aeo self-assessment checklist for
TRANSCRIPT
T MU MD 00009 F2 AEO Self-Assessment Checklist Template
Sup
erse
ded
by T
MU
MD
000
09 F
2 v2
.0, 0
8/05
/201
7
AEO Self-Assessment Checklist for <Insert Organisation>
T MU MD 00009 F2
1. Instructions – Self-assessment checklist 1.1. Who fills it in?
The individual(s) within the prospective AEO who are preparing for the authorisation assessment
The individual(s) completing the self-assessment should call on SME support internally to support them
1.2. When is it used? It is completed after the scoping meeting with the ASA facilitator and as part of evidence gathering in preparation to begin the formal assessment process
It is to be used by the applicant to gauge their organisation's readiness for the full formal assessment as an AEO
1.3. What documents accompany it? • T MU MD 00009 ST AEO Authorisation Requirements (which includes guidance on applicant interpretation against mandatory requirements)
• T MU MD 00009 F3 AEO Self-Assessment Tool Template
• Applicant organisations engineering management process documentation
• Applicant organisations evidence records of deployment of engineering management processes
© State of NSW through Transport for NSW Page 1 of 29
T MU MD 00009 F2 AEO Self-Assessment Checklist Template
Sup
erse
ded
by T
MU
MD
000
09 F
2 v2
.0, 0
8/05
/201
7
1.4. Explanation on completing key fields • read these instructions and the maturity levels set out in Table 1
• read each requirement carefully, as it reflects the key requirements to become an AEO
• use the completed Engineering Services Scoping Matrix for the organisation to provide the context for self-assessment
• identify evidence for system documentation and deployment for your engineering management function which supports each requirement and list it in the
"Evidence available" column
• insert comments supporting the context of your evidence in the "Comments supporting the available evidence:" row for each requirement
• for evidence that documented arrangements and processes are in place, enter a maturity rating (0 – 5) in the "Documented system" column. This number
indicates a self-assessment of the organisations confidence level in its own documented processes
• for evidence that the documented arrangements are deployed, enter a maturity rating (0 – 5) in the "Deployed System" column. This number indicates a self-
assessment of the organisations confidence level in the deployment of its own documented processes
• insert comments supporting the context of your rating in the "Comments supporting the rating:" row for each requirement
Table 1 - Levels of maturity and description of rating levels
Rating level Rating level description
0 Our organisation does not currently have or do this.
1 This is created or deployed unpredictably, with poor control and is reactive.
2 This is created or deployed on a project or service basis and is often reactive
3 This is created or deployed at the organisational level and is tailored for projects or services accordingly.
4 This is created or deployed at the organisational level and is actively measured and controlled within the organisation.
5 This is created or deployed at the organisational level with a focus on process improvement.
N/A Not applicable
© State of NSW through Transport for NSW Page 2 of 29
T MU MD 00009 F2 AEO Self-Assessment Checklist Template
AEO Self-Assessment Checklist for <Insert Organisation>
Item No
Requirements (For guidance and rationale see "TS 10502 AEO Authorisation Requirements)
Evidence available (Document title / number)
Rating level 1 to 5
Doc
umen
ted
syst
em
Dep
loye
d sy
stem
8 Engineering management
8.1 General engineering management
ENM1 An AEO shall have arrangements for executing engineering services in a competent and systematic way. An AEO shall have engineering management methodologies appropriate to its engineering services
Comments supporting the available evidence:
Comments supporting the rating:
ENM2 An AEO shall ensure that its engineering services map to relevant phases of the TfNSW asset life cycle model
Comments supporting the available evidence:
Comments supporting the rating:
© State of NSW through Transport for NSW Page 3 of 29
Sup
erse
ded
by T
MU
MD
000
09 F
2 v2
.0, 0
8/05
/201
7
T MU MD 00009 F2 AEO Self-Assessment Checklist Template
Item No
Requirements (For guidance and rationale see "TS 10502 AEO Authorisation Requirements)
Evidence available (Document title / number)
Rating level 1 to 5
Doc
umen
ted
syst
em
Dep
loye
d sy
stem
ENM3 An AEO shall establish and maintain an engineering assurance process that aligns to the range of engineering services and activities that the organisation intends to provide
Comments supporting the available evidence:
Comments supporting the rating:
ENM4 An AEO shall demonstrate engineering assurance based on progressive stage gateway reviews
Comments supporting the available evidence:
Comments supporting the rating:
ENM5 AEOs shall apply a risk-based approach to engineering assurance
Comments supporting the available evidence:
Comments supporting the rating:
© State of NSW through Transport for NSW Page 4 of 29
Sup
erse
ded
by T
MU
MD
000
09 F
2 v2
.0, 0
8/05
/201
7
T MU MD 00009 F2 AEO Self-Assessment Checklist Template
Item No
Requirements (For guidance and rationale see "TS 10502 AEO Authorisation Requirements)
Evidence available (Document title / number)
Rating level 1 to 5
Doc
umen
ted
syst
em
Dep
loye
d sy
stem
ENM6 Design AEOs shall have capability to provide design support during construction, inspection, test and commissioning stages
Comments supporting the available evidence:
Comments supporting the rating:
ENM7 Design AEOs shall have 'safety in design' as part of producing engineering designs
Comments supporting the available evidence:
Comments supporting the rating:
ENM8 An AEO shall incorporate sustainability in design as relevant to the scope of the authorised engineering services
Comments supporting the available evidence:
Comments supporting the rating:
© State of NSW through Transport for NSW Page 5 of 29
Sup
erse
ded
by T
MU
MD
000
09 F
2 v2
.0, 0
8/05
/201
7
T MU MD 00009 F2 AEO Self-Assessment Checklist Template
Item No
Requirements (For guidance and rationale see "TS 10502 AEO Authorisation Requirements)
Evidence available (Document title / number)
Rating level 1 to 5
Doc
umen
ted
syst
em
Dep
loye
d sy
stem
ENM9 An AEO shall consider environmental impact as relevant to the scope of the authorised engineering services
Comments supporting the available evidence:
Comments supporting the rating:
8.2 Asset management
ENM10 An AEO shall have management arrangements in place that align with the requirements of ISO 55001: 2014 Asset management - Management systems – Requirements, or PAS 55-1:2008 Asset Management, as applicable to the scope of engineering services provided
Comments supporting the available evidence:
Comments supporting the rating:
© State of NSW through Transport for NSW Page 6 of 29
Sup
erse
ded
by T
MU
MD
000
09 F
2 v2
.0, 0
8/05
/201
7
T MU MD 00009 F2 AEO Self-Assessment Checklist Template
Item No
Requirements (For guidance and rationale see "TS 10502 AEO Authorisation Requirements)
Evidence available (Document title / number)
Rating level 1 to 5
Doc
umen
ted
syst
em
Dep
loye
d sy
stem
8.3 Standards management
ENM11 An AEO shall establish and maintain a repository of the latest relevant engineering standards, guidance, codes of practice, and similar documents that are applicable to the engineering service areas and disciplines for which it seeks and obtains authorisation. Standards relevant to TfNSW include:
• TfNSW standards (including legacy RailCorp standards) • Australian standards (referred to indirectly in TfNSW standards, or in their own right) • international standards (ISO, IEC, EN, and similar) • other standards that may be appropriate to the transport industry
Comments supporting the available evidence:
Comments supporting the rating:
8.4 Judgment of significance
ENM12 An AEO shall establish arrangements for assessing the significance of proposed engineering changes arising from the delivery of its engineering services
Comments supporting the available evidence:
Comments supporting the rating:
© State of NSW through Transport for NSW Page 7 of 29
Sup
erse
ded
by T
MU
MD
000
09 F
2 v2
.0, 0
8/05
/201
7
T MU MD 00009 F2 AEO Self-Assessment Checklist Template
Item No
Requirements (For guidance and rationale see "TS 10502 AEO Authorisation Requirements)
Evidence available (Document title / number)
Rating level 1 to 5
Doc
umen
ted
syst
em
Dep
loye
d sy
stem
ENM13 An AEO shall ensure that a competent person has accountability for assessing and approving the engineering change
Comments supporting the available evidence:
Comments supporting the rating:
9 Engineering management
9.1 General systems engineering management
SEM1 An AEO shall have a systems engineering approach to the planning and delivery of its engineering services or products
Comments supporting the available evidence:
Comments supporting the rating:
© State of NSW through Transport for NSW Page 8 of 29
Sup
erse
ded
by T
MU
MD
000
09 F
2 v2
.0, 0
8/05
/201
7
T MU MD 00009 F2 AEO Self-Assessment Checklist Template
Item No
Requirements (For guidance and rationale see "TS 10502 AEO Authorisation Requirements)
Evidence available (Document title / number)
Rating level 1 to 5
Doc
umen
ted
syst
em
Dep
loye
d sy
stem
9.2 Requirements management
SEM2 An AEO shall have requirements management arrangements that set out process, responsibilities, structure, tools and deliverables for management of stakeholder requirements applicable to the scope of engineering services provided across the system life cycle
Comments supporting the available evidence:
Comments supporting the rating:
SEM3 An AEO shall establish and maintain a requirements management tool/system that is capable of managing the categorisation, allocation, changes, traceability and verification of all requirements within its scope of control
Comments supporting the available evidence:
Comments supporting the rating:
© State of NSW through Transport for NSW Page 9 of 29
Sup
erse
ded
by T
MU
MD
000
09 F
2 v2
.0, 0
8/05
/201
7
T MU MD 00009 F2 AEO Self-Assessment Checklist Template
Item No
Requirements (For guidance and rationale see "TS 10502 AEO Authorisation Requirements)
Evidence available (Document title / number)
Rating level 1 to 5
Doc
umen
ted
syst
em
Dep
loye
d sy
stem
SEM4 The requirements management tool/system shall be able to easily exchange all requirements information using a common interchange format with other organisations
Comments supporting the available evidence:
Comments supporting the rating:
9.3 Interface management
SEM5 An AEO shall have interface management arrangements that set out the process, responsibilities, structure, tools and deliverables
Comments supporting the available evidence:
Comments supporting the rating:
© State of NSW through Transport for NSW Page 10 of 29
Sup
erse
ded
by T
MU
MD
000
09 F
2 v2
.0, 0
8/05
/201
7
T MU MD 00009 F2 AEO Self-Assessment Checklist Template
Item No
Requirements (For guidance and rationale see "TS 10502 AEO Authorisation Requirements)
Evidence available (Document title / number)
Rating level 1 to 5
Doc
umen
ted
syst
em
Dep
loye
d sy
stem
SEM6 An AEO shall ensure that all interface requirements under the control of its engineering services are identified, captured and managed
Comments supporting the available evidence:
Comments supporting the rating:
SEM7 An AEO shall ensure that interface design reviews and checks are conducted at appropriate stages of the design process by competent subject matter experts
Comments supporting the available evidence:
Comments supporting the rating:
SEM8 An AEO shall identify and manage interface risks and outcomes that may have a safety or other undesired impact
Comments supporting the available evidence:
Comments supporting the rating:
© State of NSW through Transport for NSW Page 11 of 29
Sup
erse
ded
by T
MU
MD
000
09 F
2 v2
.0, 0
8/05
/201
7
T MU MD 00009 F2 AEO Self-Assessment Checklist Template
Item No
Requirements (For guidance and rationale see "TS 10502 AEO Authorisation Requirements)
Evidence available (Document title / number)
Rating level 1 to 5
Doc
umen
ted
syst
em
Dep
loye
d sy
stem
SEM9 An AEO that intends to offer rail systems integration services shall demonstrate that it has suitable management arrangements to plan and carry out the integration of all the declared systems
Comments supporting the available evidence:
Comments supporting the rating:
9.4 System architecture management
SEM10 A design AEO shall demonstrate that it has arrangements to manage the synthesis and development of system level requirements into a credible system architecture
Comments supporting the available evidence:
Comments supporting the rating:
9.5 RAM management
© State of NSW through Transport for NSW Page 12 of 29
Sup
erse
ded
by T
MU
MD
000
09 F
2 v2
.0, 0
8/05
/201
7
T MU MD 00009 F2 AEO Self-Assessment Checklist Template
Item No
Requirements (For guidance and rationale see "TS 10502 AEO Authorisation Requirements)
Evidence available (Document title / number)
Rating level 1 to 5
Doc
umen
ted
syst
em
Dep
loye
d sy
stem
SEM11 An AEO shall demonstrate that it has RAM management arrangements in place, relevant to the engineering services or products provided
•
Comments supporting the available evidence:
Comments supporting the rating:
9.6 Verification and validation
SEM12 An AEO shall have arrangements for verification and validation management of the engineering services or products provided
Comments supporting the available evidence:
Comments supporting the rating:
9.7 Human factors integration
© State of NSW through Transport for NSW Page 13 of 29
Sup
erse
ded
by T
MU
MD
000
09 F
2 v2
.0, 0
8/05
/201
7
T MU MD 00009 F2 AEO Self-Assessment Checklist Template
Item No
Requirements (For guidance and rationale see "TS 10502 AEO Authorisation Requirements)
Evidence available (Document title / number)
Rating level 1 to 5
Doc
umen
ted
syst
em
Dep
loye
d sy
stem
SEM13 An Authorised Engineering Organisation shall manage all human factors relevant to the scope of the authorised engineering services
Comments supporting the available evidence:
Comments supporting the rating:
SEM14 Human factors integration tasks shall be done by a competent resource. The competency requirements of the resource shall be determined by the needs of the specific project
Comments supporting the available evidence:
Comments supporting the rating:
© State of NSW through Transport for NSW Page 14 of 29
Sup
erse
ded
by T
MU
MD
000
09 F
2 v2
.0, 0
8/05
/201
7
T MU MD 00009 F2 AEO Self-Assessment Checklist Template
Item No
Requirements (For guidance and rationale see "TS 10502 AEO Authorisation Requirements)
Evidence available (Document title / number)
Rating level 1 to 5
Doc
umen
ted
syst
em
Dep
loye
d sy
stem
9.8 Electromagnetic compatibility
SEM15 An AEO engaged by TfNSW to undertake engineering activities involving the specification, design, integration or testing of electrical or electronic systems involving electromagnetic interference emitters (threats) or receivers (victims) shall have arrangements for managing electromagnetic compatibility
Comments supporting the available evidence:
Comments supporting the rating:
SEM16 An AEO engaged by TfNSW to undertake engineering activities involving the specification, design, build, integration or modification of electrically conductive or magnetically permeative structures shall ensure that arrangements are in place for managing electromagnetic interference and electromagnetic compatibility
Comments supporting the available evidence:
© State of NSW through Transport for NSW Page 15 of 29
Sup
erse
ded
by T
MU
MD
000
09 F
2 v2
.0, 0
8/05
/201
7
T MU MD 00009 F2 AEO Self-Assessment Checklist Template
Item No
Requirements (For guidance and rationale see "TS 10502 AEO Authorisation Requirements)
Evidence available (Document title / number)
Rating level 1 to 5
Doc
umen
ted
syst
em
Dep
loye
d sy
stem
9.9 Systems safety assurance
SEM17 The AEO shall have system safety assurance arrangements in place, relevant to the engineering services or products provided. These arrangements must include suitable planning activities and deliverables. They must also demonstrate suitable and sufficient integration into the engineering services
Comments supporting the available evidence:
Comments supporting the rating:
SEM18 The AEO's safety assurance arrangements must provide progressive assurance through the project or system life cycle
Comments supporting the available evidence:
Comments supporting the rating:
© State of NSW through Transport for NSW Page 16 of 29
Sup
erse
ded
by T
MU
MD
000
09 F
2 v2
.0, 0
8/05
/201
7
T MU MD 00009 F2 AEO Self-Assessment Checklist Template
Item No
Requirements (For guidance and rationale see "TS 10502 AEO Authorisation Requirements)
Evidence available (Document title / number)
Rating level 1 to 5
Doc
umen
ted
syst
em
Dep
loye
d sy
stem
SEM19 The AEO shall have arrangements for the identification and management of safety risks associated with the changes to be introduced. This process should follow a life cycle approach such that the granularity of risks and the level of analysis aligns with the progression through the engineering life cycle. It shall also support risk-based decision-making with records to show traceability of all decisions made
Comments supporting the available evidence:
Comments supporting the rating:
SEM20 The AEO shall have arrangements for delivering safety assurance arguments and supporting evidence (or input to such documentation) that describes how it has ensured safety SFAIRP and managed safety risks to tolerable and SFAIRP. The content of such documents should be aligned with the requirements of the System Safety Standard TS20001 so that they meet the requirements of the configuration management committee process
Comments supporting the available evidence:
Comments supporting the rating:
© State of NSW through Transport for NSW Page 17 of 29
Sup
erse
ded
by T
MU
MD
000
09 F
2 v2
.0, 0
8/05
/201
7
T MU MD 00009 F2 AEO Self-Assessment Checklist Template
Item No
Requirements (For guidance and rationale see "TS 10502 AEO Authorisation Requirements)
Evidence available (Document title / number)
Rating level 1 to 5
Doc
umen
ted
syst
em
Dep
loye
d sy
stem
SEM21 The AEO shall have its safety engineering and assurance arrangements subject to independent safety assessment (ISA), where it is responsible for the introduction of new or novel systems that affect on the operational safety of the network, or where the general scope and complexity of the project requires it. There shall be arrangements in place to support the appointment of an ISA and to engage with an ISA at all stages of the engineering activities being undertaken
Comments supporting the available evidence:
Comments supporting the rating:
10 Configuration management
CFM1 An AEO shall have a documented approach, including identifiable roles and responsibilities for the management of all proposed or existing configuration items under its control
Comments supporting the available evidence:
Comments supporting the rating:
© State of NSW through Transport for NSW Page 18 of 29
Sup
erse
ded
by T
MU
MD
000
09 F
2 v2
.0, 0
8/05
/201
7
T MU MD 00009 F2 AEO Self-Assessment Checklist Template
Item No
Requirements (For guidance and rationale see "TS 10502 AEO Authorisation Requirements)
Evidence available (Document title / number)
Rating level 1 to 5
Doc
umen
ted
syst
em
Dep
loye
d sy
stem
CFM2 An AEO shall have arrangements to identify and manage all the configuration items under its control
Comments supporting the available evidence:
Comments supporting the rating:
CFM3 An AEO shall have configuration change control arrangements that are appropriate for the engineering services offered
Comments supporting the available evidence:
Comments supporting the rating:
CFM4 An AEO shall have arrangements for identifying stakeholders and managing their engagement during changes
Comments supporting the available evidence:
Comments supporting the rating:
© State of NSW through Transport for NSW Page 19 of 29
Sup
erse
ded
by T
MU
MD
000
09 F
2 v2
.0, 0
8/05
/201
7
T MU MD 00009 F2 AEO Self-Assessment Checklist Template
Item No
Requirements (For guidance and rationale see "TS 10502 AEO Authorisation Requirements)
Evidence available (Document title / number)
Rating level 1 to 5
Doc
umen
ted
syst
em
Dep
loye
d sy
stem
CFM5 An AEO shall have appropriate tools for managing the change control process
Comments supporting the available evidence:
Comments supporting the rating:
CFM6 An AEO shall have arrangements in place for assuring that configuration items match documentation
Comments supporting the available evidence:
Comments supporting the rating:
CFM7 An AEO shall have arrangements to manage and appropriately deliver the necessary configuration information about configuration items under its control
Comments supporting the available evidence:
Comments supporting the rating:
© State of NSW through Transport for NSW Page 20 of 29
Sup
erse
ded
by T
MU
MD
000
09 F
2 v2
.0, 0
8/05
/201
7
T MU MD 00009 F2 AEO Self-Assessment Checklist Template
Item No
Requirements (For guidance and rationale see "TS 10502 AEO Authorisation Requirements)
Evidence available (Document title / number)
Rating level 1 to 5
Doc
umen
ted
syst
em
Dep
loye
d sy
stem
CFM8 An AEO shall have suitable tools for managing configuration information under its control
Comments supporting the available evidence:
Comments supporting the rating:
11 Competence management
CPM1 An AEO shall demonstrate that it employs people who have the necessary knowledge, skills, and attitude to competently and safely discharge their duties in providing engineering services
Comments supporting the available evidence:
Comments supporting the rating:
© State of NSW through Transport for NSW Page 21 of 29
Sup
erse
ded
by T
MU
MD
000
09 F
2 v2
.0, 0
8/05
/201
7
T MU MD 00009 F2 AEO Self-Assessment Checklist Template
Item No
Requirements (For guidance and rationale see "TS 10502 AEO Authorisation Requirements)
Evidence available (Document title / number)
Rating level 1 to 5
Doc
umen
ted
syst
em
Dep
loye
d sy
stem
CPM2 An AEO shall have comprehensive arrangements and systems for managing the competence of its staff relevant to the engineering services provided. A system for managing staff competence must consist of an unambiguous series of documented arrangements of the organisations roles, plans, processes, tools, and records in relation to managing competence
Comments supporting the available evidence:
Comments supporting the rating:
CPM3 An AEO shall define the skills and proficiency levels that are relevant to the tasks and activities used in the provision of engineering services to TfNSW
Comments supporting the available evidence:
Comments supporting the rating:
© State of NSW through Transport for NSW Page 22 of 29
Sup
erse
ded
by T
MU
MD
000
09 F
2 v2
.0, 0
8/05
/201
7
T MU MD 00009 F2 AEO Self-Assessment Checklist Template
Item No
Requirements (For guidance and rationale see "TS 10502 AEO Authorisation Requirements)
Evidence available (Document title / number)
Rating level 1 to 5
Doc
umen
ted
syst
em
Dep
loye
d sy
stem
CPM4 An AEO shall set minimum acceptable competence requirements for posts carrying out ‘key roles’ identified in the organisation
Comments supporting the available evidence:
Comments supporting the rating:
CPM5 An AEO shall identify and assess its engineering work activities and associated risks to determine those that could affect safe railway operations, or that may affect occupational health and safety of staff, passengers or the general public
Comments supporting the available evidence:
Comments supporting the rating:
CPM6 An AEO shall provide a job description containing roles, function, and abilities before starting assessment of a candidate
Comments supporting the available evidence:
Comments supporting the rating:
© State of NSW through Transport for NSW Page 23 of 29
Sup
erse
ded
by T
MU
MD
000
09 F
2 v2
.0, 0
8/05
/201
7
T MU MD 00009 F2 AEO Self-Assessment Checklist Template
Item No
Requirements (For guidance and rationale see "TS 10502 AEO Authorisation Requirements)
Evidence available (Document title / number)
Rating level 1 to 5
Doc
umen
ted
syst
em
Dep
loye
d sy
stem
CPM7 An AEO shall consider relevant external qualification standards to benchmark the skills to be assessed
Comments supporting the available evidence:
Comments supporting the rating:
CPM8 An AEO shall maintain evidence that relevant industry competence requirements, including TfNSW standards, have been analysed and interpreted for the appropriate engineering services offered
Comments supporting the available evidence:
Comments supporting the rating:
CPM9 An AEO shall have arrangements in place to train, develop, and assess the competence of staff using established methods and competence standards
Comments supporting the available evidence:
Comments supporting the rating:
© State of NSW through Transport for NSW Page 24 of 29
Sup
erse
ded
by T
MU
MD
000
09 F
2 v2
.0, 0
8/05
/201
7
T MU MD 00009 F2 AEO Self-Assessment Checklist Template
Item No
Requirements (For guidance and rationale see "TS 10502 AEO Authorisation Requirements)
Evidence available (Document title / number)
Rating level 1 to 5
Doc
umen
ted
syst
em
Dep
loye
d sy
stem
CPM10 An AEO shall provide for the planning, implementation, recording, assessment and recognition of relevant continuing professional development activities to enhance the knowledge and skills of staff and the organisation as a whole
Comments supporting the available evidence:
Comments supporting the rating:
CPM11 An AEO shall establish training and development needs and competence assessment requirements for staff that will deliver the engineering services
Comments supporting the available evidence:
Comments supporting the rating:
CPM12 An AEO shall establish timescales for periodic re-assessment of staff competence
Comments supporting the available evidence:
Comments supporting the rating:
© State of NSW through Transport for NSW Page 25 of 29
Sup
erse
ded
by T
MU
MD
000
09 F
2 v2
.0, 0
8/05
/201
7
T MU MD 00009 F2 AEO Self-Assessment Checklist Template
Item No
Requirements (For guidance and rationale see "TS 10502 AEO Authorisation Requirements)
Evidence available (Document title / number)
Rating level 1 to 5
Doc
umen
ted
syst
em
Dep
loye
d sy
stem
CPM13 An AEO shall maintain competence management records that contain appropriate and up-to-date information about all competence aspects of a candidate
Comments supporting the available evidence:
Comments supporting the rating:
CPM14 An AEO shall maintain evidence for audits, of periodic reviews of it competence records for its engineering staff and other engineering-related service provision staff
Comments supporting the available evidence:
Comments supporting the rating:
CPM15 An AEO shall establish and maintain a register of all engineering and other engineering-related services provision staff and their competences
Comments supporting the available evidence:
Comments supporting the rating:
© State of NSW through Transport for NSW Page 26 of 29
Sup
erse
ded
by T
MU
MD
000
09 F
2 v2
.0, 0
8/05
/201
7
T MU MD 00009 F2 AEO Self-Assessment Checklist Template
Item No
Requirements (For guidance and rationale see "TS 10502 AEO Authorisation Requirements)
Evidence available (Document title / number)
Rating level 1 to 5
Doc
umen
ted
syst
em
Dep
loye
d sy
stem
CPM16 An AEO shall keep all engineering staff competence records in a secure location for the duration of the AEO certification validity period
Comments supporting the available evidence:
Comments supporting the rating:
CPM17 An AEO shall maintain the competence of those managers and assessors executing the competence management system, and ensure that the managers and assessors understand their responsibilities
Comments supporting the available evidence:
Comments supporting the rating:
CPM18 An AEO shall define competence management roles and responsibilities for its engineering-related services
Comments supporting the available evidence:
Comments supporting the rating:
© State of NSW through Transport for NSW Page 27 of 29
Sup
erse
ded
by T
MU
MD
000
09 F
2 v2
.0, 0
8/05
/201
7
T MU MD 00009 F2 AEO Self-Assessment Checklist Template
Item No
Requirements (For guidance and rationale see "TS 10502 AEO Authorisation Requirements)
Evidence available (Document title / number)
Rating level 1 to 5
Doc
umen
ted
syst
em
Dep
loye
d sy
stem
CPM19 An AEO shall assign ownership and responsibility of competence management for its engineering-related services to suitably qualified and experienced individuals
Comments supporting the available evidence:
Comments supporting the rating:
CPM20 Assessors shall have relevant subject matter expertise, qualifications and assessment experience in the relevant engineering or related services being assessed
Comments supporting the available evidence:
Comments supporting the rating:
12 Quality management
QAM1 An AEO shall establish and maintain a management system, which complies with the requirements of ISO 9001
Comments supporting the available evidence:
Comments supporting the rating:
© State of NSW through Transport for NSW Page 28 of 29
Sup
erse
ded
by T
MU
MD
000
09 F
2 v2
.0, 0
8/05
/201
7
T MU MD 00009 F2 AEO Self-Assessment Checklist Template
Item No
Requirements (For guidance and rationale see "TS 10502 AEO Authorisation Requirements)
Evidence available (Document title / number)
Rating level 1 to 5
Doc
umen
ted
syst
em
Dep
loye
d sy
stem
12.1 Knowledge management
QAM2 An AEO shall demonstrate the development and maintenance of knowledge management networks and the sharing of industry-relevant lessons learned and experience with the ASA
Comments supporting the available evidence:
Comments supporting the rating:
12.2 Record keeping
QAM3 An AEO shall establish and maintain as a minimum, records of the following: • competence management records, for example, assessments, development, logbooks, and CVs • engineering assurance records applicable to the authorised services, for example, construction,
manufacturing, integration, testing, commissioning, maintenance and disposal • configuration data records, for example as built drawings, manuals and training materials in a common
format that can be exchanged with other parties • quality assurance records, for example, inspections, audits, and reports • safety assurance records, for example, hazard logs, safety plans and safety reports
Comments supporting the available evidence:
Comments supporting the rating:
© State of NSW through Transport for NSW Page 29 of 29
Sup
erse
ded
by T
MU
MD
000
09 F
2 v2
.0, 0
8/05
/201
7