on experience, with the ability to perform at a higher level than our competitors. our goal is to...

60
www.azengineers.com

Upload: others

Post on 09-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: on experience, with the ability to perform at a higher level than our competitors. Our goal is to attain a position whereby we are capable of delivering construction solutions at

www.azengineers.com

Page 2: on experience, with the ability to perform at a higher level than our competitors. Our goal is to attain a position whereby we are capable of delivering construction solutions at

Introduction:Created in 1990 by Pakistani engineers Shahzad Ashraf and Syed Haris Ali, AZ Engineers has become a very well-known company in construction and related services in several countries of the world. From 1990 till date, a strong growth has been recorded in the Group’s construction and civil engineering activities locally & internationally.

AZ ENGINEERS has undertaken projects in Pakistan, Libya, South Africa, Iraq, Bahrain and Sultanate of Oman. The Company has its head office in Pakistan and branch offices in Sultanate of Oman and Bahrain.

Vision:We believe that our company offers a range of integrated construction services to match the evolving needs of today’s marketplace. We aim to be known as a company founded on experience, with the ability to perform at a higher level than our competitors. Our goal is to attain a position whereby we are capable of delivering construction solutions at an affordable price without compromising on quality and the stipulated timeline.

Mission:Our mission is to become a leading construction company with an ethical approach, respect, safety of employees, service quality, and commitment towards our customers, profitable growth & a committed workforce. As a company, we pride ourselves on quality and precision, and always work within a framework of honesty and integrity.

The company aims to serve the needs of the people, and is happy to be a part of building a better and even brighter world to live in. The company is committed to providing construction services and turn-key solutions while taking a leading role in protecting the environment and conserving our planet for the future generations.

Starting small, AZ Engineers has come a long way throughout its relatively short history. Keeping up with our objectives of providing engineering services with a skilled and proficient technical team, the company has grown beyond borders. Thus, we have the distinction of working with consultants and companies all over the region and beyond, and delivering international projects with professionalism, quality, standard of safety and most importantly on time.

The company relies heavily on its in-house training and human resource development. There have been multiple examples where an unskilled worker has been trained and has made his way up the ranks to become a site supervisor/engineer, making them more useful in the industry. The company has undertaken various projects in Pakistan, Oman, Libya, South Africa, Iraq & Bahrain. It has done more than 500,000 cubic meters of concrete in Oman and has achieved up to 14,000 cubic meters in a month. Our portfolio includes more than 50 Bridges (Wadi, Flyovers, Box Girder I-Beams & Arch Bridges) with a total length of 8,000 linear meters, more than 20 vehicular Underpasses having a length of more than 1,000 linear meters and Retaining Walls (RCC, MSE & Geo-Grid Walls) with a length of approximately 7,500 linear meters. It has also constructed more than 500 Box Culverts including Multi Cells and approximately 2000 Housing Units in Multi-Story Residential & Commercial Buildings.

Page 3: on experience, with the ability to perform at a higher level than our competitors. Our goal is to attain a position whereby we are capable of delivering construction solutions at

Major Services & Areas of Works-Expertise• Bridges (Post tensioned Voided Slab, Box Girders Arch Bridges & Integrated span Bridges with I/T Beams)

• Underpass Bridges (Vehicular & Pedestrians)

• Box Culverts (all sizes and multi-cells/battery type)

• Construction of Retaining Walls (Mechanically Stabilized Earth Walls, RCC Retaining walls & Geo- Grid Walls)

• Multi-story Buildings (Commercial & Residential)

• Residential Villas (All type of Housing Units)

• Rigid Pavements (Concrete Roads & Irish crossings)

• Concrete Safety Barriers (Heavy Duty, Median & single face side barriers)

• Road Protection Works (cut off walls, Rip Rap, Gabions, Ditches & slope protection)

• Beautification Works (including curb stone, interlock tiles & marbles etc.)

Mobilization works (Temporary Camp building including civil services & security fencing, warehouses, Batching Plant/Crush Plant foundations, crush plant foundations, Sewage and Potable Water Networking and material stock areas)

Residential / Commercial BuildingAZ ENGINEERS serves clients in both the public and private sectors, comprising of well coordinated and highly professional team located across Pakistan, Oman and Bahrain. Our team ranges from....skilled workers. The experience and resolve of our team enables them to take up even the most challenging of projects and yet deliver them in the most efficient and timely manner. .

• Provide complete execution of civil construction works.

• Complete & prepare working drawings for Road Structures including Bridges, Underpasses, Retaining Walls and Culverts.

• Complete and prepare working drawings for Residential and Commercial Buildings.

• Complete and prepare working drawings for Housing Units.

• Mobilization works, Camp facilities and Plant foundations.

• Execute structural, Finishing and MEP works for the Multi-Story Residential and Commercial Buildings.

Page 4: on experience, with the ability to perform at a higher level than our competitors. Our goal is to attain a position whereby we are capable of delivering construction solutions at

Project: GOLF TOWERMulti-storey Residential and Commercial Luxurious Building. 51,000 m² area including 2 basements and G+7 Floors atMadinat Ul Irfan Muscat.

Client: Muscat Hills DevelopmentConsultant: VIA InternationalContractor: AZ Engineers & Partners LLC (Completed December 2018)

Page 5: on experience, with the ability to perform at a higher level than our competitors. Our goal is to attain a position whereby we are capable of delivering construction solutions at
Page 6: on experience, with the ability to perform at a higher level than our competitors. Our goal is to attain a position whereby we are capable of delivering construction solutions at

Project: BUSINESS TOWER-ONEMulti-storey Commercial Building. 32,000 m² areas including 3 basements and G+7 Floors at Madinat Ul Irfan Muscat.

Client: Muscat Hills DevelopmentConsultant: VIA InternationalContractor: AZ Engineers & Partners LLC(On-going)

Page 7: on experience, with the ability to perform at a higher level than our competitors. Our goal is to attain a position whereby we are capable of delivering construction solutions at
Page 8: on experience, with the ability to perform at a higher level than our competitors. Our goal is to attain a position whereby we are capable of delivering construction solutions at

Project: Construction of Golf Lake Apartments at Jebel SifahFinishing works Client: Muriya Consultant: AEB Assaf Main Contractor: Hussain Fadhil & Partners Sub Contractor: AZ Engineers(July 2018- April 2019)

Page 9: on experience, with the ability to perform at a higher level than our competitors. Our goal is to attain a position whereby we are capable of delivering construction solutions at
Page 10: on experience, with the ability to perform at a higher level than our competitors. Our goal is to attain a position whereby we are capable of delivering construction solutions at

Project: AL-MUZN HOTELMultistory Commercial Building.12,500 m² areas including One Basement and G+3 Floors at Mawaleh-North, Muscat.

Client: AL-MUZN DevelopmentConsultant: Hoehler+AlSalmy LLCMain Contractor: Shaksy Engineering servicesSub-Contractor: AZ Engineers & Partners LLC (2017-2018)

Page 11: on experience, with the ability to perform at a higher level than our competitors. Our goal is to attain a position whereby we are capable of delivering construction solutions at
Page 12: on experience, with the ability to perform at a higher level than our competitors. Our goal is to attain a position whereby we are capable of delivering construction solutions at

Project: Civil Services Employees Pension Fund at Airport Heights, MuscatStructural works of the upcoming building

Client: Civil Services Employees Pension FundConsultant: Manarah Engineering ConsultancyMain Contractor: Ghantoot transport & General Consultancy LLCSub-Contractor: AZ Engineers & Partners(Since Dec. 2018)

Page 13: on experience, with the ability to perform at a higher level than our competitors. Our goal is to attain a position whereby we are capable of delivering construction solutions at
Page 14: on experience, with the ability to perform at a higher level than our competitors. Our goal is to attain a position whereby we are capable of delivering construction solutions at

Project: GRADE SEPARATEDINTERCHANGE BRIDGES-EXPRESS WAY TO NEW AIRPORTSeven nos Box girder Bridges connecting Southern Expressway to New Airport at Ghala, Muscat. Total Length of 1,300m

Client: MUSCAT MunicipalityConsultant: Parsons International, OmanMain Contractor: Soares Da CostaSub-Contractor: AZ Engineers & Partners LLC(Nov 2012- May 2015)

Page 15: on experience, with the ability to perform at a higher level than our competitors. Our goal is to attain a position whereby we are capable of delivering construction solutions at
Page 16: on experience, with the ability to perform at a higher level than our competitors. Our goal is to attain a position whereby we are capable of delivering construction solutions at

Project: GRADE SEPARATEDINTERCHANGE BRIDGES- UMMUL GHAWAREEF, SALALAHMulti-Level Box girder Interchange Bridges for Salalah-Taqah-Thumrait junction at Ummul Gwareef with 2nd level Bridge con-necting Salalah-Thumrait. Total Length of 1,900m.

Client: DHOFAR MunicipalityConsultant: Al-Manarah engineering ConsultancyMain Contractor: Shanfari & PartnersSub-Contractor: AZ Engineers & Partners LLC(Mar2014 - Mar 2017)

Page 17: on experience, with the ability to perform at a higher level than our competitors. Our goal is to attain a position whereby we are capable of delivering construction solutions at
Page 18: on experience, with the ability to perform at a higher level than our competitors. Our goal is to attain a position whereby we are capable of delivering construction solutions at

Project: DUALIZATION OF BIDBID-SURROAD Section-1, Package-1AMulti-cell Box culverts, Underpass Bridges, Arch Bridge, Retaining walls at Sumail Reigion

Client: MOTC, OmanConsultant: Dar-Al-HandasaMain Contractor: Astaldi-Ozkar JVSub-Contractor: AZ Engineers & Partners LLC(2011 - 2016)

Page 19: on experience, with the ability to perform at a higher level than our competitors. Our goal is to attain a position whereby we are capable of delivering construction solutions at
Page 20: on experience, with the ability to perform at a higher level than our competitors. Our goal is to attain a position whereby we are capable of delivering construction solutions at

Project: GRADE SEPARATEDINTERCHANGE BRIDGES- AIRPORT, SALALAHBox girder Interchange Bridges and Pedestrian Bridge for Salalah airport at Bypass Road.

Client: DHOFAR MunicipalityConsultant: Cowi & Partners LLC, OmanMain Contractor: Oman Building Cont. CompanySub-Contractor: AZ Engineers & Partners LLC(Mar2014 - Jul 2015)

Page 21: on experience, with the ability to perform at a higher level than our competitors. Our goal is to attain a position whereby we are capable of delivering construction solutions at
Page 22: on experience, with the ability to perform at a higher level than our competitors. Our goal is to attain a position whereby we are capable of delivering construction solutions at

Project: GRADE SEPARATED ACCESS RAMP AND BRIDGE- BARKASHOPPING MALLMSE Wall ramp and multispan Voided Slab Bridge for Vehicular Access to Barka Grand Mall.

Client: Sheikh Salim Bin Mustahil Al- MahsaniConsultant: Amjaad ConsultancyMain Contractor: BECSASub-Contractor: AZ Engineers & Partners LLC(Mar2014 - Jul 2015)

Page 23: on experience, with the ability to perform at a higher level than our competitors. Our goal is to attain a position whereby we are capable of delivering construction solutions at
Page 24: on experience, with the ability to perform at a higher level than our competitors. Our goal is to attain a position whereby we are capable of delivering construction solutions at

Project: GRADE SEPARATEDINTERCHANGE BRIDGE- ALMURTFAH, MUSCATSuperstructure for box Girder Interchange Bridge at Jama-Al AkberStreet, Al-Murtafah.

Client: MUSCAT MunicipalityConsultant: Parsons International, OmanMain Contractor: Khalid Bin Ahmed & Sons (KAS)Sub-Contractor: AZ Engineers & Partners LLC(Mar2014 - Jul 2015)

Page 25: on experience, with the ability to perform at a higher level than our competitors. Our goal is to attain a position whereby we are capable of delivering construction solutions at
Page 26: on experience, with the ability to perform at a higher level than our competitors. Our goal is to attain a position whereby we are capable of delivering construction solutions at

Project: FILLING STATIONS ROAD AND BRIDGES- ALONG MUSCAT EXPRESSWAYConstruction of Bridge over live traffic at Rusayl Junction and extention of Box culverts along express way for construction of additional lanes for access to filling stations. At Ghala, Al-Ansab, Rusayl, Al-khud and Halaban.

Client: MUSCAT MunicipalityConsultant: Parsons International, OmanMain Contractor: Oman united Engineering Services (OUES)Sub-Contractor: AZ Engineers & Partners LLC(Sep 2015 - Jan 2017)

Page 27: on experience, with the ability to perform at a higher level than our competitors. Our goal is to attain a position whereby we are capable of delivering construction solutions at
Page 28: on experience, with the ability to perform at a higher level than our competitors. Our goal is to attain a position whereby we are capable of delivering construction solutions at

Project: QURIYAT TO SUR ROADSECTION-I & SUR CITY BRIDGESConstruction of 08 I-girder Wadi Bridges, one Interchange Bridge, 08 Underpass, Box culverts, Barriers, Slope protectionworks etc.

Client: MOTC OmanConsultant: Renardet S A & Partners, OmanMain Contractor: STFA-POLAT JVSub-Contractor: AZ Engineers & Partners LLC (Mar2004 - Jul 2009)

Page 29: on experience, with the ability to perform at a higher level than our competitors. Our goal is to attain a position whereby we are capable of delivering construction solutions at
Page 30: on experience, with the ability to perform at a higher level than our competitors. Our goal is to attain a position whereby we are capable of delivering construction solutions at

Project: BATINAH COASTAL HIGHWAY SECTION-1Construction of 14nos I-girder Wadi Bridges, Interchange Bridges and Flyover at Al-Naseem Garden, Underpass, Box culverts, Barriers etc.

Client: MOTC OmanConsultant: NESPAK, OmanMain Contractor: MAKYOLSub-Contractor: AZ Engineers & Partners LLC(Mar2010 - Jul 2014)

Page 31: on experience, with the ability to perform at a higher level than our competitors. Our goal is to attain a position whereby we are capable of delivering construction solutions at
Page 32: on experience, with the ability to perform at a higher level than our competitors. Our goal is to attain a position whereby we are capable of delivering construction solutions at

Project: STORAGE AREA AT SALALAHConstruction of 350mx12m High Counter fort Retaining Walls, 2 nos Tank foundations with 2000m³ concrete

Client: Oman Gas CompanyConsultant: PETROFAC/WINTECOMain Contractor: Oman Gulf CompanySub-Contractor: AZ Engineers & Partners LLC(2017-2018)

Page 33: on experience, with the ability to perform at a higher level than our competitors. Our goal is to attain a position whereby we are capable of delivering construction solutions at
Page 34: on experience, with the ability to perform at a higher level than our competitors. Our goal is to attain a position whereby we are capable of delivering construction solutions at

Project: PIPE RACK FOUNDATIONCivil and Concrete works for the pipe rack foundations at the Port of Salalah, consisting of a total of more than 360 nos. of foundations.

Client: Oman Gas CompanyConsultant: Oman Gas Company (in-house)Main Contractor: Oman Gulf CompanySub-Contractor: AZ Engineers & Partners LLC(Since Dec 2017)

Page 35: on experience, with the ability to perform at a higher level than our competitors. Our goal is to attain a position whereby we are capable of delivering construction solutions at
Page 36: on experience, with the ability to perform at a higher level than our competitors. Our goal is to attain a position whereby we are capable of delivering construction solutions at

Project: QURM CULVERTConstruction of multiple cells box culvert at Qurm Muscat, Oman

Client: Muscat MunicipalityConsultant: Renardet S.A. & Partners Consulting EngineersMain Contractor: AZ Engineers & Partners LLC(November 2015- 2018)

Page 37: on experience, with the ability to perform at a higher level than our competitors. Our goal is to attain a position whereby we are capable of delivering construction solutions at
Page 38: on experience, with the ability to perform at a higher level than our competitors. Our goal is to attain a position whereby we are capable of delivering construction solutions at

Project: MODERNIZATION OF BAHRAIN INTERNATIONAL AIRPORTConstruction of Access Ramp, skew bridge and main Bridge at New Bahrain International Terminal Building.

Client: Bahrain Airport CompanyConsultant: ADPiMain Contractor: ARABTEC - TAV JVSub-Contractor: AZ Engineers & Partners in association with NAYAP Bahrain WWL(Since July 2017)

Page 39: on experience, with the ability to perform at a higher level than our competitors. Our goal is to attain a position whereby we are capable of delivering construction solutions at
Page 40: on experience, with the ability to perform at a higher level than our competitors. Our goal is to attain a position whereby we are capable of delivering construction solutions at

Project: MODERNAZATION OF BAHRAIN INTERNATIONAL AIRPORTConstruction of new passenger terminal building & Rotundas

Client: Bahrain Airport CompanyConsultant: ADPiMain Contractor: ARABTEC - TAV JVSub-Contractor: AZ Engineers & Partners in association with NAYAP Bahrain WWL(2017-2018)

Page 41: on experience, with the ability to perform at a higher level than our competitors. Our goal is to attain a position whereby we are capable of delivering construction solutions at
Page 42: on experience, with the ability to perform at a higher level than our competitors. Our goal is to attain a position whereby we are capable of delivering construction solutions at

Project: VARIOUS CULVERTSConstruction of Culverts at different locations including:

- 84 cell at Ibri- Bid-Bid Sur Section 1A- Quriyat- Sur Road

Page 43: on experience, with the ability to perform at a higher level than our competitors. Our goal is to attain a position whereby we are capable of delivering construction solutions at
Page 44: on experience, with the ability to perform at a higher level than our competitors. Our goal is to attain a position whereby we are capable of delivering construction solutions at

Project: PORT OF DUQUM CONTROLBUILDINGSConstruction of substructure of 53m High Control Tower and Administrative Buildings at Port of Duqum

Client: SEZADConsultant: Khatib & Alami and PartnersMain Contractor: SERKA-MSF JVSub-Contractor: AZ Engineers & Partners LLCDec 2017-Mar 2018

Page 45: on experience, with the ability to perform at a higher level than our competitors. Our goal is to attain a position whereby we are capable of delivering construction solutions at
Page 46: on experience, with the ability to perform at a higher level than our competitors. Our goal is to attain a position whereby we are capable of delivering construction solutions at

Project: DHOFAR AUTOMOTIVESConstruction of Building for 3S facility at Wattayah - Muscat

Client: Wattayah MotorsConsultant: Huckle & Partners, JPG ConsultantsMain Contractor: Hispanica Shanfari LLCSub-Contractor: AZ Engineers & Partners in association(Feb 2015- Nov 2015)

Page 47: on experience, with the ability to perform at a higher level than our competitors. Our goal is to attain a position whereby we are capable of delivering construction solutions at
Page 48: on experience, with the ability to perform at a higher level than our competitors. Our goal is to attain a position whereby we are capable of delivering construction solutions at

Project: ALBA (Aluminium Bahrain)Extension of Potline 6

Client: ALBA (Aluminium Bahrain)Consultant: ESBI Main Contractor: GAMA - GE JVSub-Contractor: AZ Engineers & Partners in association with NAYAP Bahrain WWL(Dec 2017 - Aug 2018)

Page 49: on experience, with the ability to perform at a higher level than our competitors. Our goal is to attain a position whereby we are capable of delivering construction solutions at
Page 50: on experience, with the ability to perform at a higher level than our competitors. Our goal is to attain a position whereby we are capable of delivering construction solutions at

Project: AL MOUJ SERVICE ROADThe project comprises the construction of a new service road in front of Al Mouj Golf to replace and modify part of the existing service road. The length of the service road is approximately 1.3 km

Client: Al Mouj Muscat (Majid Al Futaim)Consultant: Renardet S.A & Partners and Parsons InternationalMain Contractor: AZ Engineers & Partners(Ongoing, Started Feb-2019)

Page 51: on experience, with the ability to perform at a higher level than our competitors. Our goal is to attain a position whereby we are capable of delivering construction solutions at
Page 52: on experience, with the ability to perform at a higher level than our competitors. Our goal is to attain a position whereby we are capable of delivering construction solutions at

A. Infrastructure

Quriyat Sur Road-Oman Bridges, 08 Underpass, Barrier, Rip RapMain Contractor: STFA-POLAT JV

July,2004 -July,2007

Culverts Works at Sohar Buraimi Road Project-OmanMain Contractor: CCC Oman Mar 2007- Dec 2008

Fixing of Guard Rail with CCC at Ras Al Had & Ghallah Muscat-OmanMain Contractor: CCC Oman Jan 2009- Dec 2009

Sur City 2 Nos Bridges -OmanMain Contractor: STFA-POLAT JV

April,2008 –Nov,2009

Rip Rap works on QSR Road Project-OmanMain Contractor: STFA-POLAT JV 2008 -2009

Rigid Pavement at Wadi TIWI-Oman(3-KM)Main Contractor: NUEC Oman

Sept, 2009-April, 2010

Gunu Related Rehabilitation Works-Oman Culverts & Beautification Jan-2010 toFeb-2010

Rigid Pavement Concrete Road at Yanqul Fida-Dank Road Project-OmanMain Contractor: NUEC Oman

Jan 2010-Sept.2010

Phet Damages Repair works at QSR Road Project-Oman Feb 2011-May2011

Multicell box culvert at Qurum Beach PlazaMain Contractor: A’Ssaud National LLC

Feb - March,2011

Sur LNG Round about Monument-OmanConstruction of Monument Round AboutMain Contractor: STFA-POLAT JV

Feb-May,2011

Drain Culvert 3km, Man Holes & Retaining walls at Salalah-OmanMain Contractor: Shanfari & Partners Co. LLC Oman

Sept,2010 toJune,2011

PROJECTS COMPLETED

Page 53: on experience, with the ability to perform at a higher level than our competitors. Our goal is to attain a position whereby we are capable of delivering construction solutions at

Structural Works for Duqm Town-OmanMain Contractor: Oman Gulf Company

April, 2010 toJuly, 2011

Construction of Water Supply line with chambers at Sur LNG-OmanMain Contractor: Electro mechanic llc

April, 2011 toJune, 2011

Civil Works at Muscat International Airport Package MC3-OmanMain Contractor: Bechtel-ENKA-Bhawan JVClient: MOTC Aviation Oman

(uly 2011 -May 2012

40 cells (4 m x 4m) Box Culvert at Thumrait Al-Maziona Road-OmanMain Contractor: Oman Gulf Company

March, 2011-Sept,2011

Civil Works at Muscat International Airport Package MC2-OmanMain Contractor: CCC-TAV JV

June 2012 –Nov 2012

Construction of Voided Slab Bridges at A’ NAAMAN at Batinah HighwayJunctions’ Up gradation Project-OmanMain Contractor: CCC

Nov 2012 –Jan 2013

Batinah Coastal Highway Section-1 OmanBox Girder Interchange Bridges at AL-Naseem Interchange (0+000 km)Main Contractor: MAKYOL

June 2010 –June 2014

Construction of Underpasses & Retaining Walls Ibri – Miskin Road-OmanMain Contractor: STRABAG

Aug, 2012 –Jun 2013

Structural Works for Duqm Town-OmanMain Contractor: Oman Gulf Company

Oct, 2012 –Dec 2013

Construction of Box Culverts, Trapezoidal Channels at Duhouk – North IraqMain Contractor: Makyol-Cengiz JV

June, 2013 –Mar 2014

Civil Works at Muscat International Airport Package MC3-OmanMain Contractor: Bechtel-ENKA-Bhawan JV

Nov 2013 –Mar 2014

Construction of Box Culverts And Vehicular Underpass-Oman in IbriMain Contractor: M/s KAS & Desert Convoy

Feb 2014 –Oct 2014

Construction of Barka Shopping Mall Flyover Bridge over Batinah Highway nearBarka-OmanMain Contractor: M/s BECSA

April 2014 –Mar 2015

Page 54: on experience, with the ability to perform at a higher level than our competitors. Our goal is to attain a position whereby we are capable of delivering construction solutions at

Construction of Box Girder Bridge Superstructure works at Al -Murtafa StreetMuscat-OmanMain Contractor: M/s Khalid Bin Ahmed & Sons LLC

Nov 2014 –Feb 2015

Construction of Box Girder Bridges in Muscat-OmanMain Contractor: SOARES DA COSTA-OUEC JV

Nov, 2012 –May 2015

Construction of Super Structures for Box Girder Airport Interchange Bridges inSalalah-OmanMain Contractor: M/s Oman Building & Cont. Co. LLC.

March, 2014 –Jul 2015

Construction of Arch Bridges, Box Culverts & Mobilization works at Sur – BidbidSection-1, Package 1-B-OmanMain Contractor: STFA-HLG JV

Oct, 2011 –Oct 2015

Construction of Box Culverts For Alternate Road to Sultan Qaboos Mosque –Nizwa-OmanMain Contractor: M/s Oman United Engineering Services Co. LLC.

Jan 2015 –Oct 2015

Construction of Concrete AppronsMain Contractor: M/s Joannou & Paraskevaides (Oman) LLC.

Jan 2015 –Oct 2015

Construction of Gantry & Cantilever FoundationsMain Contractor: MAKYOL

June - Oct2015

Construction of Multiple Cells Box Culvert at Muscat Hills-Oman July - Oct2015

Construction of Box Culverts, Arch-Bridges, Wadi Bridges, Retaining Walls &Mobilization works at Sur –Bidbid Section-1, Package 1-A-OmanMain Contractor: ASTALDI-OZKAR JV

Jul 2011 - Jan2016

Construction of Box Culverts And Vehicular & Pedestrian Underpasses-Oman ,Bidbid-Sur Section-2, Package 2AMain Contractor: M/s Larsen & Toubro

Mar 2015 -Jan 2016

Construction of Box Culverts at Mirbat to Hasik Road-OmanMain Contractor: M/s Oman Building & Cont. Co. LLC.

Aug 2014 –Apr 2016

Construction of Multiple Cells Box Culvert Yanqul-OmanMain Contractor: M/s Yuksel

Nov 2015 –Apr 2016

Drain Culvert 3km, Man Holes & Retaining walls at Salalah-OmanMain Contractor: Shanfari & Partners Co. LLC Oman

Sept,2010 toJune,2011

Construction of Multi Cell Box Culverts, Bidbid-Sur Section-2, Package 2AOmanConstruction of Multicells Box CulvertsMain Contractor: M/s Larsen & Toubro

Jan 2017- 2018

PROJECTS COMPLETED

Page 55: on experience, with the ability to perform at a higher level than our competitors. Our goal is to attain a position whereby we are capable of delivering construction solutions at

Structural Works for Duqm Town-OmanMain Contractor: Oman Gulf Company

Nov 2015 –Apr 2016

Construction of Portable Water Tank at Muscat Hills-OmanMain Contractor: M/s Muscat Hills

Nov- 2015 -Apr 2016

Construction of Multiple Cells Box Culvert & Interchange Bridge MuscatExpressway Muscat-OmanMain Contractor: M/s Oman United Engineering Services LLC

Sep 2015 -Jan 2017

Construction of Multiple Cells Box Culvert Raysut Salalah-OmanMain Contractor: M/s Oman Gulf Company

Oct 2015 -Sep 2016

Construction of Dual Carriage Wadi Bridge at Rustaq-OmanMain Contractor: M/s Kayson Al Omania LLC.

Feb 2016 -Dec 2016

Construction of Multiple Cells Box Culvert at Duqm-OmanMain Contractor: M/s Serka LLC.

(May 2016- Oct2016)

Construction of Voided Deck Slab Dual Carriageway Bridges at SamahramSalalah -OmanMain Contractor: M/s Al-Hashmi & Al-Rawas LLC.

Jun 2016 - Jan2017

Construction of Box Culverts, at Sur –Bidbid Section-1, Package 1-A-OmanConstruction of Multicell box culverts July 2016- Dec 2017

Construction of Underpass Bridge & Extension of Multiple Cells Box Culvert atNizwa-OmanMain Contractor: M/s Oman United Engineering Services Co. LLC.

Dec 2016- June 2017

Construction of Flyover Box Girder Bridges at Salalah-Oman02 Box Girder Bridges (Total Length of 1200 linear meters)01 Flyover Bridge (Total Length of bridge 700 linear meters)Main Contractor: Shanfari & Partners Co. LLC Oman + AZ Engineers & PartnersLLC Oman

Feb 2014- March 2017

Construction of Multiple Cells Box Culvert at Qurm Muscat-OmanConstruction of Multi Cells Box CulvertsClient Muscat Municipality

Jan 2017- 2018

Construction of Box Culverts And Vehicular & Pedestrian Underpasses-Omanat Bidbid-Sur Section-2 Package 2BConstruction of Multicell Box CulvertsVehicular & Pedestrian Under PassesMain Contractor: M/s KAS – CC JV

Mar 2015- June 2018

Drain Culvert 3km, Man Holes & Retaining walls at Salalah-Oman*Main Contractor: Shanfari & Partners Co. LLC Oman

(Sept,2010 toJune,2011)

Page 56: on experience, with the ability to perform at a higher level than our competitors. Our goal is to attain a position whereby we are capable of delivering construction solutions at

B. Building Works: (Nov 2014 –Feb 2015)

700 housing units at Juffra Libya with STFA-LibyaIt includes the finishes works for the 700 housing unitsMain Contractor: STFA

(Nov, 2012 –May 2015)

Turkish Embassy-PakistanMain Contractor: STFA

(March, 2014 –Jul 2015)

Housing development in Port Elizabeth-South Africa.50 nos. of Housing unit was completed in 2006

(Oct, 2011 –Oct 2015)

Model Houses & Ware Houses (with RADIC Construction) Project-OmanMain Contractor: RADIC

(Jan 2015 –Oct 2015)

700 Housing Units Project in Libya700 housing units near Tripoli Libya.Main Contractor: STFA

(Jan 2015 –Oct 2015)

Construction Of Building for 3s Facility At Wattayah – Muscat-OmanConstruction of Building for the 3S Facility (Showroom for Dhofar Automotives)Main Contractor: M/s Hispanica Shanfari LLC

(June - Oct2015)

Construction of Golf Tower Building-Luxurious Construction at Muscat HillsTotal Built-up area of the building is 51,000 sqm with 02 basements & 08Floors.Main Contractor: M/s AZ Engineers & Partners LLC

Sep 2015- Dec 2018

Hotel Al Muzn Development, Muscat (3 Star Hotel)Basement + Ground & 4 Floor Total Built up area (12,500 Sq.m) Aug 2017- 2018

Construction of Residential Villa A-15 At Jabl -e- SifaClient Muriya Tourism DevelopmentMain Contractor AZ Engineers & Partners LLC

Feb 2017- Mar 2018

Construction of VIP Villa on Plot 200 At Muscat HillsClient: Muscat Hills DevelopmentMain Contractor : AZ Engineers & Partners LLC

Jan 2017- Dec 2018

PROJECTS COMPLETED

Page 57: on experience, with the ability to perform at a higher level than our competitors. Our goal is to attain a position whereby we are capable of delivering construction solutions at

C. Industrial

Construction of 200 MLD Independent Water Plant QuriyatConstruction of Water Tank & Project BuildingsMain Contractor: M/s Hyflux

Jul 2011 - Jan2016

Construction of Pollution Control Upgradation of Line-2 at Oman CementFactory-Al-Misfah PlantCivil Works for the Pollution Control TowersMain Contractor: M/s JV UIE & 4trust

Mar 2015 -Jan 2016

Salalah II Independent Power Project (Asphalt Road Works ) July 2017- 2018

D. Ongoing

Al Mouj Service RoadMain Contractor: AZ Engineer -

Bahrain Airport ViaductMain Contractor: ARABTEC - TAV JVSub-Contractor: AZ Engineers & Partner

-

Civil Service Employes Pension FundMain Contractor: Ghantoot Transport & General ConsultancySub-Contractor: AZ Engineers & Partners

-

New Commercial / Offices Building on Plot 219 Muscat Hill,Total Built-Up Area of Building 32,086 Sqm with 3 Basements & 8 FloorsClient: Muscat Hills Development

-

Page 58: on experience, with the ability to perform at a higher level than our competitors. Our goal is to attain a position whereby we are capable of delivering construction solutions at

OUR VALUED CLIENTS

Page 59: on experience, with the ability to perform at a higher level than our competitors. Our goal is to attain a position whereby we are capable of delivering construction solutions at

Company Equipments & Shuttering:• Tower Cranes

• Mobile Cranes

• Fork Lifters

• Skid Loaders

• Hiab Trucks

• Generators Various Sizes

• Air Compressors

• Steel Cutting & Bending Machines

• Tiles & Block cutting machines

• Welding Plants

• Electrical & Mechanical Vibrators with Shafts

• Tower Lights

• Complete shuttering system for all kind of road structures (Including more than 30,000 Liner

Meters of H20 Beams, Doka-RMD-Pilosio-Alphi, SGB Designed Shutters system.

• 50,000 m3 of Cup lock shuttering system

Company Certification/Approval:We AZ Engineers & Partners LLC Oman has approval/certification for Residential & Commercial Buildings,

Road Infrastructure works (Bridges, underpasses, box culverts, NJ Barriers, Retaining

Walls etc) from the following government authorities;

• Ministry of Commerce & Industry

• Oman Chamber of Commerce & Industry

• Registration in Tender Board of Oman

• Registered as a Tender Board Excellent Grade 1 company

• Muscat Municipality

• Dhofar Municipality

• MOTC (DG Muscat & DG Dhofar) Oman

• Supreme Committee for Town Planning

Page 60: on experience, with the ability to perform at a higher level than our competitors. Our goal is to attain a position whereby we are capable of delivering construction solutions at

Syed Haris AliManaging PartnerGSM : +968-92320388 (Oman)Land Line : +968-24495594 (Oman)Fax : +968-24495598 (Oman)E-mail : [email protected]

Shahzad AshrafPartnerGSM : +92 321-4405255 (Pak)Land Line : +92-42-37188538 (Pak)GSM : +968-24495594 (Oman)Fax : +968-24495598 (Oman)E-mail : [email protected]

Ali ImranCountry ManagerGSM : +968-95756090 (Oman)Land Line : +968-24495594 (Oman)Fax : +968-24495598 (Oman)E-mail : [email protected]

Syed Azhar AliProjects DirectorGSM : +968-96569653 (Oman)Land Line : +968-24495594 (Oman)Fax : +968-24495598 (Oman)GSM : +92-324-4360092 (Pak)E-mail : [email protected]

Rasheed Ahmed SiddiqieTechnical ManagerGSM : +968-94191782 (Oman)Land Line : +968-24495594 (Oman)Fax : +968-24495598 (Oman)E-mail : [email protected]

Javed HussainManager Accounts & FinanceGSM : +968-96549393 (Oman)Land Line : +968-24495594 (Oman)Fax : +968-24495598 (Oman)E-mail : [email protected]

Villa # 4, Building # 490, Plot # 421, Block # 248, 18th November Street,

North Azaiba, Muscat.

Sulaiman Al SiyabiDirector AdministrationGSM : +968-94000850 (Oman)Land Line : +968-24495594 (Oman)Fax : +968-24495598 (Oman)E-mail : [email protected]