Maboe Maphaka
Energy LossesManagement Programme
© 2008 Eskom. All rights reserved. 2
Agenda
Background
Strategy formulation
Implementation
Results
Concluding Remarks
© 2008 Eskom. All rights reserved. 3
Challenge
Background to Energy Loss Programme
Distribution experienced higher than expected energy losses over the past few years
Initiated the Energy Losses Management ProgrammeAction
Arrest negative trend Improve current energy loss management practices Introduce new strategies Establish acceptable level at which losses should be managed as an inherent risk of
the business Ensure operational sustainability Leverage other internal business competencies
In support of the Eskom Financial Sustainability Objective
Objective
© 2008 Eskom. All rights reserved. 4
44
Total Distribution Energy Losses Trend
12 month moving average (MMA)
Total Energy Losses
0.00
1.00
2.00
3.00
4.00
5.00
6.00
7.00
% T
ota
l L
osses 5.34% YTD5.34% YTD
Rising Energy Rising Energy Losses Trend, a Losses Trend, a major concern major concern for the utilityfor the utility
© 2008 Eskom. All rights reserved. 5
Reasons For Energy Losses Management Initiative
Theft Illegal connections and revenue lost due to theft of electricity is a public domain risk for Eskom
Regulatory Management
In light of Eskom’s impending tariff hikes over the next three years, the public (and NERSA) will potentially criticise Eskom for rate hikes while not managing energy and revenue losses. Eskom would have to demonstrate its serious interventions to address the problem
Reputation Risk Eskom need to show all reasonable attempts to get the SA public to be aware, informed and encouraged to be compliant by addressing behaviour
Revenue Recovery
The considerable revenue loss suffered, necessitates Eskom to explore and employ all possible avenues to recover and prevent these losses
Base Load Electricity theft impacts demand (load) on the grid. LPUs, SPUs and PPUs who are illegally connected, tampering with metres, etc, will have no incentive whatsoever to use electricity efficiently
© 2008 Eskom. All rights reserved. 6
Agenda
Background
Strategy formulation
Implementation
Results
Concluding Remarks
© 2008 Eskom. All rights reserved. 7
7
Strategy Formulation
Strategy Development: Literature reviews
– International best practices– Technology investigations
International consultant input (PA Consulting) International visits (Brazil and Argentina) Conducted national industry workshops Internal workshops with subject matter experts
Strategic Objectives: Arrest the current upwards energy loss trend Manage the trend to an acceptable level Ensure sustainability at an acceptable level
© 2008 Eskom. All rights reserved. 8
Detailed Losses Management Strategy1. Normalise Losses to an agreed level in the medium term.
2. Build the mechanisms to sustain at that level as part of normal business.
Audit, measure and fix customer
installations
Audit, measure and fix customer
installations
Ringfence electrical networks to balance
energy delivered
Ringfence electrical networks to balance
energy delivered
Implement tested technologies to manage
energy losses
Implement tested technologies to manage
energy lossesEnsure sustainability
through proper resourcing
Ensure sustainability through proper resourcing
Use business intelligence to identify high loss customers
Resource and prioritise customer audits
Co-ordinate customer audits
Measure results nationally
Identify network based boundaries
Install metering to measure energy flows
Audit and clean data per measured area
Balance energy inflows and outflows to determine
anomalies
Investigate all possible options to reduce energy
losses
Pilot and test scalability of identified technologies
Implement and measure benefits of tested
technologies
Determine business RACIs for revenue losses
management activities
Perform detailed environmental analysis
and identify gaps
Implement measures to address identified gaps
Build competence and certify revenue loss
management resources
Measure results and adjust resource strategy
accordingly
Communicate and educate internal and external stakeholders
Improved Data Accuracy critical to processHow?How? How?How? How?How? How?How?
© 2008 Eskom. All rights reserved. 9
N
on
-Tec
hn
ical
Lo
sses
Tec
hn
ical
Lo
sses
Strategic Objective
Strategies for Managing Energy Losses
Communicate and educate internal and
external stakeholders
Build mechanisms to control losses
Reduce Losses to agreed level (medium term)
Audit, measure and fix customer
installations
Ring fence electrical networks to balance
energy delivered
Implement tested technologies
Ensure sustainabilityActions
1 2 3 4
Strategic Objective
Achieve cost optimised level of technical losses throughout network
Initiated Power Factor correction
project
Reactive Power Compensation
Working Group
Reviewing energy losses criteria during network design and operations
Actions1 2 3
© 2008 Eskom. All rights reserved. 10
Strategic Objective
Strategies for Managing Technical Losses
Achieve cost optimised level of technical losses throughout network
Initiated Power Factor correction
project
Reactive Power Compensation
Working Group
Reviewing energy losses criteria in
project design and planning
Actions
Focuses on preventing voltage collapse in poor power factor networks
Improves transfer capacity of networks and reduce technical line losses in the short term
Develop guidelines for application to Sub transmission networks
Going forward network planning incorporate principles of reactive compensation and the loss reduction effects thereof
Design and planning of new or refurbished networks in line with energy loss objectives, network standards and related investment criteria's
Detail
1 2 3
Review current technical loss calculation methods & assumptions (clean slate review)Review of technical losses imbedded in terms of long term cost of supplyApproach
© 2008 Eskom. All rights reserved. 11
Strategic Objective
Strategies for Managing Non-technical Losses
Communicate and educate internal and
external stakeholders
Build mechanisms to control losses
Reduce Losses to agreed level (medium term)
Audit, measure and fix customer
installations
Ring fence electrical networks to balance
energy delivered
Implement tested technologies
Ensure sustainability
Actions
Use business intelligence to identify high loss customers
Resource and prioritise customer audits
Co-ordinate customer audits
Measure results nationally
Identify network based boundaries
Install metering to measure energy flows
Audit and clean data per measured area
Balance energy inflows and outflows to determine anomalies
Investigate all possible options to manage; reduce energy losses
Pilot and test scalability of identified technologies
Implement and measure benefits of tested technologies
Determine business RACIs for revenue losses management activities
Detailed analysis and identify gaps
Build competence and certify revenue loss management resources
Measure results and adjust resource strategy accordingly
Approach
1 2 3 4
© 2008 Eskom. All rights reserved. 12
ELP Public Communication Initiative Detail
To influence the voluntary behaviour of SA consumers to be legal electricity users by: Reducing the number of illegal electricity consumers Mobilising South Africans to report and prevent illegal connections Building partnerships to deal with illegal electricity consumption
Objective
Through-the-line1 campaign that supports, publicises and drives behaviour-change utilising: Community mobilisation: building compliant behaviour through norms, values, partnerships, etc Amnesty & Reporting line campaign Partnership campaign with Organised business, Civil society & Communities Compliance campaign, Eskom Audit roll-out, Trend analysis Communication: Publicising all the above
Tool
1 Through-the-line: Utilising both Above-the-line (National media such as TV, radio, national press) and Below-the-line (Community media, brochures, etc.) channels
Focus on both LPUs/ Large SPUs and residential SPUs. Two integrated pillars: a Pro-active Integrity-based Program and a Compliance-based
Program Show target audiences the impact & risk of illegal use of electricity Show target audiences the benefits of legal electricity usage Empower target audiences through partnerships, organised structures and mobilisation Tie this campaign in with broader energy efficiency education Aligned with existing Eskom campaigns
Approach
1. Reduce energy losses 2.Improve safety 3.Reduce non-payment 4. Improve availability of supplyBenefits
© 2008 Eskom. All rights reserved. 13
Agenda
Background
Strategy formulation
Implementation
Results
Concluding Remarks
© 2008 Eskom. All rights reserved. 14
Realising Results
In order to realise results, the following has been put in place to assist in the management of energy losses:
Energy Losses Audit Methodology – To enhance the value derived from customer meter audits
Energy Losses Management Scorecard– For measurement and target setting – links to Strategy– Breaks down the weighting per performance measure / KPI
Energy Losses Management RACI– Assigns RACI principles (i.e. who should be accountable, responsible for results, etc) to
various roles and departments
Functional Job Compacting– Proposed ELP Compacting assigns a weighting (% of Functional Compact dedicated to EL)
to each department / role identified in RACI
© 2008 Eskom. All rights reserved. 15
Programme Plan
Efforts to be integrated
into normal business practice
Pilot and Quantify.
Assign, Resource, Train, Measure
Ongoing Communication Initiatives
Account for energy delivered by balancing energy at feeder level
Identify and resolve structure, process, skills and resource constraints
2006/7 2008 2009 2010
Ongoing communication initiatives to create awareness and understanding of, and change behaviour in managing energy losses (both internal and external)
Prioritise and Measure
Ringfence and Balance
Pilot and Apply
Manage and Resource
Audit, measure and fix customer
installations
Ringfence electrical networks
to balance energy delivered
Implement tested technologies to manage energy
losses
Ensure sustainability
through proper resourcing
Communicate to and educate internal
and external stakeholders
Build governance and capacity to sustain as part of normal business
Proactive identification, auditing, fixing and measurement of customer audits
Build governance and capacity to sustain as part of normal business
Build governance and capacity to
sustain as part of normal business
Build governance and capacity to sustain as part of normal business
Identify, investigate, pilot and implement tested technologies to
manage energy losses
© 2008 Eskom. All rights reserved. 16
Measurement and Target SettingHow the Scorecard Supports the Strategy
Key Strategy Component Key Measures
2007/08 Weighting
2008/09 Weighting
2009/10 Weighting
LPU Low / No Consumption, Terminated PODs Advancing, Service Points Without MetersSPU Low / No Consumption, Terminated PODs Advancing, Service Points Without MetersPPU Low / No Consumption, Service Points Without MetersNumber of LPU's AuditedLPU Fix RateNumber of SPU's AuditedSPU Fix RateNumber of PPU's AuditedPPU Fix Rate% of Customers on Balanced Feeders % Unallocated CustomersTotal LossesEBM1 Residential LossesEBM2 % Coverage and Residential Losses
Inp
ut
KP
I's
Ou
tpu
t
KP
I's
Targeted Field Audits
General Methodology Based Audits
Feeder Balancing
Energy Losses Measurement
40% 25% 20%
30% 25% 20%
10% 20% 20%
20% 30% 40%
© 2008 Eskom. All rights reserved. 17
REC
Regional Project Manager
Regional ELP Task Team
Communication
Regional ELPSponsor
Regional ELP Champion/s
TechnologyNetwork Ring
FenceManage & Resource
Audit, Measure & Fix
Proposed Regional ELP Implementation Structure
Should be a REC Member
Dedicated Regional resource
National PMO
To be chaired by
ELP Sponsor
© 2008 Eskom. All rights reserved. 18
Agenda
Background
Strategy formulation
Implementation
Results
Concluding Remarks
© 2008 Eskom. All rights reserved. 19
1919
Trend of Total Distribution Energy LossesJan 02 – Jan 09
12 month moving average (MMA)Dx wide energy losses initiatives
Total Energy Losses
0.00
1.00
2.00
3.00
4.00
5.00
6.00
7.00
% T
ota
l L
osses 5.34% YTD5.34% YTD
Energy Losses Energy Losses Trend improving Trend improving
after the after the implementation of implementation of the Energy Losses the Energy Losses
Management Management ProgrammeProgramme
© 2008 Eskom. All rights reserved. 21
Wei
gh
t
Jan
Feb
YT
D (
Feb
)
% o
f T
ota
l Bas
e
Sco
re f
or
Fe
b
64.58
Known Service Points with problems 10.0
% Known LPU Service Points (with problems) Corrected 4.0 62.8% 68.4% 69% 3.01
% Known SPU Service Points (with problems) Corrected 2.0 17.6% 14.9% 15% 0.00
% Known PPU Service Points (with problems) Corrected 1.0 0.0% 0.0% 0% 0.00
Unallocated PPU Meters 3.0 19.1% 18.7% 18.7% 2.13
Number of Service Points Audited 40.0
% Large Power Users Audited - LPU 9.0 137.0% 165.5% 119% 36% 13.75
% LPU Fix Rate (Within 30 days) 9.0 3.0% 0.0% 60% 5.40
% Conventional Residential Audited- SPU 6.0 52.1% 46.1% 45% 12% 0.00
%SPU Fix Rate (Within 60 days) 6.0 2.2% 10.0% 42% 0.00
%Prepaid Residential Audited - PPU 5.0 95.9% 173.4% 88% 16% 4.40
% PPU Fix Rate (Within 60 days) 5.0 32.5% 30.3% 78% 3.90
Energy Balancing 20.0
% Stats Meters Installed at MV feeder level (New / Upgrade) 7.5 200.0% 247.5% 98% 7.35
% MV Feeders Balanced (FBM) 10.0 105.0% 92.0% 92% 9.20
Number of Projects with Losses >30% (EBM1) 2.5 0.0% 0.0% 0% 0.00
Energy Losses KPI's
Total Losses % (12MMA) 15.0 5.39% 5.36% 5.36% 15.44
% Technical Losses (sub-transmission) - 1.6% 1.6% 1.6%
% Non-Techincal Losses - 3.8% 3.7% 3.7%
EBM1 7.5
% Losses (12MMA) 7.5 30.9% 31.7% 31.7% 0.00
EBM2 7.5
% Losses (12MMA) 7.5 33.2% 33.2% 33.2% 0.00
Inp
ut
KP
I'sO
utp
ut
KP
I's
Distribution
© 2008 Eskom. All rights reserved. 22
17,371
4,658
5,713
4,658
4,761
5,647
5,355
0
2,000
4,000
6,000
8,000
10,000
12,000
14,000
16,000
18,000
Total LPUBase
AnnualTarget
YTD Target YTD Actual
Total Dx - LPU Total SP Audited
Current Financial Year
Last Financial Year
943
274
649
9037
0
200
400
600
800
1,000
1,200
1,400
Stuck and FaultyMeters
TamperedMeters
Missing ServicePoints Identified
Total Dx - LPU Problems Identified to Date
Current Financial Year
Last Financial Year
294
162
0
50
100
150
200
250
300
Problems Fixed Problems Not Fixed
Total Dx - LPU Problems Fixed vs Problems not Fixed
222222
Programme Status – LPU Audits DistributionAudit and Measure Workstream
Up to end January 2009
17,371
10,3719,419
11,002
1,217
73 127
294
162
© 2008 Eskom. All rights reserved. 23
536,812
139,664
154,621
139,664
125,281
48,790
55,817
0
100,000
200,000
300,000
400,000
500,000
600,000
Total SPUBase
AnnualTarget
YTD Target YTD Actual
Total Dx - SPU Total SP Audited
Current Financial Year
Last Financial Year
8,321
5,804
3,621
2,956
239593
0
2,000
4,000
6,000
8,000
10,000
12,000
14,000
16,000
Stuck andFaulty Meters
TamperedMeters
MissingService Points
Identified
Total Dx - SPU Problems Identified to Date
Current Financial Year
Last Financial Year
5,885
13,243
0
2,000
4,000
6,000
8,000
10,000
12,000
14,000
Problems Fixed Problems Not Fixed
Total Dx - SPU Problems Fixed vs Problems not Fixed
232323
Programme Status – SPU Audits DistributionAudit and Measure Workstream
Up to end January 2009
536,812
294,285264,945
104,125
14,125
6,577
832
5,885
13,243
© 2008 Eskom. All rights reserved. 24
3,829,911
639,104
740,971
639,104
617,476
612,663
490,451
0
500,000
1,000,000
1,500,000
2,000,000
2,500,000
3,000,000
3,500,000
4,000,000
Total PPUBase
AnnualTarget
YTD Target YTD Actual
Total Dx - PPU Total SP Audited
Current Financial Year
Last Financial Year
14,657
14,758
44,676
33,203
14,654
8,134
0
10,000
20,000
30,000
40,000
50,000
60,000
70,000
80,000
Stuck andFaulty Meters
TamperedMeters
Missing ServicePoints Identified
Total Dx - PPU Problems Identified to Date
Current Financial Year
Last Financial Year
45,23334,108
0
5,000
10,00015,000
20,000
25,00030,000
35,000
40,00045,000
50,000
Problems Fixed Problems Not Fixed
Total Dx - PPU Problems Fixed VS Problems not Fixed
242424
Programme Status – PPU Audits DistributionAudit and Measure Workstream
Up to end January 2009
3,829,911
1,380,0751,310580 1,103,114
29,415
77,879
22,788
45,233
34,108
© 2008 Eskom. All rights reserved. 25
Agenda
Background
Strategy formulation
Implementation
Results
Concluding Remarks
© 2008 Eskom. All rights reserved. 26
Lessons learned
Energy theft solution requires joint efforts in different kinds of areas
– Technical
– Commercial
– Governmental A close follow up is necessary to facilitate payments for low income clients Personnel commitment is fundamental for success Isolated actions are not useful Persistent actions are required with close follow up Standard procedures are important KPIs are necessary for objective progress measurement Senior management involvement is highly critical Beware of the enemy within