLlDAY
Industrial Pu
Plantation/Gardening &Othe r
Annexure- II
Date
16-Apr 53279 37903.035 310.895 1506r .07 7 t.74 0.58 28.28
16-Mav 60010 42736.565 5ZO.5U) 1694, .13 7 t.22 0.54 28.24
16-Ju n 44370 32903.035 24L.85 Ltzz> IIJ t.+. Lo 0.55 25.30
16-Jul 39850 29529.82 222.9 1009; .28 74.LQ u. fo 25.34
16-Auq 47855 3 5391.9 276.t5 72t81 .95 73.96 0.58 25.47
16-SeD 39950 29407 .5 ztt.L 1031 ,..+ /J.OI 0.57 zJ.6Z
16-oct 32790 240s9.33 181.95 8548 72 73.37 0.55 26.O7
16- Nov 29535 21618.73 139.72 7776 55 73.20 0.47 ZO.JJ
16-Dec 220L5 16353.925 110.339 5550 /5b 74.29 0.50 25.2L
77 -)an 24945 r.8878.325 145.125 5921 55 0.58 23.7 4
17-Feb 27 020 27376.65 202.775 5440 575 79.tL 0.75 20.14
17- Ma r Sbdv) 25874.025 210.05 1081( 925 /U.L5 29.30
Total 458514 336032.84 2597.159 11988 1.001 Avq 73.66 o.57 25.77
Part-E & F
Dust collected from air pollution control equipmentOther solid wastes will be used/spent oil and discard
Annexure-III
ll be 100o/o recycled in the process.drums and bags. The sources of solidthe following table.wastes, generation and its management are as given i
waste management detailsSource Quantityper
month
Type ofSolid
Waste
Reuse inpranrmachineriesforlu brication
Retu rned to rawMaterials
TOPCEM IND
VILL & P.O r G0URIPUR, AMINGAON, NO
BAG FILTER REPO
Annexure-IV
AHATI,ASSAM.
Sl No I etailsBAG FILTERLOCATION
TRUCK TRIPPLE]
BAG FILTE CODE 491 BF1
BAG LENGTH 3660 MM
BAG DIA rc04TOTAL NO OFBAGS
72 NOS
FLOW CAPACITY 10000 (AM3/HR'
NO OF CHAMBER
BAG FILTERLOCATION
TRUCK TRIPPLE
BAG FILTE CODE 4918F2
BAG LENGTH 3660 MM
BAG DIA 1604
TOTAL NO OF
BAGS72 NOS
FLOW CAPACITY 10000 (AM3/HR
BAG FILTERLOCATION
CLINKER STORI :E SILO TOP,
BAG FILTE CODE 491 BF3
BAG LENGTH 3660 MM
BAG DIA 1600
TOTAL NO OFBAGS
72 NOS
FLOW CAPACITY 10000 (AM3/HF
NO OF CHAMBER
BAG FILTERLOCATION
CLINKER EXTfu CTION BELT CONVEYOR 511 BC3
BAG FILTE CODE 511 BF3
BAG LENGTH 3660 M[rl.
BAG DIA 1,60Q.
TOTAL NO OF
BAGS96 NoS,
FLOW CAPACITY 12000 (AM3/HI
5BAG FILTERLOCATION
cypsuMsroRlc'sHED. ,,a.gft
BAG FILTE CODE K2l BFI
8AG LENGTH 3660 MM.
BAG DIA 1600
TOTAL NO OFBAGS
36 NOS.
FLOW CAPACITY 5000 (AM3/HR)
NO OF CHAMBER
BAG FILTERLOCATION
GYPSUM CRUSHT R HOUSE,
BAG FILTE CODE K21 BF2
BAG LENGTH 3660 MM.
BAG DIA 7600
TOTAL NO OFBAGS
72 NOS.
FLOW CAPACITY 10000 (AM3/HR'
NO OF CHAMBER
BAG FILTERLOCATION
CEMENT MILL H )PPER.
BAG FILTE CODE 5318F1
BAG LENCTH 3660 MM.
BAG DIA rcoaTOTAL NO OF
BAGS112 NOS.
FLOW CAPACITY 15000 (AM3/HR
NO OF CHAMBER
BAG FILTERLOCATION
CEMENT MILL H )PPER WEIGH FEEDER.
BAG FILTE CODE 531 BFz
BAG LENGTH 3660 MM.
BAG DIA r60a
TOTAL NO OF
BAGS112 NoS.
FLOW CAPACITY 15000 (AM3/HR
NO OF CHAMBER
BAG FILTERLOCATION
CEM ENT MILL F OUSE,
BAG FILTE CODE 561 BFZ
BAG LENGTH 3660 MM.
BAG DIA 760d
TOTAL NO OFBAGS
112 NOS.
FLOW CAPACITY 15000 (AM3/Ht
10
BAG FILTERLOCATION
CEMENT MILL I OUSE,
BAG FILTE CODE 561 BF1
BAG LENGTH 3665 MM.
BAG DIA 149Q -,frTOTAL NO OF 396 NOS.
BAGS
FLOW CAPACITY 41000 (AM3/HR)
NO OF CHAMBER
11
BAG FILTERLOCATION
STEEL SILO TOP.
BAG FILTE CODE 591 BF3
BAG LENGTH 3660 MM.
BAG DIA 160@
TOTAL NO OFBAGS
36 NOS.
FLOW CAPACITY 5000 (AM3/HRJ
NO OF CHAMBER
72
BAG FILTERLOCATION
RCC CEMENT SIL( TOP.
BAG FILTE CODE 611 BFl
BAG LENGTH 3660 MM.
BAG DIA 1.606
TOTAL NO OFBAGS
36 NOS.
FLOW CAPACITY 5000 (AM3/HR)
NO OF CHAMBER
IJ
BAG FILTERLOCATION
AIR SLIDE DEDUI TING
BAG FILTE CODE 6118F1
BAG LENGTH 3660 MM.
BAG DIA 1600
TOTAL NO OFBAGS
35 NOS.
FLOW CAPACITY 5000 (AM3/HR)
NO OF CHAMBER
14
BAG FILTERLOCATION
AIR SLIDE DEDU iTING
BAG FILTE CODE 6ll BF+
BAG LENGTH 3660 MM.
BAG DIA r60aTOTAL NO OF
BAGS36 N0S.
FLOW CAPACITY s000 (AM3/HRl
NO OF CHAMBER
l:)
BAG FILTERLOCATION
PACKER DEDUS' ING
BAC FILTE CODE 66r BF1
BAG LENGTH 3660 MM.
BAG DIA 760Q
TOTAL NO OF BAGS 96 N0S.
FLOW CAPACITY 12000 (AM3/HR
NO OF CHAMBER rfe.ltli
t6
BAG FI]
LOCAT]
TER]N
PACKER DEDUSTI {G
BAG FII TE CODE 667 BFz
BAG LE 'IGTH 3650 MM.
BAG DI 760Q
TOTAL {O OF BAGS 144 NOS.
FLOW APACITY 20000 (AM3/HRl
NO OF :HAMBER
L7
BAC FILOCAT
,TER
ONPACKER DEDUST NG
BAG FI ,TE CODE 6628F7
BAC LI NGTH 3660 MM.
BAG D \ rc04
TOTAL NO OF BAGS 96 NOS.
FLOW :APACITY 12000 (AM3/HR)
NO OF ]HAMBER
18
BAG FILOCA'I
,TERON
PACKER DEDUST NG
BAG FI ,TE CODE 662 BF2
BAG LI NGTH 3660 MM,
BAG D 760Q
TOTAI NO OF BAGS 144 NOS.
FLOW ]APACIfi 20000 (AM3/HRl
NO OF :HAMBER
H.t-rlti)