I I i;i ifii BY REGD. POST V/ITH ACK DUE order No. sErAA/AP/ MDK-27/2010- 9q+& -- 'Dt:25.10.2013. Sub: SEIAA, A.P. - Biotech Park Phase-III by M/s. Andhra Pradesh Industrial l)_ 3t-::_rf:P".^:o1p:1"tion -Ltd.,_ !y: No: 276 to 284, 2sr ro 318 & 321 (p), ' (A-\- -/ J<aralaryrtla (v), Murugu (M), M;dak District - Enviro;-;r;J cl.;;;': zll-\- -/ Jqo q, x* Issued - Reg. - ^t- v ' v I' This has reference to your application submitted vide lr. dt. 18.03.2010 and subsequent lr. dt. v), / 06'07'2012, 08.10.201i se"ting Environmental clearance for the proposed Biotech park phase- ' w III bv l\{/s. Andhra Pradesh Industrial Infrastructure Corporation Ltd., Sy. No. 276 to 2g4, V' 2gl io lry & 321 (P), r"""t "p"tla (v), Mulugu (M), Medak District. The capital cost of the - . fi -*':,:::J'"Y;T11.:I:'::. j1y11 fenorlg that th-e g"ll i"g":trial units which are proposed within '6:F*:+;l#,tqilTru*;'"1::,t.li#rffi rkT;*ril4lq#h+lll#f :rr,',r k N ?' , considered as an Area Developme"t p-:..i. l\-/ z,,t lt' It was reported that total -..u_:l the project is Ac. 60g.92 (246.42 Ha.), out of which 'P'"/ Ac' 100 is notified as Biotech-slz. o.rt'of the total area, the area earmarked for: plotted / industrial area is Ac.437.31; Road area is Ac.92.25; open space is Ac. 61.33;cFC area is Ac. I l '98; and road affected area by is Ac. 2.g2. rtwas reported thit about 90 plots are proposed in the project and out of that about 33 plots were allotted to 2g units. ru' The source of fresh water is HMws&SB. The total water requirement shall not exceed 2273 KLD. out of that, water required for: Industrial activity is 1200 {rn; Domestic is 1 12.5 KLD; A.c.is 780 KLD; Canteen is 50 KLD; Fi_re fighring is"tOS.s KLD; & developil-;G..iU"i i. ZS KLD' The sewage generated from the pri.;..iitio be treated in STp and the treated waste water is to reused' The Municipal solid waste Q! kg/day) generated is to be sent to Municipal solid waste disposal site; STP sludge is to be used as-man.rrl; ur.a oil and used batteries are to be sent to Authorized Recyclers' Bio-medical yurJ" r2oo igiaa shall be disposed to common biomedical waste treatment disposal facility-authorized uy arrin. E-waste, i-f-*y, shall be disposed to the. recyclers authorized by the AppCB. IV' The proposal has been examined and processed in accordance with EIA Notification, 2006 & its amendments thereof' The state rgvgl lx1ert Appraisal co_mminee rsEacl examined the proposal in its meetings held on07.04.2010,24.06.2010, jr.oi.2012 &r8.r0.2013. The project is exempted from Public Hearing as it is an Area Development Project. Based on th. information fumished, presentation made by the proponent and the consultant IWs. Environment protection Training and Research Institute, Hyderabad; the committee considered the project proposal and recommended for issue of Environmental clearance. The state Level.pnuirooio.niil;;" Assessment Authority (SEIAA)' in its meeting held on 24.10.2013 examined the proposal and the recommendations of SEAC' and decided to issue Environmental clearance. The s'pna, a.r nereby accords prior Environmental clearance to the project as mentioned at para no. i under the provisions of the EIA Notification 2006 and its subsequent amendments issued under Environment (protection) Act, 1986 subject to implementation of the following rf."inr *d g"n"rui*nJirion* PART - A: SPECIFIC CONDITIONS I. Construction phase: i' Provision shall be made for the housing of the construction labour within the site with all necessary infrastructure and facilities .rr1h u. safe drinki.rg *ut"r, f.r"l for cooking, mobile toilets, mobile srP, medical health care, crdch. Lt.., The housing may be in the form of temporary structures to be removed afterthe completion of the pr":".i The safe disposal of wastewater and solid wastes generated during the cbnstruction phase should be ensured. Page I of5

Upload: others

Post on 14-Sep-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: TSIICtsiic.telangana.gov.in/pdf/EC-Order-Biotech-Park-Ph.III_.pdfCreated Date 12/21/2013 3:31:41 PM

I I i;i ifii

BY REGD. POST V/ITH ACK DUE

order No. sErAA/AP/ MDK-27/2010- 9q+& -- 'Dt:25.10.2013.

Sub: SEIAA, A.P. - Biotech Park Phase-III by M/s. Andhra Pradesh Industriall)_ 3t-::_rf:P".^:o1p:1"tion -Ltd.,_ !y: No: 276 to 284, 2sr ro 318 & 321 (p),

' (A-\- -/

J<aralaryrtla (v), Murugu (M), M;dak District - Enviro;-;r;J cl.;;;':zll-\- -/ Jqoq, x* Issued - Reg.- ^t-v'

v I' This has reference to your application submitted vide lr. dt. 18.03.2010 and subsequent lr. dt.v), / 06'07'2012, 08.10.201i se"ting Environmental clearance for the proposed Biotech park phase-

' w III bv l\{/s. Andhra Pradesh Industrial Infrastructure Corporation Ltd., Sy. No. 276 to 2g4,V' 2gl io lry & 321 (P), r"""t

"p"tla (v), Mulugu (M), Medak District. The capital cost of the

- . fi -*':,:::J'"Y;T11.:I:'::. j1y11 fenorlg

that th-e g"ll i"g":trial units which are proposed within

'6:F*:+;l#,tqilTru*;'"1::,t.li#rffi rkT;*ril4lq#h+lll#f :rr,',rk N ?' , considered as an Area Developme"t p-:..i.

l\-/z,,t lt' It was reported that total -..u_:l the project is Ac. 60g.92 (246.42 Ha.), out of which'P'"/ Ac' 100 is notified as Biotech-slz. o.rt'of the total area, the area earmarked for: plotted /industrial area is Ac.437.31; Road area is Ac.92.25; open space is Ac. 61.33;cFC area is Ac.I l '98; and road affected area by is Ac. 2.g2. rtwas reported thit about 90 plots are proposed in theproject and out of that about 33 plots were allotted to 2g units.

ru' The source of fresh water is HMws&SB. The total water requirement shall not exceed 2273 KLD.out of that, water required for: Industrial activity is 1200 {rn; Domestic is 1 12.5 KLD; A.c.is780 KLD; Canteen is 50 KLD; Fi_re fighring is"tOS.s KLD; & developil-;G..iU"i i. ZSKLD' The sewage generated from the pri.;..iitio be treated in STp and the treated waste water isto reused' The Municipal solid waste Q! kg/day) generated is to be sent to Municipal solid wastedisposal site; STP sludge is to be used as-man.rrl; ur.a oil and used batteries are to be sent toAuthorized Recyclers' Bio-medical yurJ" r2oo igiaa shall be disposed to common biomedicalwaste treatment disposal facility-authorized uy arrin. E-waste, i-f-*y, shall be disposed to the.recyclers authorized by the AppCB.

IV' The proposal has been examined and processed in accordance with EIA Notification, 2006 & itsamendments thereof' The state rgvgl lx1ert Appraisal co_mminee rsEacl examined the proposalin its meetings held on07.04.2010,24.06.2010, jr.oi.2012 &r8.r0.2013. The project is exemptedfrom Public Hearing as it is an Area Development Project. Based on th. information fumished,presentation made by the proponent and the consultant IWs. Environment protection Training andResearch Institute, Hyderabad; the committee considered the project proposal and recommendedfor issue of Environmental clearance. The state Level.pnuirooio.niil;;" Assessment Authority(SEIAA)' in its meeting held on 24.10.2013 examined the proposal and the recommendations ofSEAC' and decided to issue Environmental clearance. The s'pna, a.r nereby accords priorEnvironmental clearance to the project as mentioned at para no. i under the provisions of theEIA Notification 2006 and its subsequent amendments issued under Environment (protection) Act,1986 subject to implementation of the following rf."inr *d g"n"rui*nJirion*

PART - A: SPECIFIC CONDITIONS

I. Construction phase:

i' Provision shall be made for the housing of the construction labour within the site with allnecessary infrastructure and facilities .rr1h u. safe drinki.rg *ut"r, f.r"l for cooking, mobiletoilets, mobile srP, medical health care, crdch. Lt.., The housing may be in the form oftemporary structures to be removed afterthe completion of the pr":".i The safe disposal ofwastewater and solid wastes generated during the cbnstruction phase should be ensured.

Page I of5

Page 2: TSIICtsiic.telangana.gov.in/pdf/EC-Order-Biotech-Park-Ph.III_.pdfCreated Date 12/21/2013 3:31:41 PM

ll.

lll.

A First Aid Room shall be provided in the project both during construction and operation ofthe project.

All the topsoil excavated during construction activities should be stored for use inhorticulture/landscape development within the proj ect site.

iv. Disposal of muck during construction phase should not create any adverse effect on the

neighbouring coflrmunities and be disposed taking the necessary precautions for general

tafety and hialth aspects of people, only in approved sites with the approval of competent

authority.

v. Soil and ground water samples will be tested to ascertain that there is no threat to ground

water q,rulity by leaching of heavy metals and other toxic contaminants.

vi. Construction spoils, including bituminous material and other hazardous materials, must not

be allowed to contaminate watercourses and the dump sites for such material must be secured

so that they should not leach into the ground water'

vii. Any hazardous waste including biomedical waste, if any, should be disposed of as per

applicable Rules & norms with necessary approvals of the Andhra Pradesh Pollution Control

Board.

viii. The diesel generator sets to be used during construction phase should te low sulphur diesel

type and should conform to E (P) Rules prescribed for air and noise emission standards'

ix. Vehicles hired for bringing construction material to the site should be in good condition and

should conform to appiicaUle air and noise emission standards and should be operated only

during non-Peak hours.

x. Ambient noise levels should conform to the residential standards both during day and night

as notified by the MoE&F, GOI from time to time. Incremental pollution loads on the

ambient air and noise quality should be closely monitored during construction phase'

Adequate measures should be male to reduce ambient air and noise level during construction

phase,soastoconformtothestipulatedstandardsbytheCPCB.

xi.AspertheprovisionsofFlyAshNotificationNo:S'O'2804(E)'dt'03'11'2009'everyconstruction agency engaged in the construction of buildings within a radius of hundred

kilometers fiom a coal or lignite based thermal power plant shall use only fly ash based

products for construction, ,.r.h ur, cement or concrete, fly ash bricks or blocks or tiles or clay

fly ash bricks, blocks or tiles or cement fly ash bricks or bricks or blocks or similar products

or a combination or aggregate of them in every construction project'

xii. Ready mixed concrete must be used in building construction.

xiii. Storm water control and its

applications.

re-use shall be as per cGwB and BIS standards for various

xiv. permission to draw ground water shalr be obtained from the competent Authority prior to

construction/operation of the proj ect'

xv. Water demand during construction should be reduced by use of pre-mixed concrete' curing

agents and other best practices referred'

xvi. Separation of grey and black water should be done by the use of dual plumbing line for

separation of grey and black water'

xvii. Fixtures for showers, toilet flushing and drinking should be of low flow either by use of

aerators or pressure reducing devices of sensor based control.

xviii. Use of glass may be reduced by upto 40o/o to1ed.u3e the electricity consumption and load on

air-conditioning. If necessary, trig'h quality double glass with special reflective coating in

window is to be used.

Page 2 of 5

Page 3: TSIICtsiic.telangana.gov.in/pdf/EC-Order-Biotech-Park-Ph.III_.pdfCreated Date 12/21/2013 3:31:41 PM

xix. Roof should meet prescriptive requirement as per Energy Conservation Building Code byusing appropriate thermal insulation material to fulfill requirement.

xx. Adequate measures to reduce air and noise pollution during construction keeping in mindCPCB nonns on noise limits.

xxi. Opaque wall should meet prescriptive requirement as per Energy Conservation BuildingCode which is proposed to be mandatory for all air-conditioned spaces while it is aspirationalfor non-air conditioned spaces by use of appropriate thermal insulation material to fulfillrequirement.

xxii. The approval of the competent authority shall be obtained for structural safety of thebuildings due to earthquake, adequacy of fire fighting equipments, etc. as per NationalBuilding code including protection measures from tgntening eic.

xxiii' Regular supervision of the above and other measures for monitoring should be in place allthrough the construction phase, so as to avoid disturbance to the surro"undinss.

il. Occupational Phase:

i rhe installation of the Sewage Treatment Plant (srP) should be certified by an independentexpert and a report in this regard should be submiued to the SEIAA before the projecf iscommissiongd for operation. Discharge of treated sewage shall conform to the norms &standards of the Andhra Pradesh Pollution control Board.-sewage Treatment plant should bemonitored on a regular basis. No effluent shall be disposed

-outside the premises of theBiotech park and zero Liquid Discharge concepts shall bL adopted.

ii As an integral part of the park, the APIIC shall build the common Effluent Treatment plantand make it ready to be used.by the project proponents in the park, similar to otherinfrastructures such as Roads and drainagi ,yrt"_i.

iii Greenbelt shall be developed in an area of 33% of the total area of the park as committed,along the boundary', vacant places and within the industrial plots.

iv Rain water harvesting for roof run-off and surface run-ofi as plan submitted should beimplemented' Before recharging the surface run ofl pre-treatment must be done to removesuspended matter, oil and grease.

v The solid waste generated should be properly collected & segregated before disposal to thecity Municipal Facility. The organic *uri. silall be composted.

vi The D'G' Sets shall be provided with acoustic enclosures and adequate stack height as perCPCB norrns' The fuel used for the diesel g..r*o, sets should be tow sulphur diesel andshould conform to E (P) Rules prescribed foi air and noise emission standards.

vii Any hazatdous waste including biomedical waste thould be disposed of as per applicableRules & norms with necestuty upp.ouals of the Andhra pradesh pollution control Board.

viii rhe green belt- design along the periphery of the plot shalr achieve attenuation factorconforming to the day and night noise staniuras prescribed for residential land use by theMoE&F' GOI/CPCB' The open spa.es inside the plot should be suitably landscaped andcovered with vegetatiol o.{ lndigelgrgs variety. During night time the noise levels measuredat the boundary of the building shall be r"stti.t"J to ttre permissible ilvets to comply withthe prevalent regulations.

ix Incremental pollution loads on the ambient air quality, noise and water quality should beperiodically monitored after commissioning of the fio.;.rt.

x Application of solar energy should be incorporated for illumination of common areas,lighting for gardens and street lighting in aoaition io provision for solar water heating. Ahybrid systems or fully solar system foi a portion of the apartments shouio be provided.

Page 3 of5

Page 4: TSIICtsiic.telangana.gov.in/pdf/EC-Order-Biotech-Park-Ph.III_.pdfCreated Date 12/21/2013 3:31:41 PM

xl

xu

xllt

xlv

Traffic congestion near the entry and exit points from the roads adjoining the proposed

project site must be avoided. Parking should be fully intemalized and no public space

should be utilized.

Adequate number of parking spaces shall be provided for visitor vehicles. Rest room

facilities should be pr-vided for service population. The proponent shall provide public

convenience facilitie; such as toilets, bathrooms, waiting rooms etc. for the drivers, workers

etc. so as to maintain cleanness/hygienic conditions in the surroundings of the project.

The proponent shall comply with Energy Conservation Practices, Energy efficient practices

aod eneigy audit practices. Wherever ieasible, green building concepts shall be adopted'

Use of solar panels may be done to the extent possible'

Adequate measures should be taken to prevent odour problem from solid waste processing

plant and STP.

Part - B. General Conditions:

i. This order is valid for a period of 5 years'

ii. ,.consent for Establishment" shall be obtained from Andhra Pradesh Pollution control

Board under Air and Water Act before the start of any construction work at site'

iii.Theproponentshallsubmithalf-yearlycompliancereportsinrespectofthetermsandconditions ,tipuiut.a in this order & monitoring ..pottt in hard,and soft copies to the

SEIAA and Ministry's Regional office, Bangalo-re on ltt June and ltt December of each

calendar Year.

iv.officialsfromtheRegionalofficeofMoE&F,Bangalorewhowouldbemonitoringtheimplementation of .n riron-.n a safeguards shouldle given full co-operation' facilities

and documents/data by the proj.r, prop"onents during their-inspectt:l' A complete set of all

thedocumentsshallbesubmitteatottreCCF,Regionaloffice,MoE&F,Bangalore.

v.Inthecaseofanychange(s)inthescopeoftheproject'theprojectwouldrequireafreshappraisal by this SEIAA. No further expansion or modifications in the project shall be

carried out without prior approval of the SEIAA' AP'

vi.TheprojectproponentshallsubmitthecopiesoftheenvironmentalclearancetotheHeadsof local bodies, panchayats *J rrrr*i.ipai Bodies in addition to the relevant offices of the

Government who in tum has to display ih" ,u-. for 30 days from the date of receipt'

vii. The proponent shall obtain clearance from Fire Department' All other statutory clearances

shall be obtained, as applicable by project proponenis from the competent authorities'

viii. The project proponent should advertise in at least two local Newspapers widely circulated in

the region, one of which shall be in the vernacular language informing that the project has

been accorded environm.ntui.t.ur*ce and copies of cGarance letters are available with the

Andhra pradesh pollution control Board. The advertisement should be made within 7 days

from the day of issue of ,tr" .i.u*nce letter and a copy of the same should be forwarded to

the Regionul Offttt of this Ministry at Bangalore'

ix. The funds earmarked for environmental protection measures (Rs. 1270 Lakhs) should be kept

in separate account ana snoutd not be diverted for other purpose' Year wise expenditure

should be reported to the sEilA and Ministry's Regional office located at Bangalore'

x. Any appeal against this Environmental clearance shall lie with the National Green Tribunal'

if preferred, within a period of 30 days as prescribed under Section 16 of the National Green

Tribunal Act,2010'

xi.ThesElAAmayrevokeorsuspendtheorder,ifimplementationofanyoftheaboveconditions is not satisfactory. The SEIAA reserves the right to alter/modiff the above

conditions or stipulate any fuihe, condition in the interest of environment protection'

Page 4 of 5

Page 5: TSIICtsiic.telangana.gov.in/pdf/EC-Order-Biotech-Park-Ph.III_.pdfCreated Date 12/21/2013 3:31:41 PM

xii. Concealing the factual data or failure to comply with any of the conditions mentioned abovemay result in withdrawal of this clearance and attract action under the provisions ofEnvironment (Protection) Act, 1986 without any prior notice.

xiii. These stipulations would be enforced among others under the provisions of Water(Prevention and Control of Pollution) Act, 1974, the Air (Prevention and Control ofPollution) Act, 1981, the Environment (Protection) Act, 1986, the Public Liability(Insurance) Act, 1991 and EIA Notification,2006.

sd/- sd/- sd/-MEMBER SECRETARY, MEMBER, CHAIRMAN,

SEIAA, A.P. SEIAA, A.P. SETAA, A.P.

To

The Executive Director,lWs. Andhra Pradesh Industrial InfrastructureCorporation Ltd., (APIIC Ltd.),Parishram Bhavan, 6th Floor,Hyderabad- 500 004.Ph: 040-23212789 123233251e-mail: [email protected]

tn.c.F.B.oil

AI\vpv4.ENIOR ENVIRONMENTAL ENGINEER

(rrNrT-r)S

w

Page 5 of5