, bhu bharati. 1 @ towards guaranteed land titling system a presentation by vinod k agrawal, i.a.s....

9
, BHU BHARATI BHU BHARATI . 1 @ Towards Guaranteed Land Titling System Towards Guaranteed Land Titling System a presentation by Vinod K Agrawal, Vinod K Agrawal, I.A.S. I.A.S. Commissioner for Survey, Settlements and Land Records, Govt. of Andhra Pradesh BHU BHARATI

Upload: kerrie-blake

Post on 03-Jan-2016

218 views

Category:

Documents


4 download

TRANSCRIPT

Page 1: , BHU BHARATI. 1 @ Towards Guaranteed Land Titling System a presentation by Vinod K Agrawal, I.A.S. Commissioner for Survey, Settlements and Land Records,

,BHU BHARATIBHU BHARATI

..

1

@

Towards Guaranteed Land Titling SystemTowards Guaranteed Land Titling System

a presentation by

Vinod K Agrawal, Vinod K Agrawal, I.A.S.I.A.S.

Commissioner for Survey, Settlements and Land Records, Govt. of Andhra Pradesh

BHU BHARATI

Page 2: , BHU BHARATI. 1 @ Towards Guaranteed Land Titling System a presentation by Vinod K Agrawal, I.A.S. Commissioner for Survey, Settlements and Land Records,

,BHU BHARATIBHU BHARATI

..

2

Guaranteed Title System: componentsGuaranteed Title System: components

A public record of Titles: conclusive

Entries in this record are guaranteed

Entries need to be always correct and true

3 Principles - Curtain

- Mirror

- Insurance

Torrens

Page 3: , BHU BHARATI. 1 @ Towards Guaranteed Land Titling System a presentation by Vinod K Agrawal, I.A.S. Commissioner for Survey, Settlements and Land Records,

,BHU BHARATIBHU BHARATI

..

3

Accurate description of property- Cadastral surveys- Unique ID- Unified graphical and textual data

Guaranteed Title System: RequirementsGuaranteed Title System: Requirements

Title Registration System

A central Registry of Titles over all properties - final and conclusive

Auto updating - changes in record integral to transaction

(no mutation)

Page 4: , BHU BHARATI. 1 @ Towards Guaranteed Land Titling System a presentation by Vinod K Agrawal, I.A.S. Commissioner for Survey, Settlements and Land Records,

,BHU BHARATIBHU BHARATI

..

4

Impediments in IndiaImpediments in India

Gap between –RoR and registration

- Registration & RoR (mutation) - Mutation and sub division- Sub division and RoR

Deed Registration System:Registration doesn't convey title No title records: Revenue records presumptive Old and outdated, incomplete and inaccurate cadastral records – graphical + textual

Urban records & Registration: stand alone systems

Multiple handling agencies – lack of coordination

Page 5: , BHU BHARATI. 1 @ Towards Guaranteed Land Titling System a presentation by Vinod K Agrawal, I.A.S. Commissioner for Survey, Settlements and Land Records,

,BHU BHARATIBHU BHARATI

..

5

Action neededAction needed Describe all properties accurately

Resurvey/ supplemental survey

Create Register of titles: two alternatives 1. Public enquiries and

recording

2. Incremental method

Provide ‘conclusivity’ – New law

Introduce Title Registration System

Create unified delivery system – one agency to handle

‘records’, ‘registration’ and ‘survey’ Single system for all areas - urban and rural, agricultural and non agricultural Re engineer processes

Page 6: , BHU BHARATI. 1 @ Towards Guaranteed Land Titling System a presentation by Vinod K Agrawal, I.A.S. Commissioner for Survey, Settlements and Land Records,

,BHU BHARATIBHU BHARATI

..

6

What is Bhu Bharati….What is Bhu Bharati….

Description of all the attributes of land and its owner

Record of conclusive title: Title Registration System

e-conveyance: auto updation

Integrated & digital record : Multi point accessibility

Operated by a single and dedicated agency

Citizen centric system

Every square inch of land will be mapped and described

Vision Approach Advantages Services Offered Conceptual Model Where are we

Page 7: , BHU BHARATI. 1 @ Towards Guaranteed Land Titling System a presentation by Vinod K Agrawal, I.A.S. Commissioner for Survey, Settlements and Land Records,

,BHU BHARATIBHU BHARATI

..

7

Concept approved by state government and orders issued for state wide implementation

Pilot project for one district: Nizamabad• Objectives : Proving the concept

: Firming up of processes and applications

: Firming up of legal framework and procedures

• Cost : 33.85 crores

• Area : 8,000 sq.km

Current Status of Bhu BharatiCurrent Status of Bhu Bharati

Pilot in advance stage of implementation : to be completed by July, 2008

Page 8: , BHU BHARATI. 1 @ Towards Guaranteed Land Titling System a presentation by Vinod K Agrawal, I.A.S. Commissioner for Survey, Settlements and Land Records,

,BHU BHARATIBHU BHARATI

..

8

To roll out the project for entire state

ProposalProposal

Covering 37 mn properties : Project cost - $400 mn

Covering all the 22 Districts in 4 phases • 4 to 6 Districts in each phase

Commencing this year • To be completed by July, 2012

Page 9: , BHU BHARATI. 1 @ Towards Guaranteed Land Titling System a presentation by Vinod K Agrawal, I.A.S. Commissioner for Survey, Settlements and Land Records,

,BHU BHARATIBHU BHARATI

..

9

Visit : www.aponline.gov.in/Apportal/index_ILIS.html

Contact : comm_ss&[email protected]