& himachal pradesh, in national highway-21 ... di versanti | kiratpur-ner chowk national...
TRANSCRIPT
Consolidamento di versanti | Kiratpur-Ner Chowk National Highway-21, Punjab & Himachal Pradesh, IN 2/6
KIRATPUR-NER CHOWK NATIONALHIGHWAY-21, PUNJAB & HIMACHAL PRADESHConsolidamento di versanti
Progetto Kiratpur-Ner Chowk National Highway-21, Punjab & Himachal PradeshStrada Kiratpur-NerChowk Expressway Limited, National Highway 21Codice postale 174001Luogo Bilaspur, Himachal PradeshPaese / Regione India
Anno di installazione 2015
Cliente IL&FS Engineering & Construction Company Ltd.Progettazione ITNL & Grusamar Ltd.Contraente M/s Pioneer Foundations Engineers, M/s Sai Gr Impex Pvt. Ltd., M/s Afond
Construction Pvt. Ltd.
Situazione A total of 8 different chainage locations with a cumulative area of approximately50000 m² of slopes required stabilization. The client required an active slopestabilization system with greening which should look aesthetically appealing. Thisproject is a part of the project 4-Laning of Kiratpur-NerChowk section of NationalHighway-21 (from km 21.55 to km 154.00) in the state of Punjab & HimachalPradesh.
Descrizione TECCO® SYSTEM³ was nailed by fully threaded rock-bolts, with minimum dia of 28mm to a maximum of 40 mm and hot-dip galvanized. The nail pattern wasvariable with 1.9 x 1.9 m to a maximum of 2.4 x 2.4 m at different chainagepoints. The installation was carried out by trained professionals having expertisein drilling and civil work, under the expert supervision of Geobrugg India Pvt. Ltd.to ensure maximum safety with correct methodology also guiding the siteengineers and sub-contractors for optimum effects and results.
Oggetto protetto StradaSistemi TECCO® G65/3
Protezione dalla corrosione GEOBRUGG SUPERCOATING ®
Area stabilizzata 50000 m²
Altezza del versante 40 mInclinazione versante 60 ° - 80 °
Rinverdimento SìTappeto anti erosione SìEsposizione A nord
Consolidamento di versanti | Kiratpur-Ner Chowk National Highway-21, Punjab & Himachal Pradesh, IN 3/6
TECCO® SYSTEM³ after installation - slope is fullyprotected
Overview of the construction site
Slope cut at km 147+020 showing the geology conditionsof the construction site
Consolidamento di versanti | Kiratpur-Ner Chowk National Highway-21, Punjab & Himachal Pradesh, IN 4/6
Extremely weathered ground conditions at km 147+780before stabilization works
Installation works in progress at km 147+780 - slope isalready particularly stabilized with TECCO® SYSTEM³
Installation and drilling works in progress, at the slopeangle of 75°
Consolidamento di versanti | Kiratpur-Ner Chowk National Highway-21, Punjab & Himachal Pradesh, IN 5/6
Laying of TECCO® G65/3 mesh under the supervision ofGeobrugg specialist
Slope covered with TECCO® G65/3 mesh along withMultiMat 030 to support further vegetation
Closer look at the slope completely stabilized withTECCO® SYSTEM³ - visible mesh pretensioning effect,minimizing further deformations
Consolidamento di versanti | Kiratpur-Ner Chowk National Highway-21, Punjab & Himachal Pradesh, IN 6/6
TECCO® G65/3 mesh together with anti-erosion TenaxMultimat 030 after installation completion
Per qualsiasi domanda vogliate contattare il nostro specialista Geobrugg
Head office and production
Telefono +1 505 771 4080
Geobrugg North America, LLC22 Centro Algodones | Algodones NM 87001 | Stati Uniti d'America| www.geobrugg.comA company of the BRUGG Group | Certified to ISO 9001